Search NASA⌕ Search

SEARCH · Search NASA

Results for “cascade refueling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Experimental Comparison of Hydrogen Refueling with Directly Pressurized vs. Cascade Method

This paper presents a comparative analysis of two hydrogen station configurations during the refueling process: the conventional “directly pressurized refueling process” and the innovative “cascade refueling process.” The objective of the cascade process is to refuel vehicles without the need for booster compressors. The experiments were conducted at the Hydrogen Research and Fueling Facility located at California State University, Los Angeles. In the cascade refueling process, the facility buffer tanks were utilized as high-pressure storage, enabling the refueling operation. Three different scenarios were tested: one involving the cascade refueling process and two involving compressor-driven refueling processes. On average, each refueling event delivered 1.6 kg of hydrogen. Although the cascade refueling process using the high-pressure buffer tanks did not achieve the pressure target, it resulted in a notable improvement in the nozzle outlet temperature trend, reducing it by approximately 8 °C. Moreover, the overall hydrogen chiller load for the two directly pressurized refuelings was 66 Wh/kg and 62 Wh/kg, respectively, whereas the cascading process only required 55 Wh/kg. This represents a 20% and 12% reduction in energy consumption compared to the scenarios involving booster compressors during fueling. The observed refueling range of 150–350 bar showed that the cascade process consistently required 12–20% less energy for hydrogen chilling. Additionally, the nozzle outlet temperature demonstrated an approximate 8 °C improvement within this pressure range. These findings indicate that further improvements can be expected in the high-pressure region, specifically above 350 bar. This research suggests the potential for significant improvements in the high-pressure range, emphasizing the viability of the cascade refueling process as a promising alternative to the direct compression approach.

08 HYDROGEN↗

Reference Station Design for Heavy-Duty Vehicles

Five alternative design configurations for a heavy-duty hydrogen refueling truck stop are detailed in this work. Each of the station concepts provides fast, 5-minute, 50 kg fills of up to 4 vehicles simultaneously, with a station capacity of 4200 kg/day. Two on-site production stations using PEM electrolysis are considered: one with off-peak production of the daily capacity; and one with on-demand production of hydrogen during vehicle refueling. Three delivered liquid hydrogen station concepts are considered: one with the same, high-pressure cascade storage system for dispensing as the electrolysis supplied stations, with low-pressure vaporization of the liquid hydrogen and pressurization via a compressor; and two with on-demand pressurization: one by low-pressure vaporization and compressors; and one with a cryogenic pump and high-pressure vaporization. Design, economic, and operational considerations for each of the components needed in these station concepts is provided. Of all the station concepts, the delivered liquid station with a low-pressure vaporizer and a cascade dispensing system has the lowest capital costs and equipment footprint, but the second highest operating costs primarily due to high costs for liquid hydrogen delivery. The lowest operating cost station is that with on-site production via PEM electrolysis at off-peak hours with a cascade delivery system. The low-pressure buffer storage system and electrolyzers have a large footprint and considerable capital costs, but could result in a low total cost of ownership, depending on the design timeline. The liquid hydrogen station with a cryo-pump has moderate capital costs, the lowest operating costs of the three delivered hydrogen stations, and the same small equipment footprint as the delivered liquid, cascade dispensing system. As cryogenic pumping technology improves and the capital costs for these pumps decreases, this station concept will become even more favorable. Three-dimensional renderings of the five station concepts provide station designers with a starting point for the development of heavy-duty refueling stations.

08 HYDROGEN↗

The cold high-pressure approach to hydrogen delivery

In view of the very expensive and wasteful nature of today's approaches to H 2 delivery, in this work we explore the possibility of transporting cold (200 K) high pressure (875 bar) H 2 in thermally insulated trailers and dispensing H 2 directly from the trailer, with the potential to eliminate station compressor, cascade, and refrigerator, leading to major reductions in station complexity, maintenance, electricity consumption, and cost, while improving functionality by enabling essentially unlimited back to back refuels, and improving safety due to reduced H 2 expansion energy at low temperature. Detailed techno-economic analysis shows promise for substantial delivery cost reductions through cold high pressure H 2 dispensed directly from the trailer. Results indicate that: (1) Terminal operations for cold high pressure H 2 delivery are $\$$0.32/kg H 2 more expensive than for 350 bar compressed gas delivery (today's lowest cost H 2 delivery technology) due to higher level of pressurization (to 1000 bar) and chilling needs (to 165 K). (2) Trailer cost drops slightly ($\$$0.73 vs. $\$$0.81/kg H 2 for a 350 bar trailer) due to increased capacity (1035 kg H 2 delivered vs. 700 kg) compensating for increased capital cost ($\$$906,900 for cold high pressure H 2 vs. $\$$634,000 for 350 bar trailer). (3) Cold hydrogen delivery presents major advantages in fueling station cost, reduced from $\$$1.27 to $\$$0.46/kg H 2 due to elimination of major system components: compressor, cascade, and chiller. (4) Total compression cost (terminal + station) drops from $\$$0.92/kg H 2 ($\$$0.32 terminal and $\$$0.60 station) for 350 bar trailers to $\$$0.55/kg H 2 (all at the terminal) for cold high pressure H 2 . (5) Elimination of small-scale station compressors is the main contributor to reduced delivery cost due to their inefficiency, capital expense, and maintenance needs. In summary, total delivery cost reduction vs. 350 bar trailer equals $\$$0.58/kg H 2 (from $\$$2.96 to 2.38/kg H 2 ), equivalent to 24% of the total delivery cost. This large cost advantage will improve the economics of H 2 vehicles facilitating the transition to a future of zero emission transportation.

08 HYDROGEN↗

Refueling Infrastructure Scoping and Feasibility Assessment for Hydrogen Rail Applications

The feasibility and component cost of hydrogen rail refueling infrastructure is examined. Example reference stations can inform future studies on components and systems specifically for hydrogen rail refueling facilities. All of the 5 designs considered assumed the bulk storage of liquid hydrogen on-site, from which either gaseous or liquid hydrogen would be dispensed. The first design was estimated to refuel 10 multiple unit trains per day, each train containing 260 kg of gaseous hydrogen at 350 bar on-board. The second base design targeted the refueling of 50 passenger locomotives, each with 400 kg of gaseous hydrogen on-board at 350 bar. Variations from this basic design were made to consider the effect of two different filling times, two different hydrogen compression methods, and two different station design approaches. For each design variation, components were sized, approximate costs were estimated for major components, and physical layouts were created. For both gaseous hydrogen-dispensing base designs, the design of direct-fill using a cryopump design was the lowest cost due to the high cost of the cascade storage system and gas compressor. The last three base designs all assumed that liquid hydrogen was dispensed into tender cars for freight locomotives that required 7,500 kg of liquid hydrogen, and the three different designs assumed that 5, 50, or 200 tender cars were refueled every day. The total component costs are very different for each design, because each design has a very different dispensing capacity. The total component cost for these three designs are driven by the cost of the liquid hydrogen tank; additionally, delivering that much liquid hydrogen to the refueling facility may not be practical. Many of the designs needed the use of multiple evaporators, compressors, and cryopumps operating in parallel to meet required flow rates. In the future, the components identified here can be improved and scaled-up to better fit the needs of heavy-duty refueling facilities. This study provides basic feasibility and first-order design guidance for hydrogen refueling facilities serving emerging rail applications.

08 HYDROGEN↗