Search NASASearch

SEARCH · Search NASA

Results for “checklist”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Are CO2 batteries ready for the grid? A cross-cutting deployment checklist

Metal-CO2 batteries have attracted considerable research interest in the past decade due to the utilization of the greenhouse CO2 gas. The low cost and abundance of CO2 feedstocks, together with high specific capacity metal anodes, make this technology a promising candidate for electricity-demanding data centers and grids. However, nonstandard data reporting, ambiguous hardware designs, and questionable cycling parameters have emerged as the field has grown. A clear checklist and standardized reporting format for research and development are urgently needed. Here, after carefully re-analyzing 15 Na-CO2 and 9 Li-CO2 studies, we propose a general checklist and a flowchart for CO2 batteries and related gas conversion systems. Specific performance values from a deployment-oriented perspective, based on commercial lithium iron phosphate batteries, are integrated into the list. We frame research and development efforts around grid-relevant outputs, including areal rate and capacity, cyclability, gas utilization, and safety. While illustrated for Na- and Li-CO2 cells, this framework is directly transferable to other CO2 batteries and air/oxygen batteries, helping align benchtop demonstrations with systematic metrics that ultimately govern future deployment.

Wu, Wenda [ORNL] (ORCID:000900033307687X)

Microgrid Procurement Checklist Training: Part 1

Learn how to navigate the Microgrid Procurement Checklist, a key resource for federal agencies developing microgrid projects. This first session will provide a step-by-step walkthrough of the checklist, helping participants understand its structure, key tasks, and how to apply it in project planning.

25 ENERGY STORAGE

Equipment Self-Assessment Guide Checklist

This Equipment Self-Assessment Checklist is designed for asset owners and operators (AOOs) responsible for the deployment, operation, maintenance, or cybersecurity oversight of grid systems and digital energy technologies. It provides a structured inspection checklist for evaluating the security, integrity, and operational trustworthiness of equipment across substations, generation sites, distributed energy resources (DERs), and control environments.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS

Simple Wins: Driving Effective Implementation of Energy Efficiency Projects

Small- and medium-sized manufacturers (SMMs) in the United States, making up over 98% of manufacturing firms, account for 48.3% of the sector’s energy consumption. Despite access to energy assessments and technical resources, such as those from the US Department of Energy’s Better Plants program and Industrial Training and Assessment Centers, implementation rates for identified energy-saving measures remain lower than expectations, averaging 47%. Some barriers were identified by other researchers as limited workforce capacity, inadequate training, and time constraints hinder progress. This article studied the development of customized checklists together with the energy assessment report as a practical solution to improve implementation rates for energy efficiency projects among SMMs. The framework for the checklists was grounded in five principles: short, precise, actionable, relevant, and codeveloped (SPARC). A case study of a 500,000-squarefoot SMM demonstrates how tailored checklists targeting significant energy users—such as heating, ventilating and air conditioning (HVAC), lighting, and compressed air systems for this facility—can simplify the process for staff to do facility walkthroughs to monitor best practices and track the progress of energy efficiency project implementation.

Guo, Wei [Oak Ridge National Laboratory (ORNL), Oa

MISIP: a data standard for the reuse and reproducibility of any stable isotope probing-derived nucleic acid sequence and experiment

DNA/RNA-stable isotope probing (SIP) is a powerful tool to link in situ microbial activity to sequencing data. Every SIP dataset captures distinct information about microbial community metabolism, process rates, and population dynamics, offering valuable insights for a wide range of research questions. Data reuse maximizes the information derived from the labor and resource-intensive SIP approaches. Yet, a review of publicly available SIP sequencing metadata showed that critical information necessary for reproducibility and reuse was often missing. Here, we outline the Minimum Information for any Stable Isotope Probing Sequence (MISIP) according to the Minimum Information for any (x) Sequence (MIxS) framework and include examples of MISIP reporting for common SIP experiments. Our objectives are to expand the capacity of MIxS to accommodate SIP-specific metadata and guide SIP users in metadata collection when planning and reporting an experiment. The MISIP standard requires 5 metadata fields—isotope, isotopolog, isotopolog label, labeling approach, and gradient position—and recommends several fields that represent best practices in acquiring and reporting SIP sequencing data (e.g., gradient density and nucleic acid amount). The standard is intended to be used in concert with other MIxS checklists to comprehensively describe the origin of sequence data, such as for marker genes (MISIP-MIMARKS) or metagenomes (MISIP-MIMS), in combination with metadata required by an environmental extension (e.g., soil). The adoption of the proposed data standard will improve the reuse of any sequence derived from a SIP experiment and, by extension, deepen understanding of in situ biogeochemical processes and microbial ecology.

Simpson, Abigayle

Importance of Sample Handling and Preparation for Surface Analysis: A Summary of ISO Standard 20579 Part 1, Documenting and Reporting the Handling of Specimens Prior to Analysis

Reliable and reproducible analysis of surfaces is critically dependent on how samples have been collected, handled, and prepared before analysis. Although there are important, well-established general guidelines to minimize unintended alteration of the surfaces to be analyzed, specific handling steps depend on the nature of the samples and information desired. Assessments of the validity and reliability of the results require adequate information about sampling, handling, and processing. ISO standard 20579 part 1 describes the information to be recorded and reported for samples that are prepared or submitted for surface analysis. This paper summarizes elements of the standard, which includes annexes that justify and inform the sample handling processes. Also included is a checklist of information that needs to be recorded and reported and an appendix containing an example of a form that might be used to report the information.

AES

Good practices for documenting AI-based studies on energy and buildings

Artificial intelligence has transformed building science research over the past decade, with applications spanning energy modeling, energy prediction, HVAC optimization and controls, fault detection, and occupancy modeling. However, many studies lack adequate documentation of datasets, algorithms, training procedures, and validation methods. Building science research faces additional challenges including inconsistent evaluation metrics, limited generalizability across building types, climates, and significant gaps between experimental studies and deployed systems. This communication provides practical guidance for good practices in documenting and publishing AI-based research following established standards from the computer science and machine learning communities. By adopting frameworks such as Datasheets for Datasets, Model Cards, and standardized reproducibility checklists, researchers can ensure their work meets the rigorous documentation standards necessary for reproducible, comparable, and impactful building science research.

Hong, Tianzhen [Lawrence Berkeley National Laborat

A critical review and meta-analysis of energy demand, carbon footprint, and other environmental impacts from carbon fiber manufacturing

The demand for carbon fibers and carbon fiber-reinforced polymers (CFRPs) is rapidly growing due to their outstanding mechanical properties and potential to enhance sustainability, particularly for lightweighting applications. However, carbon fibers are typically produced from fossil-based feedstocks, involve energy-intensive processes, and have limited options for sustainable end-of-life management or circularity. Despite these challenges, the energy demand and lifecycle environmental implications of their production remain poorly understood. Here, we conduct a critical literature review and meta-analysis of carbon fiber manufacturing, revealing significant variations in reported energy demand, carbon footprint, and lifecycle inventory data. Our analysis makes two novel contributions. First, we identify key underlying factors driving these variations. Second, we highlight that carbon fiber, far from being a homogeneous product, has grades varying substantially in mechanical properties, end-use markets, energy intensity of manufacturing processes, and therefore environmental impacts—an aspect often underrepresented in life cycle assessments. We assert that current data are insufficient for reliably evaluating environmental impacts, posing a risk of misleading decision-making. Addressing this gap requires new lifecycle inventory datasets clearly incorporating carbon fiber heterogeneity and key influencing factors identified in this study. Additionally, we propose actionable recommendations, including a checklist, to advance sustainability in the carbon fiber sector.

CED

STREAMS guidelines: standards for technical reporting in environmental and host-associated microbiome studies

The interdisciplinary nature of microbiome research, coupled with the generation of complex multi-omics data, makes knowledge sharing challenging. The Strengthening the Organization and Reporting of Microbiome Studies (STORMS) guidelines provide a checklist for the reporting of study information, experimental design and analytical methods within a scientific manuscript on human microbiome research. Here, in this Consensus Statement, we present the standards for technical reporting in environmental and host-associated microbiome studies (STREAMS) guidelines. The guidelines expand on STORMS and include 67 items to support the reporting and review of environmental (for example, terrestrial, aquatic, atmospheric and engineered), synthetic and non-human host-associated microbiome studies in a standardized and machine-actionable manner. Based on input from 248 researchers spanning 28 countries, we provide detailed guidance, including comparisons with STORMS, and case studies that demonstrate the usage of the STREAMS guidelines. In conclusion, STREAMS, like STORMS, will be a living community resource updated by the Consortium with consensus-building input of the broader community.

59 BASIC BIOLOGICAL SCIENCES

The need for standardization and improved open (meta)data practices in metaproteomics

Metaproteomics enables functional insight into microbial communities by identifying and quantifying proteins in complex samples. Yet, heterogeneous analytical workflows and the lack of standardization across experimental and bioinformatics stages hinder reproducibility and comparability, limiting integration with other omics data. We here present a community-developed reporting checklist tailored to the specific needs of metaproteomics. We also outline current efforts to enable structured and interoperable metadata capture, drawing on standards from proteomics and microbiome research wherever possible. By promoting transparent reporting and advancing metadata practices, our recommendations aim to align metaproteomics more closely with FAIR principles and support reproducible and interoperable research practices.

Armengaud, Jean [Universite Paris-Saclay, France]

The Pan-Arctic Vegetation Cover (PAVC) database v1.1

The Pan-Arctic Vegetation Cover (PAVC) database contains synthesized field-data observations of vegetation cover from 978 Arctic Alaska plots with observations from 2010 to 2021. The cover datasets contain plot data at both the plant functional type (PFT) and species-level resolution, with standardized PFT definitions and species names. We synthesized publicly available point-intercept and visual estimate plots from the Arctic Vegetation Archive of Alaska, the Alaska Vegetation Plots Database, the North Slope Science Catalog, and the National Ecological Observatory Network; as well as previously unpublished data from the Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic).Users will find four synthesized datasets, 4 associated data descriptor (dd) files, and 1 metadata file in the PAVC database:synthesized_species_fcover.csv contains fractional cover (fcover) for unique accepted species names, where names include vegetation identified at the family, genus, species, subspecies, and variety levels, as well as general functional types across all 5 data sources. The synthesized_species_fcover_dd.csv accompanies this dataset with header information.synthesized_pft_fcover.csv contains fcover for the following PFTs: non-vascular plants with lichen and bryophyte subcategories, trees with deciduous and evergreen subcategories, shrubs with deciduous and evergreen subcategories, graminoids (grasses), and forbs (herbaceous flowering plants) measured as total cover. Litter and “other” cover are also included as total cover. Additional “types” include water and bare ground, which were measured as top cover. The synthesized_pft_fcover_dd.csv accompanies this dataset with header information.species_pft_checklist.csv is a lookup table containing the translation from a dataset species name to an accepted species name and to a PFT. This table can be used to clarify our species to PFT adjudications, and to aid users in assigning their own PFTs. Any issues found in this checklist should be reported in the Issues tab of our github.survey_unit_information.csv contains auxiliary information about the plots synthesized in this database. It contains useful information for filtering plots of interest based on temporal, geospatial, and contextual information about the plot surveys.flmd.csv contains metadata information about each file in the database.This research was performed as a part of the NGEE Arctic project. The NGEE Arctic project was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research.The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska.Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES

Enhancing Cloud Cybersecurity: Prescriptive Controls for Operational Technology

This whitepaper provides strategic insights and recommendations into security cloud-based solutions for electric utilities, encompassing operational technology (OT), virtual power plants (VPP), distributed energy resources (DERs), applications, networks, and data storage as they transition to and leverage cloud infrastructure through managed service providers (MSPs) and cloud service providers (CSPs). Principles derived from established frameworks serve as a foundation for best practices across cybersecurity projects and remove the constraints of settling on a single framework. For organizations that prefer not to integrate a specific framework altogether, elements of the proposed approach could be adopted or tailored to best fit defined requirements and expected functionalities. The Cirrus assessment, a utility cloud feasibility tool, and the roadmap it provides serve as a precursor to this paper, which seeks to be a valuable resource for defining next steps following cloud technology integration feasibility appraisal. With its comprehensive approach to adoption, the Cirrus framework offers strategic guidance on responsibly preparing for or deploying a utility cloud solution. The previously published whitepaper, “Use Case-Informed Framework for Utility Cloud Migration,” details the guiding strategy, research, and deployment of cloud solutions within electric and interconnected grid systems. Before implementing the controls suggested in this document, it is recommended that stakeholders complete Cirrus's cloud integration assessment and pair the results with their unique cybersecurity controls to form a comprehensive cloud-based utility cybersecurity plan. The Cirrus outcome will consider a series of future architectures for the grid before and after the energy transition and evaluate the arguments for and against cloud applications for each electric and interconnected grid layer. This document is a companion to the original whitepaper, "Use Case-Informed Framework for Utility Cloud Migration" to further identify and recommend security controls based on Cirrus’s cloud integration assessment output. The following whitepaper outlines the cybersecurity controls that secure cloud-service models pertinent to the electric sector using the predefined categories identify, protect, detect, and respond and recover. The objective is to outline prescriptive security controls based on the type of architecture and data stored in the cloud. The focus includes dissecting the shared responsibility model and elucidating what on-premises Infrastructure as a Service (IaaS), Platform as a Service (PaaS), and Software as a Service (SaaS) entail. A pivotal consideration in this context is allocating responsibility for foundational cybersecurity aspects—having used Cirrus for the cloud integration assessment. The ensuing controls detailed herein also represent a checklist of controls necessary for a secure cloud transition, equipping utilities with the knowledge to navigate this digital transformation with confidence and strategic foresight in a safe and responsible manner.

42 ENGINEERING

Economic Evaluation of Modernization Expenditures for Electric Utility Distribution Systems: A Guide for Utility Regulators

Cost-effectiveness evaluation of potential grid modernization solutions is integral to integrated distribution system planning (IDSP). This report synthesizes and updates prior cost-effectiveness approaches identified by the U.S. Department of Energy for grid modernization investments, incorporating multi-objective decision-making. The structure of the report follows the IDSP process, from identifying objectives and priorities to prioritizing grid solutions. The report details two methods for conducting initial cost-effectiveness screening of individual and interdependent grid components: (1) Lowest Reasonable Cost and (2) Benefit-Cost Analysis. Drawing on solutions that passed the initial cost-effectiveness screen, the utility prioritizes grid solutions based on policy objectives and priorities, regulatory compliance, operational efficiencies, and other factors to develop a portfolio of distribution solutions. The utility uses multi-objective decision-making to assess each proposed expenditure against each objective and respective metric. The utility applies a weighting factor, reflecting the priority ranking of the objective, to the total numerical “score” based on the contribution of the proposed solution to addressing each objective. Ultimately, the utility ranks each expenditure from highest to lowest priority using the final score for each solution as well as its cost. The report includes examples of emerging best practices for states and utilities and a cost-effectiveness process checklist.

24 POWER TRANSMISSION AND DISTRIBUTION

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY

Connectivity Troubleshooting Guide for Advanced Electricity Meters

This guide is designed to walk users through a troubleshooting process for disconnected advanced electricity meters. The guide centers on two connectivity troubleshooting decision trees related to power issues and network connectivity issues, respectively. Additionally, it contains additional background information such as definitions, diagrams, and checklists that can help a user prepare to troubleshoot meter connectivity issues.

24 POWER TRANSMISSION AND DISTRIBUTION

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY