Search NASA⌕ Search

SEARCH · Search NASA

Results for “class 8”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Evaluating the performance of portable air filter walls for the James Webb Space Telescope launch campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Evaluating the Performance of Portable Air Filter Walls for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Lunar Floor-Fractured Craters: Classification, Distribution and Implications for Magmatism and Shallow Crustal Structure

Floor-fractured craters (FFCs) are a class of lunar craters defined by their distinctly shallow, often plate-like floors, and combinations of radial, con-centric, and polygonal floor-fractures; a variety of other interior features are often observed, such as moats, ridges, small dark-haloed pits, and patches of mare material. They were first classified by Schultz [1] , who recognized eight overall types of floor-fractured crater. These eight subtypes have widely differing appearances, a factor that could provide insight into formation mechanisms (different manifestations of the same mechanism, or indicators of varying formation mechanisms). Two formation mechanisms for FFCs were initially proposed: 1) magmatic intrusion [1], in which magma rising toward the surface in dikes encountered low-density breccia lenses beneath crater floors and spread laterally to form sills, raising and fracturing the crater floor. 2) viscous relaxation [2], in which the properties of the crust permitted viscous flow in the vicinity of the crater, causing long-wavelength relaxation of the topography and uplift and fracturing of the crater floor. Critical to distinguishing between these two end-member hypotheses and identifying others is a quantitative assessment of the topography of FFCs and knowledge of their regional and local settings. The purpose of this study is to use newly available Lunar Reconnaissance Orbiter (LRO) Lunar Orbiter Laser Altimeter (LOLA) altimeter and Lunar Reconnaissance Orbiter Camera (LROC) image data to provide an updated global catalog of the locations, classes, morphometric and morphologic characteristics of all lunar floor-fractured craters. We use the excellent 8-class system initially described in Schultz [1] as a starting point for classification and the enhanced LOLA/LROC data sets to examine and categorize all FFCs; we found evidence for a new FFC class, discernably different from the previously existing types. Our approach, and the global categorization of all FFCs, permits the spatial distribution of each FFC-subtype to be plotted and assessed allowing for further investigation into FFC formation mechanisms. Upon completion, the data set will be made available on our web site at http://www.planetary.brown.edu/html_pages/data.htm.

Jozwiak, L. M.↗

Transforming any Facility for Meeting Strict Cleanliness Requirements

Over the life of the James Webb Space Telescope (JWST), Integration & Test (I&T) has taken place in areas that needed considerable work to make the facility itself and/or the protocols used while working in the rooms suitable to meet JWST percent area coverage (PAC) and molecular accumulation requirements. In addition to normal particulate matter, JWST had a uniquely significant challenge: fibers! Fibers not only cause much higher PAC levels, but they also risk damaging the angstrom sized Near Infrared Spectrometer (NIRSpec) microshutter array (MSA), which is critical to NIRSpec instrument performance. The primary emphasis of this paper is to address particulate and fiber contamination. The success of the JWST mission required effective cleanrooms, protocols, and mitigations in non-cleanroom areas that were pressed into service to house contamination-sensitive optics and scientific instruments. Some presented profound challenges. These included: NASA’s 60-year-old Johnson Space Center (JSC) Chamber A, which had never been used for anything contamination-sensitive, and the European tropical launch facilities, which were designed to meet International Standard Organization (ISO) Class 8 processing for communication satellites. The final challenge for JWST, as if to stare us in the face and say, “I dare you to try and make me clean enough,” was preparing the 4 areas in the Centre Spatial Guyanais (CSG) Final Assembly Building (BAF) located in French Guiana, a building in which one entire side opens for Ariane 5 rocket ingress and egress. This paper will describe our initial evaluation processes and the actual work undertaken to transform even the most challenging areas into first class cleanrooms that met JWST particulate and fiber requirements.

James Webb Space Telescope↗

Jupiter orbiter lifetime - The hazard of Galilean satellite collision

An assessment of the long-term collision risk is made for an uncontrolled orbiting spacecraft that repeatedly enters the spatial region occupied by the satellites. Numerical data are obtained for 50-year orbit propagations which account approximately for the major perturbative effects of Jupiter oblateness, solar gravity and satellite gravity. A broad statistical viewpoint regarding the question of collision likelihood is adopted and is based on a total sample size of 480 initial orbits distributed among 4 orbit classes, 8 inclinations and 15 initial epochs. Numerical results compare favorably with an analytical prediction formula which shows that eccentric, low-inclination orbits have high collision probability.

Friedlander, A. L.↗

Jupiter orbiter lifetime - The hazard of Galilean satellite collision

An assessment of the long-term collision risk is made for an uncontrolled orbiting spacecraft that repeatedly enters the spatial region occupied by the satellites. Numerical data are obtained for 50-year orbit propagations which account approximately for the major perturbative effects of Jupiter oblateness, solar gravity and satellite gravity. A broad statistical viewpoint regarding the question of collision likelihood is adopted and is based on a total sample size of 480 initial orbits distributed among 4 orbit classes, 8 inclinations and 15 initial epochs. Numerical results compare favorably with an analytical prediction formula which shows that eccentric low-inclination orbits have high collision probability.

Friedlander, A. L.↗

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope, launch, contamination,↗

Environmental Testing of Contamination Sensitive Instruments and Optics in Non-Cleanliness Controlled Facilities

The James Webb Space Telescope (JWST) Optical Telescope Element + Integrated Science Instrument Module (OTIS) went through environmental testing at the Goddard Space Flight Center. The vibration and acoustic tests occurred outside of cleanrooms. These areas are typically around ISO Class 8, far out of specifications for JWST. Through collaboration between the OTIS Mechanical and Contamination Engineering teams, a portable clean enclosure was designed, built, and verified to prevent contamination of the sensitive OTIS assembly. This manuscript describes the process of designing and building this enclosure, including materials selection and High Efficiency Particle Air (HEPA) filtration. This enclosure also provided environmental control with a portable air conditioning unit to control the relative humidity level enabling personnel to work within it. The manuscript emphasizes working in a systematic order to maintain cleanliness and integrity. “Clean as you go” during construction was a top priority to ensure that this critical Ground Support Equipment (GSE) was acceptable. The process of installing the walls and then sealing their internal and external surfaces with approved films was critical to maintaining OTIS integrity. This proved important because OTIS was in the enclosure for months longer than originally planned. This manuscript concludes by reviewing the process used to verify that the OTIS clean enclosure could achieve acceptable contamination level fallout accumulation for use during the vibration and acoustic testing and then verifying that the predicted performance was achieved after testing was complete.

Contamination Control, James Webb Space Telescope,↗

Integration of Mirror Design with Suspension System Using NASA's New Mirror Modeling Software

Advances in mirror fabrication are making very large space based telescopes possible. In many applications, only monolithic mirrors can meet the performance requirements. The existing and near-term planned heavy launch vehicles place a premium on lowest possible mass, and then available payload shroud sizes limit near term designs to 4 meter class mirrors. Practical 8 meter class and beyond designs could encourage planners to include larger shrouds, if it can be proven that such mirrors can be manufactured. These two factors, lower mass and larger mirrors, present the classic optimization problem. There is a practical upper limit to how large of a mirror can be supported by a purely kinematic mount system handling both operational and launch loads. This paper shows how the suspension system and mirror blank need to be designed simultaneously. We will also explore the concepts of auxiliary support systems which act only during launch and disengage on orbit. We will define required characteristics of these systems and show how they can substantially reduce the mirror mass.

Arnold, William R., Sr.↗

Integration of Mirror Design with Suspension System using NASA's New Mirror Modeling Software

Advances in mirror fabrication are making very large space based telescopes possible. In many applications, only monolithic mirrors can meet the performance requirements. The existing and near-term planned heavy launch vehicles place a premium on lowest possible mass, and then available payload shroud sizes limit near term designs to 4 meter class mirrors. Practical 8 meter class and beyond designs could encourage planners to include larger shrouds, if it can be proven that such mirrors can be manufactured. These two factors, lower mass and larger mirrors, present the classic optimization problem. There is a practical upper limit to how large of a mirror can be supported by a purely kinematic mount system handling both operational and launch loads. This paper shows how the suspension system and mirror blank need to be designed simultaneously. We will also explore the concepts of auxiliary support systems which act only during launch and disengage on orbit. We will define required characteristics of these systems and show how they can substantially reduce the mirror mass.

Arnold,William R., Sr.↗

Large Space Optics: From Hubble to JWST and Beyond

If necessity truly is the mother of invention, then advances in lightweight space mirror technology have been driven by launch vehicle mass and volume constraints. In the late 1970 s, at the start of Hubble development, the state of the art in ground based telescopes was 3 to 4 meter monolithic primary mirrors with masses of 6000 to 10,000 kg - clearly too massive for the planned space shuttle 25,000 kg capability to LEO. Necessity led Hubble to a different solution. Launch vehicle mass constraints (and cost) resulted in the development of a 2.4 meter lightweight eggcrate mirror. At 810 kg (180 kg/m2), this mirror was approximately 7.4% of HST s total 11,110 kg mass. And, the total observatory structure at 4.3 m x 13.2 m fit snuggly inside the space shuttle 4.6 m x 18.3 m payload bay. In the early 1990 s, at the start of JWST development, the state of the art in ground based telescopes was 8 meter class monolithic primary mirrors (16,000 to 23,000 kg) and 10 meter segmented mirrors (14,400 kg). Unfortunately, launch vehicles were still constrained to 4.5 meter payloads and 25,000 kg to LEO or 6,600 kg to L2. Furthermore, science now demanded a space telescope with 6 to 8 meter aperture operating at L2. Mirror technology was identified as a critical capability necessary to enable the next generation of large aperture space telescopes. Specific telescope architectures were explored via three independent design concept studies conducted during the summer of 1996 (1). These studies identified two significant architectural constraints: segmentation and areal density. Because the launch vehicle fairing payload dynamic envelop diameter is approximately 4.5 meters, the only way to launch an 8 meter class mirror is to segment it, fold it and deploy it on orbit - resulting in actuation and control requirements. And, because of launch vehicle mass limits, the primary mirror allocation was only 1000 kg - resulting in a maximum areal density of 20 kg/m2. At the inception of JWST in 1996, such a capability did not exist. A highly successful technology development program was initiated resulting in matured and demonstrated mirror technology for JWST (2, 3). Today, the JWST 6.5 meter primary mirror has an areal density of 25 kg/m2 for a total mass of 625 kg or 9.6% of the total JWST observatory mass of 6,500 kg. Looking into the future, science requires increasing larger collecting apertures. Ground based telescopes are already moving towards 30+ meter mirrors. The only way to meet this challenge for space telescopes is via even lower areal density mirrors or on-orbit assembly or larger launch vehicles (4). The planned NASA Ares V with its 10 meter fairing and 55,000 kg payload to L2 eliminates this constraint (5).

Stahl, H. Philip↗

JWST Mirror Technology Development

Since the initial Design Studies leading to JWST, Mirror Technology was identified as a (if not the) critical capability necessary to enable the next generation of large aperture space telescopes required to achieve the science goals of imaging the earliest galaxies and proto-galaxies after the big bang. Specific telescope architectures were explored via three independent design concept studies conducted during the summer of 1996. Achieving the desired science objectives required a never before demonstrated space telescope capability, one with an 8 meter class primary mirror that is diffraction limited at 2 micrometers and operating in deep space at temperatures well below 70K. Beryllium was identified in the NASA "Yardstick" design as the preferred material because of its ability to provide stable optical performance in the anticipated thermal environment as well as its excellent specific stiffness. Because of launch vehicle constraints, two very significant architectural constraints were placed upon the telescope: segmentation and areal density. Each of these directly resulted in specific technology capability requirements. First, because the maximum launch vehicle payload fairing diameter is approximately 4.5 meters, the only way to launch an 8 meter class mirror is to segment it, fold it and deploy it on orbit - resulting in actuation and control requirements. Second, because of launch vehicle mass limits, the primary mirror allocation was only 1000 kg - resulting in a maximum areal density specification of 20 kilograms per square meter.

Stahl, H. Philip↗

Imaging Transitional Disks with TMT: Lessons Learned from the SEEDS Survey

TMT studies of the early phases of giant planet formation will build on studies carried out in this decade using 8-meter class telescopes. One such study is the Strategic Exploration of Exoplanets and Disks with Subaru transitional disk survey. We have found a wealth of indirect signatures of giant planet presence, including spiral arms, pericenter offsets of the outer disk from the star, and changes in disk color at the inner edge of the outer disk in intermediate-mass PMS star disks. T Tauri star transitional disks are less flamboyant, but are also dynamically colder: any spiral arms in these diskswill be more tightly wound. Imaging such features at the distance of the nearest star-forming regions requires higher angular resolution than achieved with HiCIAO+ AO188. Imaging such disks with extreme AO systems requires use of laser guide stars, and are infeasible with the extreme AO systems currently commissioning on 8-meter class telescopes. Similarly, the JWST and AFTAWFIRST coronagraphs being considered have inner working angles 0.2, and will occult the inner 28 atomic units of systems at d140pc, a region where both high-contrast imagery and ALMA data indicate that giant planets are located in transitional disks. However, studies of transitional disks associated with solar-mass stars and their planet complement are feasible with TMT using NFIRAOS.

star-forming regions↗

Design Study of an 8 Meter Monolithic Mirror UV/Optical Space Telescope

This paper will review a recent NASA MSFC preliminary study that demonstrated the feasibility of launching a 6 to 8 meter class monolithic primary mirror telescope to Sun-Earth L2 using an Ares V. The study started with the unique capabilities of the Ares V vehicle and examined the feasibility of launching a large aperture low cost low risk telescope based on a conventional ground based glass primary mirror. Specific technical areas studied included optical design; structural design/analysis including primary mirror support structure, sun shade and secondary mirror support structure; thermal analysis; launch vehicle performance and trajectory; spacecraft including structure, propulsion, GN & C, avionics, power systems and reaction wheels; operations & servicing, mass budget and system cost. The study telescope was an on-axis three-mirror anastigmatic design with a fine steering mirror. The observatory has a 100 arc-minute (8.4 X 12 arc-minutes) of diffraction limited field of view at a wavelength les than 500 nm. The study assumed that the primary mirror would be fabricated from an existing Schott Zerodur residual VLT blank edged to 6.2 meters, 175 mm thick at the edge with a mass of 11,000 kg. The entire mass budget for the observatory including primary mirror, structure, light baffle tube, instruments, space craft, avionics, etc. is less than 40,000 kg - a 33% mass margin on the Ares V's 60,000 kg Sun-Earth L2 capability. An 8 meter class observatory would have a total mass of less than 60,000 kg of which the primary mirror is the largest contributor.

Stahl, H. Philip↗

NASA/LMSC instrument design and fabrication

The topics addressed are: (1) class-10 flight test program; (2) class system requirements; (3) Doppler wind velocity measurement; (4) systems specifications rational; (5) signal-to-noise equation for remote atmospheric sensing laser velocimeter; (6) variation of signal-to-noise ratios and true wind velocity with distance; (7) velocity error as a function of signal-to-noise ratio, with turbulence; and (8) final class optomechanical design on NASA B/737.

Targ, Russel↗