Search NASA⌕ Search

SEARCH · Search NASA

Results for “coal fired power plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Potential reductions in fine particulate matter and premature mortality following implementation of air pollution controls on coal-fired power plants in India

Coal-fired power plants (CFPPs) account for > 70% of electricity generation in India, but < 5% of facilities have installed technologies for sulfur dioxide (SO 2 ) and nitrogen oxide (NO X ) removal. Emissions of these pollutants lead to the formation of fine particulate matter (PM 2.5 ) and an increased risk of premature mortality for exposed populations. Here, we use a nested version of the GEOS-Chem global chemical transport model (0.5° × 0.625° resolution) for India to estimate reductions in PM 2.5 concentrations that could have been achieved by implementing existing emission control technologies like flue-gas desulfurization (FGD) and/or selective catalytic reduction (SCR). We quantify the associated burden of disease using the integrated exposure response (IER) and global exposure mortality model (GEMM) functions and compare the costs of premature mortality to those for FGD installation. Model simulations for 2010 suggest installation of FGD would have reduced mean annual PM 2.5 concentrations across India by 8%, compared to 3% with SCR installation, and 11% with both FGD and SCR. A 7–28% reduction in PM 2.5 was simulated for local communities closest to CFPPs (same model grid cell), leading to up to 17% reduction in annual premature mortality. Overall, more than 0.21–0.48 million premature deaths would have been avoided over a 10-year period if FGD had been implemented on all CFPPs, compared to 0.09–0.21 million with SCR and 0.22–0.72 million with both FGD and SCR. Benefits associated with such actions are approximately $\$18.1$–$\$604$ billion USD per year, which is equivalent to ~ 0.44 to 10% of India’s GDP. These results suggest that monetary benefits from avoided premature mortality far outweigh the capital and operational costs of FGD and/or SCR installation of $\$19.5$ billion and/or $\$32.8$ billion per year, respectively. This information is essential because the high costs of installation and operation are often given as reasons for delaying installation and commissioning. Finally, we conclude that policy actions to control air pollution from CFPPs are economically justifiable.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Coal Fired Power Plant Configuration and Operation Impact on Plant Effluent Contaminants and Conditions

The primary objective of this project is to characterize coal contaminants in coal-fired power plant wastewater as a function of coal type, unit configurations, and unit operation profile with uncertainty analysis. This project was in response to the U.S. Department of Energy (DOE) Solicitation DE-FOA-0001842. The project duration was between September 01, 2018, and December 31, 2021 (no-cost extension filed, due to the Covid-19 pandemic restrictions, and approved). Field and lab test program was conducted with the main goal to characterize coal contaminants in coal-fired power plant wastewater as a function of coal type, unit configurations, and unit operation profile with uncertainty analysis. In this project, the team of Lehigh University (prime recipient) and Western Kentucky University identified two suitable Thermoelectric Power Plants (TTPs) firing bituminous and sub-bituminous coals respectively, designed test plans, and performed sample collection. Sampling included coal from each TTPs power generation units, Wet Flue Gas Desulfurization (WFGD) slurry material and waste-water samples taken from the outlet of the water treatment tank prior to discharge and other pertinent locations. Coal samples are dried, crushed, and pulverized according to the American Society for Testing and Materials (ASTM) methods. The prepared coal samples are analyzed for normal proximate and ultimate analysis tests in addition to the toxic metals and anions according to ASTM methods. The FGD slurry materials are analyzed for toxic metals and anions according to Electric Power Research Institute (EPRI) or Environmental Protection Agency (EPA) methods, as appropriate. The wastewater samples from the water treatment tank outlet are analyzed for toxic metals and anions according to EPA methods. The effluent species analyzed include mercury, arsenic, selenium, nitrate/nitrite, bromide, and chlorine. This project provided results of effluent conditions as a function of coal type, unit configuration, and unit operation profile, and identified the levels of uncertainty in the effluent results.

01 COAL, LIGNITE, AND PEAT↗

Enabling the Next Generation of Smart Sensors in Coal Fired Power Plants using Cellular 5G Technology

An important need for coal fired power plants is the ability to monitor multiple systems with ease and accuracy. Common implementations of these monitoring systems come with drawbacks due to the nature of coal fired power plants. Harsh environments, High Temperatures, and lots of RF (Radio Frequency) noise can create issues for accurately recording and transmitting data across wireless signals. In addition, as renewable energy sources come online, existing fossil fueled plants will need to operate more flexibly with their maintenance schedules outside of standard conditions. Therefore, additional sensing and control mechanisms need placed in existing plants to provide operators with more information such that maintenance decisions can be made well in advance of failures. A solution to this problem is the Next Generation of Smart Sensors, which leverages the power of 5G cellular signals and machine learning to overcome the myriad of problems with current implementations

20 FOSSIL-FUELED POWER PLANTS↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Life cycle assessment of co-firing biomass at coal-fired power plants with carbon capture and storage toward net-zero emissions

Co-firing biomass with carbon capture and storage (BECCS) offers a technological option to decarbonize coal-fired power plants toward net-zero emissions. This study estimates the life cycle emissions of co-firing biomass at coal-fired power plants with CCS and quantifies its variability and uncertainty. Deployment of co-firing BECCS at coal-fired power plants can significantly reduce the life cycle emissions toward the net-zero target but lower the power plant performance, which vary with numerous factors, including coal type, biomass type, co-firing level, and CO 2 capture rate. The breakeven co-firing levels required for biomass at coal-fired power plants with 90 % CO 2 capture to reach net-zero emissions fall with a range roughly from 15 % to 25 % on an energy basis, depending on coal and biomass types. Increasing the CO 2 capture rate from 90 % to 95 % can lower the breakeven co-firing levels by about 5 to 8 percentage points for the biomass resources of interest, which can lower reliance on biomass resources and facilitate large-scale deployment of co-firing BECCS in fossil-rich regions but with limited biomass resources. Furthermore, findings improve the understanding of the techno-environmental performance of co-firing BECCS and inform strategic planning decisions on net-zero emissions in the coal-fired power sector.

Breakeven co-firing level↗

Aqueous Bromide Discharges from U.S. Coal-Fired Power Plants: Points of Origin, Concentration Ranges, and Effluent Treatment Costs

Bromide discharges from coal-fired power plants have received increased attention from regulatory bodies due to their contribution to the formation of disinfection byproducts (DBPs) in downstream drinking water treatment plants. Here, this paper characterizes the relative contributions of bromide from coal feedstocks and bromine-based mercury control processes, estimates the distribution of bromide concentrations at 85 active coal-fired power plants across the United States (U.S.) with wet flue gas desulfurization units, and estimates the cost of bromide removal from wastewater discharge using year 2020 data. Bromide discharges are estimated at the plant level using a combination of the reported coal rank and composition combusted, estimates of bromide addition in mercury control techniques under multiple halogen addition scenarios, and the estimated flue gas desulfurization (FGD) wastewater flow rate. The median, simulated plant-level estimation of total FGD wastewater flow is 18.3 gallons/min at a bromide concentration of 319 mg/L, equivalent to ~11.6 tonnes/year of bromide discharges to the environment. Next, we evaluated the expected cost of employing the best available technology (BAT) to control bromide discharges in FGD wastewater to prevent contributions to DBP formation. Treatment would need to remove more than 99.8% of bromide to reach the 0.2 mg/L voluntary incentive program (VIP) limit. The total cost of treatment depends on whether disposal is on- or off-site; the average costs for all plants combined come to an average of $110 million ($95.2/kgal) in 2021 U.S. dollars for on-site disposal, or $134 million ($115/kgal) for off-site disposal.

01 COAL, LIGNITE, AND PEAT↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Report

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of subcritical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Mid Infra-Red Laser Sensor for Continuous Sulfur Trioxide Monitoring to Improve Coal-Fired Power Plant Performance during Flexible Operations

During the course of this project, we performed exhaustive research and development of SO3/H2SO4 sensing technology for coal-fired power plant applications (Figure 1). The development culminated in a successful field campaign of a prototype continuous real-time H2SO4 monitor at a coal-fired power plant (TRL 6) accomplishing the primary goal of the project. The developed sensors utilize tunable laser absorption spectroscopy (TLAS) operating in the mid-infrared (Mid-IR) wavelength region, which is the so-called “molecular fingerprint” region. Systems operating in the Mid-IR have orders of magnitude more sensitivity than systems operating at shorter wavelengths, such as near-infrared (NIR). However, NIR systems are more widespread due to more mature supporting technology (e.g., fiber optics, optical components, etc.). In this project, we not only produced a specific Mid-IR sensor, we also advanced Mid-IR sensor technology in general through the development and demonstration of such supporting technology. In this project, we also developed proprietary broad tuning lasers enabling the ability to effectively measure SO3, H2SO4, H2O, and SO2. Different molecular species have unique spectral signatures that can be probed with lasers operating at different wavelengths. Standard TLAS uses relatively narrow wavelength tuning distributed feedback (DFB) lasers, which can typically only target a single species with narrow features, and are not appropriate for species with broad features, such as SO3 or H2SO4. In contrast, by developing unique, broad-tuning laser technology, we were able to measure these species, as well as SO2 and H2O simultaneously. Furthermore, to enable real-time analysis at a power plant, we modified a commercially available heated gas cell to operate in the Mid-IR wavelength range and fiber coupled the lasers to enable remote delivery of the beams. To generate reference data (library spectra), our collaborators at the University of California Irvine (UCI) developed a catalytic SO3 generation facility. It is worth mentioning that representative H2SO4 and SO3 Mid-IR spectra are not a part of any publicly available database and the data generated under this project is a valuable resource in and of itself. In addition, based on the UCI study we determined that detection of SO3 is complicated by the very strong SO2 absorption. For that reason, we concentrated on H2SO4 detection. Since SO3 and H2SO4 exist in a flue gas in a state of equilibrium, which depends on temperature and humidity, by measuring water concentration and controlling the temperature of the gas cell, we developed an approach to determine SO3 concentration from the H2SO4 measurement. During the development phase of the project, we performed three testing campaigns at our collaborator’s FERCo flue gas facility with conditions representative of the coal-fired power plant (~ 40ppm SO3, 1700ppm to 2800 ppm SO2, 10% water) with the exception of particulate matter. After three test campaigns at FERCo we performed field testing at Harrison Power Station. The final system was mounted on a duct and measured H2SO4, SO2 and water. The tests were highly successful with a demonstrated real-time H2SO4 precision of 1 ppm with a 1 second update. Our collaborators at EPRI conducted an industry survey and determined that there is a very high interest for the SO3/H2SO4 monitoring in the power generation industry as well as in heavy industries in general. Furthermore, work performed by OptoKnowledge beyond the scope of this project under a synergistic DOE SBIR determined another approach to SO3 detection. We applied for Phase II on this SBIR for development a of versatile SO3/H2SO4 sensor but were not selected. We are currently looking for another opportunity to leverage all the technological advancements produced by this project including but not limited to the flue gas facility at UCI, the hardware and software developed, and relationships with FERCo, EPRI CEMTEK, and Harrison Station.

01 COAL, LIGNITE, AND PEAT↗

Dynamic Simulation of a Sub-Critical Coal Fired Power Plant

In order to address the demanding operating conditions for remaining coal-fired power plants, a dynamic model and a suite of tools have been developed for studying load cycling and to find optimization opportunities. A sub-critical steam cycle power plant was modeled in a flow-sheet modeling tool, APROS™. The model represented the firing system, economizer, evaporator, superheat, and reheat systems. Four loads from 100% TMCR to 25% TMCR were calibrated and tested such that low-to-high cycling could be studied. The model was run through various load cycles; one of which is presented here. This modeling is a prototype for general use in developing cutting edge controls products and for maximizing economic, low-emissions, and efficient operation of the existing coal power fleet.

Braun, Timothy↗

Use of Systems Engineering in Repurposing Coal-Fired Power Plants with Malta Pumped Thermal Energy Storage System

he electric sector across North America is facing a transition. Both economics and policy decisions have pointed towards a broad retirement of fossil assets across markets. Owners are facing the problem of how to evolve the base of the electric sector from fossil asset to greener alternative. Coal-fired power plants built the modern electricity grid. Their rotating machinery are the beating heart of the grid, providing essential resiliency and reliability services. Power plant retirements are disruptive to plant workforces and cause outsized impacts on surrounding communities. The transition from thermal power plants that use rotating machinery to generate electricity (e.g., coal- and gas-fired plants) to variable, inverter-based generation (e.g., solar and wind) is affecting the reliability of the electric grid. Grid operators and national regulators have issued warnings about known and anticipated risk. In 2021, Malta Inc. was awarded a Department of Energy (DOE) grant to study how to integrate a Malta 100MW Pumped Heat Energy Storage (PHES) system with a retiring coal-fired power plant to meet emissions requirements, retain plant workforces, preserve communities, and maintain grid reliability. This presentation provides a summary of this study, focusing on how systems engineering approach was used to arrive at a proposed design concept that met multiple objectives and requirements. There will be three main parts for this presentation. The first part of the presentation will focus on how different systems engineering was applied for this work. In particular, the following areas: stakeholder engagement, site selection process, developing requirements and use cases for the integrated system, defining the system and its boundary, coming up with different system architecture/option, performing a techno-economic analysis to compare the different options and down selection of the preferred option, will be discusses. For these areas, discussion on the decisions on how much breadth and depth to go into each area will be provided. These discussions provide good insights into how to apply systems engineering. The second part of the presentation will provide a deeper dive into the two recommended integration options that repurpose coal-fired power plants with Malta PHES system. The comparison of the two options and general guidance of how to choose an option will be provided. This is particularly useful for utilities who are facing coal-plant retirements. The two options will be compared based on its performance (such as power output, efficiency), complexity, and cost. The social impact on local communities of the two options will also be discussed. The final part of the presentation will discuss the impact that this work has had, including Malta Inc. being invited to the White House to discuss progress and outcomes of this work with the Interagency Working Group on Coal and Power Plant Communities and Economic Revitalization. In summary, this presentation aims to provide a showcase of how sy

25 ENERGY STORAGE↗

Transient Efficiency Flexibility and Reliability Optimization of Coal-Fired Power Plants (Reduced Order Model Development Report)

This document pertains to the reporting requirements of DOE contract FE-0031767. The document covers the development of a reduced order model library that can be used to represent coal-fired power plants. The models are transient and physics-based. Model classes in the library that correspond to different components in CFPPs are presented with physical explanations and representative results. Also, the use of the library to build an overall model for a representative CFPP is presented along with simulation results.

20 FOSSIL-FUELED POWER PLANTS↗

Transient Efficiency Flexibility and Reliability Optimization of Coal-Fired Power Plants (Model-Based Estimation Library Report)

This document pertains to the reporting requirements of DOE contract FE-0031767. The document covers the development of a model-based estimation (MBE) library for generating digital twins of coal-fired power plants (CFPPs). The models used by the MBE are transient and physics-based. Model classes in the library that correspond to different components in CFPPs are presented with physical explanations and representative results. MBE library provides Extended Kalman Filter (EKF), and Unscented Kalman Filter (UKF) algorithms. The MBE library is generic and can be used to represent a variety of CFPPs. A digital twin of a CFPP will be created as the reduced-order model of that CFPP is embedded in the developed MBE architecture.

20 FOSSIL-FUELED POWER PLANTS↗

Enabling The Next Generation of Smart Sensors in Coal Fired Power Plants using Cellular 5G Technology

Ohio University (OHIO), West Virginia University (WVU), and American Electric Power (AEP) proposed to study and report on the benefits of 5G wireless cellular technologies for coal-fired power plants. The significant advantages, cost savings, and potential of 5G wireless data communications based sensors promised to usher in a new era of reliable, inexpensive, and powerful embedded systems that had not previously been available for coal-fired power plants. The team built upon existing experience with cellular-based systems, power plant water quality sensing, and high temperature sensors developed during past projects. Principal Investigator Wilhelm had been developing cellular-based sensor data systems with a commercial partner for 10 years, pioneering innovative solar-powered devices that began with 2G technology. The lessons and knowledge gained served as a foundation to demonstrate innovations and potential impacts specific to coal fired power plants enabled by 5G technology, along with integration with existing sensors and systems.

20 FOSSIL-FUELED POWER PLANTS↗

Pilot testing of CO2 capture from a coal-fired power plant—Part 2: Results from 1-MWe pilot tests

Abstract Using a 1-MWe slipstream pilot plant, solid-sorbent-based post-combustion CO2 capture was tested at a coal-fired power plant. Results from pilot testing were used to develop a preliminary full-scale commercial design. The sorbent selected for pilot-scale evaluation during this project consisted of an ion-exchange resin that incorporated amines covalently bonded to the substrate. A unique temperature-swing-absorption (TSA) process was developed that incorporated a three-stage fluidized-bed adsorber integrated with a single-stage fluidized-bed regenerator. Overall, following start-up and commissioning challenges that are often associated with first-of-a-kind pilots, the pilot plant operated as designed and expected, with a few key exceptions. The two primary exceptions were associated with: (i) handling characteristics of the sorbent, which were sufficiently different at operating temperature than at ambient temperature when design specifications were established with lab-scale testing; and (ii) CO2 adsorption in the transport line between the regenerator and adsorber that preloaded the sorbent with CO2 prior to entering the adsorber. Results from the pilot programme demonstrate that solid-sorbent-based post-combustion capture can be utilized to achieve 90% CO2 capture from coal-fired power plants.

Sjostrom, Sharon↗

Investigation of Cycling Coal-Fired Power Plants Using High-Fidelity Models

The project delivers a well-integrated and validated simulation platform for cycling operation analysis in coal-fired power plant. Two critical mechanical components of the boiler island were analyzed through mechanical integrity assessment and economic benefit analysis. The current phase of the project focuses on the development of the integrated simulation infrastructure and prove its feasibility and effectiveness using two typical use cases. This integrated platform can help save a lot of engineering efforts for model development and simulation analysis. Through the real simulation scenarios in this document, it was demonstrated that using this platform, an analysis can be completed in approximately 2 days, while it could cost several weeks before using this platform. Going forward, the platform built in this project can be used for more boiler service applications, and it can be further enhanced with more functions/features to maximize its usage and benefits. 1) Extend component-level analysis with more use cases to cover all the major critical components of boiler island under cycling operations. A library of critical components can be developed and validated for typical pulverized coal-fired subcritical boiler units. 2) Develop predictive maintenance features based on the integrated models (Digital Twins) and engineering analysis procedures. Predictive maintenance enables each asset to be serviced based on forecast on life consumption and cost profile for replacing/welding the critical mechanical parts of the boiler. This minimizes the chance of unscheduled shutdowns and emergency services at much higher costs and prevent the fatal accidents in unit operations. 3) Develop and maintain a standard library for critical component analysis under flexible plant operations, which will include libraries of: process models, MI models for typical pressure parts, and economic models with typical plant operating data and ISO power trade data.

01 COAL, LIGNITE, AND PEAT↗