Search NASA⌕ Search

SEARCH · Search NASA

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop

Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible trouble-shooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.

Piesciorovsky, Emilio↗

Commissioning of a two-target DC cylindrical magnetron sputter coater for depositing Nb 3 Sn film on Nb superconducting radiofrequency cavities

A DC cylindrical magnetron sputter coater was commissioned and used to coat Nb 2.6 GHz superconducting radiofrequency (SRF) cavity with Nb 3 Sn. The sputter coater has two identical cylindrical magnetrons that can move, with a controlled speed, along the axis of the SRF cavity to coat the inside surface of the cavity. The design of the sputter coater is discussed, along with its performance. Initially, a sample holder that allows coating on flat substrates at positions similar to the equator and beam tubes of a 2.6 GHz SRF cavity was used to test conditions for fabricating Nb 3 Sn layers. Multilayers of Nb and Sn were sequentially sputtered on flat Nb and sapphire substrates mounted on the equivalent positions of the cavity's beam tubes and the equator using the two identical cylindrical magnetrons. Then, the Nb/Sn multilayers were annealed at 950 °C for 3 h. Here, the ~1.2 μm thick Nb 3 Sn film did not show any other Nb–Sn compounds and had a superconducting transition temperature of 17.61–17.76 K. The 2.6 GHz SRF cavity was coated using similar conditions as flat samples. Cryogenic RF testing of the Nb 3 Sn-coated cavity demonstrated a quality factor of 3.2 × 10 8 at an accelerating gradient of 5 MV/m at 4.4 K.

43 PARTICLE ACCELERATORS↗

APS upgrade: Commissioning the world’s first light source based on swap-out injection

The Advanced Photon Source (APS) has recently completed a major upgrade, replacing its 25-year-old storage ring with a cutting-edge hybrid seven-bend achromat lattice enhanced by six additional reverse bends. The new design achieves a natural emittance of 42 pm-rad, enabling the production of X-rays up to 500 times brighter than those generated by the original APS. A key innovation of the upgrade is the implementation of a swap-out injection scheme, which replaces entire depleted bunches instead of performing traditional top-up injection. This approach enables on-axis injection to accommodate for the reduced dynamic aperture resulting from strong focusing. This paper outlines the commissioning process, shares initial operating experience with swap-out injection, and presents performance data for new systems such as the bunch-lengthening cavity.

Sajaev, Vadim [Argonne, PHY]↗

Review of Literature and Utility Commission Proceedings Relevant to Integrated System Planning: Annotated Bibliography Prepared to Support the Washington Utilities and Transportation Commission

In 2024 the Washington State Legislature passed the Decarbonization Act for Large Combination Utilities (Engrossed Substitute House Bill 1589 – the Act). The Act requires a large combination electric and gas utility to conduct integrated system planning supporting electrification and gas system decarbonization, including a reduction in the gas rate base. The utility is required to submit the first integrated system plan (ISP) by January 1, 2027. The requirements are to be developed and adopted by the Washington Utilities and Transportation Commission (UTC) by July 1, 2025. In October 2024 Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) began providing technical assistance to the UTC to support the ISP rulemaking. PNNL and LBNL have prepared this annotated bibliography of research and reports, and state examples of coordinated gas and electric planning, future of gas, and future of heat proceedings in other U.S. States and one Canadian Province. The items described here have been selected by the authors for their potential relevance to the UTC’s integrated system planning rule discussions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pre-commissioning of the wide-dynamic range halo monitor to be installed in the Fermilab MI-8 line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, initial testing of equipment, and ray tracing simulations for the Offner optics and the targets used in the monitor.

Babacan, Betiay [IIT, Chicago; Fermilab]↗

Bringing Fault Detection and Diagnostics (FDD) Tools into the Mainstream: Retro Commissioning and Continuous Commissioning of HVAC and Refrigeration Systems

HVAC systems in the commercial building sector consume about 3.4 quads of energy annually. Of all the HVAC systems, packaged rooftop air–conditioning units (RTUs) provide cooling and heating for over 60 percent of the commercial building floorspace (about 90 billion ft2) in the U.S. and they are a significant source of energy consumption and peak demand. All HVAC systems suffer from faults that impact thermal comfort and increase energy consumption. There are several commercially available Automated Fault Detection and Diagnostic (AFDD) tools on the market that can detect and diagnose faults, and if those faults are corrected, can save significant national energy. However, there are multiple market barriers for these tools including lack of independent verification of their performance in the field in terms of their technical capabilities, ease of use and installation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Maximizing Efficiency and Quality: Leveraging Automated Testing for Laboratory Commissioning

The traditional commissioning process for a building often implements sampling rates to select equipment for functional acceptance testing when large quantities of equipment are present. While this approach is generally effective in identifying wide-spread issues, it has several key shortfalls. (1) It provides a one-time validation of equipment operation in which the standard documentation is a simple checklist of pass/fail questions. (2) It fails to evaluate equipment not included in the sample rate selection. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. The goal of this presentation will be to highlight the advantages offered by automated functional testing in this critical laboratory setting. These are primarily (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with connected commissioning and the important conversations with the key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.

automated testing↗

Maximizing Efficiency and Quality: Leveraging Automated Testing for Laboratory Commissioning

The traditional commissioning process uses sampling to select equipment for functional acceptance testing when large quantities of equipment are present. Although this approach is generally effective in identifying wide-spread issues, it has several shortcomings: it fails to evaluate equipment not included in the sample, provides only a one-time validation of equipment operation, and the standard documentation is a simple checklist of pass/fail questions. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. This presentation highlights the advantages offered by automated functional testing in this critical laboratory setting: (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with Connected Commissioning and the important conversations with key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.

automated testing↗

Commissioning of the Liquid Nitrogen Thermo-Siphon System for NASA-JSC Chamber-A

NASA's Space Environment Simulation Laboratory's (SESL) Chamber A, located at the Johnson Space Center in Houston Texas has recently implemented major enhancements of its cryogenic and vacuum systems. The new liquid nitrogen (LN2) thermo-siphon system was successfully commissioned in August of 2012. Chamber A, which has 20 K helium cryo-panels (or shrouds ) which are shielded by 80 K nitrogen shrouds, is capable of simulating a deep space environment necessary to perform ground testing of NASA s James Webb Space Telescope (JWST). Chamber A s previous system used forced flow LN2 cooling with centrifugal pumps, requiring 200,000 liters of LN2 to cool-down and consuming 180,000 liters per day of LN2 in steady operation. The LN2 system did not have the reliability required to meet the long duration test of the JWST, and the cost estimate provided in the initial approach to NASA-JSC by the sub-contractor for refurbishment of the system to meet the reliability goals was prohibitive. At NASA-JSC's request, the JLab Cryogenics Group provided alternative options in 2007, including a thermo-siphon, or natural flow system. This system, eliminated the need for pumps and used one tenth of the original control valves, relief valves, and burst disks. After the thermo-siphon approach was selected, JLab provided technical assistance in the process design, mechanical design, component specification development and commissioning oversight, while the installation and commissioning operations of the system was overseen by the Jacobs Technology/ESC group at JSC. The preliminary commissioning data indicate lower shroud temperatures, 70,000 liters to cool-down and less than 90,000 liters per day consumed in steady operation. All of the performance capabilities have exceeded the design goals. This paper will outline the comparison between the original system and the predicted results of the selected design option, and the commissioning results of thermo-siphon system.

Homan, J.↗

Commissioning of the Liquid Nitrogen Thermo-Siphon System for NASA-JSC Chamber A

NASA s Space Environment Simulation Laboratory s (SESL) Chamber A, located at the Johnson Space Center in Houston Texas has recently implemented major enhancements of its cryogenic and vacuum systems. The new liquid nitrogen (LN) thermo-siphon system was successfully commissioned in August of 2012. Chamber A, which has 20 K helium cryo-panels (or shrouds ) which are shielded by 80 K nitrogen shrouds, is capable of simulating a deep space environment necessary to perform ground testing of NASA s James Webb Space Telescope (JWST). Chamber A s previous system used forced flow LN cooling with centrifugal pumps, requiring 220,000 liters of LN to cool-down and consuming 180,000 liters per day of LN in steady operation. The LN system did not have the reliability required to meet the long duration test of the JWST, and the cost estimate provided in the initial approach to NASA-JSC by the subcontractor for refurbishment of the system to meet the reliability goals was prohibitive. At NASA-JSC s request, the JLab Cryogenics Group provided alternative options in 2007, including a thermo-siphon, or natural flow system. This system, eliminated the need for pumps and used one tenth of the original control valves, relief valves, and burst disks. After the thermo-siphon approach was selected, JLab provided technical assistance in the process design, mechanical design, component specification development and commissioning oversight, while the installation and commissioning operations of the system was overseen by the Jacobs Technology/ESC group at JSC. The preliminary commissioning data indicate lower shroud temperatures, 68,000 liters to cool-down and less than 91,000 liters per day consumed in steady operation. All of the performance capabilities have exceeded the design goals. This paper will outline the comparison between the original system and the predicted results of the selected design option, and the commissioning results of thermo-siphon system.

Homan, J.↗

Mars 2020 Perseverance Rover Surface Operations Commissioning Phase Overview

This paper presents work done by the Mars 2020 Project to plan, test, and execute the Mars 2020 Perseverance Rover surface operations commissioning phase. Immediately after the successful landing of Mars 2020 Perseverance rover at Jezero Crater on February 18, 2021, the rover autonomously initiated mission critical commanding necessary to transition the vehicle from a Cruise/EDL to Surface operations configuration. This began the surface operations commissioning phase, referred to as Surface Operations Transition (SOX). The objective of SOX phase is to establish vehicle health and safety and to verify that the operational characteristics of the vehicle, now operating in the Martian environment, are as-expected and safe to proceed into nominal operations. The SOX commissioning phase is organized into six logical sub-phases occurring in the following chronological order; (1) SOX1a, (2) FSW Transition, (3) SOX1b, (4) SOX2a, (5) Heli, (6) SOX2b. In total, the SOX commissioning phase was expected to take up-to 111 sols (Martian days). The Perseverance rover is an extremely complex, highly-integrated, robotic system-of-systems that requires numerous activities to incrementally and methodically verify their safe operations. This paper will discuss the development process used to plan, test, and execute the SOX commissioning phase for Mars 2020 Perseverance rover surface operations. We will discuss key challenges associated with SOX development as well as actual operations execution experience.

Koch, Justin↗

Considerations for Resilience Guidelines for Clean Energy Plans: For the Oregon Public Utility Commission and Oregon Electricity Stakeholders

This document summarizes relevant approaches, research, models, and national examples for state utility regulators tasked with developing utility guidelines for risk-based resiliency planning. In 2021, the Oregon Legislature enacted a 100 percent clean electricity by 2040 standard that requires the Oregon Public Utility Commission (PUC) to oversee utility planning for aggressive clean energy deployment through Clean Energy Plans (House Bill 2021, Sec. 4). In addition to meeting emissions reductions targets, Clean Energy Plans must also: "Include a risk-based examination of resiliency opportunities that includes costs, consequences, outcomes, and benefits based on reasonable and prudent industry resiliency standards and guidelines established by the Public Utility Commission." This report will support the Oregon Public Utility Commission in developing resilience guidelines. Other state public utility commissions may also benefit from this research.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design, development and commissioning of a multi-alkali semiconductor photocathode deposition system for the IUAC Delhi light source photoinjector

A fourth-generation light source, called Delhi Light Source (DLS) based on photocathode-based RF gun has been commissioned at Inter-University Accelerator Centre, New Delhi. Presently, the electron beam is being generated from copper photocathode and the beam is being used for scheduled experiments. Soon, the semiconductor photocathode will be used to produce higher beam current. Here, to develop the semiconductor photocathode, a dedicated photocathode deposition facility was developed in collaboration with Brookhaven national Laboratory (BNL) and has been successfully commissioned and becomes operational at IUAC. This deposition facility is an integrated system with the electron gun and is a unique system as it is capable of producing, preserving (without residual gas poisoning) and in-vacuum transfer of the deposited photocathodes from the deposition chamber up to the RF electron gun. The system is designed to operate under ultra-high vacuum (UHV) and is equipped with load-lock chambers, substrate heating assembly, thickness monitoring via a quartz crystal microbalance (QCM), and an in-situ setup for quantum efficiency (QE) measurements. After testing of all the subsystems and a detailed calibration, the first deposition of a cesium telluride (Cs 2 Te) photocathode was successfully performed on a copper (Cu) substrate. This successful commissioning and initial deposition mark a significant step toward the indigenous photocathode development and lays the groundwork for further research into advanced photo emissive materials at IUAC. This paper will discuss the salient features, installation, commissioning, first semiconductor photocathode deposition and its results.

47 OTHER INSTRUMENTATION↗

Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

Status of the Slow Extraction Commissioning for the Mu2e Experiment at Fermilab

We present the current status of slow-extraction commissioning for the Mu2e experiment at Fermilab. The system employs third-integer resonant extraction of 8 GeV protons from the Delivery Ring to deliver a uniform, slow-spilled beam to the production target. During recent commissioning periods, we achieved stable optics, reproducible injection and energy matching, and consistent multi-spill operation. The sextupole circuits and fast-ramping quadrupoles were exercised near nominal resonance conditions, yielding promising extraction performance. A prototype spill-regulation system based on the ARIA-10 SoC was commissioned with integrated diagnostics, demonstrating closed-loop operation and establishing the framework for PID- and RFKO-based control. These commissioning results lay the foundation for achieving precision-regulated, high-quality slow extraction in upcoming Mu2e operations.

Narayanan, A. [Fermilab]↗

The UNO Aviation Monograph Series: Aviation Security: An Annotated Bibliography of Responses to the Gore Commission

This monograph is a companion to UNOAI Monograph 96-2, "The Image of Airport Security: An Annotated Bibliography," compiled in June 1996. The White House Commission on Aviation Safety and Security, headed by Vice President Al Gore, was formed as a result of the TWA Flight 800 crash in August 1996. The Commission's final report included 31 recommendations addressed toward aviation security. The recommendations were cause for security issues to be revisited in the media and by the aviation industry. These developments necessitated the need for an updated bibliography to review the resulting literature. Many of the articles were written in response to the recommendations made by the Gore Commission. "Aviation Security: An Annotated Bibliography of Responses to the Gore Commission" is the result of this need.

Carrico, John S.↗

Solar Dynamics Observatory Launch and Commissioning

The Solar Dynamics Observatory (SDO) was launched on February 11, 2010. Over the next three months, the spacecraft was raised from its launch orbit into its final geosynchronous orbit and its systems and instruments were tested and calibrated in preparation for its desired ten year science mission studying the Sun. A great deal of activity during this time involved the spacecraft attitude control system (ACS); testing control modes, calibrating sensors and actuators, and using the ACS to help commission the spacecraft instruments and to control the propulsion system as the spacecraft was maneuvered into its final orbit. This paper will discuss the chronology of the SDO launch and commissioning, showing the ACS analysis work performed to diagnose propellant slosh transient and attitude oscillation anomalies that were seen during commissioning, and to determine how to overcome them. The simulations and tests devised to demonstrate correct operation of all onboard ACS modes and the activities in support of instrument calibration will be discussed and the final maneuver plan performed to bring SDO on station will be shown. In addition to detailing these commissioning and anomaly resolution activities, the unique set of tests performed to characterize SDO's on-orbit jitter performance will be discussed.

O'Donnell, James R., Jr.↗

Commissioning of a 20 K Helium Refrigeration System for NASA-JSC Chamber A

A new 20 K helium refrigerator installed at NASA Johnson Space Center s Space Environment Simulation Laboratory (SESL) was successfully commissioned and tested in 2012. The refrigerator is used to create a deep space environment within SESL s Chamber A to perform ground testing of the James Webb Space Telescope (JWST). The chamber previously and currently still has helium cryo-pumping panels (CPP) and liquid nitrogen shrouds used to create low earth orbit environments. Now with the new refrigerator and new helium shrouds the chamber can create a deep space environment. The process design, system analysis, specification development, and commissioning oversight were performed by the cryogenics department at Jefferson Lab, while the contracts and system installation was performed by the ESC group at JSC. Commissioning data indicate an inverse coefficient of performance better than 70 W/W for a 18 kW load at 20 K (accounting for liquid nitrogen pre-cooling power) that remains essentially constant down to one third of this load. Even at 10 percent of the maximum capacity, the performance is better than 150 W/W at 20 K. The refrigerator exceeded all design goals and demonstrated the ability to support a wide load range from 10 kW at 15 K to 100 kW at 100 K. The refrigerator is capable of operating at any load temperature from 15 K to ambient with tight temperature stability. The new shroud (36 tons of aluminum) can be cooled from room temperature to 20 K in 24 hours. This paper will outline the process design and commissioning results.

Homan, J.↗