Search NASA⌕ Search

SEARCH · Search NASA

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop

Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible trouble-shooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.

Piesciorovsky, Emilio↗

Commissioning of a two-target DC cylindrical magnetron sputter coater for depositing Nb 3 Sn film on Nb superconducting radiofrequency cavities

A DC cylindrical magnetron sputter coater was commissioned and used to coat Nb 2.6 GHz superconducting radiofrequency (SRF) cavity with Nb 3 Sn. The sputter coater has two identical cylindrical magnetrons that can move, with a controlled speed, along the axis of the SRF cavity to coat the inside surface of the cavity. The design of the sputter coater is discussed, along with its performance. Initially, a sample holder that allows coating on flat substrates at positions similar to the equator and beam tubes of a 2.6 GHz SRF cavity was used to test conditions for fabricating Nb 3 Sn layers. Multilayers of Nb and Sn were sequentially sputtered on flat Nb and sapphire substrates mounted on the equivalent positions of the cavity's beam tubes and the equator using the two identical cylindrical magnetrons. Then, the Nb/Sn multilayers were annealed at 950 °C for 3 h. Here, the ~1.2 μm thick Nb 3 Sn film did not show any other Nb–Sn compounds and had a superconducting transition temperature of 17.61–17.76 K. The 2.6 GHz SRF cavity was coated using similar conditions as flat samples. Cryogenic RF testing of the Nb 3 Sn-coated cavity demonstrated a quality factor of 3.2 × 10 8 at an accelerating gradient of 5 MV/m at 4.4 K.

43 PARTICLE ACCELERATORS↗

APS upgrade: Commissioning the world’s first light source based on swap-out injection

The Advanced Photon Source (APS) has recently completed a major upgrade, replacing its 25-year-old storage ring with a cutting-edge hybrid seven-bend achromat lattice enhanced by six additional reverse bends. The new design achieves a natural emittance of 42 pm-rad, enabling the production of X-rays up to 500 times brighter than those generated by the original APS. A key innovation of the upgrade is the implementation of a swap-out injection scheme, which replaces entire depleted bunches instead of performing traditional top-up injection. This approach enables on-axis injection to accommodate for the reduced dynamic aperture resulting from strong focusing. This paper outlines the commissioning process, shares initial operating experience with swap-out injection, and presents performance data for new systems such as the bunch-lengthening cavity.

Sajaev, Vadim [Argonne, PHY]↗

Review of Literature and Utility Commission Proceedings Relevant to Integrated System Planning: Annotated Bibliography Prepared to Support the Washington Utilities and Transportation Commission

In 2024 the Washington State Legislature passed the Decarbonization Act for Large Combination Utilities (Engrossed Substitute House Bill 1589 – the Act). The Act requires a large combination electric and gas utility to conduct integrated system planning supporting electrification and gas system decarbonization, including a reduction in the gas rate base. The utility is required to submit the first integrated system plan (ISP) by January 1, 2027. The requirements are to be developed and adopted by the Washington Utilities and Transportation Commission (UTC) by July 1, 2025. In October 2024 Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) began providing technical assistance to the UTC to support the ISP rulemaking. PNNL and LBNL have prepared this annotated bibliography of research and reports, and state examples of coordinated gas and electric planning, future of gas, and future of heat proceedings in other U.S. States and one Canadian Province. The items described here have been selected by the authors for their potential relevance to the UTC’s integrated system planning rule discussions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pre-commissioning of the wide-dynamic range halo monitor to be installed in the Fermilab MI-8 line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, initial testing of equipment, and ray tracing simulations for the Offner optics and the targets used in the monitor.

Babacan, Betiay [IIT, Chicago; Fermilab]↗

Bringing Fault Detection and Diagnostics (FDD) Tools into the Mainstream: Retro Commissioning and Continuous Commissioning of HVAC and Refrigeration Systems

HVAC systems in the commercial building sector consume about 3.4 quads of energy annually. Of all the HVAC systems, packaged rooftop air–conditioning units (RTUs) provide cooling and heating for over 60 percent of the commercial building floorspace (about 90 billion ft2) in the U.S. and they are a significant source of energy consumption and peak demand. All HVAC systems suffer from faults that impact thermal comfort and increase energy consumption. There are several commercially available Automated Fault Detection and Diagnostic (AFDD) tools on the market that can detect and diagnose faults, and if those faults are corrected, can save significant national energy. However, there are multiple market barriers for these tools including lack of independent verification of their performance in the field in terms of their technical capabilities, ease of use and installation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Maximizing Efficiency and Quality: Leveraging Automated Testing for Laboratory Commissioning

The traditional commissioning process for a building often implements sampling rates to select equipment for functional acceptance testing when large quantities of equipment are present. While this approach is generally effective in identifying wide-spread issues, it has several key shortfalls. (1) It provides a one-time validation of equipment operation in which the standard documentation is a simple checklist of pass/fail questions. (2) It fails to evaluate equipment not included in the sample rate selection. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. The goal of this presentation will be to highlight the advantages offered by automated functional testing in this critical laboratory setting. These are primarily (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with connected commissioning and the important conversations with the key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.

automated testing↗

Maximizing Efficiency and Quality: Leveraging Automated Testing for Laboratory Commissioning

The traditional commissioning process uses sampling to select equipment for functional acceptance testing when large quantities of equipment are present. Although this approach is generally effective in identifying wide-spread issues, it has several shortcomings: it fails to evaluate equipment not included in the sample, provides only a one-time validation of equipment operation, and the standard documentation is a simple checklist of pass/fail questions. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. This presentation highlights the advantages offered by automated functional testing in this critical laboratory setting: (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with Connected Commissioning and the important conversations with key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.

automated testing↗

Considerations for Resilience Guidelines for Clean Energy Plans: For the Oregon Public Utility Commission and Oregon Electricity Stakeholders

This document summarizes relevant approaches, research, models, and national examples for state utility regulators tasked with developing utility guidelines for risk-based resiliency planning. In 2021, the Oregon Legislature enacted a 100 percent clean electricity by 2040 standard that requires the Oregon Public Utility Commission (PUC) to oversee utility planning for aggressive clean energy deployment through Clean Energy Plans (House Bill 2021, Sec. 4). In addition to meeting emissions reductions targets, Clean Energy Plans must also: "Include a risk-based examination of resiliency opportunities that includes costs, consequences, outcomes, and benefits based on reasonable and prudent industry resiliency standards and guidelines established by the Public Utility Commission." This report will support the Oregon Public Utility Commission in developing resilience guidelines. Other state public utility commissions may also benefit from this research.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design, development and commissioning of a multi-alkali semiconductor photocathode deposition system for the IUAC Delhi light source photoinjector

A fourth-generation light source, called Delhi Light Source (DLS) based on photocathode-based RF gun has been commissioned at Inter-University Accelerator Centre, New Delhi. Presently, the electron beam is being generated from copper photocathode and the beam is being used for scheduled experiments. Soon, the semiconductor photocathode will be used to produce higher beam current. Here, to develop the semiconductor photocathode, a dedicated photocathode deposition facility was developed in collaboration with Brookhaven national Laboratory (BNL) and has been successfully commissioned and becomes operational at IUAC. This deposition facility is an integrated system with the electron gun and is a unique system as it is capable of producing, preserving (without residual gas poisoning) and in-vacuum transfer of the deposited photocathodes from the deposition chamber up to the RF electron gun. The system is designed to operate under ultra-high vacuum (UHV) and is equipped with load-lock chambers, substrate heating assembly, thickness monitoring via a quartz crystal microbalance (QCM), and an in-situ setup for quantum efficiency (QE) measurements. After testing of all the subsystems and a detailed calibration, the first deposition of a cesium telluride (Cs 2 Te) photocathode was successfully performed on a copper (Cu) substrate. This successful commissioning and initial deposition mark a significant step toward the indigenous photocathode development and lays the groundwork for further research into advanced photo emissive materials at IUAC. This paper will discuss the salient features, installation, commissioning, first semiconductor photocathode deposition and its results.

47 OTHER INSTRUMENTATION↗

Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

Status of the Slow Extraction Commissioning for the Mu2e Experiment at Fermilab

We present the current status of slow-extraction commissioning for the Mu2e experiment at Fermilab. The system employs third-integer resonant extraction of 8 GeV protons from the Delivery Ring to deliver a uniform, slow-spilled beam to the production target. During recent commissioning periods, we achieved stable optics, reproducible injection and energy matching, and consistent multi-spill operation. The sextupole circuits and fast-ramping quadrupoles were exercised near nominal resonance conditions, yielding promising extraction performance. A prototype spill-regulation system based on the ARIA-10 SoC was commissioned with integrated diagnostics, demonstrating closed-loop operation and establishing the framework for PID- and RFKO-based control. These commissioning results lay the foundation for achieving precision-regulated, high-quality slow extraction in upcoming Mu2e operations.

Narayanan, A. [Fermilab]↗

Commissioning of the Mu2e tracker DAQ, planning for the Vertical Slice Test and pre-pattern recognition studies

The primary objective of the Mu2e experiment at Fermilab is to search for the neutrino-less coherent $\mu \rightarrow e$ conversion in the field of an aluminum nucleus ($\mu^- \text{Al} \rightarrow e^- \text{Al}$). The signature of this process is a monochromatic Conversion Electron (CE) with an energy of approximately 104.97 MeV \cite{bartoszek2015mu2e}. Within the Standard Model (SM), the branching ratio for this process, including neutrino masses and oscillation, is expected to be less than $\mathcal{O}(10^{-50})$. This value is far beyond current experimental capabilities. However, models of physics beyond the SM predict much higher relative rates, approaching an observable level. The SINDRUM II experiment set an upper limit on muon conversion at $7 \times 10^{-13}$ (90\% CL) on Au target \cite{SINDRUMII:2006dvw}, and the Mu2e collaboration aims to improve this limit by four orders of magnitude. Observing this process would provide a clear evidence of physics beyond the Standard Model. A brief discussion of the theoretical and experimental aspects is provided in Chapter \ref{intr}. Mu2e adopts a sophisticated experimental setup to achieve its goals, further described in Chapter \ref{mu2echapter}. The central part of the Mu2e detector is the tracker, that consists of 18 tracking stations. The tracker must provide excellent momentum resolution, approximately 1 MeV/c, to distinguish the monochromatic CE signal from the background. To minimize the energy losses, a straw tube tracker will be used \cite{bobbb}. Chapter \ref{chaptertrk} provides an overview of the straw tracker design and its working principles. This Thesis presents a comprehensive study of the Mu2e tracker, covering complementary aspects from initial commissioning to optimization and first steps of the calibration processes. My work at Fermilab has been focused on the complete Data Acquisition (DAQ) testing from both hardware and software perspectives. I was involved in the commissioning of the Mu2e DAQ system and the Vertical Slice Test (VST) of the tracker. The VST encompasses the entire testing chain, from the straws to the readout, and to processed data on disk. I was also focused on the offline analysis, especially on pre-pattern recognition studies, to explore the best methods for identifying $\delta$-electrons during the data taking. Chapter \ref{commissioning} details the commissioning of the tracker DAQ system, emphasizing the importance of understanding of the readout process before the data acquisition. This includes validating the readout logic and firmware through Monte Carlo simulations to confirm functionality and buffering, monitoring the quality of the data from the tracker preamplifiers and front-end electronics, and assessing overall DAQ performance to ensure reliability during future calibration and data-taking. Chapter \ref{planning} discusses the initial steps towards the tracker calibration. The ultimate goal is to perform a time calibration of the first assembled station of the tracker using cosmic muons, aiming for a longitudinal hit position resolution better than 4 cm. This involves determining the signal propagation times and channel-to-channel delays. I performed a Monte Carlo study to determine the impact of the station orientation on the quality of the calibration, in particular on the cosmic track reconstruction, focusing on potential biases that could arise. These studies provide essential insights into the operation, optimization, and calibration of the Mu2e tracker system. Given the high data volume expected during Mu2e operations, estimated at approximately 7 PBytes per year, optimizing memory usage and minimizing CPU consumption are critical. A significant challenge lies in effectively flagging $\delta$-electron hits, which are the primary source of hits in the tracker, without compromising the efficiency of CE hit detection and track reconstruction. A detailed study of pre-pattern recognition and a thorough comparison of two $\delta$-electron flagging algorithms is provided in Chapter \ref{delta}. In Chapter \ref{conclusions}, the findings are concisely summarized, offering a comprehensive synthesis of the research and emphasizing the key insights derived from this study.

43 PARTICLE ACCELERATORS↗

Commissioning Guidance for Energy Savings Performance Contracts (ESPCs)

This Commissioning Guidance for Energy Savings Performance Contracts (ESPCs) is DOE’s official guidance for ordering agencies under the current DOE ESPC IDIQ contract. This guidance document explains how commissioning of energy conservation measures (ECMs) and water conservation measures (WCMs) is incorporated into the ESPC process, roles and responsibilities in project commissioning, and key elements of commissioning. This document updates the previous version, released in 2015. This guidance can also be used as applicable in the development of ESPC ENABLE and UESC performance assurance plans.

Walker, Christine↗

1.2.4.403 - Pumped Storage Hydropower FAST Commissioning Prize

The Pumped Storage Hydropower (PSH) FAST Commissioning Prize aimed to reduce the time, cost, and risk required to commission PSH projects by crowdsourcing ideas via a three-stage prize. Objectives were to reduce the time to commission PSH projects from 10+ years to less than 5 years and to develop a baseline analysis for PSH.

HYDRO ENERGY↗

Commissioning of the Advanced Rare Isotope Separator ARIS at FRIB

The Facility for Rare Isotope Beams (FRIB) at Michigan State University (MSU) consists of a newly constructed linear accelerator and fragment separator that are designed for enhanced production rates of rare isotopes for use in research and other societal applications. Recent activities through to August 2022 took place to commission the Advanced Rare Isotope Separator (ARIS) and carry out the first experiments. This followed commissioning of the newly constructed linac that is designed to provide orders of magnitude higher beam power than the previously coupled cyclotrons. This required that more advanced target, beam dump, and collimation systems of the new separator be designed and constructed to sustain unprecedented conditions by heavy ion beams. Commissioning with ~1 kW beams began recently and results from activities that began in late 2021 are reported here. Comparisons between the previous and current facilities are provided.

43 PARTICLE ACCELERATORS↗

First on-line commissioning experiments at the St. Benedict facility

Nuclear beta decays provide an excellent probe of fundamental symmetries due to their mediation by the weak interaction. In particular, precise measurements of these decays provide constraints on the unitarity of the Cabbibo-Kobayashi-Maskawa (CKM) quark-mixing matrix. While superallowed pure Fermi decays currently set the most precise limits, the alternative suite of superallowed mixed mirror decays has been ill-studied. These nuclei can provide an important consistency check of calculation and measurement methods employed for the pure Fermi decays, more critically needed now in the wake of a 2.4σ deviation from unitarity of the CKM matrix. In order to remedy the gap in data for mirror decays, the Superallowed Transition Beta-Neutrino Decay Ion Coincidence Trap (St. Benedict) facility is being commissioned at the University of Notre Dame’s Nuclear Science Laboratory (NSL). In this paper, we present first results of the commissioning of the St. Benedict facility on-line at the TwinSol radioactive beam facility. The results of initial commissioning experiments involving the St. Benedict gas catcher, RF carpet, RFQ ion guide and RFQ cooler-buncher will be presented.

beta decay↗

Commissioning of a replacement subatmospheric cold box for Jefferson Lab’s Central Helium Liquefier

Jefferson Lab’s Cryogenics Department has designed, fabricated, installed, and commissioned a new subatmospheric cold box to replace one of the two existing units within our Central Helium Liquefier (CHL). The replacement cold box, dubbed SC1R, pumps saturated helium vapor at 0.0385 atm from Jefferson Lab’s continuous electron beam accelerator facility (CEBAF) cryomodules to maintain an operating temperature of nominally 2.1 K. This is accomplished using a five-stage cryogenic centrifugal compressor (cold compressor) system and a brazed aluminum plate-fin heat exchanger operating between 2.1 K and 4.5 K. In this paper we will describe our experience commissioning the SC1R cold box. We will discuss pump-down of the system to 2.1 K and steady-state operation at the cold compressor design flow rates of 170, 200, and 250 g/s. Performance of the heat exchanger and cold compressors has been mapped across a range of flow rates and optimized for CEBAF operations. This commissioning data will be used to monitor future performance and adapt to changing load requirements.

Mastracci, B.↗