An Exploratory Study of Cost Engineering in Axiomatic Design: Creation of the Cost Model Based on an FR-DP Map

Large complex projects cost large sums of money throughout their life cycle for a variety of reasons and causes. For such large programs, the credible estimation of the project cost, a quick assessment of the cost of making changes, and the management of the project budget with effective cost reduction determine the viability of the project. Cost engineering that deals with these issues requires a rigorous method and systematic processes. This paper introduces a logical framework to a&e effective cost engineering. The framework is built upon Axiomatic Design process. The structure in the Axiomatic Design process provides a good foundation to closely tie engineering design and cost information together. The cost framework presented in this paper is a systematic link between the functional domain (FRs), physical domain (DPs), cost domain (CUs), and a task/process-based model. The FR-DP map relates a system s functional requirements to design solutions across all levels and branches of the decomposition hierarchy. DPs are mapped into CUs, which provides a means to estimate the cost of design solutions - DPs - from the cost of the physical entities in the system - CUs. The task/process model describes the iterative process ot-developing each of the CUs, and is used to estimate the cost of CUs. By linking the four domains, this framework provides a superior traceability from requirements to cost information.

Lee, Taesik↗

A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

Mizell, Carolyn↗

Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

Overruns↗

DOE Deep Energy Retrofit Cost Survey

A survey was conducted by the Lawrence Berkeley National Laboratory on deep energy retrofit (DER) market drivers, opportunities, and challenges. The survey was part a research study sponsored by the U.S. Department of Energy to gather information on the costs of DER from home performance contractors and stakeholders. Cost data was gathered from DER projects that use a comprehensive, whole-home approach to drastically reduce energy use and improve performance. DER projects often aim at reducing energy use by 50% or more. In addition, these projects can improve home comfort and potentially benefiting occupant health. Yet, market adoption of DER has been limited. Major limiting factors include complex projects, high costs, perceived risks, extensive disruption, and unfamiliar work scopes to some contractors. In order to better understand what motivates and deters DER projects in today’s market, a survey was conducted to gather this information, and to learn about promising approaches and technologies from the industry perspective. Past surveys on homeowners and home energy performance professionals have studied the motivations and barriers of energy efficiency retrofits. Two surveys of home energy performance professionals were conducted in recent years. The Resources for the Future (RFF) Home Energy Audit and Retrofit Survey was conducted in 2011 by recruiting energy auditors and retrofit installers through members of Efficiency First and Building Performance Institute (BPI) accredited contractors. The survey asked about the business and services that respondents provide, how often homeowners follow their recommendations to retrofit their homes, and the respondents’ opinion on barriers faced by the industry. The survey found that not enough homeowners know about energy audits, but more importantly, it is the high cost of retrofits compared to low energy prices that is responsible for few energy audits and retrofits being completed. The RESNET Deep Retrofit Industry Stakeholder Survey was conducted shortly after launching of the EnergySmart Home Performance Team program. The EnergySmart Team program involves a formal agreement among allied contractors who are engaged in high performance retrofits. Using this allied team approach, teams can pool their expertise and provide each other with customer referrals. The survey asked EnergySmart Team members and outside stakeholders on questions about market and technical barriers in performing home energy retrofits. Survey respondents identified lack of consumer awareness and lack of affordable financing for consumers as the leading market barriers to home energy retrofits. In their written comments, many survey respondents also echoed that the high costs of retrofit compared to low energy prices is a market barrier. Respondents found “certain housing characteristics that prevent effective retrofit” and “energy analysis software inaccuracy or limitations” are the two leading technical barriers. Their choices for technical barriers were reflective of the energy rater/auditor role played by the majority (78%) of the survey respondents. In comparison to past surveys, this work aimed to gather inputs from a broader segment of the home performance industry to identify the opportunities and barriers faced by DERs from all perspectives. The survey asks for project costs to help breakdown the high costs of DERs. This survey is also motivated by a need to better understand the role of DERs in reducing energy use by the residential sectors and meeting climate goals. The survey is designed towards obtaining more substantive inputs from survey respondents by encouraging written comments, rather than setting the goal to reach a large number of respondents. We took this approach because DER is currently still a niche market, so it is more valuable to gather in-depth inputs from individuals who are performing this work rather than getting to the masses.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Mars Environmental Survey (MESUR): Science objectives and mission description

In-situ observations and measurements of Mars are objectives of a feasibility study beginning at the Ames Research Center for a mission called the Mars Environmental SURvey (MESUR). The purpose of the MESUR mission is to emplace a pole-to-pole global distribution of landers on the Martian surface to make both short- and long-term observations of the atmosphere and surface. The basic concept is to deploy probes which would directly enter the Mars atmosphere, provide measurements of the upper atmospheric structure, image the local terrain before landing, and survive landing to perform meteorology, seismology, surface imaging, and soil chemistry measurements. MESUR is intended to be a relatively low-cost mission to advance both Mars science and human presence objectives. Mission philosophy is to: (1) 'grow' a network over a period of years using a series of launch opportunities, thereby minimizing the peak annual costs; (2) develop a level-of-effort which is flexible and responsive to a broad set of objectives; (3) focus on science while providing a solid basis for human exploration; and (4) minimize project cost and complexity wherever possible. In order to meet the diverse scientific objectives, each MESUR lander will carry the following strawman instrument payload consisting of: (1) Atmospheric structure experiment, (2) Descent and surface imagers, (3) Meteorology package, (4) Elemental composition instrument, (5) 3-axis seismometer, and (6) Thermal analyzer/evolved gas analyzer. The feasibility study is primarily to show a practical way to design an early capability for characterizing Mars' surface and atmospheric environment on a global scale. The goals are to answer some of the most urgent questions to advance significantly our scientific knowledge about Mars, and for planning eventual exploration of the planet by robots and humans.

Hubbard, G. Scott↗

A Mars environmental survey (MESUR) - Feasibility of a low cost global approach

In situ measurements of Mars' surface and atmosphere are the objectives of a novel network mission concept called the Mars Environmental SURvey (MESUR). As envisioned, the MESUR mission will emplace a pole-to-pole global distribution of 16 landers on the Martian surface over three launch opportunites using medium-lift (Delta-class) launch vehicles. The basic concept is to deploy small free-flying probes which would directly enter the Martian atmosphere, measure the upper atmospheric structure, image the local terrain before landing, and survive landing to perform meteorology, seismology, surface imaging, and soil chemistry measurements. Data will be returned via dedicated relay orbiter or direct-to-earth transmission. The mission philosophy is to: (1) 'grow' a network over a period of years using a series of launch opportunities; (2) develop a level-of-effort which is flexible and responsive to a broad set of objectives; (3) focus on Mars science while providing a solid basis for future human presence; and (4) minimize overall project cost and complexity wherever possible.

Hubbard, G. S.↗

Mars: On the Path Or In The Way?

Explore Mars may not be the highest and best use of government-? funded human space flight. However, Explore Mars is pervasively accepted as the ultimate goal for human space flight. This meme has become refractory within the human space flight community despite dramatic contextual changes since Apollo: human space flight is no longer central to commonly-?held national priorities, NASA's fraction of the federal budget has diminished 8 fold, over 60 enabling technology challenges have been identified, and the stunning achievements of robotic Mars exploration have accelerated. The Explore Mars vision has not kept pace with these changes.An unprecedented budgetary commitment would have to be sustained for an unprecedented number of decades to achieve the Explore Mars goal. Further, the goal's justification as uniquely able to definitively determine Mars habitability is brittle, and not driving current planning in any case; yet NASA owns the choice of this goal and has authority to change it. Three alternative goals for government investment in human space flight meet NASA's own expressed rationale at least as well as Explore Mars, some with far greater capacity to regain the cultural centrality of human space flight and to grow by attracting private capital. At a minimum the human space flight advocacy community should address the pragmatics of choosing such a vulnerable goal.

complex project costs↗

Metal Complex Inks for Low-Cost Photovoltaic Material Metallization

The aim of the project titled “Metal Complex Inks for Low-Cost Photovoltaic Material Metallization” was to develop new metal complex conductive inks and pastes for PV, invented and commercialized by Electroninks, Inc. (EI, Austin, TX USA, https://electroninks.com), the only global supplier and scaled-manufacturing company of these metal complex inks. These materials were developed in this work for photovoltaic applications to significantly lower the cost of metallization, improve the manufacturability, and greatly reduce metal usage, while maintaining or improving device efficiencies when compared to traditional nanoparticle-based inks. The new pastes will do so by: 1) lowering the finger resistivity and precious metals usage by printing much denser (and therefore thinner/less material) metal films than possible with traditional particle-based screen-printed pastes; 2) decreasing the firing temperature to help preserve passivation; and 3) enabling a path to move the TW-scale PV industry from Ag to other materials including Ni, Cu, and Ni/Cu alloy pastes while continuing to leverage capital investment and expertise in screen printing metallization.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quantifying Investment Risk: Analysis of the Purchase Decision of a Nuclear Power Plant (Presentation)

Cost overruns are an ill-fated part of the deployment history of nuclear power plants (NPPs) in the United States, and yet studies increasingly show the important role nuclear technologies must play in decarbonizing the U.S. economy. Paradoxically, then, a key piece of a coherent decarbonization strategy depends on attracting investor action to a purchase where historical cost overruns have been sizable. To address this challenge, this study aims to develop a financial model that quantifies the risk of cost overruns in the decision-making process for purchasing advanced reactor concepts. Using the concept of value at risk (VaR), the model is built to evaluate financial risk nuclear construction with the aim to identify risk mitigation strategies. The objective is to identify strategies to mitigate cost-risk challenges and assess the potential reduction in investor risk exposure. This paper presents the initial development and preliminary verification of the financial risk analysis model. The development of this model involved a comprehensive approach to estimating financial risk over the operating life of NPP that stems from construction uncertainties. By utilizing net present value (NPV) with discounted cash flows, the model captures the complex interconnections of project costs, construction timelines, revenue, and uncertainties. Verifying the model involved testing historical data from previous reactor construction projects against the construction project of Vogtle 3 and 4. This paper’s results present the comparison of the preconstruction cost overrun prediction with the current cost estimates from a nearly complete Vogtle 3 and 4.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantifying Investment Risk: Analysis of the Purchase Decision of a Nuclear Power Plant

Cost overruns are an ill-fated part of the deployment history of nuclear power plants (NPPs) in the United States, and yet studies increasingly show the important role nuclear technologies must play in decarbonizing the U.S. economy. Paradoxically, then, a key piece of a coherent decarbonization strategy depends on attracting investor action to a purchase where historical cost overruns have been sizeable. To address this challenge, this study aims to develop a financial model that quantifies risk of cost overruns in the decision-making process for purchasing advanced reactor concepts. Using the concept of Value at Risk (VaR), the model is built to evaluate financial risk nuclear construction with the aim to identify risk mitigation strategies. The objective is to identify strategies to mitigate cost-risk challenges and to assess the potential reduction in investor risk exposure. The paper presents the initial development and preliminary verification of the financial risk analysis model. The development of this model involved a comprehensive approach to estimating financial risk over the operating life of NPP that stems from construction uncertainties. By utilizing net present value (NPV) with discounted cash flows, the model captures the complex interconnections of project costs, construction timelines, revenue, and uncertainties. Verification of the model involved testing historical data from previous reactor construction projects against the construction project of Vogtle 3 and 4. The results of this paper present the comparison of the preconstruction cost overrun prediction with the current cost estimates from a nearly complete Vogtle 3 and 4.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

JPL Innovation Foundry

Space science missions are increasingly challenged today: in ambition, by increasingly sophisticated hypotheses tested; in development, by the increasing complexity of advanced technologies; in budgeting, by the decline of flagship-class mission opportunities; in management, by expectations for breakthrough science despite a risk-averse programmatic climate; and in planning, by increasing competition for scarce resources. How are the space-science missions of tomorrow being formulated? The paper describes the JPL Innovation Foundry, created in 2011, to respond to this evolving context. The Foundry integrates methods, tools, and experts that span the mission concept lifecycle. Grounded in JPL's heritage of missions, flight instruments, mission proposals, and concept innovation, the Foundry seeks to provide continuity of support and cost-effective, on-call access to the right domain experts at the right time, as science definition teams and Principal Investigators mature mission ideas from "cocktail napkin" to PDR. The Foundry blends JPL capabilities in proposal development and concurrent engineering, including Team X, with new approaches for open-ended concept exploration in earlier, cost-constrained phases, and with ongoing research and technology projects. It applies complexity and cost models, projectformulation lessons learned, and strategy analyses appropriate to each level of concept maturity. The Foundry is organizationally integrated with JPL formulation program offices; staffed by JPL's line organizations for engineering, science, and costing; and overseen by senior Laboratory leaders to assure experienced coordination and review. Incubation of each concept is tailored depending on its maturity and proposal history, and its highest leverage modeling and analysis needs.

mission development↗

Prefabricated Zero Energy Retrofit Technologies: A Market Assessment

Part of the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy’s (EERE’s) strategic goals is to stimulate the growth of a thriving domestic clean energy manufacturing industry. This report seeks to identify products in the European and U.S. markets that can enable a more integrated and standardized approach to conducting zero energy retrofits, leveraging off-site construction and manufacturing. Greater integration of energy conservation measures into prefabricated building components will further enable efficiency adoption, while reducing project complexity, risks, and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Prefabricated Zero Energy Retrofit Technologies: A Market Assessment

The U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy’s (EERE’s) mission is to “create and sustain American leadership in the transition to a global clean energy economy.” EERE’s vision is a strong and prosperous America powered by clean, affordable, and secure energy. In support of this vision, one of EERE’s strategic pillars is to stimulate the growth of a thriving domestic clean energy manufacturing industry. This report seeks to identify products in the European and U.S. markets that can enable a more integrated and standardized approach to conducting zero energy retrofits, leveraging off-site construction and manufacturing. Greater integration of energy conservation measures into prefabricated building components will further enable efficiency adoption, while reducing project complexity, risks, and costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Strategies in transition

A new vision has emerged within the Office of Space Science and Applications (OSSA), and within the agency as a whole, for how to design missions to be responsive to the changing budget environment of the 1990s. The overall space science and applications program had to be looked at, restructuring the most expensive and complex projects to bring down costs and ensure their place in the mission queue of the future. The recent restructuring of some of OSSA's largest programs in development and the work to improve efficiency for those in operation is part of OSSA's effort to free funds for more frequent space science missions in the future. Instead of more great observatories, we are looking toward a new vision encompassing a level of great activity through small, frequent missions. The strategy developed for attaining this vision was to lower costs by reducing size and complexity through new technology, while at the same time making progress in space science. The strategy comprises two interwoven parts: the flight program strategy of each of the science disciplines and OSSA's new-technology strategy. The overall purpose of all OSSA's efforts to date has been to free resources for maximizing the space science program in a tough fiscal environment.

Diaz, Alphonso V.↗

Commercial, industrial, and institutional discount rate estimation for efficiency standards analysis: Sector-level data 1998–2021

Underlying each of the Department of Energy’s (DOE’s) federal appliance and equipment energy conservation standards are a set of complex analyses of the projected costs and benefits of regulation. Any new or amended standard must be designed to achieve significant additional energy conservation, provided that it is technologically feasible and economically justified (42 U.S.C. 6295(o)(2)(A)). DOE determines economic justification based on whether the benefits exceed the burdens, considering a variety of factors, including the economic impact of the standard on consumers of the product and the savings in lifetime operating cost compared to any increase in price or maintenance expenses (42 U.S.C. 6295(o)(2)(B)). As part of this determination, DOE conducts a Life-Cycle Cost (LCC) analysis, which models the combined impact of appliance first cost and operating cost changes on a representative commercial building sample in order to identify the fraction of customers achieving LCC savings or incurring net cost at the considered efficiency levels. Thus, the commercial discount rate value(s) used to calculate the present value of energy cost savings within the LCC model implicitly plays a role in estimating the economic impact of potential standard levels. This report provides an in-depth discussion of the commercial discount rate estimation process. It is an update to previous reports on estimating commercial discount rates from firm-level financial data (Fujita, 2016). Major topics covered in this report include: Discount rate estimation methods and rationale; -Data sources used and data limitations; -Discount rate distributions for use in standards analysis; -Discount rate estimation methods and distributions specific to the small business subgroup analysis. Going forward, this report will be updated as data allow and analyses necessitate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commercial, industrial, and institutional discount rate estimation for efficiency standards analysis: Sector-level data 1998–2022

Underlying each of the U.S. Department of Energy’s (DOE’s) federal appliance and equipment energy conservation standards are a set of complex analyses of the projected costs and benefits of regulation. Any new or amended standard must be designed to achieve significant additional energy conservation, provided that it is technologically feasible and economically justified (42 U.S.C. 6295(o)(2)(A)). DOE determines economic justification based on whether the benefits exceed the burdens, considering a variety of factors, including the economic impact of the standard on consumers of the product and the savings in lifetime operating cost compared to any increase in price or maintenance expenses (42 U.S.C. 6295(o)(2)(B)). As part of this determination, DOE conducts a life-cycle cost (LCC) analysis, which models the combined impact of appliance first cost and operating cost changes on a representative commercial building sample to identify the fraction of customers achieving LCC savings or incurring net cost at the considered efficiency levels. Thus, the commercial discount rate value(s) used to calculate the present value of energy cost savings within the LCC model implicitly plays a role in estimating the economic impact of potential standard levels. This report provides an in-depth discussion of the commercial discount rate estimation process. It is an update to previous reports on estimating commercial discount rates from firm-level and sector-level financial data (e.g., Fujita, 2021, 2016). Major topics covered in this report include the following: -Discount rate estimation methods and rationale -Data sources used and data limitations -Discount rate distributions for use in standards analysis -Discount rate estimation methods and distributions specific to the small business subgroup analysis A version of this analysis was most recently released in 2022. Going forward, this report will be updated as data allow and analyses necessitate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commercial, industrial, and institutional discount rate estimation for efficiency standards analysis: Sector-level data 1998–2023

Underlying each of the U.S. Department of Energy’s (DOE’s) federal appliance and equipment energy conservation standards are a set of complex analyses of the projected costs and benefits of regulation. Any new or amended standard must be designed to achieve significant additional energy conservation, provided that it is technologically feasible and economically justified (42 U.S.C. 6295(o)(2)(A)). DOE determines economic justification based on whether the benefits exceed the burdens, considering a variety of factors, including the economic impact of the standard on consumers of the product and the savings in lifetime operating cost compared to any increase in price or maintenance expenses (42 U.S.C. 6295(o)(2)(B)). As part of this determination, DOE conducts a life-cycle cost (LCC) analysis, which models the combined impact of appliance first cost and operating cost changes on a representative commercial building sample to identify the fraction of customers achieving LCC savings or incurring net cost at the considered efficiency levels. Thus, the commercial discount rate value(s) used to calculate the present value of energy cost savings within the LCC model implicitly plays a role in estimating the economic impact of potential standard levels. This report provides an in-depth discussion of the commercial discount rate estimation process relying on the Capital Asset Pricing Model (CAPM) to estimate a business’ cost of equity, and by adding a risk adjustment factor to the risk-free rate associated with long-term U.S. Treasury bonds to estimate their cost of debt. It is an update to previous reports on estimating commercial discount rates from firm-level and sector-level financial data (e.g., Fujita, 2021, 2016). Major topics covered in this report include the following: • Discount rate estimation methods and rationale • Data sources used and data limitations • Discount rate distributions for use in standards analysis • Discount rate estimation methods and distributions specific to the small business subgroup analysis.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Rapidly Deployable Acoustic Monitoring and Localization System Based on a Low-Cost Wave Buoy Platform

The primary objective of this project is to develop a cost-effective, fit-for-purpose environmental monitoring system, “NoiseSpotter®,” that characterizes, classifies, and provides accurate location information for anthropogenic and natural sounds in near real-time. NoiseSpotter was developed to support the evaluation of potential acoustic effects of marine energy (ME) projects. By utilizing a compact array of three acoustic particle motion sensors, NoiseSpotter triangulates individual bearings to provide sound source localization to within 5% accuracy, allowing the ability to discern ME device sounds relative to other confounding sounds in the environment, while providing location estimates to nearby marine mammals for environmental mitigation purposes. The ME industry needs proven solutions to meet environmental impact assessment needs. The NoiseSpotter® includes off-the-shelf, modular components that are easy to assemble and disassemble. Its acoustic particle motion sensors are commercially available and the data logger and real-time telemetry system is designed to be plug-and-play. The entire system is relatively compact and can be deployed from small vessels. NoiseSpotter’s near real-time capability enables operational monitoring of ME sounds, particularly during early stages of technology adoption to facilitate mitigation of potential noise effects. Widespread adoption of the technology for acoustic monitoring of ME devices requires that it be cost effective; hence the anticipated commercial cost of system hardware is $35,000. This project contributes to reducing barriers to ME testing through support of scientific research focused on reducing or mitigating environmental risks and lowering costs and complexity of environmental monitoring. This project has developed an acoustic monitoring system, NoiseSpotter® (U.S. Patent No. 11,156,734 and U.S. Registered Trademark No. 6,442,313), to detect and characterize baseline noise and sounds from ME operations and support geolocation of detected sounds. The intended outcome of the project is to mitigate concerns about the potential for ME device noise to alter marine mammal or fish behavior. NoiseSpotter® enables cost-effective, near real-time acoustic monitoring of an operational ME device relative to ambient environmental noise and provides a technical basis for ME developers seeking to navigate the permitting process in an efficient manner.