An iterative bidirectional gradient boosting approach for CVR baseline estimation

Here this paper presents a novel Iterative Bidirectional Gradient Boosting Model (IBi-GBM) for estimating the baseline of Conservation Voltage Reduction (CVR) programs. In contrast to many existing methods, we treat CVR baseline estimation as a missing data retrieval problem. The approach involves dividing the load and its corresponding temperature profiles into three periods: pre-CVR, CVR, and post-CVR. To restore the missing load profile during the CVR period, the method employs a three-step process. First, a forward-pass GBM is executed using data from the pre-CVR period as inputs. Subsequently, a backward-pass GBM is applied using data from the post-CVR period. The two restored load profiles are reconciled, considering pre-calculated weights derived from forecasting accuracy, and only the leftmost and rightmost points are retained. The newly restored points are then included as inputs for the subsequent iteration. This iterative procedure continues until the original load data in the CVR period is fully restored. We develop IBi-GBM using actual smart meter and Supervisory Control and Data Acquisition (SCADA) data. Our results demonstrate that IBi-GBM exhibits robust performance across various data resolutions and in different seasons and outperforms existing methods by achieving a 1-2% reduction in normalized Root Mean Square Error (nRMSE).

42 ENGINEERING↗

Model Quality and Measurement Density Impact on Volt/Volt Ampere Reactive Optimization Performance

The operation of the utility grid is being reshaped by the continuous addition of distributed energy resources and advanced metering infrastructure, which challenge existing grid control strategies. Some utilities deploy advanced distribution management systems (ADMS) to assist with the consolidation of various applications and to augment situational awareness in response to the new power delivery dynamics. An ADMS is an integrated software platform that provides utilities with a way to enhance their reliability, control, and optimization with advanced applications, such as volt/VAR optimization (VVO). A VVO application could serve as a vehicle to deliver cost savings by providing the utility with a method to reduce rates by controlling the voltage and decreasing the energy usage in their service territory. Some utilities are reluctant to integrate an ADMS, because it is a significant investment that requires approval from the public regulatory commission and/or their customers. This paper evaluates the impact on VVO performance when using a lower-quality network model supplemented with additional measurements, which could provide an implementation for cost savings. The results show that a better model quality would provide the highest energy savings; however, some level of telemetry is necessary in all scenarios to prevent voltage exceedances.

24 POWER TRANSMISSION AND DISTRIBUTION↗