NNL and NR Facilities and Infrastructure Visit LANL Construction Overview
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Design, construction and operation considerations for structural materials.
Since the U.S. Department of Energy Office of Nuclear Energy initiated the Nuclear Energy University Program (NEUP) in 2009, there are 29 NEUP projects focusing on high-temperature gas-cooled reactor (HTGR) research up to July 2022. The resultant research product, either experimental or computational, were published as final NEUP reports, journal articles and conference proceedings. However, these federally funded products have been scattered and sometimes cannot be easily accessed. To improve access to this valuable HTGR validation data and optimize the return on the significant investment made by the Department of Energy, the Advanced Reactor Technologies (ART) Gas-Cooled Reactor (GCR) program started a survey of completed and ongoing HTGR NEUP projects to develop a public-access database specific for HTGRs applications that can be used to retrieve computational fluid dynamics and system code validation data. This effort will help guide future NEUP-funded research, define new state of the ART Phenomena Identification and Ranking Table (PIRT), and promote the usage of this data in the codes validation matrices. This report provides an overview of the NEUP-funded HTGR-related research projects from Fiscal Year (FY) 2009–2021 and identifies validation knowledge gaps still existing in HTGR thermal-fluid research. A preliminary data platform has been developed for the 29 NEUP projects investigating HTGR thermal hydraulics, including their final reports as well as the available scientific publications. As an ultimate goal for this work, the ART-GCR program will create a central database at Idaho National Laboratory to identify, organize, and store these datasets generated by experimental investigations or computational models, experimental facility descriptions, and publicly-available academic products from the HTGR-related NEUP projects and provide future guidance for the storage and transmission of important project documentations for later NEUP projects as well.
Abstract not provided.
Precise insertion of DNA sequences at targeted locations in plant genomes is pivotal for synthetic biology, genetics, and crop improvement. Construct design plays a critical role in achieving precise insertions, yet practical guidance remains limited. This review provides an in-depth overview of construct design principles and targeted DNA insertion (knock-in) strategies in plants. We assess the strengths, limitations, and construct requirements of current knock-in methods for specific applications, including short, large, and multifragment insertions. Additionally, we explore the potential of adopting advanced nonplant technologies to enhance knock-in efficiency and precision in plants. This review provides a valuable resource for facilitating the effective application of knock-in technologies to genetically improve crops with minimal off-target effects.
The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV linac, which comprises a room temperature front end followed by an SRF accelerator. The front end has been constructed and operated with (pulsed & CW) beam in the PIP-II Injector Test facility (PIP2IT). The SRF accelerator consists of five different types of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at state-of-the-art parameters. The first two PIP-II cryomodules, HWR and Single Spoke Resonator 1 (SSR1) are installed in PIP2IT and have accelerated beam to 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was recently baselined, and site construction is underway
The paper presents the current status of the Microreactor Applications, Research, Validation, and Evaluation (MARVEL) microreactor design, qualification testing, fabrication, and high-level construction schedule. An overview of initial criticality, low power physics testing, and start-up testing is included, as well as an overview of the envisioned processes in which end-users can engage the project for access to operational data or specific demonstrations. Designed by the Idaho National Laboratory (INL) under the auspices of the US Department of Energy’s Microreactor Program for construction and operation at the INL, MARVEL is a small, fully functional advanced reactor with UZrH fuel and thermal output of 85 kW. It offers a unique opportunity for scaled demonstrations that can dramatically accelerate the design, licensing, and deployment of commercial microreactors for power production or process heat applications. MARVEL’s objective is to build a small liquid-metal thermal reactor at the INL to demonstrate design and operating processes for microreactors, microgrid integration, and process heat applications. MARVEL finished 90%-final-design in September 2023 and completed an independent project assessment in early 2024. Fabrication of long-lead components and fuel, safety analysis review, and procurement for construction are underway. MARVEL assembly and construction will start in 2025 and fuel loading is expected in mid- 2027. Initial criticality will be performed in a dry condition in late 2027, followed by loading of NaK coolant and start-up testing. Approximately six months later, release for unrestricted operations will enable subsequent testing of microreactor characteristics, microgrid integration and select heat extraction applications.
The U.S. Nuclear industry is facing significant challenges to maintain economic competitiveness in an electricity supply sector where advances in natural gas, wind, and solar technologies are reshaping the marketplace. As clean and reliable baseload generation, nuclear still has a valuable role to play. But in order for the power of the atom to remain available for meeting the nation's energy, environmental, and national security needs, it will be imperative that industry leadership innovate and become more efficient at a pace that matches the competition. Industry leaders rely, to a large extent, on their trade association - the Nuclear Energy Institute (NEI) - to be the prime mover in championing initiatives that will enable a successful future. NEI realized that, in the face of an increasingly difficult economic situation, it must become both leaner and more forward looking - it would have to extend its reach and influence while at the same time reigning in costs to its membership. Therefore, on January 17, 2017 NEI completed a restructuring to improve member value and organizational effectiveness. This restructuring was designed in recognition that the nuclear industry is at a pivotal time, and NEI had a unique opportunity to change its trajectory and underline the importance of nuclear energy's role in the nation's critical infrastructure. NEI is now better positioned to support the existing reactor fleet, promote commercialization of advanced reactors, and drive American leadership in commercial nuclear exports and technology around the world. NEI began this restructuring in the fall of 2016 when it consolidated Government Affairs, Communications, Policy and Public Affairs under a new External Affairs function. The January 2017 action extended that effort across the remainder of the organization, ensuring that the organization is highly aligned, member-focused and results driven. The new NEI takes pride in the fact that it is comprised of talented employees who are passionate about nuclear energy and can make a difference for our membership. With this team in place, NEI looks forward to advancing the interests of the nuclear industry while contributing to a safer, cleaner and more productive world. This paper will examine the details of how this new organization was constructed, provide an overview of the National Nuclear Energy Strategy it developed to guide its efforts, examine the trials and tribulations that come along with disruptive change, and reflect on what has been accomplished in the retooled organizations first year. (authors)
This fact sheet provides an overview for building owners and developers to take advantage of commercial property assessed clean energy (CPACE) financing for new construction, adaptive reuse, or renovation projects.
OpenSesame is a program for generating tabular equations of state (EOS), with capabilities for multiphase EOS construction. In this tutorial, we provide an overview of how to run OpenSesame to construct a multiphase EOS. We discuss some general features of OpenSesame, followed by a description of sample input files required for multiphase EOS construction. We also discuss how to extract data from EOS tables in order to compare to experimental data, with an example using the OpenSesame GUI. Lastly, we provide a description of how to generate ASCII-formatted EOS tables most often used by hydro code users.
The purpose of this study was to review the literature related to measuring human performance in the design and evaluation of the human-system interface (HSI) of nuclear power plant (NPP) control rooms and synthesize lessons learned and future directions for research and practice in this field. The design and evaluation of digital or hybrid HSI requires comprehensive measurement of human performance to ensure quality and safety of the nuclear power process control. Human factors evaluation frameworks have been proposed to guide the measurement of human performance constructs. However, there are few guides for selecting appropriate measures for those constructs. A systematic review of empirical research literature was conducted. Studies were identified through academic publication databases and grey literature searches. Eligible studies were coded and information regarding human performance measures was extracted and analyzed. A total of 80 studies met the criteria. Human performance measures extracted from the reviewed studies included measures of: behavioral performance; workload; situation awareness; human-human or human-machine cooperation; other cognitive performance indicators; and system performance. Behavioral performance (speed and accuracy), workload, and situation awareness were the most frequently measured constructs with validated and domain-specific instruments. The results of the literature review provided an overview of the human performance constructs and their corresponding measures for NPP control room HSI evaluation. These results can be used as an initial guide to establish appropriate and comprehensive measurements of human performance for such evaluations. Future directions in measure development are also discussed. (authors)
Though it may seem intuitive at times, the term 'complexity' is multifaceted, often encompassing various interacting aspects and components that follow local rules. This interaction leads to non-linearity, randomness, collective dynamics, hierarchy, and emergence. The phenomenological complexity found in large accelerators has recently been addressed by the Snowmass’21 Future Colliders Implementation Task Force (ITF). In this presentation, we will provide a concise overview of the mathematical constructs employed to assess hierarchical complexity, summarize the key findings from the ITF analysis, and offer a few examples demonstrating how this approach can be applied to analyze certain literaryclassics.
Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.
The Port Hope Area Initiative's Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of some 450,000 m{sup 3} of LLRW and marginally contaminated soil from the former Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Presented is an overview of the Port Granby Project and a description of the planning needed to execute the project successfully. A comprehensive suite of approximately 40 pre-construction submittals were developed and submitted for review and approval by Canadian Nuclear Laboratories (CNL), the project authority. Importantly, comprehensive training programs were developed and implemented to ensure all project staff fully understood the scope of the planning documents (covering such things as Quality Control, Environmental Monitoring, Radiation Protection, Dust Management, Noise, Radiation Protection etc.) and possess the appropriate competencies for completing the work to which they have been assigned. The effective planning that has been invested in the Port Granby project, from initial design to project planning and implementation, has allowed this complex project to proceed with minimal difficulty. (authors)
The Neutronics Group of the Second Target Station project at Oak Ridge National Laboratory is responsible for all neutronics analyses related to design and construction. This paper provides an overview of four neutronics analyses performed for the Second Target Station project, which is representative of all the ongoing work but especially tasks related to shielding. These analyses extend from the proton accelerator through the target monolith and bunker to the end of a neutron beamline. Each example highlights the tools and methods the Neutronics Group uses for analysis. The primary tool is the Monte Carlo radiation transport code MCNP 6.2, but this is augmented by other codes that supplement the input of MCNP. The other codes specifically highlighted in this paper include Attila4MC, ADVANTG, and AARE.
This report provides an overview of the ASME Boiler & Pressure Vessel Section III, Division 5 rules for the design and construction of high temperature nuclear reactor components. The overview focuses on the application of the rules to the design of Small Modular Reactors (SMRs). The discussion covers the general ASME Code rules for base metal design and construction, the rules for designing weldments, and provides an overview of environmental degradation mechanisms affecting reactor structural materials. The analysis includes historical context on the development of the ASME design approach and a description of what actions could be taken to mitigate the gaps identified in the report. The report concludes with a summary of the key gaps identified in the rules, as they apply to SMR, and a list of recommendations on how those gaps might be addressed.
The Port Granby Project is part of the Port Hope Area Initiative (PHAI) through which Canadian Nuclear Laboratory (CNL) is managing long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF), which accepted waste until the 1980's, to the newly constructed LTWMF. This paper provides an overview of the challenges of water management (control of storm and groundwater at the LTWMF and PGWMF) on a large-scale construction project with changing and unpredictable weather patterns. Consistent with increased observations of extreme weather events, over two consecutive construction seasons, weather changed from one of the driest on record (high temperatures, dry conditions and strong wind) to one of the wettest on record (short duration high-intensity rainfall that flooded the LTWMF, excavations and on-site PGWMF and LTWMF retention ponds). This paper describes the collaborative approach among Wood (Constructor), AECOM (Engineer of Record), and CNL to adjust to extremes in weather to control dust and excessive water during construction. The summer of 2016, one of the driest summers on record in southern Ontario, was followed by one of the wettest in 2017. In 2016, the project team used water from the uncontaminated on-site storm water ponds, applied a polymer product for dust control across the site to augment water applications, obtained a Permit to Take Water from the provincial government to pump water from Lake Ontario, procured large tanks for storage of Lake Ontario water to meet peak demand, and retained additional water trucks/operators for day to day site operations. In stark contrast, to accommodate heavy rains in 2017 the project team installed ∼6 million liter aboveground storage tanks with secondary containment for contaminated water storage; procured 100+ mobile water storage tanks to supplement the on-site storage, utilized LTWMF cells sumps, excavations and retention ponds to store and manage onsite water; and adjusted additional staff resources (more staff and longer shifts) during anticipated periods of high-intensity rainfall, at times managing water around the clock. Recognizing the need to minimize the release of contaminated soil and water from the construction site at all times, these efforts illustrate the importance of anticipating and reacting to extreme weather events on a more regular basis. (authors)
An Electron Ion Collider (EIC) has been identified in the Nuclear Physics Long Range Plan as the highest-priority facility for new construction. This talk presents an overview and status of the Jefferson Lab design of an EIC (JLEIC). It features frequent collisions of small electron and ion bunches providing a luminosity of 1033-1034 cm?1s?1 in a broad range of the center-of-mass energy. The small size of ion bunches is maintained against intra-beam scattering by a novel high-energy bunched beam electron cooling system. The figure-8 shape of the electron and all ion rings allows for preservation and ease of manipulation of the electron polarization and the spin of any ion species (p, d, 3He, Li, etc.). The interaction region is designed to accommodate a full-acceptance detector with complete coverage and geometry tagging in the forward and ultra-forward directions. The talk highlights recent progress on the JLEIC accelerator design with an emphasis on the integrated interaction region design.