Search NASA⌕ Search

SEARCH · Search NASA

Results for “construction workforce”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Robotic Software Architecture for in-Space Outfitting Operations

Space exploration is expanding into longer missions, larger payloads, and more complex operations. To make these larger scale missions a reality, it is necessary to perform assembly, construction, and maintenance tasks via a robotic workforce in addition to crewed operations. While there has been significant research into in-space assembly and manufacturing, it is primarily focused on rigid structural elements, such as ISRU printing or truss construction. Outfitting tasks, such as cable routing, are a critical step to a fully operational in-space facility. This paper seeks to provide a reduced order state model and an optimized combination of state-of-the-art robotics algorithms applied to a cable routing scenario. Simulation results are expected to advance approaches to online autonomous robotic manipulation of non-rigid elements.

Amy M Quartaro↗

Robotic Software Architecture for In-Space Outfitting Operations

Space exploration is expanding into longer missions, larger payloads, and more complex operations. To make these larger scale missions a reality, it is necessary to perform assembly, construction, and maintenance tasks via a robotic workforce in addition to crewed operations. While there has been significant research into in-space assembly and manufacturing, it is primarily focused on rigid structural elements, such as ISRU printing or truss construction. Outfitting tasks, such as cable routing, are a critical step to a fully operational in-space facility. This paper seeks to provide a reduced order state model and an optimized combination of state-of-the-art robotics algorithms applied to a cable routing scenario. Simulation results are expected to advance approaches to online autonomous robotic manipulation of non-rigid elements.

Amy Quartaro↗

Workforce for the Future Development of Space Access Vehicles

The development of advanced vehicles that will travel between planetary surfaces with atmospheres and space requires the availability of experimental and computational capabilities that accomplish the research leading to new technologies and the development, test, and evaluation (RDT&E) of new flight systems. The United States is at risk of not having the required RDT&E workforce – qualified and in sufficient numbers – in place and ready to meet the future market’s commercial and defense needs. Systemic challenges include uncertain Federal budgets that limit and interrupt government research and development, the projectized nature of new space access systems that drive boom/bust cycles, an aging aerospace workforce (compounded by a mid-age demographic gap), limited to declining investment in sustaining and advancing experimental and computational tools infrastructure, lack of standards for sharing (and leveraging) data, dramatically changing technologies, changing social norms, and potentially large increases in commercial market needs. Flight systems have mission-based trajectories to and from space and designers must ensure risk is properly assessed across the entire trajectory. Thus, physics questions must be answered at each stage of flight, which requires a suite of experimental and computational tools. The RDT&E workforce utilizing these tools include subject matter experts from the producers, interested in acquiring data and information on the product, and from the capabilities being utilized, interested in addressing the product customer’s needs (providing robust data collection techniques, data quality, timeliness – available when needed, efficient with cost management, and teaming on data analysis). This requires a range of skills – in addition to aerospace, other engineers, and software developers, a highly trained and certified craft and technician workforce is critical to future success. This paper will present a human resources construct that addresses the system of needs for people – including, but more than just technical skills and an application of that construct in the hypersonic Test and Evaluation (T&E) community. This is part of a larger AIAA effort to document challenges and associated best practices for the aerospace RDT&E workforce.

Steven C Dunn↗

A Contemporary Analysis of the O'Neill-Glaser Model for Space-Based Solar Power and Habitat Construction

In 1975 Gerard O Neill published in the journal Science a model for the construction of solar power satellites. He found that the solar power satellites suggested by Peter Glaser would be too massive to launch economically from Earth, but could be financially viable if the workforce was permanently located in free space habitats and if lunar and asteroid materials were used for construction. All new worldwide electrical generating capacity could be then achieved by solar power satellites. The project would financially break even in about 20 years after which it would generate substantial income selling power below fossil fuel prices. Two NASA / Stanford University led studies at Ames Research center during the summers of 1974 and 1976 found the concept technically sound and developed a detailed financial parametric model. Although the project was not undertaken when suggested in the 1970s, several contemporary issues make pursuing the O Neill -- Glaser concept more compelling today. First, our analysis suggests that if in the first ten years of construction that small habitats (compared to the large vista habitats envisioned by O Neill) supporting approximately 300 people were utilized, development costs of the program and the time for financial break even could be substantially improved. Second, the contemporary consensus is developing that carbon free energy is required to mitigate global climate change. It is estimated that 300 GW of new carbon free energy would be necessary per year to stabilize global atmospheric carbon. This is about 4 times greater energy demand than was considered by the O Neill Glaser model. Our analysis suggests that after the initial investments in lunar mining and space manufacturing and transportation, that the profit margin for producing space solar power is very high (even when selling power below fossil fuel prices). We have investigated the financial scaling of ground launched versus space derived space solar power satellites. We find that for the carbon mitigation case even modernized ground launched space solar power satellites are not financially viable. For space derived solar power satellites, however, the increased demand makes them break even substantially sooner and yield much higher profit. Third, current awareness is increasing about the dangers of humanity remaining a single planet species. Our technological power has been increasing relative to the size of the planet Earth. Since the middle of the 20th century our technological power has grown large relative to our planet's size. This presents a very real potential for human self-extinction. We argue that the potential for human self-extinction is increasing with time in proportion to the exponential growth of our technological power making self-extinction likely within this century if humanity remains a single planet species. The O Neill model of multiple independent free space habitats, it is argued, can protect humanity from extinction in the same way that portfolio diversification protects ones assets from total loss. We show that about 1 million people for the electricity only case, and about 1 billion people for the carbon mitigation case, can be provided with permanent space habitats and transportation from Earth in 30 years and can be funded by the space derived solar power satellite program. 1.2 Scope of this Chapter The goal of this chapter is to illustrate the power and importance of the O'Neill-Glaser concept in the context of human survival and maintaining a healthy planet Earth. We argue that at this point in human history our technological power is too dangerous to our selves and our home planet for us not to expand into space. We show by the models presented in the chapter that the imminent dangers of global warming and human self-extinction mandate that humanity move aggressively into the solar system in this generation. We show that the production of solar power satellites using space resources and with a work foe living in space provides a viable financial model to mitigate CO2 preventing the worst global warming scenarios, and safeguards humanity against self-extinction by providing hundreds of habitats and a billion people living in space within about 35 years. To accomplish this goal we need only consider the classic O'Neill-Glaser model which was parameterized for 1970's technological projections. Only habitat size optimization for the first ten years of production is added. This is a conservative approach since the innovations of the last 30 years will make the financial projections more favorable. However, the classic O'Neill-Glaser model represented a broad technological consensus. The model is well documented in the references and our calculations can be easily reproduced In this chapter the economics of the O Neill - Glaser model is compared with models that rely exclusively on Earth launched materials. Although many studies of Earth launched Solar Power Satellites have been made, we found that the NASA "Fresh Look Study" was the most comprehensive and well documented. It also provided one of the most optimistic Earth launch financial projections. We thus chose it for comparison purposes.

Curreri, Peter A.↗

Cassini's Maneuver Automation Software (MAS) Process: How to Successfully Command 200 Navigation Maneuvers

To keep Cassini on its complex trajectory, more than 200 orbit trim maneuvers (OTMs) have been planned from July 2004 to July 2010. With only a few days between many of these OTMs, the operations process of planning and executing the necessary commands had to be automated. The resulting Maneuver Automation Software (MAS) process minimizes the workforce required for, and maximizes the efficiency of, the maneuver design and uplink activities. The MAS process is a well-organized and logically constructed interface between Cassini's Navigation (NAV), Spacecraft Operations (SCO), and Ground Software teams. Upon delivery of an orbit determination (OD) from NAV, the MAS process can generate a maneuver design and all related uplink and verification products within 30 minutes. To date, all 112 OTMs executed by the Cassini spacecraft have been successful. MAS was even used to successfully design and execute a maneuver while the spacecraft was in safe mode.

Yang, Genevie Velarde↗

Aerospace Safety Advisory Panel Annual Report for 1999

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for the calendar year 1999.This was a year of notable achievements and significant frustrations. Both the Space Shuttle and International Space Station (ISS) programs were delayed.The Space Shuttle prudently postponed launches after the occurrence of a wiring short during ascent of the STS-93 mission. The ISS construction schedule slipped as a result of the Space Shuttle delays and problems the Russians experienced in readying the Service Module and its launch vehicle. Each of these setbacks was dealt with in a constructive way. The STS-93 short circuit led to detailed wiring inspections and repairs on all four orbiters as well as analysis of other key subsystems for similar types of hidden damage. The ISS launch delays afforded time for further testing, training, development, and contingency planning. The safety consciousness of the NASA and contractor workforces, from hands-on labor to top management, continues high. Nevertheless, workforce issues remain among the most serious safety concerns of the Panel. Cutbacks and reorganizations over the past several years have resulted in problems related to workforce size, critical skills, and the extent of on-the-job experience. These problems have the potential to impact safety as the Space Shuttle launch rate increases to meet the demands of the ISS and its other customers. As with last year's report, these work- force-related issues were considered of sufficient import to place them first in the material that follows. Some of the same issues of concern for the Space Shuttle and ISS arose in a review of the launch vehicle for the Terra mission that the Panel was asked by NASA to undertake. Other areas the Panel was requested to assess included the readiness of the Inertial Upper Stage for the deployment of the Chandra X-ray Observatory and the possible safety impact of electromagnetic effects on the Space Shuttle. The findings and recommendations in this report do not highlight any major, immediate issues that might compromise the safe pursuit of the various NASA programs. They do, however, cover concerns that the Panel believes should be addressed in the interest of maintaining NASA's excellent safety record.The Panel is pleased to note that remedial efforts for some of the findings raised are underway. Given appropriate funding and cooperative efforts among the Administration, the Congress and the various contractors, the Panel is convinced that safety problems can be avoided or solved resulting in lower risk for NASA's human space and aeronautics programs. Section II of this report contains specific findings and recommendations generated by Panel activities during the calendar year 1999. Section III presents more detailed information in support of these findings and recommendations. A current roster of Panel members, consultants, and staff is included as Appendix A. Appendix B contains NASA's response to the findings and recommendations from the 1998 annual report. It has been augmented this year to include brief explanations of why the Panel classified the NASA response as " open,""continuing," or "closed." Appendix C lists the fact-finding activities of the Panel in 1999.

Blomberg, Richard D.↗

Managing a Safe and Successful Multi-User Spaceport

Encouraged by the creation of the Office of Commercial Space Transportation within the U.S. Federal Aviation Administration (FAA) in 1984 and the Commercial Space Act of 1998, the National Aeronautics and Space Administration (NASA) now relies on an extensive network of support from commercial companies and organizations. At NASA's Kennedy Space Center (KSC), this collaboration opens competitive opportunities for launch providers, including repurposing underutilized Shuttle Program resources, constructing new facilities, and utilizing center services and laboratories. The resulting multi-user spaceport fosters diverse activity, though it engenders risk from hazards associated with various spaceflight processing activities. The KSC Safety & Mission Assurance (S&MA) Directorate, in coordination with the center's Spaceport Integration and Center Planning & Development organizations, has developed a novel approach to protect NASA's workforce, critical assets, and the public from hazardous, space-related activity associated with KSC's multi-user spaceport. For NASA KSC S&MA, the transformation to a multi-user spaceport required implementing methods to foster safe and successful commercial activity while resolving challenges involving: Retirement of the Space Shuttle program; Co-location of multiple NASA programs; Relationships between the NASA programs; Complex relationships between NASA programs and commercial partner operations in exclusive-use facilities; Complex relationships between NASA programs and commercial partner operations in shared-use facilities. NASA KSC S&MA challenges were met with long-term planning and solutions involving cooperation with the Spaceport Integration and Services Directorate. This directorate is responsible for managing active commercial partnerships with customer advocacy and services management, providing a dedicated and consistent level of support to a wide array of commercial operations. This paper explores these solutions, their relevance to the current commercial space industry, and the challenges that continue to drive improvement with a focus on areas of safety management and risk assessment that have been crucial in KSC's evolution into a multi-user spaceport. These solutions may be useful to government entities and private companies looking to partner with the commercial space industry.

Range↗

Building on 50 Years of Systems Engineering Experience for a New Era of Space Exploration

Over the past 50 years, the National Aeronautics and Space Administration (NASA) has delivered space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides the United States (US) capability for both crew and heavy cargo to low-Earth orbit to construct the International Space Station, before the Shuttle is retired in 2010. In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I crew launch vehicle and the Ares V cargo launch vehicle. The goals for this new system include increased safety and reliability coupled with lower operations costs that promote sustainable space exploration for decades to come. The Ares I will loft the Orion crew exploration vehicle, while the heavy-lift Ares V will carry the Altair lunar lander, as well as the equipment and supplies needed to construct a lunar outpost for a new generation of human and robotic space pioneers. NASA's Marshall Space Flight Center manages the Shuttle's propulsion elements and is managing the design and development of the Ares rockets, along with a host of other engineering assignments in the field of scientific space exploration. Specifically, the Marshall Center's Engineering Directorate houses the skilled workforce and unique facilities needed to build capable systems upon the foundation laid by the Mercury, Gemini, Apollo, and Shuttle programs. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level testing activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity and to validate computer modeling and simulation, as well as the main propulsion test article analysis to be conducted in the Static Test Stand. Ultimately, fielding a robust space transportation solution that will carry international explorers and essential payloads will pave the way for a new era of scientific discovery now dawning beyond planet Earth.

Dumbacher, Daniel L.↗

California Space Grant Consortium

The organizational and administrative structure of the CaSGC has the Consortium Headquarters Office (Principal Investigator - Dr. John Kosmatka, California Statewide Director - Dr. Michael Wiskerchen) at UC San Diego. Each affiliate member institution has a campus director and an scholarship/fellowship selection committee. Each affiliate campus director also serves on the CaSGC Advisory Council and coordinates CMIS data collection and submission. The CaSGC strives to maintain a balance between expanded affiliate membership and continued high quality in targeted program areas of aerospace research, education, workforce development, and public outreach. Associate members are encouraged to participate on a project-by-project basis that meets the needs of California and the goals and objectives of the CaSGC. Associate members have responsibilities relating only to the CaSGC projects they are directly engaged in. Each year, as part of the CaSGC Improvement Plan, the CaSGC Advisory Council evaluates the performance of the affiliate and associate membership in terms of contributions to the CaSGC Strategic Plan, These CaSGC membership evaluations provide a constructive means for elevating productive members and removing non-performing members. This Program Improvement and Results (PIR) report will document CaSGC program improvement results and impacts that directly respond to the specific needs of California in the area of aerospace-related education and human capital development and the Congressional mandate to "increase the understanding, assessment, development and utilization of space resources by promoting a strong education base, responsive research and training activities, and broad and prompt dissemination of knowledge and technology".

Kosmatka, John↗

Simulation Technology at NASA

NASA Ames Research Center is home to several high-fidelity research flight and air-traffic control simulation facilities which, together with an experienced workforce, produce high-quality research data and findings that have proven to be applicable in the real world. These assets include the Vertical Motion Simulator (VMS), Crew Vehicle Systems Research Facility (CVSRF), Future Flight Central (FFC) air traffic control tower simulator, and several air-traffic control (ATC) simulators. The VMS combines a high-fidelity simulation capability with an adaptable simulation environment, enabling customization for numerous human-in-the-loop research applications. The distinctive feature of the VMS is its unparalleled large amplitude, high-fidelity motion capability. In over 30 years of continuous operation, the VMS has contributed significantly to the body of knowledge in a range of disciplines directly benefiting several aerospace programs and flight safety, including the design and development of flight control systems for the Joint Strike Fighter, Space Shuttle Orbiter, and rotorcraft. It continues to be used for researching new vehicle configurations, vehicle control and safety, transfer-of-training, etc., by NASA, other government agencies, and Industry.The CVSRF includes two motion-based flight simulators: a Boeing 747-400 full flight simulator and the reconfigurable Advanced Concepts Flight Simulator (ACFS). These simulators are primarily used to research air-traffic management concepts and procedures, advanced navigation and avionics concepts, and cockpit human factors. FFC is a full-sized control tower simulator with a 360-degree external field-of-view display system and reconfigurable system architecture. FFC and the ATC simulators are used for testing air-traffic management automation and decision support tools and demonstrate their feasibility in a realistic environment prior to technology transfer for implementation in the National Airspace System (NAS).To support integrated simulations and flight-tests for NASA's Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) Project, NASA developed a distributed test environment incorporating Live, Virtual, Constructive, (LVC) concepts. Development of the software enabling the LVC is conducted primarily at the Distributed Simulation Research Lab (DSRL) at NASA Ames. The LVC components provide the core infrastructure supporting simulation of UAS operations by integrating live and virtual aircraft in a realistic air traffic environment. This provides the ability to conduct tests more efficiently by promoting the use of existing distributed assets. The LVC infrastructure was used in several human-in-the-loop simulations to evaluate acceptance of Detect and Avoid (DAA) advisories used by UAS pilots to maintain well clear of other virtual traffic and to negotiate maneuvers with air traffic control. It is currently being used to support testing of self-separation algorithms between unmanned and manned aircraft in live flight. Further simulations with more comprehensive air traffic scenarios mixing live and virtual aircraft is planned.In the current fiscal environment, maintaining and upgrading these high-fidelity simulation assets and retaining the skilled workforce necessary to meet future research needs is the primary non-technical challenge.

CVSRF↗

Mechanical Prototyping and Manufacturing Internship

The internship was located at the Johnson Space Center (JSC) Innovation Design Center (IDC), which is a facility where the JSC workforce can meet and conduct hands-on innovative design, fabrication, evaluation, and testing of ideas and concepts relevant to NASA's mission. The tasks of the internship included mechanical prototyping design and manufacturing projects in service of research and development as well as assisting the users of the IDC in completing their manufacturing projects. The first project was to manufacture hatch mechanisms for a team in the Systems Engineering and Project Advancement Program (SETMAP) hexacopter competition. These mechanisms were intended to improve the performance of the servomotors and offer an access point that would also seal to prevent cross-contamination. I also assisted other teams as they were constructing and modifying their hexacopters. The success of this competition demonstrated a proof of concept for aerial reconnaissance and sample return to be potentially used in future NASA missions. I also worked with Dr. Kumar Krishen to prototype an improved thermos and a novel, portable solar array. Computer-aided design (CAD) software was used to model the parts for both of these projects. Then, 3D printing as well as conventional techniques were used to produce the parts. These prototypes were then subjected to trials to determine the success of the designs. The solar array is intended to work in a cluster that is easy to set up and take down and doesn't require powered servomechanisms. It could be used terrestrially in areas not serviced by power grids. Both projects improve planetary exploration capabilities to future astronauts. Other projects included manufacturing custom rail brackets for EG-2, assisting engineers working on underwater instrument and tool cases for the NEEMO project, and helping to create mock-up parts for Space Center Houston. The use of the IDC enabled efficient completion of these projects at significantly reduced cost. I acquired and improved manufacturing and prototyping skills during my tour including learning about a CAD (Computer-Aided Design) program called Creo (Creo Parametric; design software), gaining valuable conventional machining experience with lathes, CNC (Computer Numerical Control) milling machines and various other tools, and improving my engineering project communication and collaboration skills. The internship also allowed me to better understand operations at NASA. I plan to work in the aerospace industry or do academic research benefitting space science and exploration, and this internship experience will enable me to have insight into manufacturing processes for research and development.

Grenfell, Peter↗

Marin County Wildland Fires: Examining Fuel Load and Land Cover Change to Inform Fire Prevention and Suppression Decisions in Marin County, CA

Heightened occurrence of severe wildfires in the Western United States is increasing the need to better understand regions of high potential wildfire severity and develop methodologies for identifying the best locations for fuels reduction and active wildfire suppression, especially in populated regions such as Marin County, California. Marin County, located in the San Francisco Bay Area, has had significant development in the wildland-urban interface and periods of highly wildfire-prone conditions. The NASA DEVELOP team collaborated with Fire Foundry (a Marin-based fire service workforce development program) and the Marin County Fire Department to develop models to assist with fire management. Using data from Sentinel-2A, PlanetScope, ECOSTRESS, a county-wide LiDAR mapping effort, Landsat 7 Enhanced Thematic Mapper (ETM+), and Landsat 8 Operational Land Imager (OLI), our team developed a number of input data layers for three different models to evaluate wildfire severity. One model performed a suitability analysis with weights based on scientific literature; another model utilized a U-Net Convolutional Neural Network trained on previous fires in Marin and neighboring Sonoma County to predict the difference normalized burn severity; and the third inputted data layers into the FlamMap tool that outputs risk categories. We compared model outputs and performed a weighted overlay analysis to identify specific locations where a fireline could be constructed to interrupt the progress of an active fire. These tools will assist partners in preparing for and managing active wildfire situations.

Remote sensing↗

Building on 50 Years of Mission Operations Experience for a New Era of Space Exploration

The U.S. National Space Policy, I the 14-nation Global Exploration Strategy,2 and the National Aeronautics and Space Administration's (NASA) 2006 Strategic Plan3 provide foundational direction for far-ranging missions, from safely flying the Space Shuttle and completing construction of the International Space Station by 2010, to fielding a next generation space transportation system consisting of the Ares I Crew Launch Vehicle!Orion Crew Exploration Vehicle and the Ares V Cargo Launch Vehicle!Altair Lunar Lander (fig. 1). Transportation beyond low-Earth orbit will open the frontier for a lunar outpost, where astronauts will harness in-situ resources while exploring this 4 billion-year-old archaeological site, which may hold answers to how the Earth and its satellite were formed. Ultimately, this experience will pave the way for the first human footprint on Mars. In October 2007, NASA" announced assignments for this lunar exploration work.4 The Marshall Space Flight Center is responsible for designing, developing, testing, and evaluating the Ares I and Ares V, which are Space Shuttle derived launch vehicles, along with a number of lunar tasks. The Marshall Center's Engineering Directorate provides the skilled workforce and unique manufacturing, testing, and operational infrastructure needed to deliver space transportation solutions that meet the requirements stated in the Constellation Architecture Requirements Document (CARD). While defining design reference missions to the Station and the Moon, the CARD includes goals that include reducing recurring and nonrecurring costs, while increasing safety and reliability. For this reason, future systems are being designed with operability considerations and lifecycle expenses as independent variables in engineering trade studies.

Onken, Jay F.↗

CryoCart Restoration and Vacuum Pipe Construction

Propulsion systems that utilize hypergolic propellants have been used to power space vehicles since the beginning of the space program. Liquid methane and oxygen propulsion systems have emerged as an alternative and have proven to be more environmentally friendly. The incorporation of liquid methane/liquid oxygen (LOX) into the propulsion system has demonstrated an increase in engine performance, as well as a reduction in the volume, size and complexity of the system. Consequently, reducing the total mass of the vehicle which is a crucial aspect that is considered when planning space missions to both the Moon and Mars [1]. Project Morpheus has made significant advancements in liquid oxygen/liquid methane propulsion system technologies by incorporating a LOX/methane propulsion system to a vertical test bed. The vehicle consisted of a 5,000 lb main engine and four 20 lb remote control system (RCS) engines that utilize liquid methane/LOX as its propellant [1]. The vehicle completed successful flight testing at Kennedy Space Center in 2014 which marked the completion of the Morpheus project. Subsequent projects utilizing Morpheus' vertical test bed have been developed to make further advancements. One of the subsequent projects consisted of the addition of a smaller 2,000 lb main engine and a cold helium heat exchanger which would make it possible for a pressurant tank systems to be send to Mars or the Moon by significantly decreasing the overall mass and volume of the pressurant tank. The hot fire tests of the integrated system with the smaller main engine and cold helium heat exchanger were successful at sea level, but further studies are being conducted to better understand how the vertical test bed will behave under thermal-vacuum conditions. For this reason, the integrated vehicle will be taken to Plum Brook to be tested in a chamber capable of simulating these conditions. To ensure that the vehicle will function properly under vacuum conditions, testing will be first completed at the component level. During this process, the igniter of the main engine and the RCS thrusters will be tested under a vacuum. To complete the testing of the components, the test setup first needed to be finalized. The CryoCart is being used to feed the propellants to the test article. The CryoCart is a movable test set-up that was developed in 2009 to provide a mobile platform for testing oxygen/methane systems with hot-fire capability up to 100 lbf. The CryoCart consists of three different systems: Oxygen, Methane, and liquid Nitrogen. The Oxygen and Methane systems are placed into two different carts while the liquid nitrogen system is mainly located in the methane cart. Over the years, the CryoCart has been utilized for different projects and has undergone deterioration. For this reason, a new phase has been developed to rebuild it to working conditions once again. During my internship, I was aiding in the construction and restoration of the CryoCart. In the initial stages of the process, I updated the fluid and electrical schematics for the oxygen, methane, and test article systems. The original CryoCart consisted of an electrical panel that utilized electromechanical relays and a terminal to drive the igniter power and signal, as well as the main fuel and oxygen valves. This electrical panel connected to the CryoCart through various wire harnesses that could be found exiting from the CryoCart. First, it was determined how these harnesses connected to the electromechanical relays so that they worked correctly. Once the electrical system was understood, an alternative for the electromechanical relays and the Molex connectors used throughout the system was sought since these components can often prove to be unreliable. Solid State relays and MIL connectors were purchased to serve as replacements. Upon arrival of the parts, crimping and wiring was completed to install the new solid state relays and MIL connectors. During the replacement of the relays and connectors, system checks of the electrical system were ran to ensure that the system was working correctly. While completing system checks, the pressure transducers that were not functioning properly were also replaced and any issue with the wiring or signal was addressed. Once the electrical components were replaced, the restoration of the fluid system began. Parts of the tubing in the CryoCart had to be rebuild and often consisted of sizing, cutting, bending, filing, and sanding the tubing to prepare it to be flared. Many components had to be proof-tested to bring their certifications up to date, and several components had to be replaced. Various flex hoses, valves, and fittings were send to the Clean Lab because they were new, dirty, or had gone through proof-testing. Once they arrived from the cleaning lab they had to be put back to the system and leak checks and functional tests were conducted. In the Nitrogen system, the copper tubing located in the Oxygen cart was rebuild and Aerogel insulation was added to this section. A new gaseous nitrogen system was added to the CryoCart to purge the vacuum tube which will serve as the test chamber. Once the CryoCart was completed, construction of parts of the vacuum tube began. A flange was manufactured with welded fittings to hold the line of the vacuum pump as well as some extra fittings which will serve as extra inlets used to introduce fluid lines to the vacuum tube. Stress analysis was ran in this flange to ensure that it would not fail under vacuum conditions. The fluid lines leading from the air side of the vacuum to the test article were also constructed and added to the mount that had already been manufactured. Three different sets of tubing were constructed to accommodate the seven different RCS thruster and the main engine igniter that are going to be tested. Full electrical system checks were completed to ensure that all the wire harnesses and valves were functioning. Upon the completion of the CryoCart and the vacuum tube, hot fire testing for the RCS thrusters and the main engine igniter are going to begin. During this time any issues encountered with the engines or igniter will be addressed to ensure that the components function under vacuum conditions. After successful completion of testing, the vertical test bed, Morpheus, will be rebuilt and prepared to be sent to Plum Brook. In Plum Brook, the vehicle will be tested in the thermal-vacuum chamber to demonstrate that integrated lox-methane propulsion system operation in space-like conditions. This internship has allowed me the opportunity to gain valuable hands on experience and to develop skills that will aid in my education as well as in the workforce, while at the same time helping me determine that I would like to further pursue a career in propulsion engineering.

Chaidez, Mariana↗

Aerospace Safety Advisory Panel

This report presents the results of the Aerospace Safety Advisory Panel (ASAP) activities during 2002. The format of the report has been modified to capture a long-term perspective. Section II is new and highlights the Panel's view of NASA's safety progress during the year. Section III contains the pivotal safety issues facing NASA in the coming year. Section IV includes the program area findings and recommendations. The Panel has been asked by the Administrator to perform several special studies this year, and the resulting white papers appear in Appendix C. The year has been filled with significant achievements for NASA in both successful Space Shuttle operations and International Space Station (ISS) construction. Throughout the year, safety has been first and foremost in spite of many changes throughout the Agency. The relocation of the Orbiter Major Modifications (OMMs) from California to Kennedy Space Center (KSC) appears very successful. The transition of responsibilities for program management of the Space Shuttle and ISS programs from Johnson Space Center (JSC) to NASA Headquarters went smoothly. The decision to extend the life of the Space Shuttle as the primary NASA vehicle for access to space is viewed by the Panel as a prudent one. With the appropriate investments in safety improvements, in maintenance, in preserving appropriate inventories of spare parts, and in infrastructure, the Space Shuttle can provide safe and reliable support for the ISS for the foreseeable future. Indications of an aging Space Shuttle fleet occurred on more than one occasion this year. Several flaws went undetected in the early prelaunch tests and inspections. In all but one case, the problems were found prior to launch. These incidents were all handled properly and with safety as the guiding principle. Indeed, launches were postponed until the problems were fully understood and mitigating action could be taken. These incidents do, however, indicate the need to analyze the Space Shuttle certification criteria closely. Based on this analysis, NASA can determine the need to receritfy the vehicles and to incorporate more stringent inspections throughout the process to minimize launch schedule impact. A highly skilled and experience workforce will be increasingly important for safe and reliable operations as the Space Shuttle vehicles and infrastructure continue to age.

Source record↗

Youth Technology Academy

One of the most important aspects of the YTA Program is that students, working with Tri-C instructors, NASA engineers, and technicians, begin to build relationships with professionals with whom they might not normally have contact. These professionals serve as role models for students and help them to apply math, science and problem-solving skills in real time to construct a competition-ready robot, allowing them to experience the satisfaction and challenges of an engineering or technical career by working diligently to solve problems that may never have been thought possible to solve. Transcending school boundaries, YTA is available to all students who are interested and qualified but who may otherwise never get an opportunity to participate because their school does not offer a robotics program. YTA fills an educational void by offering an exciting engineering and technology experience to a greater number of students than have been able to participate in the past. Our students have been working hard and see the long-term rewards for their efforts. The YTA Team 1270 was a finalist at the 2005 FIRST Robotics Florida Regional and took home second- place honors. Mark Poljak, nominated by the students of YTA Team 1270, received the Woodie Flowers Award at the FIRST 2005 Buckeye Regional competition. This award celebrates effective communication in the art and science of engineering and design. The YTA Team was also invited, as one of fifty-four teams, to participate in this year s FIRST VEX Robotics tournament representing Cuyahoga Community College and NASA GRC (Team 26), held at the FIRST Robotics National Competition in Atlanta, GA. Because of our efforts, community colleges from around the country have taken notice and have asked us to become part of the executive board of the RoboEducators, whose mission is to bring technology training to high school students in preparation for the future workforce.

Source record↗