Search NASA⌕ Search

SEARCH · Search NASA

Results for “consumers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Formulation of detailed consumables management models for the development (preoperational) period of advanced space transportation system. Volume 2: Consumables data base workbook

The consumables characteristic data associated with the performance of the mission activities required by the mission planning processor are defined to calculate the consumables requirements. The activity data is defined in terms of discrete time periods having a distinct rate for each consumable required to support the performance of a given operation. The data is structured in a series of consumable data worksheets for each activity that includes a profile of its operations and the rate of each consumable required to support the given activity. The data worksheets provide for the uniform specification of consumables data, allows for the ready identification of the consumables affected by a given activity, and facilitates the updating process. An activity and the data that must be included in the data worksheets are defined and an example of its use and application the consumables data requirements for the performance of the EVA are presented.

Zamora, M. A.↗

Consumables data base workbook: Formulation of consumables management models

Activity consumables data specifications and data applications are presented. The data are structured in a series of "Consumable Data Worksheets" for each activity that includes a profile of its operations and the rate of each consumable required to support the given activity. The data worksheets provide for the uniform specification of consumables data, allows for the ready identification of the consumables affected by a given activity, and facilitates the updating process. An activity is defined and the data that must be included in the data worksheets are specified. An example of its use and application is given, i.e. consumables data requirements for the performance of the EVA. The consumables data for the activities currently identified for the shuttle spacecraft are included. The consumables data sources are identified and information to facilitate the maintenance process is detailed.

Zamora, M. A.↗

Formulation of detailed consumables management models for the development (preoperational) period of advanced space transportation system. Volume 3: Study of constraints/limitations for STS consumables management

The constraints and limitations for STS Consumables Management are studied. Variables imposing constraints on the consumables related subsystems are identified, and a method determining constraint violations with the simplified consumables model in the Mission Planning Processor is presented.

Newman, C. M.↗

Formulation of consumables management models. Guidelines for the development of consumables subsystem redlines for advanced spacecraft

Techniques developed for determining the safe operating range or condition of past space programs are inadequate to support requirements of highly repetitive and routine earth orbit operations of advanced spacecraft systems. General concepts are presented for establishing maximum and minimum limits (redlines) for the consumables subsystems of the space shuttle orbiter. Implementation of a redline status subprocessor is recommended as a substitute for methods employed in past programs. The algorithms developed are amenable for use in the Mission Control Center, the launch processing system, and the space shuttle onboard computer.

Zamora, M. A.↗

Functional Requirements for Onboard Management of Space Shuttle Consumables

This report documents the results of the study "Functional Requirements for Onboard Management of Space Shuttle Consumables." The study was conducted for the Mission Planning and Analysis Division of the NASA Lyndon B. Johnson Space Center, Houston, Texas, between 3 July 1972 and 16 November 1973. The overall study program objective was two-fold. The first objective was to define a generalized consumable management concept which is applicable to advanced spacecraft. The second objective was to develop a specific consumables management concept for the Space Shuttle vehicle and to generate the functional requirements for the onboard portion of that concept. Consumables management is the process of controlling or influencing the usage of expendable materials involved in vehicle subsystem operation. The report consists of two volumes. Volume I presents a description of the study activities related to general approaches for developing consumable management, concepts for advanced spacecraft applications, and functional requirements for a Shuttle consumables management concept. Volume II presents a detailed description of the onboard consumables management concept proposed for use on the Space Shuttle.

Graf, P. J.↗

Consumer Expectations of Capacity Constrains and Their Effect on the Demand for Multi-Class Air Travel

This paper argues that a consumer's decision on ticket class takes into account the expected likelihood of obtaining a seat in a particular class which, in turn, partially depends on an optimum "transaction cost". Taking into account the preferences of the consumer and the information that the consumer is endowed with, the consumer will select a ticket that includes its own optimal transaction cost. This motivates the inclusion of the capacity constraint as a proxy independent variable for these consumer expectations This then forms the basis of a model of air-travel demand with specific reference to Australia. A censored likelihood function allowing for correlation in the disturbance term across k classes is introduced. The correlation in the disturbances arises as a result of the interdependence of the capacity constraints in k different ticket classes on each flight.

Battersby, Bryn D.↗

Apollo experience report: Consumables budgeting

The procedures and techniques used in predicting the consumables usage for the Apollo mission are discussed. Because of the many interfaces and influences on the consumables system, it is impractical to document all facets of consumables budgeting; therefore, information in this report is limited to the major contributions to the formulation of a consumables budget.

Nelson, D. A.↗

Functional requirements for onboard management of space shuttle consumables, volume 1

A study was conducted to determine the functional requirements for onboard management of space shuttle consumables. A generalized consumable management concept was developed for application to advanced spacecraft. The subsystems and related consumables selected for inclusion in the consumables management system are: (1) propulsion, (2) power generation, and (3) environmental and life support.

Graf, P. J.↗

Development of a Lunar Consumables Storage and Distribution Depot

NASA is in the preliminary planning stages for a future lunar base as a response to President George W. Bush's recent announcement of a new sustained exploration program beyond low earth orbit. Kennedy Space Center engineers are supporting this program by utilizing experience in Spaceport system design and operations to help develop a Lunar Consumables Depot. This depot will store propellants, life support fluids, and other consumables either transported from Earth or manufactured from In Situ resources. The depot will distribute these consumables in an energy efficient manner to end users including spacecraft, habitation modules, and rovers. This paper addresses some of the changes to lunar base architecture design as a result of advances in knowledge of lunar resources over the past 35 years, as well as technology advances in the area of In Situ Resource Utilization and consumable storage and distribution. A general system level description of the depot will be presented, including overall design philosophy and high level requirements. Finally, specific subsystem technologies that have been or will be developed by KSC will be addressed. Examples of these technologies are automated umbilicals, cryogenic refrigerators, novel storage vessels, advanced heat switches and heat exchangers, and self healing gaskets and wires.

Mueller, Robert P.↗

Mars ISRU for Production of Mission Critical Consumables - Options, Recent Studies, and Current State of the Art

In 1978, a ground breaking paper titled, "Feasibility of Rocket Propellant Production on Mars" by Ash, Dowler, and Varsi discussed how ascent propellants could be manufactured on the Mars surface from carbon dioxide collected from the atmosphere to reduce launch mass. Since then, the concept of making mission critical consumables such as propellants, fuel cell reactants, and life support consumables from local resources, commonly known as In-Situ Resource Utilization (ISRU), for robotic and human missions to Mars has been studied many times. In the late 1990's, NASA initiated a series of Mars Human Design Reference Missions (DRMs), the first of which was released in 1997. These studies primarily focused on evaluating the impact of making propellants on Mars for crew ascent to Mars orbit, but creating large caches of life support consumables (water & oxygen) as a backup for regenerative life support systems for long-duration surface stays (>500 days) was also considered in Mars DRM 3.0. Until science data from the Mars Odyssey orbiter and subsequent robotic missions revealed that water may be widely accessable across the surface of Mars, prior Mars ISRU studies were limited to processing Mars atmospheric resources (carbon dioxide, nitrogen, argon, oxygen, and water vapor). In December 2007, NASA completed the Mars Human Design Reference Architecture (DRA) 5.0 study which considered water on Mars as a potential resource for the first time in a human mission architecture. While knowledge of both water resources on Mars and the hardware required to excavate and extract the water were very preliminary, the study concluded that a significant reduction in mass and significant enhancements to the mission architecture were possible if Mars water resources were utilized. Two subsequent Mars ISRU studies aimed at reexamining ISRU technologies, processing options, and advancements in the state-of-the-art since 2007 and to better understand the volume and packaging associated with Mars ISRU systems further substantiated the preliminary results from the Mars DRA 5.0 study. This paper will provide an overview of Mars ISRU consumable production options, the analyses, results, and conclusions from the Mars DRA 5.0 (2007), Mars Collaborative (2013), and Mars ISRU Payload for the Supersonic Retro Propulsion (2014) mission studies, and the current state-of-the-art of Mars ISRU technologies and systems. The paper will also briefly discuss the mission architectural implications associated with Mars resource and ISRU processing options.

Sanders, G. B.↗

Functional requirements for onboard management of space shuttle consumables, volume 2.

A study was conducted to develop the functional requirements for onboard management of space shuttle consumables. A specific consumables management concept for the space shuttle vehicle was developed and the functional requirements for the onboard portion of the concept were generated. Consumables management is the process of controlling or influencing the usage of expendable materials involved in vehicle subsystem operation. The subsystems considered in the study are: (1) propulsion, (2) power generation, and (3) environmental and life support.

Graf, P. J.↗

EPA/ECLSS consumables analyses for the Spacelab 1 flight

The results of electrical power system (EPS) and environmental control/life support system (ECLSS) consumables analyses of the Spacelab 1 mission are presented. The analyses were performed to assess the capability of the orbiter systems to support the proposed mission and to establish the various non propulsive consumables requirements. The EPS analysis was performed using the shuttle electrical power system (SEPS) analysis computer program. The ECLSS analysis was performed using the shuttle environmental consumables requirements evaluation tool (SECRET) program.

Steines, G. J.↗

Formulation of consumables management models: Test plan for the mission planning processor working model

The test plan and test procedures to be used in the verification and validation of the software being implemented in the mission planning processor working model program are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. An overview of the working model is presented. Execution of the test plan will comprehensively exercise the working model software. An overview of the test plan, including a testing schedule, is presented along with the test plan for the unit, module, and system levels. The criteria used to validate the working model results for each consumables subsystem is discussed.

Connelly, L. C.↗

Formulation of consumables management models, executive summary

Future manned space programs that have increased launch frequencies and reusable systems require an implementation of new consumables and systems management techniques that relieve both the operations support personnel and flight crew activities. Analytical models and techniques were developed which consist of a Mission Planning Processor (MPP) with appropriate consumables data base, methods of recognizing potential constraint violations in both the planning and flight operations functions, and flight data files for storage/retrieval of information over extended periods interfacing with flight operations processors for monitoring of the actual flights. Consumables subsystems considered in the MPP were electrical power, environmental control and life support, propulsion, hydraulics and auxiliary power.

Torian, J. G.↗

STS-1 environmental control and life support system. Consumables and thermal analysis

The Environmental Control and Life Support Systems (ECLSS)/thermal systems analysis for the Space Transportation System 1 Flight (STS-1) was performed using the shuttle environmental consumables usage requirements evaluation (SECURE) computer program. This program employs a nodal technique utilizing the Fortran Environmental Analysis Routines (FEAR). The output parameters evaluated were consumable quantities, fluid temperatures, heat transfer and rejection, and cabin atmospheric pressure. Analysis of these indicated that adequate margins exist for the nonpropulsive consumables and related thermal environment.

Steines, G.↗