Search NASA⌕ Search

SEARCH · Search NASA

Results for “contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

97 MATHEMATICS AND COMPUTING↗

Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.

42 ENGINEERING↗

Practical Implementation of Synchrophasor Based Real-Time Contingency Analysis

Synchrophasor technology is increasingly accepted and adopted by the power industry. Linear State Estimator (LSE) is a recent development in the synchrophasor industry, and has been integrated and deployed at control centers, providing improved coverage and greater reliability from synchrophasor systems. This paper describes a first-of-a-kind synchrophasor based real-time contingency analysis (RTCA), which takes the LSE solved case as input, and then solves the what-if cases to provide timely information about impending grid problems to system operators. Test results on IEEE 39 bus and 300 bus system demonstrate the accuracy of the method for solving the RTCA problem using synchrophasor data. With this the synchrophasor measurement system provides an independent real-time monitoring and operation system which utilizes PMU data alone.

Nayak, Neeraj↗

Contingency Contractor Optimization Phase 3 Sustainment Requirements Document Contingency Contractor Optimization Tool - Prototype

This requirements document serves as an addendum to the Contingency Contractor Optimization Phase 2, Requirements Document [1] and Phase 3 Requirements Document [2]. The Phase 2 Requirements document focused on the high-level requirements for the tool. The Phase 3 Requirements document provided more detailed requirements to which the engineering prototype was built in Phase 3. This document will provide detailed requirements for features and enhancements being added to the production pilot in the Phase 3 Sustainment.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

97 MATHEMATICS AND COMPUTING↗

Photovoltaic frequency–watt curve design for frequency regulation and fast contingency reserves

When renewable energy resources are installed in electricity grids, they typically increase generation variability and displace thermal generator control action and inertia. Grid operators combat these emerging challenges with advanced distributed energy resource (DER) functions to support frequency and provide voltage regulation and protection mechanisms. This paper focuses on providing frequency reserves using autonomous IEC TR 61850-90-7 pointwise frequency-watt (FW) functions that adjust DER active power as a function of measured grid frequency. The importance of incorporating FW functions into a fleet of photovoltaic (PV) systems is demonstrated in simulation. Effects of FW curve design, including curtailment, deadband, and droop, were analyzed against performance metrics using Latin hypercube sampling for 20%, 70%, and 120% PV penetration scenarios on the Hawaiian island of Lanai. Finally, to understand the financial implications of FW functions to utilities, a performance function was defined based on monetary costs attributable to curtailed PV production, load shedding, and generator wear. An optimization wrapper was then created to find the best FW function curve for each penetration level. Lastly, it was found that in all cases, the utility would save money by implementing appropriate FW functions.

14 SOLAR ENERGY↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Power Grid Contingency Analysis with Machine Learning: A Brief Survey and Prospects

We briefly review previous applications of machine learning (ML) in power grid analyses and introduce our ongoing effort toward developing a generative-adversarial (GA) model for fast and reliable grid contingency analyses. According to our review, the persisting limitation of traditional ML techniques in grid analyses is the need for an exhaustive amount of training data for model generalization and accurate predictions. GA models overcome this limitation by first learning true data distribution from a small training set, from which new samples assimilating true data are generated with some variations. Subsequently, GA models can transfer learn or super-generalize with increased accuracy, that is, accurately predict n - (k + 2) contingencies from a small n - k training set and generated n - (k + 1) data. The joint effort between Idaho National Lab and Florida State University strives to develop a zero-shot and deep learning-based contingency analysis tool, named Smart Contingency Analysis Neural Network (SCANN), by leveraging the aforementioned advantages of GA models. The basic architecture of SCANN stems from the Latent Encoding of Atypical Perturbations network combined with an adversarial network, and it is designed to generate imbalanced power flow data from learned true data distributions for prediction purposes. Here we also introduce the abstract concept of resilience-chaos plots, a new resilience characterization tool proposed to complement SCANN by aiding in the assessment of large amounts of high-order contingency predictions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

On Secured Spinning Reserve Deployment of Energy-Limited Resources Against Contingencies

Featured with fast response abilities and high ramp rates, energy storage systems (ESS), such as pumped-storage hydropower (PSH) plants and battery storage systems (BSS), are considered as key first-responders to provide spinning reserve in response to system contingencies. However, ESSs are energy-limited resources, and their sustained spinning reserve deployment is restricted by the stored energy and available capacity. Indeed, the spinning reserve deployment against contingencies may deviate actual state-of-charge (SOC) from the scheduled value, inducing potential SOC boundary violations and non-dispatchability in later hours. This paper proposes the post-contingency operation model and the spinning reserve secure constraints to address these issues. The post-contingency operation model describes that spinning reserve from ESSs is promptly deployed when contingency occurs, and then gradually substituted by quick-start units when they are switched online. By leveraging this operation strategy, spinning reserve secure constraints in terms of SOC headrooms are adopted to guarantee its deplorability. Furthermore, a modified IEEE 118-bus system with multiple PSHs and BSSs is used to verify the proposed approach.

13 HYDRO ENERGY↗

Contingency Analysis Post-Processing With Advanced Computing and Visualization

Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.

Chen, Yousu↗

DeepGrid: Robust Deep Reinforcement Learning-based Contingency Management

Increasing uncertainty raised by the integration of renewable energy resources requires an enormous number of simulations to be carried out for the security assessment of the power grid. However, it is challenging to assess the steady-state and dynamic security indices for different system contingency events by doing an exhaustive analysis in real-time due to the computational and communication constraints. One promising solution is using data-driven techniques along with the system models to train an intelligent contingency management framework to better handle the contingencies in real-time. Nevertheless, implementing a data-driven technique to obtain the best remedial actions necessitates to account for the effect of the measurement noise on the performance of the contingency management. To tackle these challenges, we leverage a robust deep reinforcement learning (DRL) algorithm called Double Deep Q-Network (DDQN) to design a recommender system capable of prescribing optimal control actions with the help of the real-time digital simulator (RTDS). The use of RTDS system in combination with the advanced DRL algorithm allows to explore a wide variety of system contingencies in order to derive better remedial actions. The performance of the proposed algorithm is evaluated in IEEE 9-bus system under different loading conditions, and different network configurations in presence of noisy measurements.

Ghasemkhani, Amir↗

Historical Contingency in Microbial Resilience to Hydrologic Perturbations

Development of reliable biogeochemical models requires a mechanistic consideration of microbial interactions with hydrology. Microbial response to and its recovery after hydrologic perturbations (i.e., resilience) is a critical component to understand in this regard, but generally difficult to predict because the impacts of future events can be dependent on the history of perturbations (i.e., historical contingency). Fundamental issues underlying this phenomenon include how microbial resilience to hydrologic perturbations is influenced by historical contingency and how their relationships vary depending on the characteristics of microbial functions. To answer these questions, we considered a simple microbial community composed of two species that redundantly consume a common substrate but specialize in producing distinct products and developed a continuous flow reactor model where the two species grow with trade-offs along the flow rate. Simulations of this model revealed that (1) the history of hydrologic perturbations can lead to the shifts in microbial populations, which consequently affect the community's functional dynamics, and (2) while historical contingency in resilience was consistently predicted for all microbial functions, it was more pronounced for specialized functions, compared to the redundant function. As a signature of historical contingency, our model also predicted the emergence of hysteresis in the transitions across conditions, a critical aspect that can affect transient formation of intermediate compounds in biogeochemistry. This work presents microbial growth traits and their functional redundancy or specialization as fundamental factors that control historical contingencies in resilience.

59 BASIC BIOLOGICAL SCIENCES↗

Database Management Module Framework for Dynamic Contingency Analysis and Visualization

The Dynamic Contingency Analysis Tool (DCAT) is being developed to mimic the response of generation dynamics, protection, and load components to extreme contingencies in power systems. Currently, DCAT generates a huge data set, with the analysis results stored in multiple subfolders using a great many files in different formats (power flow cases, time series, figures, spreadsheets). To help power system engineers thoroughly understand and analyze system behavior under many scenarios and contingencies, we developed a database management module (DBM) that enables future integration of DCAT with industry-grade Big Data analytical and interactive visualization platforms. In this paper, we demonstrate the DBM framework with interactive analytics and visualization for DCAT on the synthetic South Carolina 500-bus power system model using hurricane contingencies that capture possibilities for an extreme contingency. DCAT’s advanced data management and interactive visualization can help planning engineers to visually explore and analyze system behavior, all in one view.

Cascading, dynamic simulations, database managemen↗

Data-Efficient Strategies for Probabilistic Voltage Envelopes under Network Contingencies

This work presents an efficient data-driven method to construct probabilistic voltage envelopes (PVE) using power flow learning in grids with network contingencies. First, a network-aware Gaussian process (GP) termed Vertex-Degree Kernel (VDK-GP), developed in prior work, is used to estimate voltage–power functions for a few network configurations. The paper introduces a novel multi-task vertex degree kernel (MT-VDK) that amalgamates the learned VDK-GPs to determine power flows for unseen networks, with a significant reduction in the computational complexity and hyperparameter requirements compared to alternate approaches. Simulations on the IEEE 30-Bus network demonstrate the retention and transfer of power flow knowledge in both N-1 and N-2 contingency scenarios. The MT-VDK-GP approach achieves over 50 % reduction in mean prediction error for novel N-1 contingency network configurations in low training data regimes (50–250 samples) over VDK-GP. Additionally, MT-VDK-GP outperforms a hyper-parameter based transfer learning approach in over 75 % of N-2 contingency network structures, even without historical N-2 outage data. Furthermore, the proposed method demonstrates the ability to achieve PVEs using sixteen times fewer power flow solutions compared to Monte-Carlo sampling-based methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗