Search NASA⌕ Search

SEARCH · Search NASA

Results for “continuous deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

40kW Fission Surface Power System (FSPS) Deployability

Continuous power at the kilowatt level will be imperative for future lunar users including crew infrastructure, future science, and in-situ resource utilization (ISRU). The Compass Team explored both 10 kilowatt electric (kWe) and 40 kWe concepts, assuming planned lander and rover capabilities. Both concepts found that a crew pressurized rover chassis, repurposed for deploying reactor power components, could place a fission surface power system (FSPS) at least one kilometer from users. While the 10 kWe fission power system (FPS) could be deployed as a single unit, the 40 kWe system was too large and had to be deployed in multiple trips with the same rover. Key technologies and design approaches included a high-assay low-enriched uranium (HALEU), yttrium hydride (YH) moderated heat pipe reactor, Stirling convertors, deployable radiators based on International Space Station (ISS) designs, and power conversion/transmission at ±2800 volts of direct current (VDC).

Lunar reactor 40kW fission deployable↗

Shallow Water Optical Water Quality Buoy

This NASA grant was funded as a result of an unsolicited proposal submission to Kennedy Space Center. The proposal proposed the development and testing of a shallow water optical water quality buoy. The buoy is meant to work in shallow aquatic systems (ponds, rivers, lagoons, and semi-enclosed water areas where strong wind wave action is not a major environmental During the project period of three years, a demonstration of the buoy was conducted. The last demonstration during the project period was held in November, 1996 when the buoy was demonstrated as being totally operational with no tethered communications line. During the last year of the project the buoy was made to be solar operated by large gel cell batteries. Fund limitations did not permit the batteries in metal enclosures as hoped for higher wind conditions, however the system used to date has worked continuously for in- situ operation of over 18 months continuous deployment. The system needs to have maintenance and somewhat continuous operational attention since various components have limited lifetime ages. For example, within the last six months the onboard computer has had to be repaired as it did approximately 6 months after deployment. The spectrograph had to be repaired and costs for repairs was covered by KB Science since no ftmds were available for this purpose after the grant expired. Most recently the computer web page server failed and it is currently being repaired by KB Science. In addition, the cell phone operation is currently being ftmded by Dr. Bostater in order to maintain the system's operation. The above points need to be made to allow NASA to understand that like any sophisticated measuring system in a lab or in the field, necessary funding and maintenance is needed to insure the system's operational state and to obtain quality factor. The proposal stated that the project was based upon the integration of a proprietary and confidential sensor and probe design that was developed by KB Science and Engineering and is currently patented by KB Science. The buoy's purpose was to collected hyperspectral optical signatures for analysis and resulting estimation of water quality parameters such as chlorophyll-a, seston and dissolved organic matter (DOC). The ultimate goal of the project was to develop a buoy that would integrate a probe to measure upwelling light from a source and thus relate this backscattered light to water quality parameters.

Bostater, Charles↗

VIPER Lunar Rover Agile Mission Systems

Agile development methods, which have gone from outlier to mainstream in software development, are poised to expand into all aspects of space mission development. Modern software development operates on a principle of continuous deployment, where progress is verified not with conventional metrics, but with a continuous build, available to key stakeholders, enabling direct examination of the state of the code base, and assessment of progress through demonstration of capability. Delivery times are measured in weeks, not months. Stakeholders are part of the process on an ongoing basis. The cost of change is comparatively low and requirements, which often are not precisely defined at the start of a project, may be iteratively refined in a series of agile development cycles. Agile methods are compatible with traditional system engineering methods and may be tailored to the space operations environment. The low cost of change and iterative development cycles of agile enable requirements to be defined as outcomes and constraints, with design details to be refined during the development cycle. We are now at a point where agile methods may be extended beyond software, to Mission Systems, including the Mission Operations System and the Ground Data System. For NASA’s VIPER Lunar Rover Mission, scheduled to land at a lunar pole in late 2023, we are developing the Mission System using agile methods. As in agile software, where the measure of progress is working code, in agile mission system development, the measure of capability is what we can demonstrate. Demonstrations over presentations. We demonstrate mission system capability using simulations. The concept of operations, from commanding, to driving the rover, to how we downlink images for evaluation for a near-real time command cycle, will be tested and proven in simulation, years before we begin the traditional simulation cycle for training. “Say it then simulate it.” We develop and refine our designs using simulations, with an emphasis on new components of the system that are not well known early. For example, the required duration of a mission planning cycle for a lunar surface asset such as VIPER, that operates twenty-four hours a day, seven days a week, with continuous communications and a unique set of constraints based on the physics of the lunar poles and the line of site to Earth, is a unique problem in mission planning that is unlikely to be solved in a series of meetings. A small number of requirements specifying the outcomes may serve as the jumping off point to an agile development cycle, with demonstration in simulations. We have already demonstrated this process with simulations of rover driver decision time. VIPER is driven using near-real time command and control to waypoints. The driver decision time between waypoints is a fundamental enabling unit of productivity to accomplish the mission timeline. We have validated driver decision time in simulations of rover driving at the lunar South Pole, using the prototype mission tools for driving, command and control. The capability to develop and refine designs using simulations as part of agile Mission System development cycle changes the nature of team interactions, creating a focus on doing, rather than analyzing and documenting. Waterfall development cycles were, in part, a product of the significant cost of change in the early days of spaceflight. When the cost of change is high, it is vital to get your requirements right at the outset, because the system will be built to those specifications, and, when change is expensive, you better get it right early. However, modern technology has greatly lowered the cost of change, enabling iterative, rapid development cycles, in which key operations concepts may be tested and refined during development. Extending agile development to the Mission System for VIPER is a significant step in moving agile development methods for space operations beyond software, to the Mission System.

Agile↗

Towards the Development of a Unified Distributed Date System for L1 Spacecraft

The purpose of this grant, 'Towards the Development of a Unified Distributed Data System for L1 Spacecraft', is to take the initial steps towards the development of a data distribution mechanism for making in-situ measurements more easily accessible to the scientific community. Our obligations as subcontractors to this grant are to add our Faraday Cup plasma data to this initial study and to contribute to the design of a general data distribution system. The year 1 objectives of the overall project as stated in the GSFC proposal are: 1) Both the rsync and Perl based data exchange tools will be fully developed and tested in our mixed, Unix, VMS, Windows and Mac OS X data service environment. Based on the performance comparisons, one will be selected and fully deployed. Continuous data exchange between all L1 solar wind monitors initiated. 2) Data version metadata will be agreed upon, fully documented, and deployed on our data sites. 3) The first version of the data description rules, encoded in a XML Schema, will be finalized. 4) Preliminary set of library routines will be collected, documentation standards and formats agreed on, and desirable routines that have not been implemented identified and assigned. 5) ViSBARD test site implemented to independently validate data mirroring procedures. The specific MIT tasks over the duration of this project are the following: a) implement mirroring service for WIND plasma data b) participate in XML Schema development c) contribute toward routine library.

Lazarus, Alan J.↗

Maritime Aerosol Network as a Component of AERONET - First Results and Comparison with Global Aerosol Models and Satellite Retrievals

The Maritime Aerosol Network (MAN) has been collecting data over the oceans since November 2006. Over 80 cruises were completed through early 2010 with deployments continuing. Measurement areas included various parts of the Atlantic Ocean, the Northern and Southern Pacific Ocean, the South Indian Ocean, the Southern Ocean, the Arctic Ocean and inland seas. MAN deploys Microtops handheld sunphotometers and utilizes a calibration procedure and data processing traceable to AERONET. Data collection included areas that previously had no aerosol optical depth (AOD) coverage at all, particularly vast areas of the Southern Ocean. The MAN data archive provides a valuable resource for aerosol studies in maritime environments. In the current paper we present results of AOD measurements over the oceans, and make a comparison with satellite AOD retrievals and model simulations.

Smirnov, A.↗

High-acceleration cable deployment

Prototype high-acceleration umbilical-cable deployment allows electrical communication between above-ground instrumentation and ballistic projectile below surface. Cable deployment is made up of forebody and afterbody. Foreboy can be separated from afterbody by rocket, or they can be fired as unit at target that stops afterbody on impact (forebody would continue, deploying cable). Similar design could be used in study of sea ice and in other surface-penetration studies.

Barns, C. E.↗

Scientific tradeoffs in pinhole/occulter facility accommodation

The Pinhole/Occulter Facility (P/OF) consists of state-of-the-art instruments for the study of particle acceleration in the solar corona, and uses a large structure to obtain very high angular resolution. P/OF has been studied in the past as an attached payload for the Space Shuttle, and has been the subject of study by a NASA Science Working Group (P/OFSWG). Appendix A lists various technical studies and reports carried out under the auspices of P/OFSWG and the Program Development Office of NASA Marshall Space Flight Center. Under the rationalization of NASA flight opportunities following the Challenger disaster, and the beginning of the Space Station Freedom program, the sortie-mode deployment of P/OF seemed less efficient and desirable. Thus, NASA decided to reconsider P/OF for deployment on the Space Station Freedom. The technical studies for this deployment continue at the present and will evolve as our knowledge of Space Station architecture and capabilities increase. MSFC contracted with Teledyne Brown Engineering for these technical studies.

Hudson, Hugh S.↗

Aerodynamic control, recovery, and sensor design for a first stage flyback booster

The mission of the flyback group is to control and recover the first stage of a commercially developed winged booster launched from a B-52 at 40,000 ft and Mach 0.8. First-stage separation occurs at 210,000 ft and Mach 8.7; the second and third stages will continue deployment of their 600 lb payload into low Earth orbit. The job of the flyback group begins at this point, employing a modified control system developed to stabilize and maneuver the separated first-stage vehicle to a suitable landing site approximately 130 miles from the launch point over the Pacific Ocean. This multidisciplinary design was accomplished by four subgroups: aerodynamic design/vehicle configuration (ADVC), trajectory optimization, controls, and thermal management.

Source record↗

Antarctic Exploration Parallels for Future Human Planetary Exploration: Science Operations Lessons Learned, Planning, and Equipment Capabilities for Long Range, Long Duration Traverses

The purpose for this workshop can be summed up by the question: Are there relevant analogs to planetary (meaning the Moon and Mars) to be found in polar exploration on Earth? The answer in my opinion is yes or else there would be no reason for this workshop. However, I think some background information would be useful to provide a context for my opinion on this matter. As all of you are probably aware, NASA has been set on a path that, in its current form, will eventually lead to putting human crews on the surface of the Moon and Mars for extended (months to years) in duration. For the past 50 V 60 years, starting not long after the end of World War II, exploration of the Antarctic has accumulated a significant body of experience that is highly analogous to our anticipated activities on the Moon and Mars. This relevant experience base includes: h Long duration (1 year and 2 year) continuous deployments by single crews, h Established a substantial outpost with a single deployment event to support these crews, h Carried out long distance (100 to 1000 kilometer) traverses, with and without intermediate support h Equipment and processes evolved based on lessons learned h International cooperative missions This is not a new or original thought; many people within NASA, including the most recent two NASA Administrators, have commented on the recognizable parallels between exploration in the Antarctic and on the Moon or Mars. But given that level of recognition, relatively little has been done, that I am aware of, to encourage these two exploration communities to collaborate in a significant way. [Slide 4] I will return to NASA s plans and the parallels with Antarctic traverses in a moment, but I want to spend a moment to explain the objective of this workshop and the anticipated products. We have two full days set aside for this workshop. This first day will be taken up with a series of presentations prepared by individuals with experience that extends back as far as the late 1940s and includes contemporary experience. The people presenting bring a variety of points of view, including not only U.S. but international, although most, if not all, have collaborated on international teams. The second day will consist of a series of small focused group interactions centered on those elements likely to be needed for traverse missions, such as mobility, habitation, and extravehicular activity (EVA, aka space suits). Our invited participants will be talking with people that specialize in these elements so that we can foster more direct interaction and exchange of experiences between these two exploration communities. After the workshop we will be preparing a report documenting these presentations and the essence of the focused interactions.

Hoffman, Stephen J.↗

Deep space telecommunications and the solar cycle: A reappraisal

Observations of density enhancement in the near corona at solar cycle (sunspot) maximum have rather uncritically been interpreted to apply equally well to the extended corona, thus generating concern about the quality of outer planet navigational data at solar cycle maximum. Spacecraft have been deployed almost continuously during the recently completed solar cycle 20, providing two powerful new coronal investigatory data sources: (1) in-situ spacecraft plasma measurements at approximately 1 AU, and (2) plasma effects on monochromatic spacecraft signals at all signal closest approach points. A comprehensive review of these (solar cycle 20) data lead to the somewhat surprising conclusions that for the region of interest of navigational data, the highest levels of charged particle corruption of navigational data can be expected to occur at solar cycle minimum, rather than solar cycle maximum, as previously believed.

Berman, A. L.↗

MARSNET: A European network of stations on the surface of Mars

Following an ESA preliminary study on the possible areas of European participation in the future international exploration of Mars and an ESA call for ideas of new missions, MARSNET, a network of small surface stations, was selected for further in-depth scientific and technical assessment studies as a potential European contribution to such exploration. Subsequently, the MARSNET phase A studies started in the autumn of 1991. The industrial kickoff took place in early January 1992, following the tender evaluation and the decision to select the Aerospatiale-led consortium including Dornier, Alcatel, Laben, and Etca to perform the industrial studies. The phase A studies ended in early 1993. However, critical items such as an instrument deployment device continue to be studied in the framework of ESA's Technology Research Program. The MARSNET mission consists of a network of three semihard landers to be placed on the Martian surface, several thousand kilometers apart, thus defining a regional/global seismological and meteorological network in the Tharsis region. The small stations would be targeted for landing at scientifically interesting sites in this region of Mars, which is the most likely area to still show tectonic activity; this would allow the seismometers to acquire data for the determination of the internal structure of the planet. Landing site geology and geochemistry will also be studied.

Chicarro, A. F.↗

DBBC2 Backend: Status and Development Plan

The Digital Base Band Converter-2 (DBBC2) system is in a mature phase now, and the deployment is continuing. A review of the backend is shown, and the new functionalities in development are reported.

Tuccari, Gino↗

Thermal Design and Analysis of the Supersonic Flight Dynamics Test Vehicle for the Low Density Supersonic Decelerator Project

The thermal design and analysis of the experimental Supersonic Flight Dynamics Test (SFDT) vehicle is presented. The SFDT vehicle is currently being designed as a platform to help demonstrate key technologies for NASA's Low Density Supersonic Decelerator (LDSD) project. The LDSD project is charged by NASA's Office of the Chief Technologist (OCT) with the task of advancing the state of the art in Mars Entry, Descent, and Landing (EDL) systems by developing and testing three new technologies required for landing heavier payloads on Mars. The enabling technologies under development consist of a large 33.5 meter diameter Supersonic Ringsail (SSRS) parachute and two different types of Supersonic Inflatable Aerodynamic Decelerator (SIAD) devices - a robotic class, SIAD-R, that inflates to a 6 meter diameter torus, and an exploration class, SIAD-E, that inflates to an 8 meter diameter isotensoid. As part of the technology development effort, the various elements of the new supersonic decelerator system must be tested in a Mars-like environment. This is currently planned to be accomplished by sending a series of SFDT vehicles into Earth's stratosphere. Each SFDT vehicle will be lifted to a stable float altitude by a large helium carrier balloon. Once at altitude, the SFDT vehicles will be released from their carrier balloon and spun up via spin motors to provide trajectory stability. An onboard third stage solid rocket motor will propel each test vehicle to supersonic flight in the upper atmosphere. After main engine burnout, each vehicle will be despun and testing of the deceleration system will begin: first an inflatable decelerator will be deployed around the aeroshell to increase the drag surface area, and then the large parachute will be deployed to continue the deceleration and return the vehicle back to the Earth's surface. The SFDT vehicle thermal system must passively protect the vehicle structure and its components from cold temperatures experienced during the ascent phase of the mission as well as from the extreme heat fluxes produced during the supersonic test phase by the main motor plume and aeroheating. The passive thermal design approach for the SFDT vehicle relies upon careful and complex bounding analysis of all three modes of heat transfer - conduction, convection, and radiation - coupled with a tightly managed transient power dissipation timeline for onboard electronics components throughout all mission phases.

thermal desktop↗

Mars Relay Operations Service (MaROS): A Present Service Preparing for the Future

The Mars Relay Operations Service (MaROS) has been deployed by NASA's Mars Program Office and the Multimission Ground Systems and Services (MGSS) Project into mission operations to aid in the coordination of relay activities at Mars. This live system presents standardized interfaces and a centralized infrastructure to current and future participants in the Mars Relay Network for the purpose of reliably and securely exchanging and storing all relay-related planning and operations data. The initial development of this system leveraged over eight years of experience performing relay operations between the various spacecraft at Mars. Now, four years after its initial deployment, MaROS continues to undergo further refinement to better meet the needs of the Mars Relay Network. The most substantial, recent update was focused on providing capabilities needed by the Mars Science Laboratory project, which landed on Mars in August of 2012. This paper will describe the nature of that update and describe additional features being added to the system to better serve the needs of current and future Mars missions.

Gladden, Roy E.↗

Real-time Unimpeded Taxi Out Machine Learning Service

This paper describes a study on the estimation of the unimpeded taxi out time using Machine Learning (ML) tools and proposes an implementation that can be used to make real-time predictions at any airport in the National Airspace System. Kedro, an open-source pipeline framework, is used to develop the model definition and training. Models are stored in scikit-learn containers on a MLFlow server where they can be retrieved and served to make predictions in the live system. These open source frameworks provide common structures between ML services, allow for easier maintenance and updates, and overall deliver an easier CI/CD (Continuous Integration/Continuous Deployment) process. The current models were trained on data acquired at KCLT and KDFW from June 1st to December 31st, 2019 and compute taxi time in the ramp, airport movement area (AMA) and total (from gates to runways). The current versions of the models achieve relatively low uncertainties of about 10 to 15% for the total and AMA taxi times and about 20% for the ramp taxi time at both KCLT and KDFW. Initial tests on offline data from 2020 and 2021 show a small degradation (10 to 15%) in accuracy performance indicating the model’s resilience to operational changes over time.

machine learning↗

Real-time Unimpeded Taxi Out Machine Learning Service

This presentation describes a study on the estimation of the unimpeded taxi out time using Machine Learning (ML) tools and proposes an implementation that can be used to make real-time predictions at any airport in the National Airspace System. Kedro, an open-source pipeline framework, is used to develop the model definition and training. Models are stored in scikit-learn containers on a MLFlow server where they can be retrieved and served to make predictions in the live system. These open source frameworks provide common structures between ML services, allow for easier maintenance and updates, and overall deliver an easier CI/CD (Continuous Integration/Continuous Deployment) process. The current models were trained on data acquired at KCLT and KDFW from June 1st to December 31st, 2019 and compute taxi time in the ramp, airport movement area (AMA) and total (from gates to runways). The current versions of the models achieve relatively low uncertainties of about 10 to 15% for the total and AMA taxi times and about 20% for the ramp taxi time at both KCLT and KDFW. Initial tests on offline data from 2020 and 2021 show a small degradation (10 to 15%) in accuracy performance indicating the model’s resilience to operational changes over time.

Machine Learning↗

A Network for Standardized Ocean Color Validation Measurements

The Aerosol Robotic Network (AERONET) was developed to support atmospheric studies at various scales with measurements from worldwide distributed autonomous sunphotometers [Holben et al. 1998]. AERONET has now extended its support to marine applications through the additional capability of measuring the radiance emerging from the sea with modified sun-photometers installed on offshore platforms like lighthouses, navigation aids, oceanographic and oil towers. The functionality of this added network component called AERONET - Ocean Color (AERONET-OC), has been verified at different sites and deployment structures over a four year testing phase. Continuous or occasional deployment platforms (see Fig. 1) included: the Acqua Alta Oceanographic Tower (AAOT) of the Italian National Research Council in the northern Adriatic Sea since spring 2002; the Martha s Vineyard Coastal Observatory (MVCO) tower of the Woods Hole Oceanographic Institution in the Atlantic off the Massachusetts coast for different periods since spring 2004; the TOTAL Abu-Al-Bukhoosh oil Platform (AABP, shown through an artistic rendition in Fig. 1) in the Persian (Arabian) Gulf in fall 2004; the Gustaf Dal n Lighthouse Tower (GDLT) of the Swedish Maritime Administration in the Baltic Sea in summer 2005; and the platform at the Clouds and the Earth's Radiant Energy System (CERES) Ocean Validation Experiment (COVE) site located in the Atlantic Ocean off the Virginia coast since fall 2005. Data collected during the network testing phase, confirm the capability of AERONET-OC to support the validation of marine optical remote sensing products through standardized measurements of normalized water-leaving radiance, LWN, and aerosol optical thickness, a, at multiple coastal sites.

Zibordi, Giuseppe↗

Arc-jet Testing of Continuously Woven Aeroshells–Spiderweave–for Adaptable Deployable Entry Placement Technology

The Adaptable, Deployable Entry Placement Technology (ADEPT) is an entry system that, when deployed, creates a large, umbrella-like drag surface that can be used to decelerate spacecraft during atmospheric entry, resulting in lower entry loads and heating than a rigid aeroshell of equivalent mass. Until needed for entry, the system can remain stowed, enabling missions to overcome launch vehicle fairing diameter constraints. 12-inch diameter umbrella-like articles, similar to a small reentry probe using ADEPT, were tested in the Ames 20-MWAerodynamic Heating Facility. Performance of the test articles built with a novel, continuously woven aeroshell construction (called Spiderweave) is compared against those built with legacy construction styles. In addition, candidate thermal protective layer treatments applied to structurally sensitive regions of the aeroshell are assessed using data from on-board instrumentation as well as facility optical instruments.

ADEPT↗