Building a Collaborative Relationship between Contractor and Oversight at SRPPF

The success of Department of Energy (DOE) projects is dependent on a functional, healthy, and collaborative relationship between the contractor and the federal oversight. A healthy relationship marked by a collaborative mindset between these two groups, can facilitate better operational safety, operational efficiency, and regulatory compliance. This paper will explore aspects of such a relationship, the roles and responsibilities of the contractor and federal oversight, the present and historical relationships in the DOE complex, and best practices considered by the contractor and federal oversight used at the Savannah River Plutonium Processing Facility (SRPPF) at the Savannah River Site (SRS). Due to the current design phase of the SRPPF, the contractor and federal oversight have a unique opportunity to begin establishing a strong relationship early in the project’s life. As a result of this dynamic, the two groups have already demonstrated their ability to successfully respond to ongoing design issues. In general, a strong criticality safety program is beginning to mature for the SRPPF alongside a developing criticality safety federal oversight group. This paper will discuss the various factors that have brought about this collaborative relationship. Lastly, a case study will be incorporated into this paper demonstrating the ability of the SRPPF contractor and federal oversight to overcome challenges relating to the SRPPF project. This case study may guide groups around the DOE Complex to create better, more functional relationships between the two parties. The case study will provide a detailed description of the issue and parties involved, highlight the factors that allowed the group to overcome the challenge via effective collaboration, and the outcome of the event. Increasing collaboration may benefit the complex, as a whole, in order to meet the mission demands of the DOE.

collaboration

When and Why Hiring and Training Occur: A Survey of Building Efficiency Contractors

As state and local governments, along with homeowners, work to enhance building energy performance, a sufficiently skilled energy-efficiency workforce is essential for implementing solutions at scale. In recent years, employers in the energy efficiency sector, including building performance contractors, have frequently reported challenges finding qualified workers. Additionally, as building performance technologies evolve and become more sophisticated, current workers need to acquire new skills and practices to maintain high-quality work. This study surveyed 209 contractors involved in building energy performance projects across 37 U.S. states, Washington, D.C., Guam, and the Marshall Islands. The survey aimed to understand their experiences in the labor market, their business practices, and their decision-making processes when hiring new workers and training existing employees. The findings highlight contractors' motivations and considerations in hiring and training, as well as the most significant challenges they face in the labor market. These insights can help workforce development practitioners design training programs that are aligned with workforce needs and responsive to employer concerns.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Unlocking the Path to Decarbonized Building Thermal Systems: Strategies for Designers and Contractors: Preprint

The design and construction community plays a pivotal role in facilitating the transition to decarbonized thermal systems that maintain human comfort while reducing building emissions. Through the U.S. Department of Energy Better Buildings initiative's Design and Construction Allies, a cohort of leading architecture, engineering, and construction firms have identified top ranked barriers that designers and contractors face when implementing solutions for building owners. These barriers to decarbonizing thermal - especially heating - systems include equipment availability; electrical capacity constraints; space allocations; complex system configurations; and lack of experience in designing, installing, and maintaining heat pumps. These impediments significantly amplify the risk and financial burden associated with the adoption of decarbonized solutions. The barriers also decrease the likelihood that designers, contractors, and owners will adopt decarbonization strategies without clear plans and guidance on how to implement these solutions, mitigate risk, and overcome the identified barriers. The National Renewable Energy Laboratory, the Design and Construction Allies, and the American Society of Heating, Refrigerating, and Air-Conditioning Engineers have developed "how to" thermal decarbonization guidance based on best practices. The subjects covered range from the role of energy efficiency in facilitating decarbonized heating solutions to strategies for decarbonizing new and existing heating, ventilating, and air-conditioning systems. The focus is on overcoming barriers so that energy-efficient, electrified buildings - both new and retrofit - become the industry standard. This paper outlines 1) the method used to collect and organize this guidance, 2) industry barriers to decarbonization, and 3) decarbonization techniques that have broad market applicability.

building heating

Optimizing Residential HVAC Systems: Evaluating How the Usage of Smart Diagnostic Tools for Quality Installation and Commissioning Impacts System Performance and HVAC Contractor Businesses

The adoption of digital quality installation and fault detection tools has the potential to transform the $14 billon residential heating, ventilating, and air conditioning (HVAC) service and installation industry. Increased market penetration can be accelerated by providing an increased understanding of the energy and economic value proposition of the usage of these tools. In tandem with energy and HVAC system performance impact research and analysis, the Southface Team investigated the economic business implications for HVAC service and installation contractors adopting the use of measureQuick (mQ), a smart diagnostic app that aids in quality installation and fault detection and works agnostically with Bluetooth-enabled HVAC technician tools.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Realizing the Residential Electrification Opportunity: One Heat Pump at a Time

Space and water heating in residential buildings is a major contributor of greenhouse gas (GHG) emissions in the United States. Advanced electric heat pumps (HP) and heat pump water heaters (HPWH) are poised to provide a low carbon alternative to traditional fossil-based space and water heating. Widespread deployment of heat pumps could help address the significant portion of building emissions and primary energy used in American households, however much work needs to be done to close the knowledge gap between like-for-like fossil equipment replacement and switching to HPs for the average contractor. The Pacific Northwest National Laboratory (PNNL) has been working on closing this knowledge gap through the development of decision tools and resources targeted towards contractors and installers. Developed in coordination with stakeholders and experienced contractors from a variety of geographic regions, these tools help streamline the process of sizing and selecting residential HPs and HPWHs for key use cases. Along with the complementary Retrofit Decision Tool developed by PNNL, the decision tools will help contractors understand the importance of whole building considerations when choosing HPs including envelope upgrades, duct assessments, and electrical assessments to ensure optimal selection and performance of the HP or HPWH. They also provide direct links to resources and best practices developed by PNNL as well as external entities to further help contractor education and training. This paper describes the development of these tools, and their role in moving the existing space and water heating market towards HPs to help realize the country’s decarbonization goals.

heat pump, heat pump water heater, Residential bui

Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects (Final Technical Report)

The number of commercial coal, gas, and nuclear projects built over the past 100 years number in the thousands. As such, there is a large database, available to a wide range of commercial engineering contractors, on proven designs. In essence, unsuccessful designs have, through generations of iterations, been identified and then deleted from further consideration. In contrast, the number of commercial parabolic trough projects using nitrate salt for the thermal storage media is perhaps 60. Further, the number of commercial central receiver projects using nitrate salt as the working fluid is on the order of 20, including estimates for China. Given the relative immaturity of salt technology, and commercial pressures to successfully bid new solar projects into a mature electricity market, solar projects often promise more than has been delivered. The Design Basis Document / Owner’s Technical Specification is a first step in the iteration process. The report describes the successful features of commercial projects, outlines a range equipment and system failures in projects that didn’t operate as intended, and provides a draft set of design changes intended to correct the known problems. The product of the study is 3 volumes of technical material; one volume is on parabolic trough technologies; a second is on central receiver technologies, and the third is on potential design changes to parabolic trough and central receiver projects. The 3 volumes, which total some 590 pages, can be found at https://www.solardynllc.com/csp-plant-technologies. One of the principal topics in the report is the use of functional or prescriptive specifications. Functional specifications describe what the equipment needs to do, consistent with the minimum legal requirements of the local jurisdictions. The details of how this is to be accomplished is developed by the engineering contractor. Prescriptive specifications, which are developed by the Owner, prescribe to the engineering contractor how the functional requirements are to be met. This arrangement ensures that the favorable experience from a previous project is repeated. One example is the design code for the hot salt tank in central receiver projects. The closest design basis is API Standard 650 Welded Steel Tanks for Oil Storage. However, the maximum design temperature in API 650 is 260 °C. As such, solar projects have typically adopted a hybrid Code approach, in which allowable material stresses are taken from ASME Section II Materials. Further, since the tanks experience daily changes in temperature and in (static) pressure, and since portions of the tank can operate at stresses beyond the elastic range, the low cycle fatigue life of the tank is conducted using the rules of Section VIII Division 2. However, in a recent study by NREL, the principal damage mechanism was identified as creep rather than fatigue. Further, design stresses permitted under Section VIII Division 2, corresponding to a fatigue life of 30 years, result in projected creep lifetimes of only 2 to 5 years. An alternate design approach, prescribed by the Owner, would be based on Code sections intended for high temperature service in the creep regime. A candidate is Section III Division 5. Granted, this is a nuclear code section, and it’s use would not likely be mandated by local jurisdictions. However, the effects of creep have been deemed to be of sufficient importance that one nuclear project developer, and one central receiver project developer, have stipulated in the tank design specification that the equipment be designed to the requirements of Section III Division 5.

14 SOLAR ENERGY

Flexible Fuel Electric Hybrid Glass Furnace Demonstration

The furnace contractor completed General Arrangement (GA) layouts and Piping and Instrumentation Diagrams (P&ID) for both furnaces during this reporting period. Preliminary equipment lists accompanied this work. Control system architecture in progress. Key furnace design elements and deliverables on track to be complete by end of phase. The facilities design and integration contractor completed a 3D scan and modeling of the facility. The work during this period focused on preliminary design with a focus on overall project scope and feasibility. This key work supports the overall project deliverables for 30% preliminary engineering and Preliminary Design Report (PDR) which are on track to be complete by the end of the phase. These deliverables are approximately 50% complete through the end of this reporting period. The batch house operations design contractor continues development of site plan and General Arrangement (GA) layout to support the 30% preliminary engineering and design package. This work is 60% complete by the end of this reporting period and is on track to be complete by the end of the phase.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Staged Z-Pinch Modeling with Hydra and Chicago Codes (CRADA Final Report)

This was a collaborative effort between Lawrence Livermore National Security, LLC (“Contractor”), as manager and operator of Lawrence Livermore National Laboratory (“LLNL”) and Magneto Inertial Fusion Technologies, Inc. ("MIFTI" or "Participant"), to develop staged Z-pinch (SZP) modeling with HYDRA and CHICAGO codes. The contractor performed numerical simulations of the SZP to reproduce and validate Participant’s MACH2 simulations. Contractor used the state-of-the-art, radiation-magneto-hydrodynamic code HYDRA, as well as the hybrid particle-in-cell code CHICAGO. This work helped assess the physical and numerical uncertainties associated with the simulations and the overall fusion scheme. HYDRA is a well-established and validated code. This work has helped to independently assess the SZP concept to give confidence to the Participant and to the broader fusion community.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

SPC-71123 Rev 1 MARVEL Control Drum Actuator Torsional Spring

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This specification defines the requirements for the procurement and factory acceptance testing of the MARVEL control drum actuator torsional spring. The purpose of this specification is to define the requirements to procure the MARVEL control drum actuator torsional spring component and witness a torsional spring rate Factory Acceptance Test (FAT) at the subcontractor’s facility with the contractor present. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN

The Building Business Network (B-Biz): Addressing Gaps in the High-Performance Building Technology Market, Especially for Underserved Customers

Increased market intelligence and business model innovation is needed to build contractor confidence in high-performance building technologies in order to increase the speed and scale of adoption to meet the U.S. Department of Energy's building stock decarbonization goals. Although there have been important innovations in energy efficiency, affordability, and decarbonization of building technologies, consumers are not purchasing these technologies at the necessary speed and scale partially due to a gap in institutional understanding around barriers contractors face in providing and servicing these technologies. Small businesses in this market must mitigate risk around high-performance building technologies, limiting their opportunities in the market and impacting the rate of adoption. The Building Business Network (B-Biz) aims to provide high-performance building technology solutions to underserved customers by collaborating with local small businesses that provide and service high-performance building technologies in communities with the lowest rates of adoption. This research explores the current market, the importance of business models, and the opportunity to utilize small businesses to address market gaps in underserved communities.

B-Biz

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING

2023 Annual Site Environmental Report for Sandia National Laboratories, Tonopah Test Range, Nevada

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, Tonopah Test Range. Activities at the site are conducted in support of U.S. Department of Energy weapons programs and have operated at the site since 1957. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Tonopah Test Range during calendar year 2023. Environmental topics include cultural resource management, chemical management, air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES

2023 Annual Site Environmental Report for Sandia National Laboratories, Kaua‘i Test Facility, Hawai‘i

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at the Sandia National Laboratories Kaua‘i Test Facility in Hawai‘i. Activities at the site are conducted in support of U.S. Department of Energy weapons programs, and the site has operated as a rocket preparation launching and tracking facility since 1962. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Kaua‘i Test Facility, during calendar year 2023. Environmental topics include cultural resource management, chemical management, air quality, meteorology, ecology, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES

2023 Annual Site Environmental Report for Sandia National Laboratories, Albuquerque, New Mexico

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, New Mexico. Activities at the site support research and development programs with a wide variety of national security missions, resulting in technologies for nonproliferation, homeland security, energy and infrastructure, and defense systems and assessments. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection and monitoring programs in place at Sandia National Laboratories, New Mexico, during calendar year 2023. Environmental topics include cultural resource management, chemical management, air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES

2023 Annual Site Environmental Report for Sandia National Laboratories, Livermore, California

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the Prime Contract and oversees contractor operations at Sandia National Laboratories, California. Activities at this multi-program engineering and science laboratory support the nuclear weapons stockpile program, energy and environmental research, homeland security, micro-and nanotechnologies, and basic science and engineering research. The U.S. Department of Energy’s National Nuclear Security Administration and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report provides a summary of environmental monitoring of information and compliance activities that occurred at Sandia National Laboratories, California during calendar year 2023 unless noted otherwise. General site and environmental program information is also included. This report was prepared in accordance with DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting.

54 ENVIRONMENTAL SCIENCES

Sustainable Polymer for Polyolefin Replacement (CRADA Final Report)

Sustainable Chemicals, LLC (Participant, Sust-Chem) develops renewable, biodegradable bioplastics for the replacement of large-volume petrochemical plastics such as polyethylene (PE) and polypropylene (PP). Participant’s patented bioplastics will find use in everyday items such as plastic bags, flexible containers, packaging, and toys and will address customers' ask for goods that are sustainable but don't cost a premium. Participants’ plastic comes from plant biomass and at the end of its lifecycle, is compostable or chemically recyclable. During the CRADA, Participant and Contractor will jointly refine the polymerization process used to make our bioplastic. Participant and Contractor will focus on technologies that are economically and industrially feasible, complete with full polymer characterization.

36 MATERIALS SCIENCE

2024 Annual Site Environmental Report for Sandia National Laboratories, Livermore, California

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly-owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the Prime Contract and oversees contractor operations at Sandia National Laboratories, California. Activities at this multi-program engineering and science laboratory support the nuclear weapons stockpile program, energy and environmental research, homeland security, micro- and nanotechnologies, and basic science and engineering research. The U.S. Department of Energy’s National Nuclear Security Administration and its management and operating contractor are committed to fulfilling regulatory obligations, safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report (ASER). This report provides a summary of environmental monitoring and compliance activities that occurred at Sandia National Laboratories, California, during calendar year 2024, unless noted otherwise. General site and environmental program information is also included. This report was prepared in accordance with DOE Order 231.1B, Admin Change 1, Environment, Safety and Health Reporting.

54 ENVIRONMENTAL SCIENCES

Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects: Volume 1 Specifications for Parabolic Trough Projects, Volume 2 - Specifications for Central Receiver Projects, Volume 3 - Narrative

Design Basis Documents / Owner’s Technical Specifications are developed for parabolic trough and central receiver power plants using nitrate salt as the heat transport fluid and the thermal storage medium. The goals were to 1) distill the successful experience with nitrate salt systems from as many commercial projects as possible, 2) provide technical bases for equipment design/selection that an owner can impose on an EPC contractor, 3) compile this information in one location to provide guidance on salt systems that is as broadly applicable to as many projects as possible, and 4) work toward an industry consensus on a Design Basis Document that reflects the lessons learned from earlier commercial projects. The document allows an owner to provide design guidance, and to impose a minimum set of requirements, above and beyond those in the normal Codes and Standards, on an EPC contractor in an effort to avoid a repeat of past mistakes. If successful, this would allow salt systems to achieve the same levels of reliability and availability as commercial parabolic trough plants using diphenyl oxide / biphenyl (i.e., Dowtherm A, Therminol VP-1) as the heat transfer fluid. The report consists of 3 volumes: • Volume 1 - Specifications for Parabolic Trough Projects • Volume 2 - Specifications for Central Receiver Projects • Volume 3 - Narrative Volumes 1 and 2 include discussions of the following topics: • Plant functional requirements for the salt systems • Plant operating states, and transitions between states, for the salt systems • Risk analysis of the principal salt components • Plant requirements for the salt systems to meet the functional and the operating requirements • Type of specification for the principal salt components: functional; or prescriptive • Current state of the art for salt systems. Volume 3 discusses a number of cases in which the salt equipment at commercial parabolic trough and central receiver projects has not met the projected levels of reliability and availability. Possible reasons for the sources of the problems are discussed, as is a range of possible alternate designs that could avoid the known problems.

14 SOLAR ENERGY