At least 19 records

Review of LLNS Contractor Assurance System (CAS)

The focus of the review was to evaluate the LLNS Contractor Assurance System (CAS) system description document and implementation plan. The team reviewed the description document and the near and long term strategy improvement plans for the defined enhancements to the LLNS CAS. Review emphasis was placed on the CAS functional elements of Assessments, Issues Management, and Performance Measures, as well as the related CAS attributes of Requirements, Policies and Procedures, Risk Methodology, and Continuous Improvement. The approach taken by the team was to review the pertinent LLNL CAS documents, interview key CAS Process Owners, and interview selected line managers. The reviews were conducted in such a manner to achieve an understanding of the overall objective of the CAS and the processes within; and the soundness of the improvement plans for each of the elements/related attributes. The team then identified suggested recommendations for consideration as the overall implementation process for improvements move forward. The team appreciates the work that went into the development of the CAS Implementation Plan. It provided a meaningful starting place for this AIM team as it included sufficient information to quickly gain an understanding of the current LANS CAS processes and improvement initiatives. The team found that the July 2007 CAS Description Document did not provide a level of detail which would provide the reader an understanding of the elements and attributes of the CAS, how they are integrated, and how they help Managers manage the performance of their activities. Consider revising the document to include a level of detail that would provide value to the LLNS Board of Governors, LSO, and LLNL Managers. The team also found the description document to focus almost exclusively on describing the LLNS approach and initiatives associated with the 17 key attributes of Contract Clause H-4. While these discussions are appropriate for inclusion in the description document, by themselves, they do not clearly address the requirements and criteria in Attachment 1 and Appendix A to DOE 226.1A. It would seem that a comprehensive written CAS description document would address not only the expectations of Clause H-4, but that it would also address the requirements and criteria from DOE O 226.1A.

99 GENERAL AND MISCELLANEOUS↗

Direct Feed Low Activity Waste Program Integration - 16638

The mission of Program Integration is to champion and steer the development and implementation of common and consistent programs between the Tank Operating Contract (TOC) contractor and the Waste Treatment Plant (WTP) contractor. TOC is managed by Washington River Protection Solutions LLC (WRPS) and WTP is managed by Bechtel National, Inc. (BNI). The DOE Office of River Protection (DOE ORP) is the Program Owner. WRPS has been actively managing the TOC at the Hanford Site Tank Farms (TF) since 2008. Programs are already developed, verified, and in use for the TOC, whereas WTP is still in the construction phase. WTP Programs are established for construction only, but not developed for commissioning and future operations. An extensive effort is underway at WTP to develop commissioning programs. In order to drive consistency and minimize differences in program requirements between TF, which will feed the tank waste, and WTP, which will receive and treat the tank waste, DOE-ORP requires the two contractors to integrate and collaborate in program development. Advantages of integration are: - Achieves cost and time savings as WTP is able to review existing TOC programs as starting points in development of its programs. - Promotes interfaces with industry counterparts to share experiences, issues, and lessons learned. ? Minimizes difference in program requirements between the companies. - Helps prepare for and ultimately succeed in Operational Readiness Reviews (ORR). Program Integration is a priority for TOC and WTP, and in order to maintain the focus and drive to this effort, a unified One System Program Integration Council (OSPIC) was created in 2012. Membership of the OSPIC consists of senior managers from both companies and the OSPIC chair's report directly to their respective President. Thirty (30) programs are subject to integration, including but not limited to Conduct of Operations, Worker Safety and Health, Quality Assurance, Contractor Assurance, and Environmental Management. Progress of program development and integration efforts are tracked and monitored, and barriers to integration are resolved in a collaborative fashion within both companies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GSFC Supplier Surveillance

Topics covered include: Develop Program/Project Quality Assurance Surveillance Plans The work activities performed by the developer and/or his suppliers are subject to evaluation and audit by government-designated representatives. CSO supports project by selecting on-site supplier representative s by one of several methods: (1) a Defense Contract Management Agency (DCMA) person via a Letter Of Delegation (LOD), (2) an independent assurance contractor (IAC) via a contract Audits, Assessments, and Assurance (A3) Contract Code 300 Mission Assurance Support Contract (MASC)

Kelly, Michael P.↗

Environment, Safety and Health Self-Assessment Report Fiscal Year 2010

The Lawrence Berkeley National Laboratory (LBNL) Environment, Safety, and Health (ES&H) Self-Assessment Program was established to ensure that Integrated Safety Management (ISM) is implemented institutionally and by all divisions. The ES&H Self-Assessment Program, managed by the Office of Contractor Assurance (OCA), provides for an internal evaluation of all ES&H programs and systems at LBNL. The primary objective of the program is to ensure that work is conducted safely and with minimal negative impact to workers, the public, and the environment. Self-assessment follows the five core functions and guiding principles of ISM. Self-assessment is the mechanism used to promote the continuous improvement of the Laboratory's ES&H programs. The process is described in the Environment, Safety, and Health Assurance Plan (PUB-5344) and is composed of three types of self-assessments: Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review. The Division ES&H Self-Assessment Manual (PUB-3105) provides the framework by which divisions conduct formal ES&H self-assessments to systematically identify program deficiencies. Issue-specific assessments are designed and implemented by the divisions and focus on areas of interest to division management. They may be conducted by teams and involve advance planning to ensure that appropriate resources are available. The ES&H Technical Assurance Program Manual (PUB-913E) provides the framework for systematic reviews of ES&H programs and processes. The ES&H Technical Assurance Program Assessment is designed to evaluate whether ES&H programs and processes are compliant with guiding regulations, are effective, and are properly implemented by LBNL divisions. The Division ES&H Peer Review Manual provides the framework by which division ISM systems are evaluated and improved. Peer Reviews are conducted by teams under the direction of senior division management and focus on higher-level management issues. Peer Review teams are selected on the basis of members knowledge and experience in the issues of interest to the division director. LBNL periodically requests in-depth independent assessments of selected ES&H programs. Such assessments augment LBNL's established assessment processes and provide an objective view of ES&H program effectiveness. Institutional Findings, Observations, and Noteworthy Practices identified during independent assessments are specifically intended to help LBNL identify opportunities for program improvement. This report includes the results of the Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review, respectively.

99 GENERAL AND MISCELLANEOUS↗

Performance Analysis: Control of Hazardous Energy

LLNL experienced 26 occurrences related to the control of hazardous energy from January 1, 2008 through August 2010. These occurrences were 17% of the total number of reported occurrences during this 32-month period. The Performance Analysis and Reporting Section of the Contractor Assurance Office (CAO) routinely analyzes reported occurrences and issues looking for patterns that may indicate changes in LLNL’s performance and early indications of performance trends. It became apparent through these analyses that LLNL might have experienced a change in the control of hazardous energy and that these occurrences should be analyzed in more detail to determine if the perceived change in performance was real, whether that change is significant and if the causes of the occurrences are similar. This report documents the results of this more detailed analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Idaho National Laboratory Integrated Safety Management System FY 2016 Effectiveness Review and Declaration Report

Idaho National Laboratory’s (INL’s) Integrated Safety Management System (ISMS) effectiveness review of fiscal year (FY) 2016 shows that INL has integrated management programs and safety elements throughout the oversight and operational activities performed at INL. The significant maturity of Contractor Assurance System (CAS) processes, as demonstrated across INL’s management systems and periodic reporting through the Management Review Meeting process, over the past two years has provided INL with current real-time understanding and knowledge pertaining to the health of the institution. INL’s sustained excellence of the Integrated Safety and effective implementation of the Worker Safety and Health Program is also evidenced by other external validations and key indicators. In particular, external validations include VPP, ISO 14001, DOELAP accreditation, and key Laboratory level indicators such as ORPS (number, event frequency and severity); injury/illness indicators such as Days Away, Restricted and Transfer (DART) case rate, back & shoulder metric and open reporting indicators, demonstrate a continuous positive trend and therefore improved operational performance over the last few years. These indicators are also reflective of the Laboratory’s overall organizational and safety culture improvement. Notably, there has also been a step change in ESH&Q Leadership actions that have been recognized both locally and complex-wide. Notwithstanding, Laboratory management continues to monitor and take action on lower level negative trends in numerous areas including: Conduct of Operations, Work Control, Work Site Analysis, Risk Assessment, LO/TO, Fire Protection, and Life Safety Systems, to mention a few. While the number of severe injury cases has decreased, as evidenced by the reduction in the DART case rate, the two hand injuries and the fire truck/ambulance accident were of particular concern. Aggressive actions continue in order to understand the causes and define actions needed to prevent similar injuries and accidents in the future. While our injury rate is not where we want it to be, it is not the only indicator that defines our ISMS program, safety culture, and efforts to be a continuous learning organization. When reviewing the entire year’s performance, and all areas that integrate ISMS principles and core functions, INL has an “effective” ISMS program that is continually improving.

99 GENERAL AND MISCELLANEOUS↗

Battelle Energy Alliance, LLC (BEA) 2016 Self-Assessment Report for Idaho National Laboratory (INL)

This report provides Battelle Energy Alliance’s (BEA) self-assessment of performance for the period of October 1, 2015, through September 30, 2016, as evaluated against the goals, performance objectives, and notable outcomes defined in the Fiscal Year (FY) 2016 Performance Evaluation and Measurement Plan (PEMP). BEA took into consideration and consolidated all input provided from internal and external sources (e.g., Contractor Assurance System [CAS], program and customer feedback, external and independent reviews, and Department of Energy [DOE] Idaho Operations Office [ID] quarterly PEMP reports and Quarterly Evaluation Reports). The overall performance of BEA during this rating period was self-assessed as “Excellent,” exceeding expectations of performance in Goal 1.0, “Efficient and Effective Mission Accomplishment”; Goal 2.0, “Efficient and Effective Stewardship and Operation of Research Facilities”; and Goal 3.0, “Sound and Competent Leadership and Stewardship of the Laboratory.” BEA met or exceeded expectations for Mission Support Goals 4.0 through 7.0 assessing a final multiplier of 1.0. Table 1 documents BEA’s assessment of performance to the goals and individual performance objectives. Table 2 documents completion of the notable outcomes. A more-detailed assessment of performance for each individual performance objective is documented in the closeout reports (see the PEMP reporting system). Table 3 includes an update to “Performance Challenges” as reported in the FY 2015 Self-Assessment Report.

99 GENERAL AND MISCELLANEOUS↗

Issues Management Process Course # 38401

The purpose of this training it to advise Issues Management Coordinators (IMCs) on the revised Contractor Assurance System (CAS) Issues Management (IM) process. Terminal Objectives: Understand the Laboratory’s IM process; Understand your role in the Laboratory’s IM process. Learning Objectives: Describe the IM process within the context of the CAS; Describe the importance of implementing an institutional IM process at LANL; Describe the process flow for the Laboratory’s IM process; Apply the definition of an issue; Use available resources to determine initial screening risk levels for issues; Describe the required major process steps for each risk level; Describe the personnel responsibilities for IM process implementation; Access available resources to support IM process implementation.

99 GENERAL AND MISCELLANEOUS↗

FY17 LLNL LDRD Annual Report

The LDRD Program achieves continual improvement through internal and external reviews of Program management, execution, and oversight of each LDRD project. In accordance with DOE Order 226.1B of the prime contract between NNSA and Lawrence Livermore National Security, LLC, a contractor-assurance system is in place at the Laboratory; the LDRD office uses this system and tools provided to support improvements in LDRD Program performance. The FY17 portfolio was carefully structured to promote the Program’s vigorous strategic vision and the long-term goals of DOE, NNSA, and Livermore.

99 GENERAL AND MISCELLANEOUS↗

2017 BEA Self-Assessment Report for Idaho National Laboratory

This report provides Battelle Energy Alliance’s (BEA) self-assessment of performance for the period of October 1, 2016, through September 30, 2017, as evaluated against the goals, performance objectives, and notable outcomes defined in the Fiscal Year (FY) 2017 Performance Evaluation and Measurement Plan (PEMP). BEA took into consideration and consolidated all input provided from internal and external sources (e.g., Contractor Assurance System [CAS], program and customer feedback, external and independent reviews, and Department of Energy [DOE] Idaho Operations Office [ID] quarterly PEMP reports and Quarterly Evaluation Reports). After considering the information related to performance during the rating period, including feedback from the Office of Nuclear Energy (NE), Idaho Operations Office (ID), and other programmatic sponsors, BEA has self-assessed the Laboratory’s performance at a grade of A, an adjectival rating of “Excellent.” Table 1 documents BEA’s assessment of performance to the goals and individual performance Objectives. Table 2 documents completion of the Notable Outcomes. A more-detailed assessment of performance for each individual performance objective is documented in the closeout reports (see the PEMP reporting system). Table 3 includes an update to “Performance Challenges” as reported in the FY 2016 Self-Assessment Report.

99 GENERAL AND MISCELLANEOUS↗

A VHSIC general purpose processor

The very high speed integrated circuit (VHSIC) program offers NASA and its contractors assured availability of military specification embedded computer components and integrated computer aided design/computer aided engineering and software development support that result in low system life costs for data management systems on the space station and the Earth Observatory Satellite. Viewgraphs given review progress in both the Department of Defense VHSIC program and the NASA VHSIC related insertion development of a general purpose processor are presented.

Benz, H. F.↗

Panel Session 33: Aligning Decision-Making to Deliver Timely Performance in Large Results-Based Programs

The panel focused on results-based project execution and ways to improve the effectiveness of program and project-specific decisions by gearing them to consistently achieving timely, cost-efficient, and sustainable results. Panelists discussed the complexities of making sound, actionable decisions in the face of budgetary, resource and technological constraints. Toward that end, the 10 panelists responded to the following questions: 1. What decision-making process has been most effective for you and your project team? 2. How effective are the incentives in your contract? 3. What would you be doing differently if your project were being executed on purely commercial terms? 4. Are your Contractor Assurance Programs effective? 5. Have we challenged industry and national laboratories to deliver revolutionary rather than evolutionary technologies to solve challenges? 6. What can we do to make stakeholder involvement more meaningful? 7. How do you apply lessons learned from events and issues like the Mixed Oxide Facility (MOX), the Plutonium Finishing Plant (PFP) event, and the Waste Isolation Pilot Plant (WIPP) incident?.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation Of The NASA Quality Surveillance System Pilot In Meeting Requirements For Contractor Surveillance Under Performance Based Contracting

The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

Schmahl, Karen E.↗

Evaluation of the NASA Quality Surveillance System Pilot in Meeting Requirements for Contractor Surveillance Under Performance Based Contracting

The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

Schmahl, Karen E.↗

RH Packaging Program Guidance

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package (also known as the "RH-TRU 72-B cask") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗