Search NASA⌕ Search

SEARCH · Search NASA

Results for “core recovery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

2005 GOM JIP - LEG I Core Recovery Log

2005 GOM JIP - LEG I Core Recovery Log offers information on the cores recovered during this expedition and is the official recovery log from the field phase of that cruise. The primary objective of the Gulf of Mexico Hydrates Joint Industry Project (JIP) was to develop technology and data to assist in the characterization of naturally occurring gas hydrates in the deepwater Gulf of Mexico. Other objectives of this project were to better understand how natural gas hydrates can affect seafloor stability, to gather data that can be used to study climate change, and to determine how the results of this project can be used to assess if and how gas hydrates act as a trapping mechanism for shallow oil or gas reservoirs. More information about this cruise is available here https://edx.netl.doe.gov/dataset/gulf-of-mexico-gas-hydrates-joint-industry-project-jip-characterizing-natural-gas-hydrates-in-the

core↗

Estimation of Core Recovery Time with TRACE

Following the severe accident in Fukushima Daiichi Nuclear Power Plant in Japan, safety related concerns about the zirconium based claddings used in current light water reactors have increased. High corrosion resistance and low neutron absorption cross section make zirconium a suitable cladding material for normal nuclear plant operational conditions. However, for nuclear accident scenarios when safety functions of the plant are lost, Zr claddings undergo exothermic reaction with steam and exacerbate the accident conditions. The exothermic reaction increases the temperature of the cladding and accelerates core melting in severe accident progression. And the generation of explosive hydrogen gas accumulates and challenges the structural integrity. The accident tolerant fuel (ATF) concept is the fuel and cladding system that gives a longer time margin, compared to standard Zr claddings, to cope with the accident when core cooling systems are lost in a nuclear power plant. The ATF cladding should have slower oxidation kinetics and less hydrogen generation than Zr to alleviate consequences of cladding interaction with steam at high temperatures. The maximum time available to mitigate progression of severe accident is an important measure to evaluate benefits of ATF claddings. For this work, the maximum time available to mitigate progression of severe accident is selected as the time at which cladding melting reaction starts. Melting reaction is selected as an upper limit because of the degradation of coolable geometry. Maintaining the coolable geometry is a regulation criteria for both loss of coolant (LOCA) analyses and outside the LOCA analyses. Once the melting of the cladding starts, it exacerbates the deformation of the fuel assembly and hottest rods within the core cannot be cooled by water reflood and results in fuel melting progression. The aim of this work is to evaluate time margin gain of ATF cladding in a severe accident scenario of LOCA without safety injections and station blackout considering oxidation kinetics only. Also it is assumed that safety injections are recovered before melting of the claddings start and the sensitivity of safety injection actuation time on core recovery is analyzed. The core recovery time is the time when makeup water from safety injections quench the fuel rods and halt the progression of the severe accident. This time is estimated by initiating safety injections at different times and observing the hot rod behavior which represents 1/5. of the core in this work. It is considered that core is not recoverable when 20% of the core is damaged.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Expedition UT-GOM2-2 Site H

Pressure and conventional cores were collected at Site H of the Walker Ridge Protracted Area Block 313 in the Terrebonne Basin, deepwater Gulf of America (Gulf of Mexico) during the University of Texas (UT) Deepwater Hydrate Coring Expedition (UT-GOM2-2). Pressure and conventional cores were collected continuously to a depth of 155.1 meters below the seafloor (mbsf). At deeper depths, cores were taken periodically from hydrate-bearing sands and their bounding muds to a total depth of 861.3 mbsf. 162.6 m of conventional core and 54.8 m of pressure core were recovered. Twelve temperature measurements were made between 27.1 and 144.5 mbsf to determine the geothermal gradient. At the seafloor, more than 4 m of sandy silt of unknown origin was encountered. Beneath this sand, to a depth of about 200 mbsf, the section was composed of interbedded mud and biogenic carbonate ooze. The ooze correlated to low density and high porosity intervals observed in the previously acquired logging while drilling (LWD) data and as measured. These ooze intervals also correspond to lighter sediment color, increased Ca content based on X-ray florescence (XRF) core scanning, and increased calcareous nannofossil abundance. Calcareous nannofossil biostratigraphy constrains the entire record to the Pleistocene (< 0.91 million years), with a pronounced increase in sedimentation rate with depth. Below 200 mbsf, the section was predominantly composed of mud with two thicker, hydrate-bearing coarse-grained intervals, which are commonly known as the Blue and Orange sands. The dissolved gas concentration was quantified from pressure cores. In the shallow section, dissolved methane concentration increased below the sulfate-methane transition zone (SMTZ) and reaches saturation (the limit of solubility for methane) at 147 mbsf. Gas expansion was very common in conventional and depressurized pressure (conventionalized) cores below the SMTZ. At deeper depths, the methane concentration within muds bounding the Blue and Orange reservoirs was generally found to be less than saturation. The dissolved and hydrate gas composition is consistent with a microbial source, containing greater than 99.99% methane and only trace concentrations of ethane, propane, and butane. The methane to ethane ratio (C1 /C2 ) and the methane to ethane plus propane (C1 /(C2 +C3 )) decrease with depth down to at least 678 mbsf, mainly driven by the increase in ethane with depth. It is unclear if this trend continues through the Orange sand interval. The δ13C isotopic signature of methane ranges between -69.9 and -78.5 ‰ relative to the Vienna Pee Dee Belemnite (VPDB) standard. Pressure core recovery in sandy intervals was poor. However, pressure core logs of the Orange sand show intervals of low density and high velocity, which are indicative of high hydrate saturation. One pressure core was degassed and the average hydrate saturation in the core was determined to be 24%. One core from within the Orange sand was composed of interbedded graded sandy silt and mud. The sandy silts from this core are composed of mainly quartz and feldspar with some lithics. Most of the recovered pressure core samples are maintained at near in-situ pressure and temperature (within the hydrate stability field) at the University of Texas Pressure Core Center awaiting analysis. In the shallow section, samples will be used to determine the flux of organic carbon through the basin system, find the rate at which that carbon was consumed, and understand the microbial population responsible for these processes. In the deeper section, samples from in and around the hydrate reservoirs will be used to determine the petrophysical properties of the reservoir and bounding seals in these systems.

03 NATURAL GAS↗

UT-GOM2-2 Preliminary Report: Terrebonne Basin Northern Gulf of Mexico, 30 July-28 September 2023

In the summer and fall of 2023, the Gulf of Mexico Deepwater Hydrate Coring Expedition (UT-GOM2-2) drilled, cored, made downhole measurements, and analyzed samples from the seafloor to the base of the gas hydrate stability zone in one location (Site H, WR313) in the Terrebonne basin, deepwater Gulf of Mexico. Analyses of data and samples from the expedition will inform biological, geochemical, and geomechanical models to constrain the role of gas hydrates in the carbon cycle and the potential for gas hydrates as an energy resource. Pressure and conventional cores were collected continuously to a depth of 155.1 meters below the seafloor (mbsf). At deeper depths, cores were taken periodically from hydrate-bearing sands and their bounding muds to a total depth of 861.3 mbsf. 162.6 m of conventional core and 54.8 m of pressure core were obtained. Twelve temperature measurements were made between 27.1 and 144.5 mbsf to determine the geothermal gradient. At the seafloor, more than 4 m of sandy silt of unknown origin was encountered. Beneath this sand, to a depth of ~200 mbsf, the section was composed of interbedded mud and biogenic carbonate ooze. The biogenic ooze correlated to low density and high porosity intervals observed in the previously acquired logging while drilling (LWD) data and as measured. Calcareous nannofossil biostratigraphy constrains the entire record to the Pleistocene (< 0.91 million years) with a pronounced increase in sedimentation rate with depth. Beneath 200 mbsf, the section was predominantly composed of mud with two thicker, hydrate-bearing coarse-grained intervals, which are commonly known as the Blue and Orange sands. The dissolved gas concentration was quantified from pressure cores. In the shallow section, dissolved methane concentration increased below the sulfate-methane transition zone (SMTZ) and reaches saturation (the limit of solubility for methane) at 147 mbsf. Gas expansion was very common in conventional and depressurized pressure (conventionalized) cores below the SMTZ. At deeper depths, the methane concentration within muds bounding the Blue and Orange reservoirs was generally found to be less than saturation. The dissolved and hydrate gas composition is consistent with a microbial source, containing greater than 99.99% methane and only trace concentrations of ethane, propane, and butane. The methane to ethane ratio (C 1 /C 2 ) and the methane to ethane plus propane (C 1 /(C 2 +C 3 )) decrease with depth down to at least 678 mbsf, mainly driven by the increase in ethane with depth. It is unclear if this trend continues through the Orange sand interval. The δ 13 C isotopic signature of methane ranges between -69.9 and -78.5 ‰ Vienna Pee Dee Belemnite (VPDB). Pressure core recovery of all sandy intervals was poor. However, pressure core logs of the Orange sand show intervals of low density and high velocity, which are indicative of high hydrate saturation. One core from within the Orange sand was composed of interbedded graded sandy silt and mud. The sandy silts from this core are composed of mainly quartz and feldspar with some lithics. Most of the recovered pressure core samples are maintained at near in-situ pressure and temperature (within the hydrate stability field) at the University of Texas Pressure Core Center awaiting analysis. In the shallow section, samples will be used to determine the flux of organic carbon through the basin system, find the rate at which that carbon was consumed, and understand the microbial population responsible for these processes. In the deeper section, samples from in and around the hydrate reservoirs will be used to determine the petrophysical properties of the reservoir and bounding seals in these systems.

03 NATURAL GAS↗

Main results of the french R and D on minor actinides partitioning, a significant improvement towards nuclear waste reduction - 15618

In the framework of the successive 1991 and 2006 Waste Management Act, French government supported a very significant R and D program on partitioning and transmutation of minor actinides (MA). This program aims to study potential solutions for still minimizing the quantity and the hazardousness of final waste, by MA recycling. Indeed, MA recycling can reduce the heat load and the half-life of most of the waste to be buried to a couple of hundred years, overcoming the concerns of the public related to the long-life of the waste. Within this framework, this paper aims to present the most recent progress obtained in CEA on the development of innovative actinide partitioning hydrometallurgical processes in support of their recycling, either in an homogeneous mode (MA are recycled at low concentration in all the standard reactor fuel) or in an heterogeneous mode (MA are recycled at higher concentration in specific targets, at the periphery of the reactor core). Recovery performances obtained on recent tests in high active conditions of the so-called GANEX and DIAMEX-SANEX process will be presented and discussed in light of the potential P and T scenarios. Finally, recent developments regarding the recycling of the sole Am will be presented as well as the results obtained on highly active solutions for this so-called EXAM process. This set of results gives to the French government a portfolio of potential recycling processes which could be separately and progressively implemented if decided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Particle transport inferences from density sawteeth

Sawtooth oscillations in tokamaks are defined by their effect on electron temperature: a rapid flattening of the core profile followed by an outward heat pulse and a slow core recovery caused by central heating. Recent high-resolution, multi-chord interferometer measurements on JTEXT extend these studies to particle transport. Sawteeth only partially flatten the core density profile, but enhanced particle diffusion on the time scale of the thermal crash occurs over much of the profile, relevant for impurities. Recovery between crashes implies an inward pinch velocity extending to the center.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Management of the Three Mile Island, Unit 2, Accident Corium and Severely Damaged Fuel Debris

The Three Mile Island, Unit Two (TMI-2) pressurized water reactor core melted down in 1979 due to an untimely combination of maintenance problems that led to a loss of feedwater, followed by a series of operational misunderstandings and errors. The melted core recovery process required development of a wide array of tools. After approximately three years of water management and other cleanup actions, the first views of the core revealed a much higher degree of damage than previously expected. Approximately 62 metric tons of the core had melted, leaving only 42 of the 177 fuel assemblies standing with a majority of rods intact. The core to be recovered was composed of loose debris and a solidified mass of formerly molten fuel. Robotic tools that had been designed for the task were of limited effectiveness due to the range of material types and phases. Over a period of several years, the central melt was broken up, primarily by use of a core-boring drill originally designed to acquire samples through the depth of the debris field. The broken pieces were loaded into specially designed debris canisters by use of long-handled pick-and-place tools and suctioned into baffled knockout canisters using an airlift vacuum system. A remotely operable underwater plasma arc torch was developed for removal of the lower core support structure to be able to retrieve the fuel pieces and secondary melt that had accumulated on the bottom reactor vessel head. Canister design played a central role in defining the initial retrieval process and later affected transportation, interim wet and its current interim dry storage. Due to concerns about the potential for radiolysis of residual water in the debris and other canister material, the canisters were fitted with hydrogen recombiner catalyst units to prevent a buildup of flammable gas and potential pressurization. To confirm the effectiveness of the recombiners during shipping, eight dewatered canisters were kept sealed for up to 205 days with periodic sampling of the headspace gas. The highest hydrogen value (9 vol%) was observed in a canister held for 147 days while the longest stored canister resulted in a 5% hydrogen concentration. The oxygen concentration never exceeded 0.5 %, and the primary backfill was >80% argon, meaning there was no flammability risk. Radiolytic hydrogen was also observed in wet pool storage, where the vented canisters discharged a portion of the water backfill as a result of gas production. The 344 canisters (268 fuel debris, 62 filter, and 12 knockout type) were dewatered, loaded in groups of seven into a double barrier shipping cask, and transported to the U.S. Department of Energy site in Idaho for 10 years of pool storage.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Management of the Three Mile Island Unit 2 Accident Corium and Severely Damaged Fuel Debris (Rev. 2)

The Three Mile Island, Unit Two (TMI-2) pressurized water reactor core underwent a significant meltdown in 1979 due to an untimely combination of maintenance problems that led to a loss of feedwater, followed by a series of operational misunderstandings and errors. Primary coolant discharging through a malfunctioning valve represented what was analyzed as a “small-break” loss-of-coolant accident (LOCA) and ultimately became a full core meltdown. The melted core recovery process required the development of a wide array of tools. After approximately three years of water management and other cleanup actions, the first views of the core revealed a much higher degree of damage than previously expected. Approximately 62 metric tons of the core had melted, leaving only 42 of the 177 fuel assemblies standing with fuel rods intact. The core to be recovered was composed of loose, gravel-like and granular particulate material and a central solidified mass of formerly molten fuel. Molten fuel had also penetrated some of the pressure vessel internals and resolidified below the main core support structure. Robotic tools that had been designed for the task were of limited effectiveness due to the range of material types and phases.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Management of the Three Mile Island Unit 2 Accident Corium and Severely Damaged Fuel Debris (Rev. 2)

The Three Mile Island, Unit Two (TMI-2) pressurized water reactor core underwent a significant meltdown in 1979 due to an untimely combination of maintenance problems that led to a loss of feedwater, followed by a series of operational misunderstandings and errors. Primary coolant discharging through a malfunctioning valve represented what was analyzed as a “small-break” loss-of-coolant accident (LOCA) and ultimately became a full core meltdown. The melted core recovery process required the development of a wide array of tools. After approximately three years of water management and other cleanup actions, the first views of the core revealed a much higher degree of damage than previously expected. Approximately 62 metric tons of the core had melted, leaving only 42 of the 177 fuel assemblies standing with fuel rods intact. The core to be recovered was composed of loose, gravel-like and granular particulate material and a central solidified mass of formerly molten fuel. Molten fuel had also penetrated some of the pressure vessel internals and resolidified below the main core support structure. Robotic tools that had been designed for the task were of limited effectiveness due to the range of material types and phases.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Directional Drilling Technology for HLW Disposal - Outline of System and its Application - 16078

During high-level waste (HLW) disposal site selection, borehole measurement and logging to investigate the hydro-geological and geo-mechanical conditions of the host rocks is a very important way to examine the potential of the disposal candidates. In Japan, attention is being given to Neogene soft sedimentary rock as the host rock for HLW disposal. In particular, the soft sedimentary rock in coastal areas is thought to be one of the best candidates, because there is little driving force from underground water. Directional drilling is supposed to be efficient under limited topographic and geological conditions, and the Central Research Institute of Electric Power Industry (CRIEPI) has been conducting a project on directional drilling and logging/measurement technologies since 2000. Basic directional drilling system was developed and the system was applied to the Neogene normal sedimentary rock at the Hokushin area of the Horonobe town in Hokkaido. The borehole was drilled to the 700 m long and the applicability of the system was confirmed until 2004. A basic directional drilling system was developed, and the system was applied to the Neogene normal sedimentary rock in the Hokushin area, in the town of Horonobe in Hokkaido. A 700-m borehole was drilled, and the applicability of the system was confirmed in 2004. After conducting a seismic reflection survey for the Omagari fault distribution at the Kami-Horonobe area in the town of Horonobe, a drilling site was selected, and a borehole trace was planned to perpendicularly intersect the fault zone in 2005. Considering the planned trace, a 1000-m-long borehole was drilled to a depth of 450 m. From 750 m to the bottom (1000 m), the borehole was horizontal. The total core recovery was 99.8%, even though it was drilled in the fault zone. The geological, hydrological, geo-mechanical, geophysical, and geochemical data were collected using borehole logging/measurement/survey and core logging/measurement/analysis, and the Omagari fault was characterized. After conducting all the work in the borehole, a steel pipe was inserted into the borehole to case the wall. Open hole sections for monitoring were constructed considering the hydro-geological conditions throughout the hole. Then, the monitoring system was inserted and set up to obtain the initial conditions of the groundwater pressure and chemistry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Apollo drill core depth relationships

Preliminary depth relationships are presented for the Apollo 15, 16, and 17 drill core samples. For a given depth in any of these drill stems, the in situ lunar surface depth can be estimated. Ranges of uncertainty are also established, based on percent core recovery and degree of sample disturbance. The most likely explanation for the sample disturbance observed in the top three sections of the Apollo 16 drill stem is sample migration after the stem was capped on the lunar surface; essentially no sample was lost. Similar disturbance occurred in the Apollo 17 drill core, although to a lesser degree. The average original bulk densities (i.e., before any disturbance occurred) of the Apollo 15, 16, and 17 drill cores are 1.76, 1.59, and 1.87 g/cu cm, respectively. The Apollo 15 and 17 values are probably close to the in situ values; but the Apollo 16 average in situ density could be as much as 13% less than the already low density in the drill core.

Carrier, W. D., III↗

UT-GOM2-2 Drilling Fluid (Technical Note)

It is proposed that a salt-saturated, water-based mud might improve borehole stability for UT-GOM2-2 relative to a fresh-water-based mud. However, the primary objective for UT-GOM2-2 is to safely and successfully acquire uncompromised hydrate-bearing sediment cores. This can only be done if conditions stay within the hydrate stability zone, and well away from the hydrate stability boundary. The addition of salt to the drilling mud, shifts the hydrate stability boundary closer to estimated conditions. This shift, by some estimates of pressure and temperature, where conditions now fall outside of the hydrate stability zone, may result in borehole enlargement and the release of free gas into the borehole. This shift by all estimates, even when coring conditions stay inside the hydrate stability zone, shrinks the window between the estimated conditions and the hydrate stability boundary. This shift is likely to compromise the hydrate-bearing cores while they are being recovered from the bottom-hole to the rig floor. In this report we present two examples: 1) Assuming temperature and pressure from in-situ estimates: Hydrate within the target reservoirs (Orange and Blue) at Walker Ridge Block 313 (WR 313) will be outside the hydrate stability zone in the presence of a drilling mud with 9.5 wt.% salinity (the salinity of the proposed 10.5 ppg salt-based mud) at in situ pressure and temperature. Thus, the hydrate will be unstable. A 10.5 ppg salt-based mud may result in dissociation of the hydrate into its components: water and gas. 10.5 ppg salt-based mud may enlarge the borehole, release free gas into the borehole, and compromise the cores. 2) Assuming temperatures equal to the measured LWD borehole temperatures at this location: Hydrate within the target reservoirs will be stable with a salinity of 9.5 wt.% (the salinity of the proposed 10.5 ppg salt-based mud), but possibly unstable (just at the methane hydrate stability boundary) for a salinity of 17.2 wt.% (the salinity of the proposed 13.5 ppg salt-based kill mud). if the borehole has the same temperature as recorded during previous LWD drilling at this location. A 13.5 ppg salt-based kill mud may destabilize the borehole. More importantly, a 10.5 ppg salt-based mud does not provide a large enough window between the estimated conditions and the hydrate stability boundary. Core temperatures and pressures fluctuate from the bottom-hole conditions as the core is brought up from the bottom-hole to the rig floor. These fluctuations are likely to cause the hydrate in the cores to touch or cross the stability boundary. Therefore, cores captured using a 10.5 ppg salt-based mud are likely to be compromised during core recovery to the rig floor.

03 NATURAL GAS↗

Micropillar compression technique applied to micron-scale mudstone elasto-plastic deformation.

Mudstone mechanical testing is often limited by poor core recovery and sample size, preservation and preparation issues, which can lead to sampling bias, damage, and time-dependent effects. A micropillar compression technique, originally developed by Uchic et al. 2004, here is applied to elasto-plastic deformation of small volumes of mudstone, in the range of cubic microns. This study examines behavior of the Gothic shale, the basal unit of the Ismay zone of the Pennsylvanian Paradox Formation and potential shale gas play in southeastern Utah, USA. Precision manufacture of micropillars 5 microns in diameter and 10 microns in length are prepared using an ion-milling method. Characterization of samples is carried out using: dual focused ion - scanning electron beam imaging of nano-scaled pores and distribution of matrix clay and quartz, as well as pore-filling organics; laser scanning confocal (LSCM) 3D imaging of natural fractures; and gas permeability, among other techniques. Compression testing of micropillars under load control is performed using two different nanoindenter techniques. Deformation of 0.5 cm in diameter by 1 cm in length cores is carried out and visualized by a microscope loading stage and laser scanning confocal microscopy. Axisymmetric multistage compression testing and multi-stress path testing is carried out using 2.54 cm plugs. Discussion of results addresses size of representative elementary volumes applicable to continuum-scale mudstone deformation, anisotropy, and size-scale plasticity effects. Other issues include fabrication-induced damage, alignment, and influence of substrate.

03 NATURAL GAS↗

Basic Data Report for Well Plugging and Abandonment Activities for Fiscal Year 2009

The Waste Isolation Pilot Plant (WIPP) facility is a U.S. Department of Energy (DOE) facility for disposal of transuranic mixed waste under a permit issued by the New Mexico Environment Department. The WIPP facility is 26 miles southeast of Carlsbad, New Mexico, in eastern Eddy County. Disposal panels are mined in the Permian Salado Formation at a depth of 2,150 feet below ground surface (bgs). Field activities for this Basic Data Report were initiated in June 2009, and concluded in July 2009. The FY 2009 program included the plugging and abandonment (P&A) of two monitoring wells, which permanently removed them from the monitoring network. This Basic Data Report presents the summary of procedures followed for each well completion as documented by the Subcontract Technical Representative (STR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Drillhole SNL-6 and -6A (C-3151)

SNL-6 and SNL-6A were drilled in the southeast quarter of section 7, T21S, R32E, in western Lea County, NM. This location places the drillholes north-northeast of the WIPP site. An original drillhole (now designated SNL-6A) on the wellpad could not be completed and was plugged and abandoned. A second well (known as SNL-6) was drilled and completed on the same wellpad, and it is monitored for water levels. The focus of this report is the completed well (SNL-6), with reference as appropriate to geologic and other data from SNL.6A. Appendix material will be referred to in the text for details of drilling, logging, and plugging and abandoning of SNL-6A. SNL-6 is located 1,847 ft from the south line (fsl) and 1,413 ft from the east line (fel) of the section. SNL-6 was begun on August 23, 2005, and was completed September 10, 2005. SNL-6 is used to monitor groundwater levels of the Culebra Dolomite Member of the Permian Rustler Formation for WIPP in an area of low transmissivity and near the northeastern corner of the hydrological modeling domain. SNL-6 was permitted by the NM State Engineer as C-3151. Official correspondence regarding permitting and regulatory information must reference this permit number. Most drillholes at WIPP have been described after completion to provide an account of the geologic, hydrologic, or other basic data acquired during drilling and immediate completion of the drillhole. In addition, the basic data report provides an account of the drilling procedures and activities that may be helpful to later interpretations of data or for further work in the drillhole, including test activities and eventual plugging and abandoning activities. The basic data report also provides a convenient means of reporting information about administrative activities necessary to drill the hole.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wireline Deep Drill for the Exploration of Icy Bodies

One of the most pressing current questions in space science is whether life has ever arisen anywhere else in the universe. Water is a critical prerequisite for all life-as-we-know-it, thus the possible exploration targets for extraterrestrial life are bodies that have or had copious liquid: Mars, Europa, and Enceladus. Due to the oxidizing nature of Mars' surface, as well as subsurface liquid water reservoirs present on Europa and Enceladus, the search for evidence of existing life must likely focus on subsurface locations, at depths sufficient to support liquid water or retain biologic signatures. To address these questions, an Auto-Gopher sampler has been developed that is a wireline type drill. This drill is suspended on a tether and its motors and mechanisms are built into a tube that ends with a coring bit. The tether provides the mechanical connection to a rover/lander on a surface as well as power and data communication. Upon penetrating to a target depth, the drill is retracted from the borehole, the core is deposited into a sample transfer system, and the drill is lowered back into the hole. Wireline operation sidesteps one of the major drawbacks of traditional continuous drill string systems by obviating the need for multiple drill sections, which add significantly to the mass and the complexity of the system (i.e. penetration rate was 40 cm per hour). Drilling to 2 meter depth and recovering of cores every 10 cm took a total time of 15 hours (a single step of drilling 10 cm and retrieving the core was 45 minutes). Total energy to reach the 2 m depth was 500 Whr. The Weight on Bit was limited to less than 70 Newton. The core recovery was 100%.

sampling↗

The Life and Death of A Subglacial Lake in West Antarctica

Over the past 50 years, the discovery and initial investigation of subglacial lakes in Antarctica have highlighted the paleoglaciological information that may be recorded in sediments at their beds. In December 2018, we accessed Mercer Subglacial Lake, West Antarctica, and recovered the first in situ subglacial lake-sediment record—120 mm of finely laminated mud. We combined geophysical observations, image analysis, and quantitative stratigraphy techniques to estimate long-term mean lake sedimentation rates (SRs) between 0.49 ± 0.12 mm a –1 and 2.3 ± 0.2 mm a –1 , with a most likely SR of 0.68 ± 0.08 mm a –1 . These estimates suggest that this lake formed between 53 and 260 a before core recovery (BCR), with a most likely age of 180 ± 20 a BCR—coincident with the stagnation of the nearby Kamb Ice Stream. Our work demonstrates that interconnected subglacial lake systems are fundamentally linked to larger-scale ice dynamics and highlights that subglacial sediment archives contain powerful, century-scale records of ice history and provide a modern process-based analogue for interpreting paleo–subglacial lake facies.

subglacial lakes↗

Effect of the Injection Pressure on Enhancing Oil Recovery in Shale Cores during the CO 2 Huff-n-Puff Process When It Is above and below the Minimum Miscibility Pressure

In CO 2 injection, there is a minimum miscibility pressure (MMP) above that CO 2 can be miscible with oil, so that oil recovery will be high. This work is to investigate the effect of the injection pressure on enhanced oil recovery in shale oil cores under huff-n-puff CO 2 injection, when the pressure is above and below the MMP. We first estimated the MMP for a Wolfcamp oil using slimtube tests. The slimtube test results showed that the estimated MMP for the CO 2 –Wolfcamp crude oil system was about 1620 psi at 104 °F. After that, we conducted 15 CO 2 huff-n-puff experiments using three different Wolfcamp shale cores at pressures below and above the MMP. These pressures were 1200, 1600, 1800, 2000, and 2400 psi. Each huff-n-puff test has 7 cycles. The huff-n-puff experiments for three cores showed that, below the MMP, the injection pressure had a significant effect on enhancing oil recovery. Higher than the MMP, the increased pressure further increased the oil recovery until the injection pressure was about 200 psi higher than the MMP. In the extremely low-permeability shale oil cores, additional pressure is needed to push gas into the deeper core to be miscible with the crude oil inside the core. The results indicated that, to have a high oil recovery in shale oil reservoirs during the CO 2 huff-n-puff process, the injection pressure should be higher (at least 200 psi in this case) than the MMP estimated from slimtube tests.

04 OIL SHALES AND TAR SANDS↗