Rapid Cost Assessment of Space Mission Concepts Through Application of Complexity-Based Cost Indices

This slide presentation reviews the development of a rapid cost assessment models for evaluation of exploration missions through the application of complexity based cost indices. In Fall of 2004, NASA began developing 13 documents, known as "strategic roadmaps," intended to outline a strategy for space exploration over the next 30 years. The Third Strategic Roadmap, The Strategic Roadmap for Solar System Exploration, focused on strategy for robotic exploration of the Solar System. Development of the Strategic Roadmap for Solar System Exploration led to the investigation of a large variety of missions. However, the necessity of planning around scientific inquiry and budgetary constraints made it necessary for the roadmap development team to evaluate potential missions not only for scientific return but also cost. Performing detailed cost studies for each of the large number of missions was impractical given the time constraints involved and lack of detailed mission studies; so a method of rapid cost assessment was developed by us to allow preliminary analysis. It has been noted that there is a strong correlation between complexity and cost and schedule of planetary missions. While these correlations were made after missions had been built and flown (successfully or otherwise), it seemed likely that a similar approach could provide at least some relative cost ranking. Cost estimation relationships (CERs) have been developed based on subsystem design choices. These CERs required more detailed information than available, forcing the team to adopt a more high level approach. Costing by analogy has been developed for small satellites, however, planetary exploration missions provide such varying spacecraft requirements that there is a lack of adequately comparable missions that can be used for analogy.

cost estimation↗

Report of the Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort. The Program size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap. A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule. The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program. The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required. Completion of ISS assembly is likely to be delayed from one to three years beyond December 2003.

Source record↗

Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort; The Program, size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap; A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule; The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program; The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program, growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required; and Completion of ISS assembly is likely to be delayed from, one to three years beyond December 2003.

Source record↗

Water Management Cost Assessment of CO2 Storage Operations

A three panel poster providing an analysis of treatment of produced waters from potential CO2 storage reservoirs. Selected water treatment technologies are modeled for several formations in five sedimentary basins in the lower 48 states assessing storage costs across a range of water quality present in these potential CO2 storage reservoirs.

Wendt, Anna↗

Life cycle cost assessment of material recovery from perovskite solar cells

Perovskite photovoltaic (PV) cells have created a significant interest over the last few years due to their low-cost and high-power conversion efficiencies. While perovskite PVs are still under development, we analyze cost of alternative sustainable end-of-life management for perovskite PV cells; this allows to reuse economically valuable materials and prevent environmental contamination. Here, we studied the life cycle cost assessment of recovering metals such as lead, aluminum, gold, nickel, and silver and other valuable materials such as glass from waste perovskite PVs. We also developed a recycling scheme to optimize the material recovery and determine the economically feasible ways to separate the cells layer-by-layer. Further, we assessed the cost and the net cost of the perovskite PV recycling processes. We found that the most feasible recycling technique’ cost is $\$$10.70 and its net cost is $\$$– 2.95 per 1 m 2 module. These values could be further improved by optimizing and reusing chemicals involved in process. These results indicate that the cost of perovskite PV recycling is economically feasible and there is potentional to gain benefit from sustainable end-of-life management of perovskite PVs.

14 SOLAR ENERGY↗

Final Report - Stationary and Emerging Market Fuel Cell System Cost Assessment

The U.S. Department of Energy (DOE) is focused on providing a portfolio of technology solutions to meet energy security challenges of the future. Fuel cells are a part of this portfolio of technology offerings. To help meet these challenges and supplement the understanding of the current research, Battelle has executed a five-year program that evaluated the total system costs and total ownership costs of two technologies: (1) an ~80 °C polymer electrolyte membrane fuel cell (PEMFC) technology and (2) a solid oxide fuel cell (SOFC) technology, operating with hydrogen or reformate for different applications. Previous research conducted by Battelle, and more recently by other research institutes, suggests that fuel cells can offer customers significant fuel and emission savings along with other benefits compared to incumbent alternatives. For this project, Battelle has applied a proven cost assessment approach to assist the DOE Fuel Cell Technologies Program in making decisions regarding research and development, scale-up, and deployment of fuel cell technology. The cost studies and subsequent reports provide accurate projections of current system costs and the cost impact of state-of-the-art technologies in manufacturing, increases in production volume, and changes to system design on system cost and life cycle cost for several near-term and emerging fuel cell markets. The studies also provide information on types of manufacturing processes that must be developed to commercialize fuel cells and also provide insights into the optimization needed for use of off-the-shelf components in fuel cell systems. Battelle’s analysis is intended to help DOE prioritize investments in research and development of components to reduce the costs of fuel cell systems while considering systems optimization.

08 HYDROGEN↗

Validated Feasibility Study of Integrally Stiffened Metallic Fuselage Panels for Reducing Manufacturing Costs: Cost Assessment of Manufacturing/Design Concepts

The objective of the Integral Airframe Structures (IAS) program was to demonstrate, for an integrally stiffened structural concept, performance and weight equal to "built-up" structure with lower manufacturing cost. This report presents results of the cost assessment for several design configuration/manufacturing method combinations. The attributes of various cost analysis models were evaluated and COSTRAN selected for this study. A process/design cost evaluation matrix was developed based on material, forming, machining, and assembly of structural sub-elements and assembled structure. A hybrid design, made from high-speed machined extruded frames that are mechanically fastened to high-speed machined plate skin/stringer panels, was identified as the most cost-effective manufacturing solution. Recurring labor and material costs of the hybrid design are up to 61 percent less than the current built-up technology baseline. This would correspond to a total cost reduction of $1.7 million per ship set for a 777-sized airplane. However, there are important outstanding issues with regard to the cost of capacity of high technology machinery, and the ability to cost-effectively provide surface finish acceptable to the commercial aircraft industry. The projected high raw material cost of large extrusions also played an important role in the trade-off between plate and extruded concepts.

Metschan, S.↗

Rapid Cost Assessment of Space Mission Concepts through Application of Complexity Indices

In 2005, the Solar System Exploration Strategic Roadmap Conmrittee (chartered by NASA to develop the roadmap for Solar System Exploration Missions for the coming decades) found itself posed with the difficult problem of sorting through several mission concepts and determining their relative costs. While detailed mission studies are the normal approach to costing, neither the budget nor schedule allotted to the conmrittee could support such studies. Members of the Jet Propulsion Laboratory (JPL) supporting the conmrittee were given the challenge of developing a semi-quantitative approach that could provide the relative costs of these missions, without requiring an in depth study of the missions. In response to this challenge, a rapid cost assessment methodology based on a set of mission cost/complexity indexes was developed. This methodology also underwent two separate validations, one comparing its results when applied to historical missions, and another comparing its estimates against those of veteran space mission managers. Remarkably good agreement was achieved, suggesting that this approach provides an effective early indication of space mission costs.

mission studies↗

Spacelab Mission Implementation Cost Assessment (SMICA)

A total savings of approximately 20 percent is attainable if: (1) mission management and ground processing schedules are compressed; (2) the equipping, staffing, and operating of the Payload Operations Control Center is revised, and (3) methods of working with experiment developers are changed. The development of a new mission implementation technique, which includes mission definition, experiment development, and mission integration/operations, is examined. The Payload Operations Control Center is to relocate and utilize new computer equipment to produce cost savings. Methods of reducing costs by minimizing the Spacelab and payload processing time during pre- and post-mission operation at KSC are analyzed. The changes required to reduce costs in the analytical integration process are studied. The influence of time, requirements accountability, and risk on costs is discussed. Recommendation for cost reductions developed by the Spacelab Mission Implementation Cost Assessment study are listed.

Guynes, B. V.↗

Advanced solar concentrator mass production, operation, and maintenance cost assessment

The object of this assessment was to estimate the costs of the preliminary design at: production rates of 100 to 1,000,000 concentrators per year; concentrators per aperture diameters of 5, 10, 11, and 15 meters; and various receiver/power conversion package weights. The design of the cellular glass substrate Advanced Solar Concentrator is presented. The concentrator is an 11 meter diameter, two axis tracking, parabolic dish solar concentrator. The reflective surface of this design consists of inner and outer groups of mirror glass/cellular glass gores.

Niemeyer, W. A.↗

Bench-Scale Development of a Hybrid Membrane-Absorption CO 2 Capture Process: Preliminary Cost Assessment

This report describes a study of capture costs for a hybrid membrane-absorption capture system based on Membrane Technology and Research, Inc. (MTR)’s low-pressure membrane contactors and the University of Texas at Austin’s 5 m piperazine (PZ) Advanced Flash Stripper (AFS; 5 m PZ AFS) based CO 2 capture system. The report is submitted for NETL review, and may be superseded by a final topical report on this topic that will be submitted to satisfy the Task 2 report requirement of the current project (DE-FE0013118).

54 ENVIRONMENTAL SCIENCES↗

Space Transportation Systems Life Cycle Cost Assessment and Control

Civil and military applications of space transportation have been pursued for just over 50 years and there has been, and still is, a need for safe, dependable, affordable, and sustainable space transportation systems. Fully expendable and partially reusable space transportation systems have been developed and put in operation that have not adequately achieved this need. Access to space is technically achievable, but presently very expensive and will remain so until there is a breakthrough in the way we do business. Since 1991 the national Space Propulsion Synergy Team (SPST) has reviewed and assessed the lessons learned from the major U.S. space programs of the past decades focusing on what has been learned from the assessment and control of Life Cycle Cost (LCC) from these systems. This paper presents the results of a selected number of studies and analyses that have been conducted by the SPST addressing the need, as well as the solutions, for improvement in LCC. The major emphasis of the SPST processes is on developing the space transportation system requirements first (up front). These requirements must include both the usual system flight performance requirements and also the system functional requirements, including the infrastructure on Earth's surface, in-space and on the Moon and Mars surfaces to determine LCC. This paper describes the development of specific innovative engineering and management approaches and processes. This includes a focus on flight hardware maturity for reliability, ground operations approaches, and business processes between contractor and government organizations. A major change in program/project cost control is being proposed by the SPST to achieve a sustainable space transportation system LCC - controlling cost as a program metric in addition to the existing practice of controlling performance and weight. Without a firm requirement and methodically structured cost control, it is unlikely that an affordable and sustainable space transportation system LCC will ever be achieved. '

Robinson, John W.↗

Comparative cost assessment of planetary missions

A study to explore the cost differences resulting from implementing a series of representative solar system exploration missions in either ballistic or low-thrust flight modes is presented. Cost comparisons of missions using a solar electric propulsion delivery systems with ballistic equivalent mission designs were made. The mission set, cost elements, and delivery modes are detailed. Objectives for each of the six mission sets including two asteroid missions, a comet mission, a Mercury mission, and two outer planet missions are given.

Source record↗

Spacecraft Disposal Rosetta Stone: Parametric Tool for Orbital Lifetime, Disposal, and Cost Assessment

This Technical Memorandum documents a simplified, parametric method for evaluating spacecraft orbital lifetime, disposal compliance, and disposal-related cost impacts during early mission formulation and preliminary design. The method captures the dominant drivers of orbital decay—effective ballistic coefficient, operating altitude, and solar-cycle variability—using conservative bounding assumptions. Solar maximum conditions are used to bound achievable mission lifetime, while solar minimum conditions are used to bound disposal timelines and compliance with orbital debris requirements. A single tabulated dataset provides orbital lifetime under both solar-cycle extremes together with representative disposal ΔV required to ensure compliant disposal, enabling rapid assessment of disposal feasibility, cost sensitivity, and system-level impacts prior to committing to higher-fidelity analyses.

Orbital debris mitigation↗

Wind Turbine Maintenance Costs: Assessing the Potential of Gear Oil Improvements

Wind turbine operations & maintenance (O&M) costs constitute a sizable portion of total energy cost for wind power. There are many components in a utility-scale wind turbine that need to be lubricated with either oil or grease. This study uses gearbox oil as an example and assesses how lubricant technology improvements may impact wind turbine power production and levelized cost of energy. Using the modeling tools (i.e., WOMBAT, reV, and SAM) developed at National Renewable Energy Laboratory and lubrication oil technology scenarios defined based on inputs provided by ExxonMobil and industry stakeholders, we quantify the potential for increasing energy production and reducing maintenance costs across the current and future U.S. fleet of wind turbines as a result of improvements in lubrication technologies. The modeled improvements reduce the median levelized cost of energy by 1-2% across the U.S. fleet. Cumulative saving from gear oil technology improvements in 2050 for U.S. fleet is estimated to be approximately $6 billion. Extending the lubricant replacement interval has a larger impact on total cost and energy production than reducing lubricant cost.

costs↗

Performance and Cost Assessment of a Natural Gas-Fueled Direct sCO 2 Power Plant

This final report details the cost and performance baseline developed at NETL for a natural gas-fueled direct sCO 2 plant, which holds promise as an efficient, cost-effective method of power production with carbon capture and storage (CCS). The steady state plant model includes turbine cooling flows based on a semi-empirical cooling model, and thermal integration with the air separation unit and oxygen compression train. Discussion of the performance of the baseline plant design is followed by details on the costing methodology, overall plant capital cost, and resulting cost of electricity (COE). Performance results yield a baseline sCO 2 plant thermal efficiency of 48.2% (HHV) with 98.2% carbon capture, an improvement over the reference NGCC plant with CCS (45.7% and 90.7% carbon capture). Cost analyses yield a 5% reduction in COE versus the NGCC plant, albeit with significant uncertainty. Finally, the effects of incomplete combustion on the overall plant performance are assessed.

03 NATURAL GAS↗

The importance of operations, risk, and cost assessment to space transfer systems design

This paper examines several methodologies which contribute to comprehensive subsystem cost estimation. The example of a space-based lunar space transfer vehicle (STV) design is used to illustrate how including both primary and secondary factors into cost affects the decision of whether to use aerobraking or propulsion for earth orbit capture upon lunar return. The expected dominant cost factor in this decision is earth-to-orbit launch cost driven by STV mass. However, to quantify other significant cost factors, this cost comparison included a risk analysis to identify development and testing costs, a Taguchi design of experiments to determine a minimum mass aerobrake design, and a detailed operations analysis. As a result, the predicted cost advantage of aerobraking, while still positive, was subsequently reduced by about 30 percent compared to the simpler mass-based cost estimates.

Ball, J. M.↗