Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost basis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Active heat exchange system development for latent heat thermal energy storage

Active heat exchange concepts for use with thermal energy storage systems in the temperature range of 250 C to 350 C, using the heat of fusion of molten salts for storing thermal energy are described. Salt mixtures that freeze and melt in appropriate ranges are identified and are evaluated for physico-chemical, economic, corrosive and safety characteristics. Eight active heat exchange concepts for heat transfer during solidification are conceived and conceptually designed for use with selected storage media. The concepts are analyzed for their scalability, maintenance, safety, technological development and costs. A model for estimating and scaling storage system costs is developed and is used for economic evaluation of salt mixtures and heat exchange concepts for a large scale application. The importance of comparing salts and heat exchange concepts on a total system cost basis, rather than the component cost basis alone, is pointed out. The heat exchange concepts were sized and compared for 6.5 MPa/281 C steam conditions and a 1000 MW(t) heat rate for six hours. A cost sensitivity analysis for other design conditions is also carried out.

Lefrois, R. T.↗

Solar energy system demonstration project at Wilmington Swim School, New Castle, Delaware

A solar energy system located at the Wilmington Swim School, New Castle, Delaware is described. The system was designed for a 40 percent heating and a 30 percent hot water solar contribution serving the heat loads in the following order: space heat - new addition, domestic water - entire facility, and pool heating - entire facility. On a cost basis for 2920 hours of operation, the heat reclaimed would cost $969.66 annually if provided by gas at 3.79 per million Btu's. At 5.5 centers per kwh, heat recovery costs of $481.80 percent a net savings of $487.86 annually.

Source record↗

The Conceptual Design of an Integrated Nuclearhydrogen Production Plant Using the Sulfur Cycle Water Decomposition System

A hydrogen production plant was designed based on a hybrid electrolytic-thermochemical process for decomposing water. The sulfur cycle water decomposition system is driven by a very high temperature nuclear reactor that provides 1,283 K helium working gas. The plant is sized to approximately ten million standard cubic meters per day of electrolytically pure hydrogen and has an overall thermal efficiently of 45.2 percent. The economics of the plant were evaluated using ground rules which include a 1974 cost basis without escalation, financing structure and other economic factors. Taking into account capital, operation, maintenance and nuclear fuel cycle costs, the cost of product hydrogen was calculated at $5.96/std cu m for utility financing. These values are significantly lower than hydrogen costs from conventional water electrolysis plants and competitive with hydrogen from coal gasification plants.

Farbman, G. H.↗

The role of ERTS in the establishment and of a nationwide land cover information system

The economic potential of utilizing an ERTS type satellite in the development, updating, and maintenance of a nation-wide land cover information system in the post-1977 time frame was examined. Several alternative acquisition systems were evaluated for land cover data acquisition, processing, and interpretation costs in order to determine, on a total life cycle cost basis, under which conditions of user demand (i.e., area of coverage, frequency of coverage, timeliness of information, and level of information detail) an ERTS type satellite would be cost effective, and what the annual cost savings benefits would be. It was concluded that a three satellite system with high and low altitude aircraft and ground survey team utilizing automatic interpretation and classification techniques is an economically sound proposal.

Abram, P.↗

Low-Temperature Forming of Beta Titanium Alloys

Low cost methods for titanium structural fabrication using advanced cold-formable beta alloys were investigated for application in a Mach 2.7 supersonic cruise vehicle. This work focuses on improving processing and structural efficiencies as compared with standard hot formed and riveted construction of alpha-beta alloy sheet structure. Mechanical property data and manufacturing parameters were developed for cold forming, brazing, welding, and processing Ti-15V-3Cr-3Sn-3Al sheet, and Ti-3Al-8V-6Cr-4Zr on a more limited basis. Cost and structural benefits were assessed through the fabrication and evaluation of large structural panels. The feasibility of increasing structural efficiency of beta titanium structure by selective reinforcement with metal matrix composite was also explored.

Kaneko, R. S.↗

Testing general relativity: Progress, problems, and prospects

The results from ground-based experimental testing are presented. Prospects for improving these experiments are discussed. Radar echo time delays, perihelion advance and solar oblateness, time variation of the gravitational constant, and radio wave deflection are considered. Ground-based and spacecraft techniques are compared on an accuracy vs. cost basis.

Shapiro, I. I.↗

A shuttle and space station manipulator system for assembly, docking, maintenance, cargo handling and spacecraft retrieval (preliminary design). Volume 3: Concept analysis. Part 2: Development program

A preliminary estimate is presented of the resources required to develop the basic general purpose walking boom manipulator system. It is assumed that the necessary full scale zero g test facilities will be available on a no cost basis. A four year development effort is also assumed and it is phased with an estimated shuttle development program since the shuttle will be developed prior to the space station. Based on delivery of one qualification unit and one flight unit and without including any ground support equipment or flight test support it is estimated (within approximately + or - 25%) that a total of 3551 man months of effort and $17,387,000 are required.

Source record↗

Boron/aluminum for space applications

Several experimental boron/aluminum structures have been built for aircraft and space vehicle applications. The success of these structures has led to the decision to use boron/aluminum tubular struts on the mid-fuselage section of the Space Shuttle Orbiter. The suitability of boron/aluminum for this application has been demonstrated in a program that involved fabricating 100 tubes and performing static, fatigue, corrosion, thermal/mechanical fatigue, and damage tolerance tests on them. Other potential applications for boron/aluminum on the Space Shuttle include the wing carry-through panels and side panels for the mid-fuselage, and the landing gear struts. These applications result in significant weight savings over conventional non-composite designs at moderate costs. Boron/aluminum can now be considered a production material that, in many cases, is competitive on a weight and/or cost basis with an all-metal or resin composite system.

Robertson, A. R.↗

Assessment of 20 kW S-band transmitter

The performance history of the 20-kW S-band transmitter, installed at three 64-meter antennas and six 26-meter antennas in the DSN, is reviewed. A number of failures and discrepancy reports are characteristic of the wearout phase of a failure curve. The type of failures are reviewed and four options toward reducing the number and cost of failures are reviewed. These are: existing (no change), refurbish, redesign and replacement. The options are compared on a ten year life cycle cost basis using FY77 expenditures for existing equipment as a base. It was concluded that benefits, in terms of reduction of outrage time, increase with an increase of expenditure toward improvement.

Dickinson, R.↗

Comparative analyses of space-to-space central power stations

The technological and economical impact of a large central power station in Earth orbit on the performance and cost of future spacecraft and their orbital transfer systems are examined. It is shown that beaming power to remote users cannot be cost effective if the central power station uses the same power generation system that is readily available for provision of onboard power and microwave transmission and reception of power through space for use in space is not cost competitive with onboard power or propulsion systems. Laser and receivers are required to make central power stations feasible. Remote power transmission for propulsion of orbital transfer vehicles promises major cost benefits. Direct nuclear pumped or solar pumped laser power station concepts are attractive with laser thermal and laser electric propulsion systems. These power stations are also competitive, on a mass and cost basis, with a photovoltaic power station.

Holloway, P. F.↗

Flight support system servicing aid tool

The Space Shuttle EVA on-orbit satellite servicing time is a scare commodity which has been limited for each mission to two 6-hour work periods with an intervening 40-hour rest period. New complex missions being planned require more servicing than two EVA's can accommodate. The GSFC (Goddard Space Flight Center) Satellite Servicing Project has been working for several years to develop a Serving Aid Tool to effectively extend this on-orbit servicing capability by IVA to the point that use of a master-slave bilateral force reflecting manipulator is now planned. This will be controlled from the Shuttle aft flight deck by the RMS mission specialist using a miniature hand controller while outfitted with a physical restraint system. This development is being done on a low cost basis using demonstrated state-of-the-art commercial teleoperated system hardware and software upgraded for space flight use.

Davis, R.↗

Robust Metal Additive Manufacturing Process Selection and Development for Aerospace Components

Metal additive manufacturing (AM) is a generic term that captures a variety of fabrication techniques. Each of these manufacturing process has unique advantages, applications for use, and challenges. The most common AM processes in use include Powder Bed Fusion (PBF) and Directed Energy Deposition (DED) as well as many solid state processes. While detailed research has been conducted among many of the processes including parameters and material properties, navigating which processes are best to select is difficult as it is based on component requirements. The focus of this presentation is to provide an overview of considerations for each of metal AM process selection for aerospace components based on various attributes. These attributes include geometric considerations, metallurgical characteristics, cost basis, post-processing and maturity of the processes. The data for these trade selections are based on studies that NASA as performed internally and with academic and industry partners. These studies include multiple AM build experiments to evaluate (1) geometric variations and constraints within the processes, (2) alloy characterization and mechanical testing, (3) pathfinder component development and hotfire evaluations, and (4) certification approaches. This presentation summarizes these results and meant to introduce various considerations when designing a metal AM component.

Additive Manufacturing↗

Metal Additive Manufacturing Process Selection and Development for Propulsion Components

Metal additive manufacturing (AM) is a generic term that captures a variety of fabrication processes. Each of these manufacturing process has unique advantages and challenges for use in aerospace propulsion applications. The most commonly used AM processes include Powder Bed Fusion (PBF), Directed Energy Deposition (DED), and solid-state processes as in Cold Spray, Ultrasonic Additive Manufacturing, and Additive Friction Stir Deposition. While detailed research has been conducted among many of the AM processes to mature processing parameters and material properties, navigating which processes are best to select is difficult as it is based on specific component requirements. The focus of this presentation is to provide an overview of considerations for each of metal AM process selection for aerospace components based on various key attributes. These key attributes include geometric considerations, metallurgical characteristics, cost basis, post-processing and maturity of the processes. The data for these trade selections are based on studies that NASA as performed internally and with academic and industry partners. These studies include multiple AM build experiments to evaluate (1) geometric variations and constraints within the processes, (2) alloy characterization and mechanical testing, (3) pathfinder component development and hot-fire evaluations, and (4) certification approaches. This presentation summarizes these results and is meant to introduce specific examples which show what to consider when designing a metal AM component for aerospace propulsion applications.

Additive Manufacturing↗

Metal Additive Manufacturing Process Selection and Development Lifecycle for Propulsion Components

Metal additive manufacturing (AM) is a generic term that captures a variety of fabrication processes. Each of these manufacturing process has unique advantages and challenges for use in aerospace propulsion applications. The most commonly used AM processes include Powder Bed Fusion (PBF), Directed Energy Deposition (DED), and solid-state processes as in Cold Spray, Ultrasonic Additive Manufacturing, and Additive Friction Stir Deposition. While detailed research has been conducted among many of the AM processes to mature processing parameters and material properties, navigating which processes are best to select is difficult as it is based on specific component requirements. The focus of this presentation is to provide an overview of considerations for each of metal AM process selection for aerospace components based on various key attributes. These key attributes include geometric considerations, metallurgical characteristics, cost basis, post-processing and maturity of the processes. The data for these trade selections are based on studies that NASA as performed internally and with academic and industry partners. These studies include multiple AM build experiments to evaluate (1) geometric variations and constraints within the processes, (2) alloy characterization and mechanical testing, (3) pathfinder component development and hot-fire evaluations, and (4) certification approaches. This presentation summarizes these results and is meant to introduce specific examples which show what to consider when designing a metal AM component for aerospace propulsion applications.

Paul Gradl↗

Space transfer vehicle concepts and requirements study. Volume 3, book 1: Program cost estimates

The Space Transfer Vehicle (STV) Concepts and Requirements Study cost estimate and program planning analysis is presented. The cost estimating technique used to support STV system, subsystem, and component cost analysis is a mixture of parametric cost estimating and selective cost analogy approaches. The parametric cost analysis is aimed at developing cost-effective aerobrake, crew module, tank module, and lander designs with the parametric cost estimates data. This is accomplished using cost as a design parameter in an iterative process with conceptual design input information. The parametric estimating approach segregates costs by major program life cycle phase (development, production, integration, and launch support). These phases are further broken out into major hardware subsystems, software functions, and tasks according to the STV preliminary program work breakdown structure (WBS). The WBS is defined to a low enough level of detail by the study team to highlight STV system cost drivers. This level of cost visibility provided the basis for cost sensitivity analysis against various design approaches aimed at achieving a cost-effective design. The cost approach, methodology, and rationale are described. A chronological record of the interim review material relating to cost analysis is included along with a brief summary of the study contract tasks accomplished during that period of review and the key conclusions or observations identified that relate to STV program cost estimates. The STV life cycle costs are estimated on the proprietary parametric cost model (PCM) with inputs organized by a project WBS. Preliminary life cycle schedules are also included.

Peffley, Al F.↗

On-orbit maintenance and repair - New era in space research and industrialization

During the seventies, NASA was developing a multifunction, economical spacecraft complete with ground and spaceborne support equipment, software, and necessary documentation to facilitate a large variety of space missions on a routine and cost effective basis. In order to reduce costs and time requirements, research was conducted to identify new approaches to a reusable, low-cost spacecraft design. The result of these studies was the development of the Multimission Modular Spacecraft (MMS). Three MMS spacecraft are currently operating in orbit. These spacecraft include the two Landsat-D earth resources satellites, Landsat-4 and -5, and the Solar Maximum Mission (SMM) spacecraft. Attention is given to details regarding the MMS, the STS-41C SMM repair mission, and failure modes and component degradation.

Cepollina, F.↗

Identification of Flights for Cost-Efficient Climate Impact Reduction

The aircraft-induced climate impact has drawn attention in recent years. Aviation operations affect the environment mainly through the release of carbon-dioxide, nitrogen-oxides, and by the formation of contrails. Recent research has shown that altering trajectories can reduce aviation environmental cost by reducing Absolute Global Temperature Change Potential, a climate assessment metric that adapts a linear system for modeling the global temperature response to aviation emissions and contrails. However, these methods will increase fuel consumption that leads to higher fuel costs imposed on airlines. The goal of this work is to identify ights for which the environmental cost of climate impact reduction outweighs the increase in operational cost on an individual aircraft basis. Environmental cost is quanti ed using the monetary social cost of carbon. The increase in operational cost is considering cost of additional fuel usage only. For this paper, an algorithm has been developed that modi es the trajectories of ights to evaluate the e ect of environ- mental cost and operational cost of ights in the United States National Airspace System. The algorithm identi es ights for which the environmental cost of climate impact can be reduced and modi es their trajectories to achieve maximum environmental net bene t, which is the di erence between reduction in environmental cost and additional operational cost. The result shows on a selected day, 16% of the ights among eight major airlines, or 2,043 ights, can achieve environmental net bene t using weather forecast data, resulting in net bene t of around $500,000. The result also suggests that the long-haul ights would be better candidates for cost-ecient climate impact reduction than the short haul ights. The algorithm will help to identify the characteristics of ights that are capable of applying cost-ecient climate impact reduction strategy.

climate impact reduction↗

Cost studies for commercial fuselage crown designs

Studies were conducted to evaluate the cost and weight potential of advanced composite design concepts in the crown region of a commercial transport. Two designs from each of three design families were developed using an integrated design-build team. A range of design concepts and manufacturing processes were included to allow isolation and comparison of cost centers. Detailed manufacturing/assembly plans were developed as the basis for cost estimates. Each of the six designs was found to have advantages over the 1995 aluminum benchmark in cost and weight trade studies. Large quadrant panels and cobonded frames were found to save significant assembly labor costs. Comparisons of high- and intermediate-performance fiber systems were made for skin and stringer applications. Advanced tow placement was found to be an efficient process for skin lay up. Further analysis revealed attractive processes for stringers and frames. Optimized designs were informally developed for each design family, combining the most attractive concepts and processes within that family. A single optimized design was selected as the most promising, and the potential for further optimization was estimated. Technical issues and barriers were identified.

Walker, T. H.↗