A strategy of cost control for Mariner Venus/Mercury 1973

The spacecraft launched by NASA on November 3, 1973 to explore Venus and Mercury proved a notable success as a development project both in space and on the ground. This article on the development points our management approaches and techniques that kept schedules and controlled costs, the intent being to stimulate thought about how to do the same with future spacecraft and payloads. The Mariner Venus/Mercury '73 (MVM '73) project kept within its originally established goals for schedule, performance, and cost. Underlying this development success was the availability of the Mariner technology. But meeting the goals demanded management determination, planning, and discipline to make optimum use of state-of-the-art technology--on the part of people at NASA, JPL, and The Boeing Co. (the contractor).

Biggs, John R.↗

Concepts for Life Cycle Cost Control Required to Achieve Space Transportation Affordability and Sustainability

Cost control must be implemented through the establishment of requirements and controlled continually by managing to these requirements. Cost control of the non-recurring side of life cycle cost has traditionally been implemented in both commercial and government programs. The government uses the budget process to implement this control. The commercial approach is to use a similar process of allocating the non-recurring cost to major elements of the program. This type of control generally manages through a work breakdown structure (WBS) by defining the major elements of the program. If the cost control is to be applied across the entire program life cycle cost (LCC), the approach must be addressed very differently. A functional breakdown structure (FBS) is defined and recommended. Use of a FBS provides the visibifity to allow the choice of an integrated solution reducing the cost of providing many different elements of like function. The different functional solutions that drive the hardware logistics, quantity of documentation, operational labor, reliability and maintainability balance, and total integration of the entire system from DDT&E through the life of the program must be fully defined, compared, and final decisions made among these competing solutions. The major drivers of recurring cost have been identified and are presented and discussed. The LCC requirements must be established and flowed down to provide control of LCC. This LCC control will require a structured rigid process similar to the one traditionally used to control weight/performance for space transportation systems throughout the entire program. It has been demonstrated over the last 30 years that without a firm requirement and methodically structured cost control, it is unlikely that affordable and sustainable space transportation system LCC will be achieved.

Rhodes, Russel E.↗

Guidelines for cost control and analysis of cost-type research and development contracts

The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

Sibbers, C. W.↗

Cost Controls in the Cloud

The pay-as-you-go model used by most Cloud Service Providers shifts ownership of resource procurement from finance and management teams to IT, engineering, development and other stakeholders. This requires individual contributors to adopt a more "cost conscious" approach to development, and for projects to invest time into the creation of automated cost controls and cost-focused monitoring. This talk will presents some patterns and examples of cost controls based on our experience managing a multi-tenant cloud environment.

circuit breaker↗

Mariner Venus/Mercury '73 - A strategy of cost control

The Mariner Venus/Mercury '73 project kept within its originally established goals for schedule, performance, and cost. Underlying this development success was the availability of the Mariner technology. But meeting the goals demanded management determination, planning, and discipline to make optimum use of state-of-the-art technology. The present work points out management approaches and techniques that kept schedules and controlled costs, the intent being to stimulate thought about how to do the same with future spacecraft and payloads.

Biggs, J. R.↗

Novel cost controlled materials and processing for primary structures

Textile laminates, developed a number of years ago, have recently been shown to be applicable to primary aircraft structures for both small and large components. Such structures have the potential to reduce acquisition costs but require advanced automated processing to keep costs controlled while verifying product reliability and assuring structural integrity, durability and affordable life-cycle costs. Recently, resin systems and graphite-reinforced woven shapes have been developed that have the potential for improved RTM processes for aircraft structures. Ciba-Geigy, Brochier Division has registered an RTM prepreg reinforcement called 'Injectex' that has shown effectivity for aircraft components. Other novel approaches discussed are thermotropic resins producing components by injection molding and ceramic polymers for long-duration hot structures. The potential of such materials and processing will be reviewed along with initial information/data available to date.

Dastin, S. J.↗

The growing importance of costs and ways to maintain cost control on a large program in today's competitive environment

Discussion of management techniques that make it possible to overcome inflationary and developmental cost rises while holding schedule and performance fixed in scientific space programs. The techniques reviewed pertain to high personnel motivation, continual review of contract rigidity for de facto modification by senior judgment, standardization vs design innovation, cooperative customer/contractor goal orientation vs task orientation, and deep real-time management visibility.

Newman, J. J.↗

Controlling Infrastructure Costs: Right-Sizing the Mission Control Facility

Johnson Space Center's Mission Control Center is a space vehicle, space program agnostic facility. The current operational design is essentially identical to the original facility architecture that was developed and deployed in the mid-90's. In an effort to streamline the support costs of the mission critical facility, the Mission Operations Division (MOD) of Johnson Space Center (JSC) has sponsored an exploratory project to evaluate and inject current state-of-the-practice Information Technology (IT) tools, processes and technology into legacy operations. The general push in the IT industry has been trending towards a data-centric computer infrastructure for the past several years. Organizations facing challenges with facility operations costs are turning to creative solutions combining hardware consolidation, virtualization and remote access to meet and exceed performance, security, and availability requirements. The Operations Technology Facility (OTF) organization at the Johnson Space Center has been chartered to build and evaluate a parallel Mission Control infrastructure, replacing the existing, thick-client distributed computing model and network architecture with a data center model utilizing virtualization to provide the MCC Infrastructure as a Service. The OTF will design a replacement architecture for the Mission Control Facility, leveraging hardware consolidation through the use of blade servers, increasing utilization rates for compute platforms through virtualization while expanding connectivity options through the deployment of secure remote access. The architecture demonstrates the maturity of the technologies generally available in industry today and the ability to successfully abstract the tightly coupled relationship between thick-client software and legacy hardware into a hardware agnostic "Infrastructure as a Service" capability that can scale to meet future requirements of new space programs and spacecraft. This paper discusses the benefits and difficulties that a migration to cloud-based computing philosophies has uncovered when compared to the legacy Mission Control Center architecture. The team consists of system and software engineers with extensive experience with the MCC infrastructure and software currently used to support the International Space Station (ISS) and Space Shuttle program (SSP).

Martin, Keith↗

Space Transportation Systems Life Cycle Cost Assessment and Control

Civil and military applications of space transportation have been pursued for just over 50 years and there has been, and still is, a need for safe, dependable, affordable, and sustainable space transportation systems. Fully expendable and partially reusable space transportation systems have been developed and put in operation that have not adequately achieved this need. Access to space is technically achievable, but presently very expensive and will remain so until there is a breakthrough in the way we do business. Since 1991 the national Space Propulsion Synergy Team (SPST) has reviewed and assessed the lessons learned from the major U.S. space programs of the past decades focusing on what has been learned from the assessment and control of Life Cycle Cost (LCC) from these systems. This paper presents the results of a selected number of studies and analyses that have been conducted by the SPST addressing the need, as well as the solutions, for improvement in LCC. The major emphasis of the SPST processes is on developing the space transportation system requirements first (up front). These requirements must include both the usual system flight performance requirements and also the system functional requirements, including the infrastructure on Earth's surface, in-space and on the Moon and Mars surfaces to determine LCC. This paper describes the development of specific innovative engineering and management approaches and processes. This includes a focus on flight hardware maturity for reliability, ground operations approaches, and business processes between contractor and government organizations. A major change in program/project cost control is being proposed by the SPST to achieve a sustainable space transportation system LCC - controlling cost as a program metric in addition to the existing practice of controlling performance and weight. Without a firm requirement and methodically structured cost control, it is unlikely that an affordable and sustainable space transportation system LCC will ever be achieved. '

Robinson, John W.↗

Cost Estimation and Control for Flight Systems

Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.

Hammond, Walter E.↗

Low cost attitude control system scanwheel development

In order to satisfy a growing demand for low cost attitude control systems for small spacecraft, development of low cost scanning horizon sensor coupled to a low cost/low power consumption Reaction Wheel Assembly was initiated. This report addresses the details of the versatile design resulting from this effort. Tradeoff analyses for each of the major components are included, as well as test data from an engineering prototype of the hardware.

Bialke, William↗

Low cost attitude control system reaction wheel development

In order to satisfy a growing demand for low cost attitude control systems for small spacecraft, development of a low power and low cost Reaction Wheel Assembly was initiated. The details of the versatile design resulting from this effort are addressed. Tradeoff analyses for each of the major components are included, as well as test data from an engineering prototype of the hardware.

Bialke, William↗

An Integrated Control and Minimum Mass Structural Optimization Algorithm for Large Space Structures

A new approach is discussed for solving dual structural control optimization problems for high-order flexible space structures, where reduced-order structural models are employed and minimum mass designs are sought. For a given initial structural design, a quadratic control cost is minimized subject to a constant-mass constraint. The sensitivity of the optimal control cost with respect to the structural design variables is then determined and used to obtain successive structural redesigns, using a constrained gradient optimization algorithm. This process is repeated until the constrained control cost sensitivity becomes negligible. The minimum mass design is obtained by solving a sequence of neighboring optimal constant mass designs, where the sequence of optimal performance indices has a minimum at the optimal minimum mass design. A numerical example is presented which demonstrates that this new approach effectively addresses the problem of dual optimization for potentially very high-order structures.

Messac, A.↗

Dual structural-control optimization of large space structures

A new approach is proposed for solving dual structural-control optimization problems for high-order flexible space structures where reduced-order structural models are employed. For a given initial structural dessign, a quadratic control cost is minimized subject to a constant-mass constraint. The sensitivity of the optimal control cost with respect to the stuctural design variables is then determined and used to obtain successive structural redesigns using a contrained gradient optimization algorithm. This process is repeated until the constrained control cost sensitivity becomes negligible. A numerical example is presented which demonstrates that this new approach effectively addresses the problem of dual optimization for potentially very high-order structures.

Messac, A.↗