Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost sensitivity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Solid Sorbent Cost Sensitivity Analysis: A Framework for UNF Reprocessing Sorbent Cost Comparison

Solid sorbents have been the subject of research and development across the U.S. Department of Energy national laboratory complex for many years. They are generally accepted as a safer alternative to cryogenic distillation for noble gas capture, and they present an easier pathway in development of long-term waste forms after iodine capture. As more types of sorbents have been proposed for capture of volatile radionuclides, it has become necessary to compare them based on performance and cost criteria. This report details cost and performance information for three promising sorbents and provides a cost sensitivity analysis. The goal of this analysis is to establish a framework which can be utilized to directly compare future sorbents, with differing properties, to the sorbents discussed in this report. Direct comparison is instrumental to making informed decisions to efficiently guide research and minimize laborious detours. In all cases, sorbent capacity is a major cost driver as it influences the mass of sorbent, operational footprint, and disposal cost requirements., However, sorbent price can greatly increase the cost of a capture technology. For sorbents used in krypton capture, the purity of krypton released to storage is the highest cost driver.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Expendable vs reusable propulsion systems cost sensitivity

One of the key trade studies that must be considered when studying any new space transportation hardware is whether to go reusable or expendable. An analysis is presented here for such a trade relative to a proposed Liquid Rocket Booster which is being studied at MSFC. The assumptions or inputs to the trade were developed and integrated into a model that compares the Life-Cycle Costs of both a reusable LRB and an expendable LRB. Sensitivities were run by varying the input variables to see their effect on total cost. In addition a Monte-Carlo simulation was run to determine the amount of cost risk that may be involved in a decision to reuse or expend.

Hamaker, Joseph W.↗

Q1-2024 Solar Cost Benchmarks

Each year, the U.S. Department of Energy’s (DOE) Solar Energy Technologies Office (SETO) and its national laboratory partners develop cost benchmarks for U.S. solar photovoltaic (PV) systems. These benchmarks track progress toward reducing solar costs and guide R&D priorities. Unlike typical studies that report only $/W, SETO uses intrinsic units (e.g., $/m² for mounting structures) to better capture how technology improvements such as module efficiency would impact system costs. This allows flexible modeling where inputs can vary significantly to assess cost sensitivity. Costs are reported in two ways: Minimum Sustainable Price (MSP): Long term, financially viable price under stable market conditions. Modeled Market Price (MMP): Actual market price, influenced by short term distortions such as tariffs or subsidies. Three national labs collect cost data from industry stakeholders, ensuring no duplication in outreach to stakeholders. Data reflects real transactions (primarily from Q1) and is weighted based on the number of sources per cost element. The PV System Cost Model (PVSCM) divides total installed system cost into eight categories: 1. Module (PV) 2. Inverter 3. Energy Storage System (ESS) 4. Structural BOS (SBOS) 5. Electrical BOS (EBOS) 6. Fieldwork 7. Office work 8. Other (developer/EPC costs) The first five are hardware costs, while the last three are soft costs. Each category includes fixed and variable cost components, where “size” depends on context (e.g., manufacturing capacity for modules vs. system capacity for installation costs). Variable costs are expressed using appropriate intrinsic units. The model reflects the owner’s upfront overnight capital cost, excluding tax credits. Tariffs and subsidies are treated as temporary market distortions affecting MMP but not MSP. PVSCM is implemented in Excel, where cost elements are aggregated into total system cost. Additional sheets handle unit conversions and operation & maintenance (O&M), with O&M costs levelized over the system’s lifetime.

14 SOLAR ENERGY↗

Cost Drivers for a Tokamak-Based Compact Pilot Plant

A comprehensive systems code that includes a range of physics and engineering considerations along with a simplified costing model has been utilized to evaluate the primary cost drivers for a compact tokamak pilot plant. The systems code has been benchmarked against several tokamak reactor designs and is utilized with sophisticated optimization algorithms to develop optimal solutions for a set of user-specified assumptions and design constraints. Here, in contrast to previous models that have focused on the cost of electricity as the key cost metric, this study uses the estimated capital cost of the facility. The analysis suggests that a pilot plant with the following features may offer potential for a cost-attractive pilot plant: A ~ 3, H 98y2 > 1.5, P net = 200 MW, 𝜏 𝑝⁢𝑢⁢𝑙⁢𝑠⁢𝑒 ~ 1 to 2 h utilizing rare-earth barium copper oxide (REBCO) magnet technology and a plug-bucked central solenoid/toroidal field (CS/TF) magnet support structure. While REBCO magnets offer some advantages relative to Nb 3 Sn magnets in all cases, the most gain is obtained when combined with the plug-bucked CS/TF bucking solution. Pulsed operation reduces capital cost requirements relative to steady-state operation, especially at low confinement. Cost sensitivity studies indicate that there are significant cost uncertainties associated with the achievable confinement quality, tritium breeding capability, attainable thermal efficiency, and achievable neutron wall loading, suggesting that these areas are the most critical areas in reducing the cost risk for a compact tokamak pilot plant. Further cost sensitivity studies indicate that the estimated cost is most sensitive to the underlying cost of the magnetic coils, providing further impetus to better establish cost-effective means for producing fusion magnets.

Compact pilot plant↗

Feature Acquisition with Imbalanced Training Data

This work considers cost-sensitive feature acquisition that attempts to classify a candidate datapoint from incomplete information. In this task, an agent acquires features of the datapoint using one or more costly diagnostic tests, and eventually ascribes a classification label. A cost function describes both the penalties for feature acquisition, as well as misclassification errors. A common solution is a Cost Sensitive Decision Tree (CSDT), a branching sequence of tests with features acquired at interior decision points and class assignment at the leaves. CSDT's can incorporate a wide range of diagnostic tests and can reflect arbitrary cost structures. They are particularly useful for online applications due to their low computational overhead. In this innovation, CSDT's are applied to cost-sensitive feature acquisition where the goal is to recognize very rare or unique phenomena in real time. Example applications from this domain include four areas. In stream processing, one seeks unique events in a real time data stream that is too large to store. In fault protection, a system must adapt quickly to react to anticipated errors by triggering repair activities or follow- up diagnostics. With real-time sensor networks, one seeks to classify unique, new events as they occur. With observational sciences, a new generation of instrumentation seeks unique events through online analysis of large observational datasets. This work presents a solution based on transfer learning principles that permits principled CSDT learning while exploiting any prior knowledge of the designer to correct both between-class and withinclass imbalance. Training examples are adaptively reweighted based on a decomposition of the data attributes. The result is a new, nonparametric representation that matches the anticipated attribute distribution for the target events.

Thompson, David R.↗

Development of a Low-Cost, Sensitivity-Optimized Fluorescence Sensor for Visible Spectrum Analysis

This paper presents an economically viable, sensitivity-optimized fluorescence sensor for detecting low concentrations of fluorophores in the visible spectrum range. The sensor employs a deep ultraviolet (DUV) 275-nm LED and a dichroic mirror to establish a co-axial optical path for excitation and emission. Instead of utilizing a general-purposed spectrometer optimized for high spectral resolution, the sensor strikes a balance between resolution and sensitivity by using an appropriate aperture size and optimized optical design tailored for the spectral characteristics of fluorophores. Here, the manuscript demonstrates measurements of ppb-level rare earth element (REE) samples containing terbium (Tb), europium (Eu), dysprosium (Dy), and samarium (Sm) in aqueous solutions. Through balanced design that optimizes collection of fluorescence emission without losing spectral information, this work shows the feasibility of developing a low-cost, compact, and highly sensitive fluorescence sensors with improved detection sensitivity when compared to bench-top commercial spectrofluorometers at far higher costs.

47 OTHER INSTRUMENTATION↗

Reliability and cost: A sensitivity analysis

In the design phase of a system, how a design engineer or manager choose between a subsystem with .990 reliability and a more costly subsystem with .995 reliability is examined, along with the justification of the increased cost. High reliability is not necessarily an end in itself but may be desirable in order to reduce the expected cost due to subsystem failure. However, this may not be the wisest use of funds since the expected cost due to subsystem failure is not the only cost involved. The subsystem itself may be very costly. The cost of the subsystem nor the expected cost due to subsystem failure should not be considered separately but the total of the two costs should be maximized, i.e., the total of the cost of the subsystem plus the expected cost due to subsystem failure.

Suich, Ronald C.↗

Determining the Best-Fit FPGA for a Space Mission: An Analysis of Cost, SEU Sensitivity,and Reliability

This viewgraph presentation reviews the selection of the optimum Field Programmable Gate Arrays (FPGA) for space missions. Included in this review is a discussion on differentiating amongst various FPGAs, cost analysis of the various options, the investigation of radiation effects, an expansion of the evaluation criteria, and the application of the evaluation criteria to the selection process.

Berg, Melanie↗

High-Flow PMR-Polymide Composites Developed With Mechanical Properties Comparable to Other High-Temperature Systems

PMR polyimides, in particular PMR-15, are well known for their excellent high-temperature stability and performance, and solvent resistance. However, the processing of these materials is limited, for the most part, to prepreg-based methods, such as compression or autoclave processing. These methods involve substantial amounts of hand labor, and as a result, manufacturing costs for components made from PMR polyimides can be high. In cost-sensitive applications, these high manufacturing costs can make the use of PMR polyimide-based components cost prohibitive. Lower cost manufacturing methods, such as resin transfer molding (RTM) and resin film infusion, have been demonstrated to reduce manufacturing costs by as much as 50 percent over prepreg-based methods. However, these processes are only amenable to materials with melt viscosities below 30 poise. Most PMR polyimides have melt viscosities on the order of 100 poise or higher. Recent efforts at the NASA Glenn Research Center have focused on chemical modifications to PMR polyimides to reduce their melt viscosity to the point where they could be processed by these low-cost manufacturing methods without adversely affecting their high-temperature properties and performance. These efforts have led to a new family of PMR polyimides that have melt viscosities significantly lower than that of PMR-15. Reductions in melt viscosity are brought about through the introduction of molecular twists in the polymer backbone. Carbon fiber (T650- 35) composites were prepared from one of these polyimides, designated PMR-Flex, by compression molding. The properties of these composites are presented below and compared with comparable composites made from PMR-15 and PETI-RTM, a new low-melt-viscosity polyimide.

Meador, Michael A.↗

Solid rocket motor cost model

A systematic and standardized procedure for estimating life cycle costs of solid rocket motor booster configurations. The model consists of clearly defined cost categories and appropriate cost equations in which cost is related to program and hardware parameters. Cost estimating relationships are generally based on analogous experience. In this model the experience drawn on is from estimates prepared by the study contractors. Contractors' estimates are derived by means of engineering estimates for some predetermined level of detail of the SRM hardware and program functions of the system life cycle. This method is frequently referred to as bottom-up. A parametric cost analysis is a useful technique when rapid estimates are required. This is particularly true during the planning stages of a system when hardware designs and program definition are conceptual and constantly changing as the selection process, which includes cost comparisons or trade-offs, is performed. The use of cost estimating relationships also facilitates the performance of cost sensitivity studies in which relative and comparable cost comparisons are significant.

Harney, A. G.↗

Cost and sizing sensitivities for the solar power satellite

A summary is provided of the characteristics and error parameters of the reference microwave transmission system for the solar power satellite (SPS). The relative importance of electrical and mechanical tolerances upon scattered microwave power and electrical costs is investigated. It is found that small increases in efficiency and/or reduction of losses (less than one percent) can improve the revenue from a single satellite over its 30-year lifetime by several hundred million dollars. Attention is given to a system definition, cost sensitivities for the reference system, the klystron dc-RF conversion efficiency, the transmitting antenna, the rectenna collection efficiency, system sizing tradeoffs, a cost analysis, and multiple antennas.

Monford, L.↗

Investigation into Sizing Photovoltaic with Energy Storage for Off-Grid Transactive Scenarios

In this study, a novel sizing methodology was developed for centralized and interconnected operating strategies of transactive microgrids and several variables were investigated including starting month, initial charge of battery, load variability, unit cost of solar panels and energy storage, number of systems, climate, and required reliability to determine their effect on total cost. The centralized strategy improved cost by seven to ten percent compared to the isolated strategy in every case. The interconnected strategy saved an incremental amount of money consistently compared to the isolated standard. The number of connected systems was not a strong effect. It was thought that increasing the number of systems would increase the benefit of energy sharing. Climate zones studied (“Cold”; “Hot-Dry/Mixed Dry”; “Mixed Humid”; and “Cold but with lower solar irradiation”) showed a large variation on cost with the Hot-Dry/Mixed Dry being the least expensive and Cold, with lower solar irradiation being the most expensive. Cost sensitivity analysis was performed showing that the unit cost of solar has a greater effect on the total cost. Required reliability of power, measured in outage hours, exhibited an inverse relation with cost.

14 SOLAR ENERGY↗

Joining Dissimilar Materials Using Friction Stir Scribe Technique

Development of a robust and cost-effective method of joining dissimilar materials could provide a critical pathway to enable widespread use of multi-material designs and components in mainstream industrial applications. The use of multi-material components such as steel-aluminum and aluminum-polymer would allow design engineers to optimize material utilization based on service requirements and could often lead to weight and cost reductions. However, producing an effective joint between materials with vastly different thermal, microstructural, and deformation responses is highly problematic using conventional joining and/or fastening methods. This is especially challenging in cost sensitive, high volume markets that largely rely on low cost joining solutions. Friction stir scribe technology was developed to meet the demands of joining materials with drastically different properties and melting regimes. The process enables joining of light metals like magnesium and aluminum to high temperature materials like steel and titanium. Viable joints between polymer composites and metal can also be made using this method. This paper will present the state of the art, progress made, and challenges associated with this innovative derivative of friction stir welding in reference to joining dissimilar metals and polymer/metal combinations.

Upadhyay, Piyush↗

JOINING DISSIMILAR MATERIALS USING FRICTION STIR SCRIBE TECHNIQUE

Development of robust and cost effective method of joining dissimilar materials can provide a critical pathway to enable widespread use of multi-material design and components in mainstream industrial applications. The use of multi-material components such as Steel-Aluminum, Aluminum-Polymer allows design engineers to optimize material utilization based on service requirements and often lead weight and cost reductions. However producing an effective joint between materials with vastly different thermal, microstructural and deformation response is highly problematic using conventional joining and /or fastening methods. This is especially challenging in cost sensitive high volume markets that largely rely on low–cost joining solutions. Friction Stir Scribe technology was developed to meet the demands of joining materials with drastically different properties and melting regimes. The process enables joining of light metals like Magnesium and Aluminum to high temperature materials like Steels and Titanium. Additionally viable joints between polymer composites and metal can also be made using this method. This paper will present state of the art, progress made and challenges associated with this innovative derivative of Friction Stir welding in reference to joining dissimilar metals and polymer/metal combinations.

Friction Stir Scribe↗

Space transfer vehicle concepts and requirements study. Volume 3, book 1: Program cost estimates

The Space Transfer Vehicle (STV) Concepts and Requirements Study cost estimate and program planning analysis is presented. The cost estimating technique used to support STV system, subsystem, and component cost analysis is a mixture of parametric cost estimating and selective cost analogy approaches. The parametric cost analysis is aimed at developing cost-effective aerobrake, crew module, tank module, and lander designs with the parametric cost estimates data. This is accomplished using cost as a design parameter in an iterative process with conceptual design input information. The parametric estimating approach segregates costs by major program life cycle phase (development, production, integration, and launch support). These phases are further broken out into major hardware subsystems, software functions, and tasks according to the STV preliminary program work breakdown structure (WBS). The WBS is defined to a low enough level of detail by the study team to highlight STV system cost drivers. This level of cost visibility provided the basis for cost sensitivity analysis against various design approaches aimed at achieving a cost-effective design. The cost approach, methodology, and rationale are described. A chronological record of the interim review material relating to cost analysis is included along with a brief summary of the study contract tasks accomplished during that period of review and the key conclusions or observations identified that relate to STV program cost estimates. The STV life cycle costs are estimated on the proprietary parametric cost model (PCM) with inputs organized by a project WBS. Preliminary life cycle schedules are also included.

Peffley, Al F.↗