NICS (NASA Instrument Capabilities Study) Instrument Schedule and Cost Study

This paper summarizes work performed on the Flight Projects Directorate Planetary Science Projects Division (PSPD, Code 430) NICS (NASA Instrument Capabilities study) instrument schedule and cost study. Included are a short summary of the original NICS (NASA, 2008), and the design and approach, data collection, analysis, preliminary findings and recommendations from select areas of the current study. The NICS (2008) was chartered by then NASA Chief Engineer Michael Ryschkewitsch and chaired by Goddard Space Flight Center (GSFC) engineer, John Leon. The focus was to identify problem areas in instrument development and, if possible, to offer solutions. In the area of instrument developments, the NICS (2008) identified a lack of resources and authority to successfully manage to instrument cost and schedule requirements; and a lack of critical skills, expertise, and leadership to successfully implement unique (one-of-a-kind) high technology developments (NASA, 2008, pp. 51, 52). Additionally, the NICS (2008) found problems in requirements formulation, reviews and management; unrealistic caps and overly optimistic estimates; and externally directed changes which increased the likelihood of overrunning cost and schedule (NASA, 2008, pp.53, 54). It is noteworthy that NICS findings are consistent with previous studies at the mission level (Robbins, Schmidt & White, 2020). Five years later in 2013, the Instrument Projects Division (IPD) was established to implement and manage instrument projects greater than $20M. The IPD was known as Code 490. Its structure incorporated several of the NICS (2008) recommendations. To see if these incorporated recommendations made a difference, and to identify other potential challenges in instrument developments, two parallel studies were initiated. Originally led by the IPD, now led by the PSPD, and the Instrument and Payload Systems Engineering Branch (IPSE, Code 592), respectively, the instrument schedule and cost study and the instrument technical complexity study began in 2017. Data collection was initiated in 2020 and is on-going. This paper is limited to the IPD/PSPD study. Among other findings, preliminary data indicate IPD/PSPD project management support positively influenced instrument development as related to providing a dedicated level of support staff, including a deputy Instrument Project Manager (dIPM), reducing IPM leadership changes, and providing other project support. Next steps include continued data collection and analysis, and mapping to technical complexity data.

NICS implementation↗

AEMS implementation cost study for Boeing 727

Costs for airline operational implementation of a NASA-developed approach energy management system (AEMS) concept, as applied to the 727 airplane, were determined. Estimated costs are provided for airplane retrofit and for installation of the required DME ground stations. Operational costs and fuel cost savings are presented in a cost-of-ownership study. The potential return on the equipment investment is evaluated using a net present value method. Scheduled 727 traffic and existing VASI, ILS, and collocated DME ground station facilities are summarized for domestic airports used by 727 operators.

Allison, R. L.↗

Development of termination and utilization concepts for flat conductor cables. Volume 3: Cost study comparison, flat versus round conductor cable

A cost study comparing flat conductor cable (FCC) with small-gage wire (SGW) and conventional round conductor cable (RCC) is presented. This study was based on a vehicle wiring system consisting of 110,000 ft of conventional RCC equally divided between AWG sizes 20,22, and 24 using MIL-W-81044-type wire and MIL-C-26500 circular connectors. Basic cost data were developed on a similar-sized commercial jet airplane wiring system on a previous company R&D program in which advanced wiring techniques were carried through equivalent installations on an airplane mockup; and on data developed on typical average bundles during this program. Various cost elements included were engineering labor, operations (manufacturing) labor, material costs, and cost impact on payload. Engineering labor includes design, wiring system integration, wiring diagrams and cable assembly drawings, wire installations, and other related supporting functions such as the electronic data processing for the wiring. Operations labor includes mockup, tooling and production planning, fabrication, assembly, installation, and quality control cost impact on payload is the conversion of wiring system weight variations through use of different wiring concepts to program payload benefits in terms of dollars.

Source record↗

Cost study of solar cell space power systems.

A study of historical costs for solar cell space power systems was made by a NASA ad hoc study group. The study covered thirteen missions that represented a broad cross-section of flight projects over the past decade. Fully burdened costs in terms of 1971 dollars are presented for the system and the solar array. The costs correlate reasonably well with array area and do not increase in proportion to array area. The trends for array costs support the contention that solar cell and module standardization would reduce costs.

Bernatowicz, D. T.↗

NASA/Navy lift/cruise fan cost reduction studies

Cost reduction studies were performed for the LCF459 turbotip fan for application with the YJ97-GE-100 gas generator in a multimission V/STOL research and technology aircraft. A 20 percent cost reduction of the research configuration based on the original preliminary design was achieved. The trade studies performed and the results in the area of cost reduction and weight are covered. A fan configuration is defined for continuation of the program through the detailed design phase.

Source record↗

Optimization of Instrument Requirements for NASAs GEO-CAPE Coastal Mission Concept Based On Sensor Capability And Cost Studies

NASA's GEOstationary Coastal and Air Pollution Events (GEOCAPE) mission concept recommended by the U.S. National Research Council (2007) focuses on measurements of atmospheric trace gases and aerosols and aquatic coastal ecology and biogeochemistry from geostationary orbit (35,786 km altitude). GEO-CAPE is currently in pre-formulation (pre- Phase) A with no established launch date. NASA continues to support science and engineering studies to reduce mission risk. Instrument design lab (IDL) studies were commissioned in 2014 to design and cost two implementations for geostationary ocean color instruments (1) Wide-Angle Spectrometer (WAS) and (2) Filter Radiometer (FR) and (3) a cost scaling study to compare the costs for implementing different science performance requirements.

Geo-CAPE↗

Cost studies for commercial fuselage crown designs

Studies were conducted to evaluate the cost and weight potential of advanced composite design concepts in the crown region of a commercial transport. Two designs from each of three design families were developed using an integrated design-build team. A range of design concepts and manufacturing processes were included to allow isolation and comparison of cost centers. Detailed manufacturing/assembly plans were developed as the basis for cost estimates. Each of the six designs was found to have advantages over the 1995 aluminum benchmark in cost and weight trade studies. Large quadrant panels and cobonded frames were found to save significant assembly labor costs. Comparisons of high- and intermediate-performance fiber systems were made for skin and stringer applications. Advanced tow placement was found to be an efficient process for skin lay up. Further analysis revealed attractive processes for stringers and frames. Optimized designs were informally developed for each design family, combining the most attractive concepts and processes within that family. A single optimized design was selected as the most promising, and the potential for further optimization was estimated. Technical issues and barriers were identified.

Walker, T. H.↗

Cost study of solar cell space power systems

Historical costs for solar cell space power systems were evaluated. The study covered thirteen missions that represented a broad cross section of flight projects over the past decade. Fully burdened costs in terms of 1971 dollars are presented for the system and the solar array. The costs correlate reasonably well with array area and do not increase in proportion to array area. The trends for array costs support the contention that solar cell and module standardization reduce costs.

Bernatowicz, D. T.↗

Maintenance cost study of rotary wing aircraft

The feasibility was studied of predicting rotary wing operation maintenance costs by using several aircraft design factors for the aircraft dynamic systems. The dynamic systems considered were engines, drives and transmissions, rotors, and flight controls. Multiple regression analysis was used to correlate aircraft design and operational factors with manhours per flight hour, and equations for each dynamic system were developed. Results of labor predictions using the equations compare favorably with actual values.

Source record↗