Search NASA⌕ Search

SEARCH · Search NASA

Results for “crew training”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Toolbox Necessity: Finding Best Practices in High-Performance Homes with the Building America Solution Center

The U.S. Department of Energy’s Building America Solution Center is a free, easy-to-access web tool containing the latest building science research from the Building America program. This paper describes how the Solution Center is bringing best practices for high-performance homes to members of the building industry to help their businesses to gain an edge to help expand their markets. It includes a tour of the Solution Center’s newest features and updates. The Building America Solution Center provides full and simple access to a wealth of best practices based on building science and energy efficiency research generated by the Building America program, along with other resources to help builders specify features, train crews, complete quality installations, and sell houses. This paper supports the visual presentation with the same title. The paper will be submitted for inclusion in the ACEEE Summer Study 2018 proceedings. The poster will be presented at the ACEEE 2018 Summer Study conference.

.S. Department of Energy Building Technologies Pro↗

Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Kongiganak Wind Turbine Replacement and System Upgrade Project

The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

17 WIND ENERGY↗

NETL's IGCC Dynamic Simulator Reserach and Training Center

The National Energy Technology Laboratory (NETL) is collaborating with software, industry, and university partners to establish a world-class Dynamic Simulator Research and Training (DSR&T) Center dedicated to the operation and control of advanced energy plants with carbon capture capabilities. The DSR&T Center will offer a collaborative R&D program and comprehensive hands-on training built around a portfolio of non-proprietary, high-fidelity, real-time dynamic simulators. The simulators will provide full-scope operator training system (OTS) capabilities for normal and faulted operations, as well as plant start-up, shutdown, and load following. Immersive three-dimensional (3-D) virtual reality will add another dimension of realism to the dynamic OTS systems and extend the training scope to both control room and outside operators, allowing them to work as a team. The benefits of high-fidelity immersive training systems (ITS) include more realistic training scenarios, improved communication and collaboration among work crews, off-line evaluations of procedures, and training for safety-critical tasks and rare abnormal situations.

01 COAL, LIGNITE, AND PEAT↗

Utilizing Open Source Software to Manage Training

At Jefferson Lab, Moodle, an Open-Source Course Management System has been used to produce a comprehensive web-based training program for accelerator operators and crew chiefs. The system is simple to use, self-paced, completely trackable, and able to tie into the lab's overall training infrastructure. Moodle serves as the on-line engine that ties together a variety of new and existing materials, including multimedia, and makes the training system manageable without large manpower requirements. This poster session shows how experienced crew chiefs, operators, and system experts create the courses, what the students see as they learn, and how the training each student has received is quantified and tracked.

Vasilauskis, Paul↗

Alaska Native Weatherization Training and Jobs Program. First Steps Toward Tribal Weatherization – Human Capacity Development (Final Report)

The Alaska Native Weatherization Training and Jobs Project expanded weatherization services for tribal members’ homes in southeast Alaska while providing weatherization training and on the job training (OJT) for tribal citizens that lead to jobs and most probably careers in weatherization-related occupations. The program resulted in; (a) 80 Alaska Native citizens provided with skills training in five weatherization training units that were delivered in cooperation with University of Alaska Southeast, in accordance with the U.S. Department of Energy Core Competencies for Weatherization Training that prepared participants for employment in three weatherization-related occupations: Installer, Crew Chief, and Auditor; (b) 25 paid OJT training opportunities for trainees who successfully completed the training course; and (c) employed trained personnel that have begun to rehab on over 1,000 housing units for weatherization.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Fuel Fabrication Facility Study for FCF HALEU

Nuclear energy technology developers seek to bring to market new advanced reactor designs and new light water reactor fuel designs, many of which would deploy fuel made from uranium with 235 U enrichment ranging from 5% to 19.75%. There is currently no commercial supply of uranium in this enrichment range, which is higher than used in today’s light water reactors but still lower than the safeguards limit of 20% 235 U. This limitation is a barrier to development of demonstration of these new nuclear energy technologies. As a means to address this near-term need, DOE and Idaho National Laboratory (INL) has considered how the HALEU product from sodium-bonded spent fuel treatment in the INL Fuel Conditioning Facility (FCF), located at the Materials and Fuels Complex (MFC), might be provided and fabricated into some of the new fuel designs. The evaluation presented in this report addresses the potential establishment of two types of fuel fabrication capability at INL, represented generically as a ceramic-type (or pellet-type) fuel fabrication line and a metallic fuel fabrication line. Because the FCF HALEU feedstock contains residual transuranic contamination and a relatively small amount of residual fission products, fabrication with that material is necessarily performed inside of engineered confinement barriers, such as gloveboxes, which would be filled with inert gas for most of the fuel types considered. The throughput rate of the fabrication lines envisioned is 2.5 metric tons of HALEU fuel per year, which is judged to be sufficiently representative of engineering-scale. Space in three existing buildings was identified for consideration in this study of pre-conceptual equipment layouts. The scope and nature of the work needed to prepare each of the three buildings for each type of fuel fabrication was identified (though not in engineering detail), and three-dimensional models of envisioned fabrication equipment were laid out in each of the buildings to assess adequacy of space. The study concluded that either type of fuel fabrication line can feasibly be installed and operated in either of the three buildings. However, each of the three buildings presents different challenges in preparation, due to accommodating current missions that would need to be relocated or necessary decontamination and decommissioning work to free-up space for fuel fabrication, or due to complications of accessibility. Rough order-of-magnitude (ROM) cost estimates for preparing buildings begin at $10M ( 20%/+50%) and would increase with increased complexity of building modifications. The cost of fabrication equipment and gloveboxes is roughly estimated to be $21M (-20%/+50%) for a metallic fuel fabrication line and $27M (-20%/+50%) for a ceramic/intermetallic fuel fabrication line. Nominal operating costs are estimated to be $7M per year (in 2019 dollars), increasing from lower amounts needed as the operating crew is being assembled and trained.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

National Criticality Experiments Research Center, NCERC NEWS (Apr. - Jun. 2021) [Slides]

National Center for Nuclear Security (NCNS) samples were irradiated on Godiva. Fission chamber testing for NCNS was conducted on Flat-Top. This operation involved multiple core configuration changes, which doubled as important training opportunities for NEN-2 Crew Member Trainees. These experiments support nuclear forensics research.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Utilizing the SACADA system to collect simulator training data to inform human reliability analyses - 169

Lack of appropriate human performance data for the development of human reliability analysis (HRA) methods has been identified as a key issue contributing to the method-to-method variability among the HRA methods. The United States Nuclear Regulatory Commission (NRC) worked with domain experts to develop the Scenario Authoring, Characterization, and Debriefing Application (SACADA) system to collect nuclear power plants' licensed operator simulator training and examination data to inform HRA. In the past two decades, significant improvements in understanding and modelling human performance in HRA have affected the perspectives of the types of data to be collected for HRA. A significant change is that human performance is strongly dependent on the context of the tasks to be performed. To incorporate this understanding, the SACADA data taxonomy collects the context and actual performance information of the training objective elements (TOEs) in nuclear plant operator simulator training. This provides a framework consistent with HRA to use context to estimate human error probabilities. It is recognized that measuring crew performance is equally important as improving operator training. SACADA is designed to support the nuclear trainers in capturing this important information that is used to identify training weaknesses and drive continuous improvement. This paper discusses the SACADA taxonomy, the SACADA system's functions, and the supporting software design to enable the SACADA system to be practically implemented in the nuclear power plants' operator simulator training program to collect data for tracking operator performance and HRA analysis. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Korean standard nuclear plant ex-vessel neutron dosimetry program Ulchin 4

A comprehensive ex-vessel neutron dosimetry (EVND) surveillance program has been deployed in 16 pressurized water reactors (PWR) in South Korea and EVND dosimetry sets have already been installed and analyzed in Westinghouse reactor designs. In this paper, the unique features of the design, training, and installation in the Korean standard nuclear plant (KSNP) Ulchin Unit 4 are presented. Ulchin Unit 4 Cycle 9 represents the first dosimetry analyzed from the EVND design deployed in KSNP plants: Yonggwang Units 3 through 6 and Ulchin Units 3 through 6. KSNP's cavity configuration precludes a conventional installation from the cavity floor. The solution, requiring the installation crew to access the cavity at an elevation of the active core, places a premium on rapid installation due to high area dose rates. Numerous geometrical features warranted the use of a detailed design in true 3D mechanical design software to control interferences. A full-size training mockup maximized the crew ability to correctly install the instrument in minimum time. The analysis of the first dosimetry set shows good agreements between measurement and calculation within the associated uncertainties. A complete EVND system has been successfully designed, installed, and analyzed for a KNSP plant. Current and future EVND analyses will continue supporting the successful operation of PWR units in South Korea. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Creating 3D Models With The Faro Scanner

The Faro Focus X 330 is a 3D scanner that combines numerous technologies in order to create a precise and life like 3D model. The technologies used by the scanner include: Time of flight (The scanner spins horizontally and vertically while emitting a class 1 laser; The laser beam then bounces off of an object and is captured by a sensor; An extremely precise chronometer tracks the beams flight time; The data is inputted into the simple formula: d=c*t/2). Point cloud system: The exact position of up to 976,000 points per second are registered and combined to form a complete model with up to ±1 mm at 330 m. Camera: Photos are taken of the surroundings that are combined to make a 165 megapixel image. The image is paired with the point cloud system. Scans have been taken of buildings 730-A and 781-A. These scans will be put into different virtual reality programs and used for tours and training. The scans also serve as a proof of concept for the Faro Focus X 330 as well as SRNL's ability to produce accurate scans with numerous useful applications. Work Scope Planning: Scanning will result in higher productivity and reduce the risk by identifying hazards; Blueprints and designs; 3D scans allow greater collaboration between engineers, construction crews, etc. by enabling them to compare blueprints to real time progress and make adjustments. Training and walk-downs: Scans can be made of places where access is not readily available, this could be due to its remote location or hazards such as radioactivity.

42 ENGINEERING↗

Hydra: Computer Vision for Data Quality Monitoring

Hydra: Computer Vision for Data Quality Monitoring Mar 13, 2024, 4:15 PM 30m Charles B. Wang Center, Stony Brook University Poster Track 1: Computing Technology for Physics Research Poster session with coffee break Speaker Ayan Roy Description Hydra is an extensible framework for training, managing, and deploying machine learning models for near real-time data quality monitoring. It is designed to take some of the burden off of shift crews by providing ‘round-the-clock’ monitoring of plots representing the data being collected. The Hydra system is backed by a database which is leveraged for near push button training and is primarily controlled and viewed through a set of web interfaces. This web interface contains a simple-to-use web based GUI for labeling of the datasets used in training; making it possible to label thousands of images quickly and efficiently. To aid in the analysis of Hydra inferences gradCAM, a method of interpretability, is performed and overlaid on the target image, highlighting regions of interest, making diagnosis of problems much faster. Development began in 2019 for the GlueX Experiment in Hall-D, the Hydra system has grown to encompass all of the experimental halls at Jefferson Laboratory. This talk will focus on the features of Hydra as well as provide details of the challenges present with deploying to disparate experimental halls. With a roadmap of development established, Hydra aims to continue to grow in richness of feature set and expand to encompass other monitoring tasks in differing communities.

Roy, Ayan↗

AI Data Quality Monitoring with Hydra

Hydra is an extensible framework for training and managing AI for near real time monitoring that aims to replace the tedious and repetitive data quality monitoring activities the shift crew and online monitoring coordinator typically perform. It continuously scans incoming data in the form of monitoring plots for signs of problems, flagging them for human review. A web app was developed such that experts can efficiently label images for training. Labels are stored in a database for use in training and model validation. Backed up by a comprehensive database, it utilizes an additional web based front-end for viewing the current monitoring status from anywhere in the world. The system has been in production use for the GlueX experiment at Jefferson Lab for more than 2 years with new features still under active development.

Britton, Thomas↗

GHEP WIBT (Guidelines for Home Energy Professionals Weatherization Installer Badges Toolkit) [SWR-20-69]

The National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy's (DOE) Weatherization Assistance Program (WAP) are collaborating with the home energy retrofit industry to support the development of skilled workers. The Installer Badges Toolkit provides a flexible, customizable, and voluntary approach to training and skills recognition for WAP implementers, utility programs, private-sector workers, and contractors. In Fiscal Year 2018, DOE, along with the Crew Leader scheme committee, determined the Retrofit Installer Technician (RIT) Job Task Analysis (JTA) could be eliminated and its tasks inserted in the Crew Leader JTA. The RIT tasks became the basis of the Installer Badges. The Badges Toolkit was updated in 2020 to add licensing and copyright agreements. Users must cite the copyright information when using or distributing copies of the Badges Toolkit in any way. The technical content has remained unchanged from previous versions of the Badges Toolkit. The Toolkit for home retrofits consists of 25 Badges, each representing different energy efficiency tasks that an installer could perform on a home. Each Badge defines the desired outcome, criteria to verify, applicable material requirements, and references to Standard Work Specifications (SWS) or other relevant standards. The Badges provide a consistent approach to training by ensuring that installers in different regions are learning the same skills nationwide. Organizations can also customize the Toolkit by choosing only those Badges that are relevant to their program. The Badges Toolkit includes five pieces: "How to Use the Badges Toolkit" provides a brief overview of how a Grantee, Subgrantee, or training provider may approach using the toolkit. The "Badges Toolkit: Worksheet" includes what to consider when determining whether and how to best incorporate the Badges into a weatherization assistance program. The "Crew Leader Job Task Analysis Spreadsheet" indicates how the Badges align with specific areas of the JTA. The "Installer Badges Passport" features separate pages for each Badge, which include places for the installer and the supervisor/trainer to record the number of times a task has been successfully completed. The "Installer Badges Verification Criteria" includes sample inspection checklists for each Badge. These can be modified as needed based on approved variance requests or more stringent requirements. They also provide a basis for consistent inspections and awarding of Badges. Note: All elements of the Badges Toolkit are designed for use by potential program implementers. They are not off-the-shelf products intended for immediate deployment. Program implementers must review and modify as needed, revise verification criteria to match local requirements, complete worksheets, and otherwise define the parameters of their own badging program.

Desai, Jal↗

Estimating the Contributions to Human Error Probability from the Convolution of the Distribution of Time Available and Time Required

As part of their duties, Human Reliability Analysis must often evaluate if crews in nuclear power plants (NPPs) can complete tasks associated with a human-failure event within time limits. For example, the time required in NPP scenarios is determined by systematic and structured walkthroughs, feasibility studies, recorded times from training exercises, and interviews with experienced operators and experts. Typically, a point estimate is derived for the estimate (mean, maximum, or 95th percentile of time required). Using point-estimate values can mask the risk associated with variability among crews, plant conditions and set-up, environmental conditions, and other impact factors under which these actions are executed. While point estimates for time required and time available have served the industry well, without considering the uncertainty they could lead to biased understanding about the risk. The Integrated Human Event Analysis System - General Methodology (IDHEAS-G) model (developed by the US Nuclear Regulatory Commission, NRC) for human error probability calculates human error probability by summing two probabilities: insufficient time and cognitive error. As such, the model takes a more holistic approach by considering the full distributions for time required and time available to calculate the human error probability because the time available to complete the task is insufficient. In this study, we expand on the work of the NRC and discuss methods for estimating these time considerations. For example, for the time required, the impact of Performance Influencing Factors (PIFs) on the distribution was divided into impacts that are aleatory in nature, such as crew-to-crew variability, and those that are epistemic (i.e., the PIFs). Starting with the factors that introduce aleatory uncertainty, a first-order distribution was developed from a large set of time required (i.e., NPP task completion times) data for the range of operator actions that occur in the NPP control room under simulated accident conditions. The first-order distribution can then be adjusted to account for epistemic uncertainty using research associated with the impact of applicable PIFs on the time required. We also develop guidance for analysts to address the probability distributions for the time available. The guidance we developed on how to estimate time required and time available distributions is based on the identification of pertinent research and data, data analyses, and expert knowledge elicitation.

human error probability, human performance, time e↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Analog, Digital, or Enhanced Human-System Interfaces? Results of an Operator-in-the-Loop Study on Main Control Room Modernization for a Nuclear Power Plant

The second Operator Study of System Overviews (OSSO-2) was conducted with a three-person reactor operator crew in the Human Systems Simulation Laboratory (HSSL) at Idaho National Laboratory (INL) in August, 2017. The study supported control room modernization at a nuclear power plant and featured a benchmark comparison of three variants of a turbine control system (TCS): the existing analog TCS, a proposed standalone digital TCS with two displays, and the digital TCS with the addition of a third display consisting of a system overview screen. TCS prototypes were developed at INL to allow evaluation of operator performance and preferences during realistic turbine scenarios in the full-scope simulator. The study revealed that completion of turbine startup was several minutes faster with the digital TCS variants than with the conventional analog TCS. Eye tracking scan paths were more widely distributed in the overview vs. standalone TCS condition, suggesting the overview screen was cueing reactor operators to verify values across the boards. There was no significant difference in workload or situation awareness across the three interfaces. Reviewing key plant parameters showed smoother transitions during load following for the digital vs. analog TCS. Despite some performance advantages for the digital TCS variants, operators preferred the existing analog TCS. Open-ended responses suggested this finding may be more an artifact of familiarity than a reflection of dissatisfaction with the new TCS. OSSO-2 provides compelling evidence that the new digital TCS was used successfully by the operators without extensive training of rewriting of the operating procedures, suggesting high usability for the digital TCS design. Further advantages were realized through the addition of the system overview screen to provide crews with at-a-glance indicators of key turbine parameters.

99 GENERAL AND MISCELLANEOUS↗

EXTRACTING HUMAN RELIABILITY FINDINGS FROM HUMAN FACTORS STUDIES IN THE HUMAN SYSTEMS SIMULATION LABORATORY

Modernization of U.S. nuclear power plants (NPPs) is widespread, with most plants currently replacing and transitioning equipment, control systems, and human system interfaces (HSI)s from analog to digital displays. This conversion remedies the obsolescence of analog parts along with needs for increased intuitiveness of design, safety, and capabilities. The Human Factors and Reliability team at Idaho National Laboratory (INL) carried out twelve control room modernization studies in the newly designed Human Systems Simulation Laboratory (HSSL) over nine years. The HSSL was constructed as a testbed for evaluating human factors techniques and performance measures, HSI frameworks, and cutting-edge operational concepts in NPPs. Installing a full-scope training simulator enabled direct design and evaluation work on the same instrumentation and control (I&C) and HSIs located at U.S. plants. The subsequent addition of glass top bays afforded crews opportunities to implement operations via the simulator using full-scale representations of their home NPP. Additionally, functional HSI prototypes were created, providing an environment for operator-in-the-loop benchmark studies. The HSSL has assisted in upgrades of six commercial NPP control rooms and served as an invaluable proving ground for new NPP operations technology. Human reliability analysis (HRA) was not originally the focus of the studies; however, data relating to HRA such as type and frequency of human errors can be extracted from the studies. INL is currently extracting data from the HSSL study reports to apprise how information gathered from simulation, HSI, and other related studies can create a broad look across different data sources to help inform HRA methods.

99 GENERAL AND MISCELLANEOUS↗