Search NASA⌕ Search

SEARCH · Search NASA

Results for “cryomodule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Operational Experience of a Cryomodule Test Stand for LCLS-II Cryomodules

CMTS1 (cryomodule test stand 1) at Fermilab was built to test cryomodules built for the LCLS-II beamline at SLAC and is currently testing cryomodules for LCLS-II-HE, the high energy upgrade to LCLS-II. The first cryomodule test was in 2016 and to date over 30 cryomodules have been tested here. This talk will highlight operational experience of the vacuum systems including insulating, coupler, and a low particulate beamline vacuum system. It will focus on the problems that have come up over the years, their solutions, and mitigations put in place to prevent further issues.

43 PARTICLE ACCELERATORS↗

Optimization of static heat loads of the PIP-II cryomodules based on prototype HB650 cryomodule test results

During the first cool down of the prototype HB650 cryomodule (pHB650 CM), high static heat loads have been measured compared to the estimation. Several analysis and calculations have been performed to explain this difference which led to cool down this cryomodule two additional times. Before each cool down, repairs and upgrades have been done, and instrumentations were added to identify the issues and quantify their impact on the heat loads. Based on these findings, the production cryomodule design and assembly process have been updated to align the future heat loads measurements with the estimations.

43 PARTICLE ACCELERATORS↗

BEAM ACCELERATION WITH A Nb3Sn CRYOMODULE AT JLAB

We report on the electron beam acceleration experiment with a Nb3Sn cryomodule at Thomas Jefferson National Laboratory (JLAB). Two CEBAF-style 5-cell 1.5 GHz Nb3Sn cavities operated at 4 K, accelerating a 100 nA continuous-wave (CW) electron beam from 200 keV to 4 MeV at JLAB’s Upgraded Injector Test Facility (UITF). The acceleration gradients in each cavity reached 11 MV/m and 7 MV/m, respectively. No field emission was observed. The unloaded quality factors reached 2¿109 at low fields at 4 K.

Geng, R. [Thomas Jefferson National Accelerator Fa↗

Standardization and First Lessons Learned of the Prototype HB650 Cryomodule for PIP-II at Fermilab

The prototype High Beta 650 MHz cryomodule (pHB650 CM) has been designed by an integrated design team, consisting of Fermilab (USA), CEA (France), STFC UKRI (UK), and RRCAT (India). The manufacturing and assembly of this prototype cryomodule is being done at Fermilab, whereas the production cryomodules will be manufactured and assembled by STFC-UKRI. As the first PIP-II cryomodule for which standardization was applied, the design, manufacturing and assembly of this cryomodule led to significant lessons being learnt and experiences gathered. These were incorporated into the design of the pre-production Single Spoke Resonator Type 2 cryomodule (ppSSR2 CM) and the pre-production Low Beta 650 MHz cryomodule (ppLB650 CM). This paper presents the pHB650 CM lessons learned and experiences gathered from the design to the lower coldmass assembly and how this cryomodule has a positive impact on all the next Proton Improvement Plan-II (PIP-II) cryomodules due to the standardization set up among SSR and 650 cryomodules.

43 PARTICLE ACCELERATORS↗

LCLS-II-HE Cryomodule Testing at Fermilab

22 Linac Coherent Light Source II (LCLS-II) cryomodules were successfully tested at the Cryomodule Test Facility (CMTF) at Fermilab. Following the completion of the LCLS-II testing program, CMTF has shifted to testing cryomodules for the LCLS-II High Energy upgrade (LCLS-II-HE). The first LCLS-II-HE cryomodule, the verification cryomodule (vCM), was successfully tested and verified the readiness of LCLS-II-HE cryomodule testing at CMTF, and production cryomodule testing has begun. Presented here are the production cryomodule test acceptance criteria, testing plan, and cryomodule test results so far.

43 PARTICLE ACCELERATORS↗

Heat load measurements for the PIP-II pHB650 cryomodule

This study presents a brief overview of the 1st and 2nd phases and an in-depth analysis of the 3rd phase heat load testing performed on the pHB650 (prototype High Beta 650 MHz) cryomodule at PIP2IT (PIP-II Injector Test Facility), with a focus on both the results and the methodological advancements that have improved testing efficiency and accuracy. A key challenge identified in the testing campaign is the higher-than-expected heat loads observed in the first PIP-II (Proton Improvement Plan II) prototype cryomodules (pSSR1 and pHB650) tested at PIP2IT. Elevated heat loads are concerning given the fixed capacity of the PIP-II cryoplant that is currently being installed at Fermilab. However, understanding the sources of these elevated heat loads offers a critical opportunity to implement effective heat load mitigations on upcoming PIP-II cryomodules to stay within the available capacity of the PIP-II cryoplant. The study includes a summary of test results, descriptions of measurement procedures, and key observations on parameters directly and indirectly related to heat load measurements. Direct observations include measured heat loads and the effectiveness of JT heat exchanger under varying conditions, while indirect observation analyze factors such as the temperature distribution on the two-phase pipe and relief piping under varying conditions. Thermal acoustic oscillations (TAO) were identified during testing, which was mitigated by replacing the original G10 stem with a stainless steel stem equipped with wipers for the cryomodule cooldown valve. A major innovation during pHB650 Phase 3 testing was the development of an automated Python script to streamline data acquisition, analysis, and reporting of heat load results. This script automatically retrieved data from ACNET (Accelerator Control Network), performed heat load calculations, and generated detailed reports featuring plots and tables. This advancement significantly reduced manual labor and enhanced the thoroughness of data analysis compared to earlier campaigns. The heat load test reports were promptly uploaded to the electronic logbook shortly after each test, enabling rapid feedback and collaboration between the SRF and cryogenic teams. The heat load measurements included various components: HTTS (high-temperature thermal shield), LTTS (low-temperature thermal shield), 2K isothermal and non-isothermal heat loads. Results were recorded both within the cryomodule and between the bayonet can supply and return. Measurements were conducted under different operating conditions such as "standard", "linac", and "simulated dynamic". Additionally, HTTS and LTTS heat loads were calculated in real time, allowing for the tracking of thermal stability and identification of changes during testing, both in steady-state and transient conditions. The results of this testing campaign not only provide valuable insights into the performance of the pHB650 cryomodule but also highlight best practices and lessons learned that will inform future cryomodule testing at PIP2IT. These include adopting automated tools for data analysis, refining real-time measurement capabilities, and emphasizing detailed pre-test planning. The framework established in this campaign aims to set an improved standard for cryomodule testing and heat load reporting in future cryomodule test campaigns.

Porwisiak, D. [Fermilab; Wroclaw Tech. U.]↗

200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab

The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.

43 PARTICLE ACCELERATORS↗

Study of Microphonic Effects on the C100 Cryomodule for High Energy Electron Beam Accelerators

The Continuous Electron Beam Accelerator Facility (CEBAF) at Thomas Jefferson National Laboratory (JLab) is a particle accelerator which can accelerate an electron beam to relativistic speeds and apply the beam onto target samples. The C100 superconducting radio frequency (SRF) cavity is the primary accelerating structure of the C100 cryomodule, one of the many cryomodules which compose the CEBAF linear accelerator. SRF cavities are particularly sensitive to internal and external vibrations that can result in a phenomenon called microphonics which degrade the operational stability of a cryomodule. The purpose of this thesis is to investigate the significance of mechanical disturbances on the electromagnetic resonant frequency of a C100 SRF cavity. Knowledge of the mechanical resonance of the cavities and cryomodule sheds light into how these disturbances are most easily realized as deformation which causes radio frequency (RF) detuning. Three studies were conducted: the development and hammer test calibration of a Finite Element Analysis (FEA) model of a C100 cavity, the development and hammer test calibration of an FEA model of a C100 cavity string, and the hammer test of the C100-10R cryomodule at the Cryomodule Test Facility (CMTF). The cavity FEA model was found to accurately predict two modes found in two real cavities in a simply supported configuration. The cavity string FEA model leveraged the calibrated cavity FEA model but was not found to accurately predict the modal behavior of a real cavity string. Even so, the modal behavior of the cavity string inside the C100-10R cryomodule was captured during a hammer test while it was partially assembled. Finally, the C100-10R cryomodule was placed in the CMTF to study RF detuning. The RF detuning spectra during hammer hits and background noise was captured. The results of the hammer testing indicate two strong peaks at low frequencies (9-10 Hz and 22-23 Hz). These two frequencies were found to be nearly coincident to four instances of mechanical resonance found during the hammer testing done on the partially-assembled C100-10R. Because of this, these two modes are believed to contribute to RF detuning of the cryomodule. This test event also included the testing of the effectiveness of a configuration of BNNT canisters designed to act as dampers. While these tests show promising results, the lurking variables render these tests somewhat inconclusive.

Hull, Caleb James↗

Development of Transformative Preparation Methods to Push up High Q&G Performance of FRIB Spare HWR Cryomodule Cavities

The FRIB accelerator project construction, a top priority of US nuclear science, was completed in January 2022, and is now moving to user operation. The stable and reliable operation of the accelerating cryomodules is essential in achieving/fulfilling DOE and user expectations. So far, FRIB cryomodules meet all FRIB specifications for cavity performance. However, during the lifetime of machine operation, degradation of cryomodule performance is possible, as reported in similar operating facilities (CEBAF, SNS). If cryomodule degradation is observed at FRIB, the under-performing cryomodule will require replacement/maintenance. In effort to manage operational reliability, FRIB plans to construct a 0.53 half-wave cryomodule to serve as an active spare. In a parallel effort, FRIB will also work toward increasing operational Q and gradient of spare cryomodule cavities to gain an overall performance margin to support future operational reliability. The current FRIB cavity designs have a potential to operate at gradients higher than 8 MV/m, but are currently limited by field emission (FE) and/or high field Q slope (HFQS); known issue in buffered chemical polished (BCP) treated cavities. The proposal looks to develop transformative surface preparation treatments to improve the operational gradient of spare cryomodules higher than 10 MV/m while maintaining high Q. Thus, increasing operational margin by 30 - 50%. With the goal to improve operational reliability set, the proposal will investigate multiple objectives as possible paths forward to achieve an overall increase in cavity performance and gain a better understanding of SRF limiting mechanisms. The proposal will study the application of different chemical surface treatments to 0.53 half-wave cavities, with the addition of low temperature bakes (LTB), and measure their effects on accelerating performance. Proposed chemical treatments to be explored in this proposal include conventional EP acid mixtures, as well as innovated EP and BCP acid mixtures designed to simplify processing paths in migrating FE and HFQS. The proposed transformative treatment wet N-doping also has the potential to replicate recent advancements in SRF technology relating to nitrogen doping and high Q operation without the requirement for an ultra-high vacuum annealing furnace; currently being developed at FNAL and JLAB. In parallel, high Q performance relating to flux trapping will be investigated with the installation of a second layer of magnetic shielding in the vertical test Dewar. The research objectives presented in the proposal, and their corresponding effects on cavity performance, will provide essential knowledge and future guidance to the SRF community and provide possible paths for future SRF based projects and applications.

43 PARTICLE ACCELERATORS↗

Design Status of BCC Cryomodule for LCLS-II HE

A Buncher or Capture Cavity (BCC) Cryomodule is currently in development at Fermilab for use in a second injector for LCLS-II-HE. The BCC Cryomodule is designed to contain one 1.3 GHz cavity and one solenoid magnet as part of a 100MeV low emittance injector. The design considerations for the Cryomodule are similar to the LCLS-II cryomodule with additional requirements to account for additional vacuum loading at the end of this vessel due to the termination of the insulating vacuum. To accomplish this design, the cryomodule is being developed using the experience gained during the development of the LCLS-II cryomodule. The design, analysis, and status of the Cryomodule will be discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design Status of BCC Cryomodule for LCLS-II HE

A Buncher or Capture Cavity (BCC) Cryomodule is currently in development at Fermilab for use in a second injector for LCLS-II-HE. The BCC Cryomodule is designed to contain one 1.3 GHz cavity and one solenoid magnet as part of a 100MeV low emittance injector. The design considerations for the Cryomodule are similar to the LCLS-II cryomodule with additional requirements to account for additional vacuum loading at the end of this vessel due to the termination of the insulating vacuum. To accomplish this design, the cryomodule is being developed using the experience gained during the development of the LCLS-II cryomodule. The design, analysis, and status of the Cryomodule will be discussed.

43 PARTICLE ACCELERATORS↗

Design of the 650 MHz High Beta Prototype Cryomodule for PIP-II at Fermilab

The Proton Improvement Plan II (PIP-II) is the first U.S. accelerator project that will have significant contributions from international partners. The prototype High Beta 650 MHz cryomodule (pHB650 CM) is designed by an integrated design team, consisting of Fermilab (USA), CEA (France), UKRI-STFC (UK), and RRCAT (India). The manufacturing & assembly of this prototype cryomodule will be done at Fermilab, whereas the production cryomodules will be manufactured and/or assembled by UKRI-STFC, RRCAT, or Fermilab. Similar to the prototype Single Spoke Resonator 1 cryomodule (pSSR1 CM), this cryomodule is based on a strong-back at room temperature supporting the coldmass. The pSSR1 CM led to significant lessons being learnt on the design, procurement, and assembly processes. These lessons were incorporated into the design and processes for the pHB650 CM. Amongst many challenges faced, the main challenges of the pHB650 CM design were to make the cryomodule compatible to overseas transportation and to design components that can be procured in USA, Europe, and India.

43 PARTICLE ACCELERATORS↗

Performance of Oak Ridge National Laboratory spallation neutron source proton power upgrade cavities and cryomodule production

The Proton Power Upgrade initiative at Oak Ridge National Lab’s Spallation Neutron Source aims to greatly boost the capability of proton beam power. This upgrade involves the integration of seven additional cryomodules, each housing four six-cell high-beta ( β = 0.81 ) superconducting radio frequency cavities. These cavities, manufactured and processed by Research Instruments in Germany, underwent meticulous treatment, including electropolishing as the bulk and final vital step. Upon delivery to Jefferson Lab, a total of 28 cavities for seven cryomodules, along with an additional four cavities for a spare cryomodule, underwent thorough vertical qualification tests, meeting the required specifications. Following cavity tanking and subsequent rf testing, the assembly of eight cryomodules was successfully executed, with all 32 cavities demonstrating compliance with acceptance criteria. The transportation of the cryomodule to SNS for high-power testing in the tunnel yielded exceptional results. Notably, the performance surpassed specifications, in terms of quality factor and accelerating gradient. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Control of microphonics for a superconducting radio-frequency photo-injector cryomodule

A superconducting radio-frequency photo-injector cryomodule is being developed for the high-energy upgrade of the Linac Coherent Light Source (LCLS-II-HE). This effort is a collaboration between the Facility for Rare Isotope Beams at Michigan State University (MSU), Argonne National Laboratory, Helmholtz-Zentrum Dresden-Rossendorf, and SLAC National Accelerator Laboratory. The cryomodule features a 185.7 MHz superconducting quarter-wave resonator (QWR) designed to operate with an RF electric field of 30 MV/m at the photo-cathode. Mechanical vibrations must be controlled for operation with stable amplitude and phase. The first prototype cryomodule was cold-tested at MSU with a QWR, fundamental power coupler, tuner, and cathode stalk. In the cold test, we observed microphonics that made it difficult to control the RF phase at high gradient. The cryogenic circuit was identified as a likely culprit. This paper presents our studies of microphonics during the cryomodule cold test and follow-up investigations at room temperature. Our findings provided valuable feedback for modifications to the cryogenic circuit and a successful second cold test of the cryomodule.

Accelerator Physics↗

Design of a Transport System for the PIP-II HB650 Cryomodule

The PIP-II Project at FNAL requires the assembly of 3 high-beta 650MHz cryomodules at STFC Daresbury (DL) in the UK. These modules must be safely transported from DL to FNAL in the USA. Previous experience with cryomodule transport was leveraged at both labs to design a transport system to protect the cryomodules during transit. Requirements for the system included mitigation of shocks, drops, and vibrations, and acting as a lifting fixture. It is comprised of a tessellated steel frame which encompasses the module with a wire rope isolator arrangement which the module mounts to. The frame was designed to withstand the weight of the 12.5 tonne cryomodule in various load cases. Details of shock and vibration profiles were obtained from MIL-STD-810H and were used to guide the sizing of the isolators. The frame and the isolation system were analysed via FEA using the shock and vibration profiles as an input. The transport system was found to be suitable for the given isolation, frame stiffness, and lifting code requirements. The frame has been fabricated and successfully load tested at FNAL. It will now be road tested with a dummy cryomodule before undergoing a trial run to DL.

43 PARTICLE ACCELERATORS↗

Cavity Qualification and Production Update for SNS-PPU Cryomodules at Jefferson Lab

The Proton Power Upgrade (PPU) project at Oak Ridge National Lab’s Spallation Neutron Source (SNS) currently being constructed will double the proton beam power capability from 1.4 to 2.8 MW by adding seven cryomodules, each containing four six-cell high-beta (β = 0.81) superconducting radio frequency cavities. Research Instruments, located in Germany, built and processed the cavities at the vendor site, including electropolishing as the final active chemistry step. Twenty-eight cavities for seven cryomodules and an additional four cavities for a spare cryomodules were delivered to Jefferson Lab and first qualification tests were completed on all cavities as received from the vendor. The performance largely exceeded the requirements on quality factor and accelerating gradient. Here we present the status of initial cavity qualification tests, rework on unqualified cavities and final cavity qualification with helium vessel prior to installation in cryomodules. In addition, an update on cryomodule production is presented.

Dhakal, P.↗

LCLS-II Cryomodules Production Experience and Lessons Learned Towards LCLS-II-HE Project

LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac consists of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF (SRF) continuous wave (CW) cryomodules with high quality factor cavities. Cryomodules were produced at Fermilab and at Jefferson Lab in collaboration with SLAC. Fermilab successfully completed the assembly, testing and delivery of seventeen 1.3 GHz and three 3.9 GHz cryomodules. LCLS-II-HE is a planned upgrade project to LCLS-II. The LCLS-II-HE linac will consist of twenty-three 1.3 GHz cryomodules with high gradient and high quality factor cavities. This paper presents LCLS-II-HE cryomodule production plans, emphasizing the improvements done based on the challenges, mitigations, and lessons learned from LCLS-II.

43 PARTICLE ACCELERATORS↗

HB650 Cryomodule Design: From Prototype to Production

In early 2023 the assembly of the prototype HB650 cryomodule (pHB650 CM) was completed and cold tests started to evaluate its performance. The lessons learned from the design, assembly and preliminary cold tests of this cryomodule, and from the design of the SSR2 pre-production cryomodule played a fundamental role during the design optimization process of the production HB650 cryomodule (HB650 CM). Several workshops have been organized to share experiences and solve problems. This paper presents the main design changes from pHB650 to the HB650 production cryomodules and their impact on the heat loads.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗