Search NASA⌕ Search

SEARCH · Search NASA

Results for “dB/dt”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Electromagnetic Analysis of ITER Electron Cyclotron Emission Model

The ITER electron cyclotron emission (ECE) diagnostic system is located at diagnostics shielding module 2 (DSM2), equatorial port 9 (EP9), to measure electron temperature profile and electron temperature fluctuations, and also assess nonthermal electron distributions via the oblique view. Therefore, ECE has both radial and oblique views with two hot sources for calibration and two couples of mirrors for two different optical views. It shall receive that the large electromagnetic (EM) loads up to 100-MN/m3 force density due to the eddy currents on the copper mirrors generated by the short transient plasma disruption. The simplified EM analysis model using magnetic field ( B ) data and flux variations (dB/dt) method based on the worst case of plasma disruption, MD_DW_EXP16MS_CATIII, has been developed to calculate the force and moments for each ECE component and support structure for EP9 DSM2 Bay2 and Bay3. The B and dB/dt methods use the constant B and dB/dt assumed for each local bay space, but the real B and dB/dt are basically varied along the radial direction of each bay. The complex global model with the local ECE components and support structure using Maxwell transient has been developed to do EM analysis to compare the results of the B and dB/dt models. The volumetric EM force density of the whole ECE components and support structure can be used for the subsequent structural analysis. In conclusion, combined with the thermal and nuclear loads and seismic and initial loads, the ECE integration analysis can be finalized for the operation case.

Fang, J. [Princeton Plasma Physics Laboratory (PPP↗

Fast cycling HTS based superconducting accelerator magnets: Feasibility study and readiness demonstration program driven by neutrino physics and muon collider needs

Development of energy-efficient fast cycling accelerator magnets is critical for the next generation of proton rapid cycling synchrotrons (RCS) for neutrino research and booster accelerators of future muon colliders. We see a unique opportunity for having such magnets to be built on base of High Temperature Superconductors (HTS). Besides being superconducting at relatively high temperatures, rare-earth HTS tapes have shown very small AC losses compared to low-temperature NbTi superconductor cables. Recent tests of the HTS-based 0.5 m long two-bore superconducting accelerator magnet have shown record high dB/dt ramping rates of about 300 T/s at 10 Hz repetition rate and 0.5 T B-field span. No temperature rise in 6 K cooling He was observed within the 0.003 K error setting the upper limit on the cryogenic power loss in the magnet conductor coil to be less than 0.2 W/m. Based on this result we outline a possible upgrade of this test magnet design to 2 T B-field in the 10 mm beam gap with the dB/dt ramping rates up to 1000 T/s. The power test results of this short sample magnet will be used to project both cryogenic and electrical power losses as a function of the magnet B-field and the dB/dt ramping rates. Then these projections will be scaled to the range of expected accelerator magnet beam gaps and B-fields for the proton and muon RCS accelerators. We invite collaborators to join these studies and call for support of the R&D program aimed at comprehensive demonstration of this approach that includes design, construction, and power tests of a long prototype of the HTS-based fast-cycling accelerator magnet by 2028.

43 PARTICLE ACCELERATORS↗

Electromagnetic Analysis of ITER Electron Cyclotron Emission Components and Support Structures for the Preliminary Design Review

The ITER electron cyclotron emission (ECE) diagnostic system is located at Design Shield Module (DSM) 2, Equatorial Port (EP) 9 to measure electron temperature profile and electron temperature fluctuations and also to assess nonthermal electron distributions via the oblique view. Therefore, ECE has both radial and oblique views with two couples of mirrors for two different optical views. This ECE diagnostic system shall be exposed to significant power due to unabsorbed electron cyclotron heating power in the plasma. It shall also receive large electromagnetic (EM) loads up to 100 MN/m 3 force density due to the eddy currents generated by the short 16-ms transient plasma disruption. The global EM models of EP12 and EP11 with the worst case of plasma disruption Major Disruption Downward Exponential 16 ms Category III (MD_DW_EXP16MS_CATIII) have been provided by ITER. However, the support structure for these critical components, including four mirrors, is still under the design and development phase, especially during the period of preliminary design reviews (PDRs). For those small in-vessel components that are not modeled explicitly for the PDRs, we can extract the magnetic field (B) data and flux variations (dB/dt) at those locations from the global model and then use the B and dB/dt method to calculate the eddy currents, EM forces, and torques on those components in the local submodels. In conclusion, this paper will present the detailed PDR EM analysis results of the ECE components and support structures.

Electromagnetic↗

The 2022 Polarized Proton Run in the Injectors

The previous polarized proton (PP) run was in 2017. During the start up process this run the injectors were set up in the same configuration using Booster and AGS PPM user 4 (BU4/AU4). Concurrently with this a new setup was established on Booster and AGS user 3 (BU3/AU3) called the split/merge. This new setup splits a single bunch into 2 in the Booster and recombines them on the AGS flattop in an attempt to improve polarization mainly by reducing the transverse emittance growth thought to be associated with higher peak beam current. Although Gold beam from EBIS was used at times in RHIC for LEReC and CeC development, from the injector perspective there is little noteworthy about it and so this note will focus solely on PP. According to the OC log, STAR Physics was first declared on Dec. 22, 2021 and the run ended on April 18, 2022. Initially, BU4/AU4 was used for RHIC. Then the split/merge setup was used from Dec. 27 until the Siemens motor generator failed on Jan. 12 and the Westinghouse motor generator had to be used in its place. The peak dB/dt available using the Westinghouse is half what it is with Siemens so the AGS required a different setup. Since the split/merge setup is more complicated than the standard one, and any benefit from it to polarization had not been demonstrated, a cycle was developed on AU6 for RHIC based on the AU4 setup but with a longer ramp. The split/merge was also set up with Westinghouse on BU3/AU7, but it was never used for RHIC. The switch back to the Siemens occurred on March 8 th once again using BU4/AU4.

43 PARTICLE ACCELERATORS↗