Search NASA⌕ Search

SEARCH · Search NASA

Results for “dam safety”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

CONUS-wide Projected Flood Frequency and Uncertainty Estimates, Version 1.0

This dataset presents a large-ensemble of CONUS-wide projected flood frequency and uncertainty estimates across ~2.7 million NHDPlusV2 river reaches over the CONUS. The framework producing this dataset leverages a multi-model, uncertainty-aware modeling framework that allows evaluating shifts in flood frequences at the stream reach level across the CONUS. CONUS-wide ensemble streamflow projections generated from hydrologic simulations driven by downscaled and bias-corrected Coupled Model Intercomparison Project Phase 6 (CMIP6) outputs are used to derive these flood frequency and uncertainty estimates over the period 1980 - 2099. A spatially consistent regional L-moment algorithm is applied across clusters defined by the US Hydrologic Unit Code Subregions (HUC4s and HUC8s) and NHDPlusV2 stream orders to estimate flood frequencies. The dataset also includes at-site based flood estimates that allow for the comparison between local and regional approach-based estimates, assess projected changes, and characterize their uncertainties. For more reliable estimation of rare flood frequencies such as 500 and 1000-year return periods, super-ensemble based estimates are also included in the dataset. This dataset is derived to support the "Impact-Informed Dam Safety Risk Assessment for Securing Hydropower Assests" project for the US Department of Energy (DOE) Hydropower and Hydrokinetic Office (H2O). For further details, refer to Kao et al. (2022), Ghimire et al. (2023), Ghimire et al. (2025), and Hosking and Wallis (1997).

Ghimire, Ganesh [ORNL] (ORCID:0000000242843941)↗

Re-evaluating probable maximum precipitation estimates: sensitivity to transposition domains and storm rotation using modern datasets

This study examines the sensitivity of Probable Maximum Precipitation (PMP) estimates to key methodological decisions embedded in the legacy approach adopted in the U.S. National Weather Service Hydrometeorological Reports No. 51 and No. 52. Although widely used for infrastructure design and risk regulation, fundamental aspects of PMP estimation—such as storm sample size, transposition domain, maximization procedures, and storm rotation—remain poorly constrained and lack formal guidance. Using the Red Rock watershed in Iowa as a case study, and leveraging the 2002–2023 NOAA Analysis of Record for Calibration (AORC) precipitation dataset, we systematically evaluate how each methodological choice, individually and in combination, influences PMP estimates. Our findings demonstrate that PMP is not a fixed physical upper bound but rather a modeling construct shaped heavily by user-defined assumptions. Notably, PMP values derived from modern gridded rainfall datasets can be substantially higher than the legacy estimate used in the original spillway design for Red Rock Dam. Decisions regarding storm sample size, domain extent, climatological window, and particularly storm rotation all contributed to higher PMP estimates. Storm rotation alone—a loosely constrained element in the current PMP practice—can amplify PMP by more than 25%. These results reveal the lack of standardized bounds in current PMP workflows and the need for systematic sensitivity and uncertainty analysis. As PMP estimation shifts toward probabilistic approaches, incorporating physically meaningful storm attributes will be key to developing more transparent, defensible methods for dam safety and climate-resilient infrastructure.

Probable maximum precipitation↗

How extreme rainfall and failing dams unleashed the Derna flood disaster

On September 11, 2023, Storm Daniel unleashed unprecedented rainfall over the Wadi Derna watershed, triggering one of the most devastating floods in modern history, striking Derna, a coastal city in Libya. This study reconstructs the disaster using an integrated modeling approach that combines satellite imagery, hydrologic, hydraulic, and geotechnical simulations, machine learning, eyewitness accounts, and digital elevation data to assess the impact of cascading dam failures. Our findings reveal that the region’s dams, even if structurally sound, would have provided minimal protection against the extreme runoff. However, their failure unleashed a destructive surge wave, amplifying the disaster’s magnitude and devastation. Here, we show that the collapse of aging flood control infrastructures, compounded by inadequate risk assessment and emergency preparedness, dramatically escalated the disaster’s impact. Our findings underscore the urgent need for systematic dam safety evaluations, enhanced flood forecasting, and adaptive risk management strategies that address climate extremes and infrastructure vulnerabilities.

Hydrology↗

Energy-Flow-Environment Linkage Map

Understanding how flexibility in environmental requirements can facilitate co-optimization of hydropower production outcomes and environmental outcomes is critical for future grid decision-making and operations as renewable energy resources increase. The environmental and power system outcomes connectivity linkage maps presented here provide a framework for conceptually and quantitatively linking power system outcomes to environmental outcomes through hydropower flow decisions. The Executive Summary Map serves as a starting for exploring the links between hydropower system performance outcomes and environmental outcomes. The centralized topic is “Flow from Hydropower System,” and connects the hydropower operations through “Flow through turbines” and “Non-turbine flows”, and to environmental outcomes through Reservoir elevation” and “Flow downstream of the hydropower system”. To the left of these central topics, “Hydro-mechanical operations” are linked through “Hydro-electrical operations” to “Hydropower performance outcomes” (“Reliability”, “Resilience”, “Revenue”, “Emissions”). On the right, environmental outcomes are grouped together by their physical location: “Upstream Outcomes” (“Upstream geomorphology”, “Upstream recreation”, “Upstream habitat”, “Upstream biota and biodiversity”, “Upstream water quality and greenhouse gas”), Outcomes relevant to both “Upstream/downstream or dam interface” (“Navigation”, “Dam safety and maintenance", “Human health”, “Water supply”, “Flood control”, ”Fish passage”), and “Downstream outcomes“ (e.g., “Downstream geomorphology”, “Downstream recreations”, “Downstream habitat”, “Downstream biota and biodiversity”, “Downstream water quality and greenhouse gas”). Each of these subtopics (e.g., “Hydro-mechanical operations”, “Hydro-electrical operations”, “Upstream geomorphology”, “Upstream recreation”) is further explored through their corresponding submaps. The “Read Me” file provides more detail information on map navigation. The “Models and tools database” file provides detailed information of models and tools presented in the maps.

13 HYDRO ENERGY↗

Program on State Agency Remote Sensing Data Management (SARSDM)

A planning study for developing a Missouri natural resources information system (NRIS) that combines satellite-derived data and other information to assist in carrying out key state tasks was conducted. Four focal applications -- dam safety, ground water supply monitoring, municipal water supply monitoring, and Missouri River basin modeling were identified. Major contributions of the study are: (1) a systematic choice and analysis of a high priority application (water resources) for a Missouri, LANDSAT-based information system; (2) a system design and implementation plan, based on Missouri, but useful for many other states; (3) an analysis of system costs, component and personnel requirements, and scheduling; and (4) an assessment of deterrents to successful technological innovation of this type in state government, and a system management plan, based on this assessment, for overcoming these obstacles in Missouri.

Eastwood, L. F., Jr.↗

Thematic Conference on Geologic Remote Sensing, 8th, Denver, CO, Apr. 29-May 2, 1991, Proceedings. Vols. 1 & 2

The proceedings contain papers discussing the state-of-the-art exploration, engineering, and environmental applications of geologic remote sensing, along with the research and development activities aimed at increasing the future capabilities of this technology. The following topics are addressed: spectral geology, U.S. and international hydrocarbon exporation, radar and thermal infrared remote sensing, engineering geology and hydrogeology, mineral exploration, remote sensing for marine and environmental applications, image processing and analysis, geobotanical remote sensing, and data integration and geographic information systems. Particular attention is given to spectral alteration mapping with imaging spectrometers, mapping the coastal plain of the Congo with airborne digital radar, applications of remote sensing techniques to the assessment of dam safety, remote sensing of ferric iron minerals as guides for gold exploration, principal component analysis for alteration mappping, and the application of remote sensing techniques for gold prospecting in the north Fujian province.

Source record↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Optimized Radar Remote Sensing for Levee Health Monitoring

Radar remote sensing offers great potential for high resolution monitoring of ground surface changes over large areas at one time to detect movement on and near levees and for location of seepage through levees. Our NASA-funded projects to monitor levees in the Sacramento Delta and the Mississippi River have developed and demonstrated methods to use radar remote sensing to measure quantities relevant to levee health and of great value to emergency response. The DHS-funded project will enable us is to define how to optimally monitor levees in this new way and set the stage for transition to using satellite SAR (synthetic aperture radar) imaging for better temporal and spatial coverage at lower cost to the end users.

radar remote sensing↗

US Non-powered Dam Characteristics Inventory

The U.S. Non-Powered Dam (NPD) Characteristics Inventory contains data from various sources, including identifiers, locations, and a wide variety of characteristics. Characteristics included describe US NPDs and their surroundings, including attributes related to the physical nature or design of a dam, environmental conditions, safety conditions, socioeconomic aspects, and hydropower development potential. Data may be continuous or discrete/categorical. Data were obtained for each dam listed as an NPD (based on USACE NID). This inventory supports the NPD Explorer and NPDamCAT web apps developed by ORNL.

13 HYDRO ENERGY↗

Mission planning for photogrammetry-based autonomous 3D Mapping of Dams using a commercial UAV

The application of autonomous unmanned aerial vehicles (UAVs) for conducting inspections of dams represents an innovative approach aimed at enhancing safety, efficiency, and cost-effectiveness. In this context, this paper presents algorithms for UAV mission design in autonomous dam inspections that include the creation of a 3D map based on photogrammetry. The algorithms were systematically developed to incorporate a comprehensive set of parameters that account for the geometric characteristics of the dam and adhere to photogrammetry specifications. To validate the proposed methodology, we utilized a commercial programmable quadrotor, specifically the Parrot Anafi USA Gov drone, which is equipped with high-quality cameras and can be programmed with the help of a software development kit (SDK) provided by the manufacturer. Our results demonstrate the efficacy of our method, highlighting how the generated maps can be used for hazard detection in the downstream slope of dams.

42 ENGINEERING↗

MASTODON: An Open-Source Software for Seismic Analysis and Risk Assessment of Critical Infrastructure

Seismic analysis and risk assessment of safety-critical infrastructure like hospitals, nuclear power plants, dams, and facilities handling radioactive materials involve computationally intensive numerical models and coupled multiphysics scenarios. They are also performed in a strict regulatory environment that requires high software quality assurance standards, and in the case of safety-related nuclear facilities, a conformance to the American Society of Mechanical Engineers Nuclear Quality Assurance (NQA-1) standard. This paper introduces the open-source finite-element software, MASTODON (Multi-hazard Analysis of Stochastic Time-Domain Phenomena), which implements state-of-the-art seismic analysis and risk assessment tools in a quality-controlled environment. MASTODON is built on MOOSE (Multi-physics Object-Oriented Simulation Environment), which is a highly parallelizable, NQA-1 conforming, coupled multiphysics, finite-element framework developed at Idaho National Laboratory. MASTODON is capable of fault rupture and source-to-site wave propagation using the domain reduction method, nonlinear site response, and soil-structure interaction analysis, implicit and explicit time integration, automated stochastic simulations, and seismic probabilistic risk assessment. When coupled with other MOOSE applications, MASTODON can also solve strongly and weakly coupled multiphysics problems. This paper presents a summary of the capabilities of MASTODON and some demonstrative examples.

42 ENGINEERING↗

Swept wing-tip shapes for low-speed airplanes

Preliminary results are presented of a study conducted to analyze the effects of several plan-form modifications on the aerodynamic characteristics of a high-aspect-ratio, natural laminar flow (NLW) wing. The study addresses the potential aerodynamic improvements available at both cruise and high angles of attack by use os swept wing-tip shapes. The swept wing tip appears to offer a viable addition to the lift of wing-tip designs which provide improvements in aerodynamic efficiency, with the added safety benefit of providing high angle-of-attack departure resistance.

Van Dam, C. P.↗

Poromechanical cohesive interface element with combined Mode I-II cohesive zone elastoplasticity for simulating fracture in fluid-saturated porous media

A combined Mode I-II cohesive zone (CZ) elasto-plastic constitutive model, and a two-dimensional (2D) cohesive interface element (CIE) are formulated and implemented at small strain within an ABAQUS User Element (UEL) for simulating 2D crack nucleation and propagation in fluid-saturated porous media. Here, the CZ model mitigates problems of convergence for the global Newton-Raphson solver within ABAQUS, which when combined with a viscous stabilization procedure allows for simulation of post-peak response under load control for coupled poromechanical finite element analysis, such as concrete gravity dam stability analysis. Verification examples are presented, along with a more complex ambient limestone-concrete wedge fracture experiment, water-pressurized concrete wedge experiment, and concrete gravity dam stability analyses. A calibration procedure for estimating the CZ parameters is demonstrated with the limestone-concrete wedge fracture process. For the water-pressurized concrete wedge fracture experiment it is shown that the inherent time-dependence of the poromechanical CIE analysis provides a good match with experimental force versus displacement results at various crack mouth opening rates, yet misses the pore water pressure evolution ahead of the crack tip propagation. This is likely a result of the concrete being partially-saturated in the experiment, whereas the finite element analysis assumes fully water saturated concrete. For the concrete gravity dam analysis, it is shown that base crack opening and associated water uplift pressure leads to a reduced Factor of Safety, which is confirmed by separate analytical calculations.

97 MATHEMATICS AND COMPUTING↗

Small Unmanned Aerial System (UAS) Flight Testing of Enabling Vehicle Technologies for the UAS Traffic Management Project

Small unmanned aerial systems (sUAS) have been studied and results indicate that there is a large array of highly-beneficial applications. These applications are too numerous to list, but include search and rescue, fire spotting, precision agriculture, etc. to name a few. Typically sUAS vehicles weigh less than 55 pounds and will be performing flight operations in the presence of manned aircraft and other sUAS. Certain sUAS applications, such as package delivery, will include operations in the close proximity of the general public. The full benefit from sUAS is contingent upon the resolution of several technological areas to enable free and widespread use of these vehicles. Technological areas in question include, but are not limited to: autonomous sense and avoid and deconfliction of sUAS from other sUAS and manned aircraft, communications and interfaces between the vehicle and human operators, and high-reliability autonomous systems. The NASA UAS Traffic Management (UTM) project is endeavoring to develop a traffic management system and concept of operations for these types of vehicles. An extensive sUAS flight test effort was performed to partially address vehicle-related technological areas and to shape an understanding of future developmental and test efforts for vehicles intended to use the UTM traffic management system. The flight testing described herein had the following objectives: 1) Install and test Dedicated Short Range Communications (DSRC) systems developed for the automotive industry for potential sense and avoid sUAS applications; 2) Evaluate the use of cellular 4G systems to provide vehicle control; 3) Obtain high-resolution video imagery in support of image-based optical detection sense and avoid systems; 4) Acquire data in fixed-wing flight to support validation and maturation of an autonomous range containment system known as Safeguard in fixed-wing flight. A total of 53 flights were performed over 12 operational days at Beaver Dam Airpark in Elberon, VA. This work was sponsored by the UTM project that is part of the Aviation Operations and Safety Program (AOSP) at NASA.

Glaab, Louis J.↗

Infrastructure-Relevant Storms of the Last Century

Historical extreme storm events are widely used to make Probable Maximum Precipitation (PMP) estimates, which form the cornerstone of large water management infrastructure safety. Past studies suggest that extreme precipitation processes can be sensitive to land surface feedback and the planetary warming trend, which makes the future safety of large infrastructures questionable given the projected changes in land cover and temperature in the coming decades. In this study, a numerical modeling framework was employed to reconstruct 10 extreme storms over CONUS that occurred during the past 100 years, which are used by the engineering profession for PMP estimation for large infrastructures such as dams. Results show that the correlation in daily rainfall for such reconstruction can range between 0.4 and 0.7, while the correlation for maximum 3-day accumulation (a standard period used in infrastructure design) is always above 0.5 for post-1948 storms. This suggests that current numerical modeling and reanalysis data allow us to reconstruct big storms after 1948 with acceptable accuracy. For storms prior to 1948, however, reconstruction of storms shows inconsistency with observations. Our study indicates that numerical modeling and data may not have advanced to a sufficient level to understand how such old storms (pre-1948) may behave in future warming and land cover conditions. However, the infrastructure community can certainly rely on the use of model reconstructed extreme storms of the 1948-present period to reassess safety of our large water infrastructures under assumed changes in temperature and land cover.

Chen, Xiaodong↗