Search NASA⌕ Search

SEARCH · Search NASA

Results for “dam safety”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

CONUS-wide Projected Flood Frequency and Uncertainty Estimates, Version 1.0

This dataset presents a large-ensemble of CONUS-wide projected flood frequency and uncertainty estimates across ~2.7 million NHDPlusV2 river reaches over the CONUS. The framework producing this dataset leverages a multi-model, uncertainty-aware modeling framework that allows evaluating shifts in flood frequences at the stream reach level across the CONUS. CONUS-wide ensemble streamflow projections generated from hydrologic simulations driven by downscaled and bias-corrected Coupled Model Intercomparison Project Phase 6 (CMIP6) outputs are used to derive these flood frequency and uncertainty estimates over the period 1980 - 2099. A spatially consistent regional L-moment algorithm is applied across clusters defined by the US Hydrologic Unit Code Subregions (HUC4s and HUC8s) and NHDPlusV2 stream orders to estimate flood frequencies. The dataset also includes at-site based flood estimates that allow for the comparison between local and regional approach-based estimates, assess projected changes, and characterize their uncertainties. For more reliable estimation of rare flood frequencies such as 500 and 1000-year return periods, super-ensemble based estimates are also included in the dataset. This dataset is derived to support the "Impact-Informed Dam Safety Risk Assessment for Securing Hydropower Assests" project for the US Department of Energy (DOE) Hydropower and Hydrokinetic Office (H2O). For further details, refer to Kao et al. (2022), Ghimire et al. (2023), Ghimire et al. (2025), and Hosking and Wallis (1997).

Ghimire, Ganesh [ORNL] (ORCID:0000000242843941)↗

Re-evaluating probable maximum precipitation estimates: sensitivity to transposition domains and storm rotation using modern datasets

This study examines the sensitivity of Probable Maximum Precipitation (PMP) estimates to key methodological decisions embedded in the legacy approach adopted in the U.S. National Weather Service Hydrometeorological Reports No. 51 and No. 52. Although widely used for infrastructure design and risk regulation, fundamental aspects of PMP estimation—such as storm sample size, transposition domain, maximization procedures, and storm rotation—remain poorly constrained and lack formal guidance. Using the Red Rock watershed in Iowa as a case study, and leveraging the 2002–2023 NOAA Analysis of Record for Calibration (AORC) precipitation dataset, we systematically evaluate how each methodological choice, individually and in combination, influences PMP estimates. Our findings demonstrate that PMP is not a fixed physical upper bound but rather a modeling construct shaped heavily by user-defined assumptions. Notably, PMP values derived from modern gridded rainfall datasets can be substantially higher than the legacy estimate used in the original spillway design for Red Rock Dam. Decisions regarding storm sample size, domain extent, climatological window, and particularly storm rotation all contributed to higher PMP estimates. Storm rotation alone—a loosely constrained element in the current PMP practice—can amplify PMP by more than 25%. These results reveal the lack of standardized bounds in current PMP workflows and the need for systematic sensitivity and uncertainty analysis. As PMP estimation shifts toward probabilistic approaches, incorporating physically meaningful storm attributes will be key to developing more transparent, defensible methods for dam safety and climate-resilient infrastructure.

Probable maximum precipitation↗

How extreme rainfall and failing dams unleashed the Derna flood disaster

On September 11, 2023, Storm Daniel unleashed unprecedented rainfall over the Wadi Derna watershed, triggering one of the most devastating floods in modern history, striking Derna, a coastal city in Libya. This study reconstructs the disaster using an integrated modeling approach that combines satellite imagery, hydrologic, hydraulic, and geotechnical simulations, machine learning, eyewitness accounts, and digital elevation data to assess the impact of cascading dam failures. Our findings reveal that the region’s dams, even if structurally sound, would have provided minimal protection against the extreme runoff. However, their failure unleashed a destructive surge wave, amplifying the disaster’s magnitude and devastation. Here, we show that the collapse of aging flood control infrastructures, compounded by inadequate risk assessment and emergency preparedness, dramatically escalated the disaster’s impact. Our findings underscore the urgent need for systematic dam safety evaluations, enhanced flood forecasting, and adaptive risk management strategies that address climate extremes and infrastructure vulnerabilities.

Hydrology↗

Energy-Flow-Environment Linkage Map

Understanding how flexibility in environmental requirements can facilitate co-optimization of hydropower production outcomes and environmental outcomes is critical for future grid decision-making and operations as renewable energy resources increase. The environmental and power system outcomes connectivity linkage maps presented here provide a framework for conceptually and quantitatively linking power system outcomes to environmental outcomes through hydropower flow decisions. The Executive Summary Map serves as a starting for exploring the links between hydropower system performance outcomes and environmental outcomes. The centralized topic is “Flow from Hydropower System,” and connects the hydropower operations through “Flow through turbines” and “Non-turbine flows”, and to environmental outcomes through Reservoir elevation” and “Flow downstream of the hydropower system”. To the left of these central topics, “Hydro-mechanical operations” are linked through “Hydro-electrical operations” to “Hydropower performance outcomes” (“Reliability”, “Resilience”, “Revenue”, “Emissions”). On the right, environmental outcomes are grouped together by their physical location: “Upstream Outcomes” (“Upstream geomorphology”, “Upstream recreation”, “Upstream habitat”, “Upstream biota and biodiversity”, “Upstream water quality and greenhouse gas”), Outcomes relevant to both “Upstream/downstream or dam interface” (“Navigation”, “Dam safety and maintenance", “Human health”, “Water supply”, “Flood control”, ”Fish passage”), and “Downstream outcomes“ (e.g., “Downstream geomorphology”, “Downstream recreations”, “Downstream habitat”, “Downstream biota and biodiversity”, “Downstream water quality and greenhouse gas”). Each of these subtopics (e.g., “Hydro-mechanical operations”, “Hydro-electrical operations”, “Upstream geomorphology”, “Upstream recreation”) is further explored through their corresponding submaps. The “Read Me” file provides more detail information on map navigation. The “Models and tools database” file provides detailed information of models and tools presented in the maps.

13 HYDRO ENERGY↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

US Non-powered Dam Characteristics Inventory

The U.S. Non-Powered Dam (NPD) Characteristics Inventory contains data from various sources, including identifiers, locations, and a wide variety of characteristics. Characteristics included describe US NPDs and their surroundings, including attributes related to the physical nature or design of a dam, environmental conditions, safety conditions, socioeconomic aspects, and hydropower development potential. Data may be continuous or discrete/categorical. Data were obtained for each dam listed as an NPD (based on USACE NID). This inventory supports the NPD Explorer and NPDamCAT web apps developed by ORNL.

13 HYDRO ENERGY↗

Mission planning for photogrammetry-based autonomous 3D Mapping of Dams using a commercial UAV

The application of autonomous unmanned aerial vehicles (UAVs) for conducting inspections of dams represents an innovative approach aimed at enhancing safety, efficiency, and cost-effectiveness. In this context, this paper presents algorithms for UAV mission design in autonomous dam inspections that include the creation of a 3D map based on photogrammetry. The algorithms were systematically developed to incorporate a comprehensive set of parameters that account for the geometric characteristics of the dam and adhere to photogrammetry specifications. To validate the proposed methodology, we utilized a commercial programmable quadrotor, specifically the Parrot Anafi USA Gov drone, which is equipped with high-quality cameras and can be programmed with the help of a software development kit (SDK) provided by the manufacturer. Our results demonstrate the efficacy of our method, highlighting how the generated maps can be used for hazard detection in the downstream slope of dams.

42 ENGINEERING↗

MASTODON: An Open-Source Software for Seismic Analysis and Risk Assessment of Critical Infrastructure

Seismic analysis and risk assessment of safety-critical infrastructure like hospitals, nuclear power plants, dams, and facilities handling radioactive materials involve computationally intensive numerical models and coupled multiphysics scenarios. They are also performed in a strict regulatory environment that requires high software quality assurance standards, and in the case of safety-related nuclear facilities, a conformance to the American Society of Mechanical Engineers Nuclear Quality Assurance (NQA-1) standard. This paper introduces the open-source finite-element software, MASTODON (Multi-hazard Analysis of Stochastic Time-Domain Phenomena), which implements state-of-the-art seismic analysis and risk assessment tools in a quality-controlled environment. MASTODON is built on MOOSE (Multi-physics Object-Oriented Simulation Environment), which is a highly parallelizable, NQA-1 conforming, coupled multiphysics, finite-element framework developed at Idaho National Laboratory. MASTODON is capable of fault rupture and source-to-site wave propagation using the domain reduction method, nonlinear site response, and soil-structure interaction analysis, implicit and explicit time integration, automated stochastic simulations, and seismic probabilistic risk assessment. When coupled with other MOOSE applications, MASTODON can also solve strongly and weakly coupled multiphysics problems. This paper presents a summary of the capabilities of MASTODON and some demonstrative examples.

42 ENGINEERING↗

Poromechanical cohesive interface element with combined Mode I-II cohesive zone elastoplasticity for simulating fracture in fluid-saturated porous media

A combined Mode I-II cohesive zone (CZ) elasto-plastic constitutive model, and a two-dimensional (2D) cohesive interface element (CIE) are formulated and implemented at small strain within an ABAQUS User Element (UEL) for simulating 2D crack nucleation and propagation in fluid-saturated porous media. Here, the CZ model mitigates problems of convergence for the global Newton-Raphson solver within ABAQUS, which when combined with a viscous stabilization procedure allows for simulation of post-peak response under load control for coupled poromechanical finite element analysis, such as concrete gravity dam stability analysis. Verification examples are presented, along with a more complex ambient limestone-concrete wedge fracture experiment, water-pressurized concrete wedge experiment, and concrete gravity dam stability analyses. A calibration procedure for estimating the CZ parameters is demonstrated with the limestone-concrete wedge fracture process. For the water-pressurized concrete wedge fracture experiment it is shown that the inherent time-dependence of the poromechanical CIE analysis provides a good match with experimental force versus displacement results at various crack mouth opening rates, yet misses the pore water pressure evolution ahead of the crack tip propagation. This is likely a result of the concrete being partially-saturated in the experiment, whereas the finite element analysis assumes fully water saturated concrete. For the concrete gravity dam analysis, it is shown that base crack opening and associated water uplift pressure leads to a reduced Factor of Safety, which is confirmed by separate analytical calculations.

97 MATHEMATICS AND COMPUTING↗

Infrastructure-Relevant Storms of the Last Century

Historical extreme storm events are widely used to make Probable Maximum Precipitation (PMP) estimates, which form the cornerstone of large water management infrastructure safety. Past studies suggest that extreme precipitation processes can be sensitive to land surface feedback and the planetary warming trend, which makes the future safety of large infrastructures questionable given the projected changes in land cover and temperature in the coming decades. In this study, a numerical modeling framework was employed to reconstruct 10 extreme storms over CONUS that occurred during the past 100 years, which are used by the engineering profession for PMP estimation for large infrastructures such as dams. Results show that the correlation in daily rainfall for such reconstruction can range between 0.4 and 0.7, while the correlation for maximum 3-day accumulation (a standard period used in infrastructure design) is always above 0.5 for post-1948 storms. This suggests that current numerical modeling and reanalysis data allow us to reconstruct big storms after 1948 with acceptable accuracy. For storms prior to 1948, however, reconstruction of storms shows inconsistency with observations. Our study indicates that numerical modeling and data may not have advanced to a sufficient level to understand how such old storms (pre-1948) may behave in future warming and land cover conditions. However, the infrastructure community can certainly rely on the use of model reconstructed extreme storms of the 1948-present period to reassess safety of our large water infrastructures under assumed changes in temperature and land cover.

Chen, Xiaodong↗

Update on Development of a U.S. Rail Transport Capability for Spent Nuclear Fuel and High-Level Waste - 20466

This paper provides an overview of the progress to date, and discussion of the path forward, related to designing, fabricating and testing prototype railcars that will comply with the safety standard S-2043. This standard was developed by the Association of American Railroads (AAR) specifically for railcars used to transport High-Level Radioactive Material (HLRM). AAR defines the term HLRM to include both spent nuclear fuel (SNF) and high-level radioactive waste (HLW). DOE is in the process of developing and testing prototype railcars that will satisfy Standard S-2043. This is a technical paper that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this paper in no manner supersedes, overrides, or amends the Standard Contract. This paper reflects technical work which could support future decision making by the Department of Energy (DOE or Department). No inferences should be drawn from this paper regarding future actions by DOE, which are limited both by the terms of the Standard Contract and a lack of Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Needs and Opportunities for Testing of Hydropower Technology Innovations

Despite hydropower’s status as a well-established technology, changes in the global energy sector have prompted a variety of necessary hydropower technological innovations. Examples include efficient lowhead turbines, more flexible and dispatchable hydropower and pumped storage systems to complement variable and intermittent renewable resources, and technologies providing higher environmental performance. However, while innovative technologies are currently being proposed to meet these development challenges, small hydropower facility owners do not have sufficient risk-bearing capacity to adopt new, unvalidated technologies. This discourages manufacturers from bringing nascent technologies to market and stalls the technological growth of the sector. To reduce the risks associated with new technologies and promote further innovation, systemic (and sometimes unconventional) validation activities and new testing capabilities for hydropower are highly desired. These testing capabilities must demonstrate the safety, environmental acceptability, reliability, and performance of innovative technologies to quantify their value compared with existing technologies. Establishing these capabilities through dedicated testing facilities will be key to promoting hydropower growth in the United States. Following direction from the House Energy and Water Development Committee, the US Department of Energy’s Water Power Technologies Office (WPTO) has been tasked with understanding the state of hydropower testing in the United States. This scoping report discusses the needs and opportunities of hydropower testing in the United States, with a specific focus on small hydropower. Future developments will likely mostly target low-head sites with less than 30 ft (9.1 m) from new stream-reach developments, non-powered dam retrofits, and rehabilitation/upgrade of existing plants.

13 HYDRO ENERGY↗

DEVELOPMENT OF AN INTEGRATED SECURITY AND SAFETY MONITORING SYSTEM FOR SPENT NUCLEAR FUEL AND HIGH-LEVEL WASTE TRANSPORTATION

This paper provides an overview of the progress to date, and discussion of the path forward, related to designing, fabricating, and testing an integrated security and safety monitoring system (ISSMS) for railcars used to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) in the United States. The system will comply with the US Department of Energy’s (DOE) Order 460.2B “Departmental Materials Transportation Management” and the Association of American Railroads’ (AAR) standard S-2043 “Performance Specification for Trains Used to Carry High-level Radioactive Material” [1] developed specifically for railcars used to transport high-level radioactive material (HLRM). DOE is in the process of developing and testing an ISSMS that will satisfy both DOE requirements and AAR standards. DOE has already developed railcar designs for transportation of HLRM. In 2024, DOE’s Atlas railcar project completed the design, fabrication and testing of three railcar types: transportation cask-carrying, buffer, and security escort, resulting in AAR conditional approval to operate on freight rail networks in North America. DOE decided to combine the required security and safety systems into one system, and this combined system is the subject of the current effort. DOE is developing and proposes to implement the ISSMS for these railcars as part of the build out of the railcar fleet. DOE began planning for development of the ISSMS in February 2020. The project is divided into seven phases starting with conceptual design and continuing through production design, as shown in Figure 1. An earlier version of the system was tested as part of the Atlas railcar consist demonstration test run in 2023. This paper describes the design features and system testing using the Atlas project railcars, and laboratory testing completed to date. The paper will also describe the activities planned to support the DOE project to ship the High Burn-Up Research Cask (HBRC) in 2027.

Schultze, Michael [ORNL] (ORCID:0000000283205671)↗

Utilization of Unmanned Aircraft Systems for Environmental Purposes at the Savannah River Site – 26578

Born in the 1950s, the Savannah River Plant was constructed as a plutonium and tritium production plant. As the Cold War era came and went, a change of direction was signaled when the name of the facility changed from Savannah River Plant to Savannah River Site (1989) – the main mission at Savannah River shifted from “production” to “cleanup.” The Department of Energy is responsible for managing the 310 square miles of land that is the Savannah River Site and the cleanup/remediation activities that occur. The Savannah River National Laboratory utilizes unmanned aircraft systems to assist with some of those environmental monitoring and remediation activities. One function of unmanned aircraft systems at the Savannah River National Laboratory is conducting aerial photography and videography. Various infrastructure evaluations have been performed with unmanned aircraft – facility rooftop inspections, water tower lock verifications, earthen dam surveys, etc. An unmanned aircraft system has been used for progress footage of remediation projects – Dunbarton Bay remediation, Saltstone Disposal Unit construction, etc. Thermal cameras on an unmanned aircraft system are used to help identify cracks/leaks in structures from vantage points not readily accessible by personnel. Virtual tours of different waste units are conducted with unmanned aircraft systems for Site groups and federal/state regulators to save costs and travel time. Additionally, advanced remote sensing technologies are used on unmanned aircraft systems at the Savannah River Site. Light Detection and Ranging uses laser pulses to measure distances to the Earth's surface or other targets to create highly detailed topographic maps that accurately portray terrain (e.g., elevation changes, slopes, and contours). Data collection with a Light Detection and Ranging unit mounted on an unmanned aircraft system is quick and efficient – large-area surveys are conducted in shorter time frames. Because Light Detection and Ranging can penetrate through foliage and vegetation to ground level, it is being used in conjunction with a watershed model to study the General Separations Area of the Site to determine stormwater flow volume and direction, monitor stream stability, and forecast river flow behavior. A hyperspectral camera captures a wide spectrum of electromagnetic wavelengths across numerous narrow bands, beyond what the human eye can see. It provides detailed spectral information about the objects or surfaces in an image, which can be used to identify and analyze materials based on their spectral signatures. A hyperspectral camera mounted on an unmanned aircraft system has been used at the Savannah River Site for non-destructive evaluation of concrete and concrete structures. Unmanned aircraft systems at the Savannah River Site are also used for the application of herbicide on identified rooftops. P-Reactor and R-Reactor are entombed nuclear reactors at the Savannah River Site. Unwanted vegetation is often present on these rooftops – over time roots can penetrate seams, cracks, and joints of the general roof and concrete caps, leading to water ingress and deterioration of the structural components. For time and cost efficiencies as well as in the interest of personnel safety, an unmanned aircraft is used to dispense herbicide on rooftop areas where vegetation is noticed to help alleviate the issues/hazards.

Lorier, Troy [Savannah River National Laboratory (↗