Search NASASearch

SEARCH · Search NASA

Results for “data center”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Advanced Data Center Energy Opportunities: Cloud and Infrastructure CoP - Data Center Energy and Efficiency with AI Adoption

The NLR portion of the "Cloud & Infrastructure CoP - Data Center Energy and Efficiency with AI Adoption" web meeting will cover data center locations, energy use and load growth, best practices, performance metrics, transition to direct liquid cooled data center equipment, and NLR's approach to optimizing data center.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Data Centers and Digital Assurance Introduction to Supply Chain and Cybersecurity for Data Centers, Session 1

The first session of the TADA (Technical Assistance for Digital Assurance) Data Centers Cohort Workshop, held on October 30, 2025, introduced foundational concepts of Digital Assurance in the context of data center and grid integration. Sponsored by the U.S. Department of Energy, the workshop brought together utilities, data center operators, developers, and vendors to address cybersecurity and supply chain vulnerabilities. The session emphasized the growing criticality of data centers within the electric grid and the need for secure, real-time, bidirectional communication. Participants explored the principles of Digital Assurance, including cybersecurity, cyber-informed engineering (CIE), and lifecycle security, and applied a threat-vulnerability-consequence framework to identify and mitigate risks at the data center–grid interface. Discussions covered a range of threats such as spoofed dispatch signals and insider threats, architectural vulnerabilities like SCADA interfaces and insecure protocols, and potential consequences including cascading grid failures. The session also raised strategic questions about business value, vendor assurance, and defining cyber boundaries and responsibilities. This foundational workshop set the stage for deeper technical analysis and the development of actionable frameworks in subsequent sessions. Session 1 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION

Scalable Data Center Capacity for DOE's AI Prototype: A Rapidly Available Gigawatt Data Center for DOE

The multilaboratory Gigawatt Data Center working group was commissioned to identify approaches to rapidly establish federal data centers with scalable capacities up to 1,000 MW. These state-of-the-art facilities will serve as hubs for interdisciplinary collaboration, industry partnerships, and transformative applications of artificial intelligence. The proposed strategic shift includes facilitating multilaboratory collaboration, prioritizing operational efficiency, expanding public–private partnerships, optimizing investments, ensuring long-term contractual flexibility, supporting open science and secure data enclaves, and exploiting high-speed national networks. Owing to their extensive experience and best practices, the US Department of Energy national laboratories are uniquely positioned to lead this initiative. We recommend conducting a feasibility analysis to rapidly identify the optimal sites for this initiative, and the effort will likely involve private industry for design, construction, financing, and operational integration. We also propose establishing multiple geographically diverse sites to ensure energy resilience, high operational reliability, and a diverse user base, thereby effectively addressing the nation’s critical needs.

42 ENGINEERING

TSDC: Transportation Secure Data Center: Real-World Data for Planning, Modeling, and Analysis

The Transportation Secure Data Center is a centralized repository for high-resolution transportation data from hundreds of travel and transit surveys and studies. It makes vital transportation data broadly available to users while preserving the privacy of survey participants. It houses surveys and studies conducted by state departments of transportation, metropolitan planning organizations, transit agencies, cities, and other public agencies. Meanwhile, the Livewire Data Platform empowers research, industry, and academic partners to easily and securely preserve, maintain, share, discover, and gain access to transportation and mobility data. Livewire accommodates a range of datasets, including behavioral, experimental, model, analytical, and raw data at the vehicle, traveler, and system levels. Datasets support mobility research and planning spanning urban science, connected and automated vehicles, fueling and charging infrastructure, mobility decision science, multimodal transportation, vehicle efficiency, and more.

33 ADVANCED PROPULSION SYSTEMS

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)

IM3 Open Source Data Center Atlas

IM3 Open Source Data Center Atlas Description This dataset contains locations of existing data center facilities in the United States. Data center locations were derived from OpenStreetMap (OSM), a crowd-sourced database. Data points from OSM are processed in various ways to determine additional variables provided in the data including: facility area (square feet), associated US county, and US state. This dataset can be used to identify areas of concentrated data center development and inform government and private sector planning strategies for future buildout of data centers and the infrastructure necessary to support it. Usage Notes Validation of OSM-derived data center locations is an ongoing development under the IM3 project, and the database will be updated as new information becomes available. In some instances, both the data center area (e.g., campus) and individual data center buildings are included as overlapping areas in the database. Both values are retained. Data center points, buildings, and campus areas are provided as separate layers in the downloadable data package. Note that data items are not necessarily complete across layers. That is, a specific data center may only be present as a single point geometry in the "point" layer while other data centers are represented in both the campus and building layers. In some cases, data center campuses and/or buildings straddle a county boundary line. Mappings to both counties are retained in the database as separate rows. These data rows will have the same data center id information, but each will have different county information. Crowd-sourced data, by nature, relies on individuals and communities to provide information. As a result, some data may be missing where it has not yet been reported. As we collect information on additional data center locations and as OSM receives additional contributions, the database will be updated to capture additional data points not yet shown. Data items will occasionally be removed from OSM if they are misidentified, if they no longer exist, if they are duplicates of another item, or similar. For that reason, updated versions of this database may not contain all data center locations included in previous versions. Technical Information Data is available for download under the following formats: GeoPackage (GPKG) CSV Geospatial data is provided in the WGS84 (EPSG:4326) coordinate reference system. The GeoPackage download contains the following layers. See usage notes for more information. "point" "building" "campus" The "point" layer includes all data from OSM that had POINT geometry type (i.e., individual coordinates). The "building" layer includes all OSM data that did not have POINT geometry and where the building tag in the OSM export was neither equal to "no" or null. Data that did not meet the "point" or "building" qualification was assumed to be a facility campus and included in the "campus" layer. The dataset contains the following parameters. Variables provided by OSM are labeled with (OSM-provided). id - unique identification number (OSM-provided with prefix of "node/", "relation/" and similar attributes removed) state - name of US state state_abb - two letter US state abbreviation state_id - state ID number county - name of US county county_id - county ID number ref - reference numbers or codes (OSM-provided) operator - the name of the company, corporation, or person in charge facility (OSM-provided) name - name of facility (OSM-provided) sqft - surface area of facility polygon, measured in square feet. Only available for "building" and "campus" layers lat - latitude of data centroid point lon - longitude of data centroid point type – represented spatial information. One of "point", "building", or "campus". geometry – POLYGON geometry of area footprint (in "campus" and "building" layers) or POINT geometry of locations (in "point" layer). This parameter is not included in the csv download. Attribution Data center locations were derived from OpenStreetMap, which is made available at openstreetmap.org under the Open Database License (ODbL). US state and county boundary information was collected from the US Census Bureau for the year 2024, which is made publicly available at https://www.census.gov/geographies/mapping-files.html Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License The IM3 Open Source Data Center Atlas is made available under the Open Database License: http://opendatacommons.org/licenses/odbl/1.0/. Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall [Pacific Northwest National Labor

IM3 Open Source Data Center Atlas

IM3 Open Source Data Center Atlas Description This dataset contains locations of existing data center facilities in the United States. Data center locations were derived from OpenStreetMap (OSM), a crowd-sourced database. Data points from OSM are processed in various ways to determine additional variables provided in the data including: facility area (square feet), associated US county, and US state. This dataset can be used to identify areas of concentrated data center development and inform government and private sector planning strategies for future buildout of data centers and the infrastructure necessary to support it. Usage Notes Validation of OSM-derived data center locations is an ongoing development under the IM3 project, and the database will be updated as new information becomes available. In some instances, both the data center area (e.g., campus) and individual data center buildings are included as overlapping areas in the database. Both values are retained. Data center points, buildings, and campus areas are provided as separate layers in the downloadable data package. Note that data items are not necessarily complete across layers. That is, a specific data center may only be present as a single point geometry in the "point" layer while other data centers are represented in both the campus and building layers. In some cases, data center campuses and/or buildings straddle a county boundary line. Mappings to both counties are retained in the database as separate rows. These data rows will have the same data center id information, but each will have different county information. Crowd-sourced data, by nature, relies on individuals and communities to provide information. As a result, some data may be missing where it has not yet been reported. As we collect information on additional data center locations and as OSM receives additional contributions, the database will be updated to capture additional data points not yet shown. Technical Information Data is available for download under the following formats: GeoPackage (GPKG) CSV Geospatial data is provided in the WGS84 (EPSG:4326) coordinate reference system. The GeoPackage download contains the following layers. See usage notes for more information. "point" "building" "campus" The "point" layer includes all data from OSM that had POINT geometry type (i.e., individual coordinates). The "building" layer includes all OSM data that did not have POINT geometry and where the building tag in the OSM export was neither equal to "no" or null. Data that did not meet the "point" or "building" qualification was assumed to be a facility campus and included in the "campus" layer. The dataset contains the following parameters. Variables provided by OSM are labeled with (OSM-provided). id - unique identification number (OSM-provided with prefix of "node/", "relation/" and similar attributes removed) state - name of US state state_abb - two letter US state abbreviation state_id - state ID number county - name of US county county_id - county ID number ref - reference numbers or codes (OSM-provided) operator - the name of the company, corporation, or person in charge facility (OSM-provided) name - name of facility (OSM-provided) sqft - surface area of facility polygon, measured in square feet. Only available for "building" and "campus" layers lat - latitude of data centroid point lon - longitude of data centroid point type – represented spatial information. One of "point", "building", or "campus". geometry – POLYGON geometry of area footprint (in "campus" and "building" layers) or POINT geometry of locations (in "point" layer). This parameter is not included in the csv download. Attribution Data center locations were derived from OpenStreetMap, which is made available at openstreetmap.org under the Open Database License (ODbL). US state and county boundary information was collected from the US Census Bureau for the year 2024, which is made publicly available at https://www.census.gov/geographies/mapping-files.html Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License The IM3 Open Source Data Center Atlas is made available under the Open Database License: http://opendatacommons.org/licenses/odbl/1.0/. Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall [Pacific Northwest National Labor

Transportation Secure Data Center: Frequently Asked Questions for Data Owners/Contributors

The Transportation Secure Data Center is a centralized repository for detailed transportation data from travel and transit surveys and studies conducted across the nation. It makes vital transportation data broadly available to users while preserving the privacy of survey participants. Hundreds of datasets from surveys and studies of household travel and transit passenger travel are archived in the TSDC, including surveys and studies conducted by state departments of transportation, metropolitan planning organizations, transit agencies, cities, and other public agencies. Detailed data from travel surveys and studies are extremely valuable for research purposes. However, the fine-grained information they contain could potentially be misused to identify individual travelers, so access to these data should only be granted with safeguards in place to protect participant privacy. The TSDC was created to address this challenge and to relieve public agencies from the burden of archiving their data and responding to data requests.

33 ADVANCED PROPULSION SYSTEMS

Data Center Market Report

The data center market is poised to explode in the coming decade due to undeniable drivers such as continued adoption of generative AI, increased data storage needs, and enterprise integration of AI in numerous industries [1] [2] [3]. Scalable power and increased computational capacity are at the forefront of considerations for hyperscalers, the major cloud service providers in this space. Lawrence Livermore National Laboratory is uniquely poised to help with informed decision making for data center market leaders during this phase of explosive expansion. National grid modeling expertise and cutting edge innovations in computer cooling systems place LLNL in an enviable position for creating economic impact in the data center industry by leveraging its expertise in these areas which can help the data center market keep up with growing demand.

97 MATHEMATICS AND COMPUTING

Data Centers Gap Analysis [Slides]

Data centers and other large loads are a significant driver of unprecedented, near-term demand growth in the United States. Power system planners, utilities, regulators, and other stakeholders are grappling with how to integrate data centers on the system without comprising reliability, resiliency, and energy affordability. NLR is pursuing work to develop a siting and decision-making tool that would draw on power systems modeling expertise to achieve granular representation of trade-offs involved in data center sitting and development. This slide deck supports the same workstream by reviewing the literature to identify mitigation options to facilitate near-term integration of large loads and by presenting options for pursuing data development and/or modeling projects to improve representation of siting options.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Bridging the Gap for Powering Data Centers

The rapid expansion of data centers, primarily driven by artificial intelligence, is outpacing the adaptability of the U.S. electric grid. This report, developed by Idaho National Laboratory (INL) , presents a gap analysis of some of the infrastructure challenges associated with large-scale data center deployment. Drawing from a national workshop hosted by INL in October of 2025, the report synthesizes stakeholder insights, survey data, and technical discussions to identify critical barriers and research needs. Key findings highlight the growing preference for behind-the-meter generation, the perceived inadequacy of legacy interconnection processes, and the urgent need for improved coordination between utilities, regulators, and data center developers. Environmental concerns such as water use and noise pollution, as well as economic constraints like equipment lead times and cost allocation, are also explored. The report outlines national lab capabilities in modeling, simulation, and technical assistance, and proposes targeted R&D priorities to support resilient, scalable, and efficient integration of data centers into the grid.

22 - GENERAL STUDIES OF NUCLEAR REACTORS

Potential of Data Center Controls in Grid Services

The rapid proliferation of large data centers brings both challenges and opportunities for grid reliability. The data center resources and their potential flexibility have the potential to contribute resources to grid operations. Through capabilities like energy shifting and resource coordination, data centers can help reduce their net demand on the transmission network, as well as provide additional grid services to support reliable operation on the grid. While transient and long-term grid planning and operations are the scenarios that draw most attention, the quasi-steady state timeseries (QSTS) operation of data centers and grid bring interesting scenarios that can help evaluate the data center controls to aid grid services. This work is focused on modeling data centers for QSTS applications – incorporating the AI data center load profiles and building on the PNNL digital twin model for the thermal management loads to enable simulation studies to reveal the impact of data center controls on grid performance. This includes the integration of a QSTS battery and natural gas generator model to incorporate local resource impacts to the system. The simulation study is performed with a modified IEEE 24-Bus transmission system. Scenarios are focused on evaluating the data center load impacts on the transmission system and leveraging both data center and local generation controls to mitigate those impacts and provide additional grid services. The data center controls revealed the ability to contribute to two main kinds of grid services: preventing congestion on a weak grid by coordinating the data center resources with the collocated BESS and onsite generation; and the ability to help the grid operations during stressed times of operation like during a contingency. Leveraging these and other capabilities has the potential to help data centers become grid responsive assets, aiding in both their integration into the power system and grid reliability.

power grid simulation

Bridging the Gap: User-Centric Energy Monitoring for Policy-Driven Application Optimization in HPC Data Centers

Application energy optimization in HPC data centers face two critical gaps. Systematic methodologies that connect data center policies to application decisions and accessible monitoring tools that enable data-driven optimization. We address both gaps through two complementary pillars. First, we present a methodology based on extended weighted Energy Delay Product (EDP) to translate data center operational priorities and integrate energy considerations into the energy optimization workflow which starts from continuous monitoring through targeted optimization. Second, we present a user-space monitoring tool, Omnistat, that enables this methodology by providing developers with direct access to actionable energy telemetry. Through deployment on the Frontier supercomputer and case studies exploring performance-energy trade-offs, we show how these pillars help energy as an integral optimization target for developers as active participants in data center efficiency.

Shin, Woong [ORNL] (ORCID:0000000172077814)

Energy and AI: Evaluating Future Grid and Water Stress Due to Data Centers

Projections of the need for new data centers to support Artificial Intelligence (AI) are large but highly uncertain. Recent projections indicate up to a 15% annual growth rate in data center electricity demand within the next 5-10 years. Given that most electric utilities are required to have a reserve margin of roughly the same magnitude as the projected growth in demand, these new data center loads could soon threaten resource adequacy and reliability unless data centers build their own generation, interruptible loads are negotiated, commensurate new capacity and/or transmission is built, or some combination of these options. Similarly, depending on the cooling technology and geographic location of new data centers, they could threaten water adequacy in water scarce regions. This presentation highlights the grid and water implications of new data centers to support AI.

Mongird, Kendall (ORCID:0000000328077088)

Case Study of Integrating High-Temperature Heat Pump with LiBr-H2O Absorption Chiller for Data Center Liquid Cooling

Data centers (DCs) are physical infrastructures that support artificial intelligence workloads. The rapid growth of artificial intelligence is putting substantial pressure on the US power grid. Most of electricity consumed by IT equipment, accounting for 50%-60% of total DC power, ultimately becomes waste heat. This heat is dissipated by DC’s cooling facilities, accounting for an additional 30%-40% of total DC power. Recovering and repurposing this waste heat offers a significant opportunity to enhance energy efficiency and reduce operating costs of DCs. One potential pathway is converting heat to cold using thermal-driven absorption chillers, therefore, reducing the power consumption in DC cooling facilities. Existing studies mainly demonstrate the technical and economic feasibility of repurposing DC’s waste heat for cooling applications but provide limited technical details on how to integrate the thermal-driven absorption chillers with DC cooling systems. In addition, the low-grade waste heat available from DCs must be upgraded to higher temperatures suitable for absorption chillers. This paper presents a case study on integrating high-temperature heat pumps with a LiBr-H2O absorption chiller to use DC waste heat for cooling. A thermodynamic model of single-effect, LiBr-H2O absorption chiller and an empirical model of high-temperature heat pumps were built. The case study considers ASHRAE W17 liquid-cooled DC, with facility service water supplied at 17.0℃ and returned at 25.3℃. The thermal behaviors of absorption chiller components were predicted for the generation temperature ranging from 75.0℃ to 115.0℃. Based on the available waste heat in the integrated system, two waste heat recovery strategies were evaluated: a facility service water-based strategy and cooling water-based strategy. Results indicated that the cooling water-based strategy achieves higher Coefficient of Performance (COPs) than the facility service water-based strategy. The relatively low cooling COPs of single-effect LiBr-H2O absorption chillers could be offset by high heating COP of high temperature heat pumps. The maximum cooling COP of absorption chiller and the overall COP of integrated systems occur at lower generation temperatures, but these conditions also yield lower cooling capacities. In practice, system operation should balance the trade-off between the COP and cooling capacity

Wang, Pengtao [ORNL] (ORCID:0000000214713429)

Hybrid Cooling and Water Treatment for Resilient, Water-Self-Sufficient Data Centers

The continued growth of data center infrastructure is intensifying demand for freshwater resources, particularly in water-stressed regions, and is increasingly limiting sustainable capacity expansion. This work investigates a conceptual hybrid system that integrates freeze desalination with ultrasonic-assisted ice separation to enable on-site production of pure water from diverse sources, including seawater, brackish groundwater, and reclaimed industrial or agricultural wastewater. Simultaneously, the system produces low-temperature cooling streams that enhance heat removal in high power density computing environments. A process-level thermodynamic analysis is performed across a range of boundary and operating conditions, including variations in feed concentration, freezing temperature, and mass flow rate. The results are presented as performance curves relating feedwater concentration and target purified water output to the corresponding intake flow requirements, enabling estimation of source water demand per unit of Information Technology Equipment (ITE) energy consumption (kWh) across varying data center scales and operational scenarios. The corresponding electrical energy consumption for integrated cooling and water treatment is also evaluated as a function of system operating parameters and target water production levels. These results provide a basis for evaluating system feasibility across different conditions and for identifying parameter ranges in which integrated water treatment and cooling improve resource efficiency, thermal performance, and operational flexibility in data centers.

Elhefny, Aly [ORNL] (ORCID:0000000284907923)

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN