Search NASA⌕ Search

SEARCH · Search NASA

Results for “decarbonization of natural gas network”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

HyBlend Collaborative Research Partnership (CRADA Final Report)

This agreement assembles a multi-lab, multi-industry team to address high-priority research topics related to the blending of hydrogen (H2) into the U.S. natural gas (NG) pipeline network. There are four main research objectives: 1. Compatibility of metals (SNL) – Develop general principles for operation of HyBlend™ delivery systems in the context of structural integrity and assess the role of gas impurities on degradation of metal pipelines. 2. Compatibility of polymers (PNNL) – Assess gas impurities in HyBlend for polymer pipeline degradation and lifetime predictions. 3. Life cycle analysis (LCA) (ANL) – Analyze the life cycle of technology pathways for hydrogen and NG blends, as well as alternative pathways. 4.Techno-economic analysis (TEA) (NREL) – Quantify the costs and opportunities for hydrogen production and blending with the NG network, as well as alternative pathways.

08 HYDROGEN↗

Pipeline Hydrogen Decarbonization and Repurposing Analyzers (P-HyDRAs)

The Pipeline Hydrogen Decarbonization and Repurposing Analyzers (P-HyDRAs) are a set of prototype computational tools for simulating and optimizing midstream natural gas pipeline system operations subject to location and time-dependent hydrogen blending. The models can accurately resolve dynamic gas flows through large-scale pipeline networks using non-ideal gas equations of state. The codes can be used as decision support for planning and design decisions involving intra-day energy flow schedules as well as spatiotemporal economic values of natural gas, hydrogen, and net energy delivered to consumers while ensuring that pipeline hydraulic limitations, gas compressor station constraints, operational factors, and pre-existing shipping contracts are satisfied. The inputs to the codes are a model of the pipeline system as well as time-series data that specify boundary conditions on the network. For optimization, the code module requires price and quantity offers for natural gas and hydrogen and price and quantity bids for energy, which are used as time-dependent constraints in an optimal control problem. The outputs are time-series data that provide a predictive simulation of gas flows, mass fractions, and pressures, or with additional degrees of freedom give an approximately optimal solution for gas injections/withdrawals, compressor settings, and sensitivities to the objective function that provide locational values of energy.

Zlotnik, Anatoly↗

Nuclear Thermal Energy Storage Configurations for Industrial Combined Heat and Power Supply: Conceptual Study and Engineering Designs

The industries examined in this report primarily rely on moderate-temperature heat provided by gas- or coal-fired boilers and combined heat and power (CHP) plants, delivered through standard process steam systems. High-temperature energy demands are often industry-specific and typically exceed the capabilities of high-temperature gas-cooled reactors (HTGRs). While it is technically feasible to replace process steam from fossil-based heat sources with nuclear energy, certain industries, such as methanol production and pulp and paper, face technoeconomic challenges in integrating nuclear energy without major changes or a technological shift. This is mainly due to the limited external energy demand remaining after the use of internal byproducts, waste heat recovery, and simple efficiency improvements. Achieving full decarbonization of these processes with nuclear energy would require significant technological advancements, involving experimental technology and substantial investments, making widespread adoption in existing industrial plants unlikely in the near term. This study reviews TES options in the context of enabling a flexible CHP supply while maintaining a steady nuclear heat input. Heat storage systems that interface between the reactor primary fluid and the CHP system offer superior performance and flexibility. Specifically, steam extraction downstream of the reheater with a two-tank molten-salt TES appears as the best solution regarding thermodynamic system benefits and system drawbacks. Using selected system configurations, a conceptual design of an industrial energy park was developed for industries with varying energy demands, such as steel production plants utilizing electric arc furnaces (EAFs) and chemical plants, as well as for those with constant energy demands, like petroleum refineries. This design highlights the capabilities of TES and explores its potential business cases. The study also conceptually develops the potential for integrating additional energy sources with nuclear systems through the implementation of TES. The potential of the HTGR-TES-CHP system was also evaluated considering key uncertainties such as industrial demand profiles, external grid access availability, and eligible tax credit levels, using the Holistic Energy Resource Optimization Network. Sensitivity of net present value to these uncertainties was analyzed to determine the optimal number of nuclear reactors (and CHP systems) and the suitable TES capacity. The results were interpreted from a decision-maker’s perspective, focusing on three key areas: deployment strategy (oversized units vs. undersized units with TES support), industrial process characteristics (thermal-intensive single profiles vs. electricity-intensive combined profiles), and operational goals (maximizing profits vs. minimizing natural gas (NG) consumption or external grid dependence). The optimization results indicate that the HTGR-TES-CHP system significantly reduces reliance on NG boilers for individual industrial processes by 9-60% (in NG capacity factor), with an average reduction of 38%, compared to standalone NG boiler operation case (Business As Usual [BAU]). For combined industrial processes, the reduction ranges from 37-77%, with an average of 60%. Additionally, the system greatly reduces dependence on external grids. In meeting industrial electrical demands, a 33-100% self-sufficient internal electricity supply is achieved for single industrial process, with an average of 74%, compared to the BAU scenario, where 100% of electricity is imported. For combined processes, 35-100% of internal electricity demands are met by the reactor, with an average of 73%. At last, the relative NG price levels at which the proposed HTGR-TES-CHP system can cost-effectively enter the market currently dominated by existing NG boilers were estimated. For a moderate HTGR CAPEX level ($\$$2500/kWth, $\$$6329/kWe), the analysis suggests that NG prices must be 2.5 to 7 times higher than HTGR variable operating and maintenance costs for single industrial process, and 5.5 to 9.5 times higher for a combined process scenario. Tax credit modeling shows that the Investment Tax Credit significantly reduces the price threshold needed to break even, making the system competitive with NG boilers in certain cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydrogen and Electric Charging Infrastructure for Heavy-Duty Trucks: A Nationally Scalable Megaregion Assessment

Decarbonizing regional and long-haul freight is challenging due to the limitations of battery-electric commercial vehicles and infrastructure constraints. Hydrogen fuel cell medium- and heavy-duty vehicles (MHDVs) offer a viable alternative, aligning with the decarbonization goals of the Department of Energy and commercial entities. Historically, alternative fuels like compressed natural gas and liquefied propane gas have faced slow adoption due to barriers like infrastructure availability. To avoid similar issues, effective planning and deploying zero-emission hydrogen fueling infrastructure is crucial. This research develops deployment plans for affordable, accessible, and sustainable hydrogen refueling stations, supporting stakeholders in the decarbonized commercial vehicle freight system. It aims to benefit underserved and rural energy-stressed communities by improving air quality, reducing noise pollution, and enhancing energy resiliency. This research also provides a blueprint for replacing diesel in over-the-road Class 8 freight truck applications with hydrogen fueling solutions. The study focuses on the Texas Triangle Megaregion (I-45, I-35, and I-10), the I-10 corridor between San Antonio, TX, and Los Angeles, CA, and the I-5/CA-99 corridors between Los Angeles, CA, and San Francisco, CA. This area represents a significant portion of U.S. heavy-duty freight movement, carrying ~8.5% of the national freight volume. Using the OR-AGENT (Optimal Regional Architecture Generation for Efficient National Transport) modeling framework, the study conducts an advanced assessment of commercial vehicles, road and freight networks, and energy systems. The framework integrates data on freight mobility, traffic, weather, and energy pathways to deliver a region-specific, optimized vehicles powertrain architectures, infrastructure deployment solutions, operational logistics, and energy pathways. By considering all vehicle origin-destination pairs utilizing these corridors and all feasible fueling station location options, the framework's genetic algorithm identifies the minimum number and optimal locations of hydrogen refueling stations, ensuring no vehicle is stranded. It also determines fuel schedules and quantities at each station. A roadmap for station deployment based on multiple adoption trajectories ensures a strategic rollout of hydrogen refueling infrastructure.

Sujan, Vivek [ORNL] (ORCID:0000000269882342)↗

Coalition for Community-Supported Affordable Geothermal Energy Systems (C2SAGES)

The C2SAGES project evaluated the feasibility of a community geothermal system for the planned Windy Ridge affordable housing development in Hinesburg, Vermont. Led by GTI Energy with Vermont Gas Systems, LN Consulting, NREL, and Frontier Energy, the work assessed technical design, energy performance, costs, business models, community engagement, maintenance, workforce development, and permitting. The proposed system was designed to serve 100% of the development’s heating, cooling, and domestic hot water loads. Compared with a baseline using air-source heat pumps and natural gas water heating, the geothermal system was estimated to reduce HVAC and domestic hot water energy use by about 45% to 48%, lower operating and maintenance costs, and reduce 30-year life-cycle costs by 37% for Phase 1 and 10% for Phase 2. Technical testing and modeling indicated that the Windy Ridge site is suitable for a community-scale geothermal system. The project also developed borehole field layouts, piping concepts, pump house designs, controls, maintenance plans, and supporting engineering drawings. The business model analysis found that first cost, ownership structure, and customer affordability remain major deployment challenges. Utility-led maintenance and operation were viewed favorably, but traditional utility cost-recovery models may require subsidy or revised financing structures to be practical for affordable housing. Community engagement highlighted the need for clear public education, transparent financing, reliable long-term maintenance, trained technicians, and the potential to pair geothermal systems with weatherization. Overall, the report concludes that community geothermal is technically feasible and offers meaningful energy, emissions, and life-cycle cost benefits, but broader deployment will depend on workable financing models and workforce readiness.

15 GEOTHERMAL ENERGY↗

COGIHTO: Comprehensive Geothermal Integrated HVAC Retrofits in Disadvantaged Communities

Geothermal heating and cooling (GHC) systems offer one of the most efficient approaches to provide space conditioning and water heating in buildings. Due to the relatively stable temperature of the ground year-round, these systems can provide an efficient solution to decarbonize heating systems. Yet this technology has faced limited market adoption due to its high first cost. This project seeks to address this barrier by designing a community GHC system at a public housing development in New York, taking advantage of load diversity (in terms of the timing and amount of heating / cooling used per person) that a larger community offers to reduce the size and thus first cost of a GHC system. Project success would result in societal benefit from reduced energy and fossil fuel use, reduced local emissions, and improved comfort, which would positively impact the health and well-being this community. This report presents the findings from Phase 1 project supported by the Department of Energy’s Geothermal Technologies Office and includes the technical design of a GHC at a public housing development in New York. To support the success of a potential deployment of a GHC system, the team conducted community engagement and prepared an assessment of the local workforce needs. The project team, led by EPRI, considered a subset of NYCHA housing developments that were previously identified by NYCHA as suitable for GHC retrofits. This report presents the site selection criteria the team developed and the overall score assigned to each of the eight developments considered. One site was selected for focus of the technical design: Stapleton Houses in Staten Island, a mid-size development with roughly 700 apartments across 6 buildings. The site has an existing hot water hydronic loop served by natural gas boilers for space heating and water heating. The technical design partner assessed baseline energy consumption at the site and established thermal models of the apartment buildings to assist in the design. The team considered several GHC system configurations and selected a hybrid geothermal design fed from water-source heat pumps with auxiliary gas boilers in a central plant. This design best leveraged the existing site configuration and minimized costs due to additional electrical infrastructure upgrades. The report also details the feedback received from community engagement efforts and the findings from the workforce needs assessment and workforce transition plan. Members of the site maintenance staff and the resident advisory council were interviewed for their input and feedback about both the site’s existing heating/cooling infrastructure and how a construction project would impact resident life. This feedback was taken into consideration when completing the geothermal system design. Research was conducted into existing workforce development opportunities available to NYCHA residents. A workforce development plan was established using information from NYCHA’s resident economic empowerment and sustainability group, along with training material and curriculum from the International Ground Source Heat Pump Association (IGSHPA).

15 GEOTHERMAL ENERGY↗