Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployment status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A simple method for verifying the deployment of the TOMS-EP solar arrays

The Total Ozone Mapping Spectrometer-Earth Probe (TOMS-EP) mission relies upon a successful deployment of the spacecraft's solar arrays. Several methods of verification are being employed to ascertain the solar array deployment status, with each requiring differing amounts of data. This paper describes a robust attitude-independent verification method that utilizes telemetry from the coarse Sun sensors (CSS's) and the three-axis magnetometers (TAM's) to determine the solar array deployment status - and it can do so with only a few, not necessarily contiguous, points of data. The method developed assumes that the solar arrays are deployed. Telemetry data from the CSS and TAM are converted to the Sun and magnetic field vectors in spacecraft body coordinates, and the angle between them is calculated. Deployment is indicated if this angle is within a certain error tolerance of the angle between the reference Sun and magnetic field vectors. Although several other methods can indicate a non-deployed state, with this method there is a 70% confidence level in confirming deployment as well as a nearly 100% certainty in confirming a non-deployed state. In addition, the spacecraft attitude (which is not known during the first orbit after launch) is not needed for this algorithm because the angle between the Sun and magnetic field vectors is independent of the spacecraft attitude. This technique can be applied to any spacecraft with a TAM and with CSS's mounted on the solar array(s).

Koppersmith, James R.↗

Status of deployable geo-truss development

The development of a deployable geo-truss spacetenna reflector is discussed. The design of the antenna is discussed. The proof of concepts development program is described.

Fager, J. A.↗

A Survey of Knowledge Management Research & Development at NASA Ames Research Center

This chapter catalogs knowledge management research and development activities at NASA Ames Research Center as of April 2002. A general categorization scheme for knowledge management systems is first introduced. This categorization scheme divides knowledge management capabilities into five broad categories: knowledge capture, knowledge preservation, knowledge augmentation, knowledge dissemination, and knowledge infrastructure. Each of nearly 30 knowledge management systems developed at Ames is then classified according to this system. Finally, a capsule description of each system is presented along with information on deployment status, funding sources, contact information, and both published and internet-based references.

Keller, Richard M.↗

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

Russell Lane↗

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

David Hitt↗

Small Expendable-tether Deployer System (SEDS) development status

Plans for proposed flight of the Small Expendable-tether Deployer System (SEDS) on a Delta II launch vehicle are discussed. The SEDS tether concept and mission requirements are outlined. Results are presented from calculations of the tether dynamics and computer modeling to determine tether behavior. The tether's thermal characteristics, electronics system, material, data collection procedure, payload, and orbital trace are described.

Harrison, James K.↗

Transrapid (the first high-speed Maglev train system certified ready for application): Development status and prospects for deployment

The Transrapid maglev technology is at the threshold of commercial deployment and technologically all prerequisites for the successful operation of the system in public service are given. In post unification Germany the domestic maglev technology is envisioned to be applied in the Berlin-Hamburg project. At present, a public-private funding concept is being prepared and the lengthy planning process is about to be initiated. In the USA the AMG has presented a program to Americanize the technology and to make it available for commercial use in the U.S. in the very near future. The paramount features of this program are to generate economic development, provide a basis for transportation technology development, create opportunities for U.S. industry, improve the U.S. transportation infrastructure, and improve the environment and traveler safety. Maglev is ready for the U.S.; is the U.S. ready for maglev?

Luerken, Reinhard F.↗

Galileo completing VEEGA - A mid-term report

In December Galileo will complete its Venus-Earth-Earth-Gravity Assist (VEEGA) mission phase and will be placed on a direct trajectory to Jupiter arriving in December 1995. Galileo will be the first aircraft to orbit Jupiter and send a probe into its atmosphere and will perform an intensive and comprehensive investigation of the planet. Observations made during the October 1991 encounter with the asteroid Gaspra are discussed. The observation plan to be used for earth and moon observations during the December 1992 gravity assist encounter is described. The Galileo High-Gain Antenna (HGA) deployment anomaly status is reported and future corrective actions are outlined. The low-gain antenna contingency mission to be implemented if the HGA cannot be deployed is described and overall performance and status of the space craft are discussed. The selected tour for the Galileo Jupiter satellite-gravity-assist orbital tour is described and the decision rationale for performing the August 1993 asteroid Ida flyby option is presented.

O'Neil, William J.↗

Space deployable truss structure design

The development status of the deployable box truss structure is summarized. Potential applications for this structural system are described. Structural and component design requirements derived from these applications are discussed. Components of prototype 4.6 m cubes which incorporate graphite/epoxy structural members, fittings, and mechanisms are described. The benefits of the component designs and their respective manufacturing processes are presented.

Coyner, J. V., Jr.↗

Current Status and Plans for Test and Deployment of the First NASA SLR System

Over the last decade the Space Geodesy Project has been progressing toward the development and deployment of NASA’s next generation network of geodetic stations ( https://space-geodesy.nasa.gov ). The Satellite Laser Ranging (SLR) part of this effort is called Space Geodesy Satellite Laser Ranging (SGSLR). Significant progress has been made in the development of SGSLR’s nine subsystems, and many of these subsystems are completed or are nearing completion. The next major step will be the Integration and Testing (I&T) of all subsystems into the first SGSLR system which will start before the end of 2022. Verification testing (collocation) with NASA’s legacy operational SLR system, MOBLAS-7, is planned for early 2024. The first SGSLR system is being developed for Kartverket, also known as the Norwegian Mapping Authority (NMA). The system will be installed at Ny-Ålesund in Svalbard, Norway. The planned start of operations is early 2025. This presentation will give the current status of development, the testing and deployment plans, and the future of NASA’s SGSLR global network.

Satellite Laser Ranging↗

Automated scheduling for NASA’s Deep Space Network

This paper describes the DSN Scheduling Engine (DSE) component of a new scheduling system being deployed for NASA’s Deep Space Network. The DSE provides core automation functionality for scheduling the network, including the interpretation of scheduling requirements expressed by users, their elaboration into tracking passes, and resolving conflicts and constraint violations. The DSE incorporates both systematic search and repair-based algorithms, used for different phases and purposes in the overall system. It has been integrated in with a web application which provides its functionality to all DSN users through a standard web browser. The system is in the process of deployment to operational status.

Tran, Daniel↗

Fission Surface Power Technology Development Status

With the potential future deployment of a lunar outpost there is expected to be a clear need for a high-power, lunar surface power source to support lunar surface operations independent of the day-night cycle, and Fission Surface Power (FSP) is a very effective solution for power levels above a couple 10 s of kWe. FSP is similarly enabling for the poorly illuminated surface of Mars. The power levels/requirements for a lunar outpost option are currently being studied, but it is known that cost is clearly a predominant concern to decision makers. This paper describes the plans of NASA and the DOE to execute an affordable fission surface power system technology development project to demonstrate sufficient technology readiness of an affordable FSP system so viable and cost-effective FSP system options will be available when high power lunar surface system choices are expected to be made in the early 2010s.

Palac, Donald T.↗

Venus Aerobot Multisonde Mission

Robotic exploration of Venus presents many challenges because of the thick atmosphere and the high surface temperatures. The Venus Aerobot Multisonde mission concept addresses these challenges by using a robotic balloon or aerobot to deploy a number of short lifetime probes or sondes to acquire images of the surface. A Venus aerobot is not only a good platform for precision deployment of sondes but is very effective at recovering high rate data. This paper describes the Venus Aerobot Multisonde concept and discusses a proposal to NASA's Discovery program using the concept for a Venus Exploration of Volcanoes and Atmosphere (VEVA). The status of the balloon deployment and inflation, balloon envelope, communications, thermal control and sonde deployment technologies are also reviewed.

Cutts, James A.↗

LDR structural technology activities at JPL

The status of the Large Deployable Reflector (LDR) technology requirements and the availability of that technology in the next few years are summarized. The research efforts at JPL related to these technology needs are also discussed. LDR requires that a large and relatively stiff truss-type backup structure have a surface accurate to 100 microns in space (initial position with thermal distortions) and the dynamic characteristics predictable and/or measurable by on-orbit system identification for micron level motion. This motion may result from the excitation of the lower modes or from wave-type motions. It is also assumed that the LDR structure can be ground tested to validate its ability to meet mission requirements. No program manager will commit a structural design based solely on analysis, unless the analysis is backed by a validation test program.

Wada, Ben↗

Proposed aerothermodynamic experiments in transition flow using the NASA/ASI tethered satellite system-2

Aerothermodynamic, aerodynamic, and atmospheric science data acquired between 55 and 150 km has been limited by the lack of vehicles or platforms capable of sustained operation at these altitudes. Tethered satellites, which have been under study for this purpose by NASA, the Italian Space Agency (ASI), and others for more than a decade, are expected to become a reality by mid-1991. This approach, in which an instrumented platform is maintained at a desired altitude by a tether attached to a host vehicle orbiting at higher altitudes, will provide the first opportunity to obtain steady state data over an extended period encompassing one or more orbital revolutions. This paper describes the objectives and measurement methods for the first of the facility-class satellites, the TSS-2, which is proposed for a 1995 deployment, and gives the status of the experiment definition. Monte Carlo modeling of the flow fields at 130 km around the baseline 1.6 m diameter sphere is discussed and illustrative results of the modeling given.

Wood, George M.↗

ORDEM 3.1 Development Status

In this presentation we shall review NASA Orbital Debris Engineering Model (ORDEM) scope, intended use, and version history; development of the latest version, v. 3.1; provide a current development status; and discuss current deployment plans. We will also place ORDEM in context with other NASA and US models as well as the ESA MASTER model, ORDEM’s closest analogue model.

Anz-Meador, P.↗

A Deployable Primary Mirror for Space Telescopes

NASA Langley Research Center, Composite Optics, Inc., and Nyma/ADF have developed jointly a deployable primary mirror for space telescopes that combines over five years of research on deployment of optical-precision structures and over ten years of development of fabrication techniques for optical-precision composite mirror panels and structures. The deployable mirror is directly applicable to a broad class of non-imaging "lidar" (light direction a nd ranging) telescopes whose figure-error requirements are in the range of one to ten microns RMS. Furthermore, the mirror design can be readily modified to accommodate imaging-quality reflector panels and active panel-alignment control mechanisms for application to imaging telescopes. The present paper: 1) describes the deployable mirror concept; 2) explains the status of the mirror development; and 3) provides some technical specifications for a 2.55- m-diameter, proof-of-concept mirror. Keywords: precision deployment, hinge joint, latch joint, deployable structures, fabrication, space telescopes, optical instruments, microdynamics.

Lake, Mark S.↗