Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployment strategy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Metaproteomics reveals enzymatic strategies deployed by anaerobic microbiomes to maintain lignocellulose deconstruction at high solids

Economically viable production of cellulosic biofuels requires operation at high solids loadings—on the order of 15 wt%. To this end we characterize Nature’s ability to deconstruct and utilize mid-season switchgrass at increasing solid loadings using an anaerobic methanogenic microbiome. This community exhibits undiminished fractional carbohydrate solubilization at loadings ranging from 30 g/L to 150 g/L. Metaproteomic interrogation reveals marked increases in the abundance of specific carbohydrate-active enzyme classes. Significant enrichment of auxiliary activity family 6 enzymes at higher solids suggests a role for Fenton chemistry. Stress-response proteins accompanying these reactions are similarly upregulated at higher solids, as are β-glucosidases, xylosidases, carbohydrate-debranching, and pectin-acting enzymes—all of which indicate that removal of deconstruction inhibitors is important for observed undiminished solubilization. Our work provides insights into the mechanisms by which natural microbiomes effectively deconstruct and utilize lignocellulose at high solids loadings, informing the future development of defined cultures for efficient bioconversion.

09 BIOMASS FUELS↗

MN Solar Pathways: Solar Deployment Strategies-Modeling and Case Studies

As part of the Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, Clean Power Research (CPR) developed a Solar Deployment Strategies modeling tool to calculate the economic impacts and market incentives created by different solar portfolios and rate structures. CPR developed the tool using Minnesota-specific data and assumptions. The case studies described in this report provide insight into possible pathways toward the state goal of 10% solar, but the emphasis of the report is the demonstration of the tool in use cases that can be expanded and modified in future years as needs change.

14 SOLAR ENERGY↗

Electric Vehicle and Infrastructure Systems Modeling in Washington D.C. and Baltimore

This report documents the Argonne-Exelon effort to develop and utilize an agent-based model (ATEAM) of charging demand and infrastructure expansion applicable to the Washington, DC–Baltimore, MD consolidated metropolitan area. This study extends the ATEAM model time horizon to 10 years (from 2020 to 2030), expands agent behavior modeling capabilities, incorporates more granular and extensive empirical data on charging behavior, and analyzes charging needs for a much larger population of PEVs, in keeping with regional goals for significant adoption of ZEVs. With given targets for annual BEV adoption, five scenarios were developed to examine public infrastructure needs and resulting charging load, considering different home charging availabilities, as well as different PEV consumer profiles and public charging infrastructure deployment strategies. Scenario results show that if new chargers (both L2 and DCFC) are spread more widely (as with ubiquitous deployment strategies), there will be less variation in the number of chargers added to each census tract in the study area. More importantly, widespread public charging infrastructure with ubiquitous deployment strategies reduces unmet charging demand and improves charging success, even with heavy reliance on public charging. About 80 percent of BEV drivers can charge on their first attempt in scenarios with ubiquitous deployment strategies. Moreover, widespread public charging infrastructure better meets the demand for more charging, and in return, increases BEV adoption. Low home charging availability produces higher charging loads in public locations, especially during the early morning (around 8:00 a.m.) and late afternoon (around 6:00 p.m.). The evening peak load indicates that drivers are taking advantage of public charging before heading home. Study results also indicate that even with 20 percent home charging availability in 2030, just 20 percent of drivers attempt to charge on a given day. With their relatively high electric range (200+ miles), the BEVs expected to be on the road in 2030 can handle daily commutes without re-charging for a couple of days.

24 POWER TRANSMISSION AND DISTRIBUTION↗

INTEGRATION OF FLEX EQUIPMENT AND OPERATOR ACTIONS IN PLANT FORCE-ON-FORCE MODELS WITH DYNAMIC RISK ASSESSMENT

The overall operation and maintenance cost to protect nuclear power plants accounts for approximately 7% of the total cost of power generation, with labor accounting for half of this cost. In the current research, from interaction with utilities and other stakeholders, it was determined that physical security forces account for nearly 20% of the entire workforce at several nuclear power plants. Labor costs continue to rise in the U.S., so any measures to reduce the cost of operating a nuclear power plant will need to include a reduction in labor. The physical security pathway within the DOE’s Light Water Reactor Sustainability program aims to lower the cost of physical security through directed research into modeling and simulation, application of advanced sensors or deployment of advanced weapons. This report presents a modeling and simulation framework for integrating Diverse and Flexible Mitigation Capability (FLEX) portable equipment performance with Force on Force models of a plant’s physical security posture. The generic framework is described in detail, followed by a case study of modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical nuclear power plant. Two different FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial Force on Force tool are integrated with the FLEX deployment model in INL’s dynamic modeling tool EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework integrating FLEX equipment with Force on Force models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security.

97 MATHEMATICS AND COMPUTING↗

Methodology and Application of Physical Security Effectiveness Based on Dynamic Force-on-Force Modeling

This report describes the research and development being performed at INL towards a dynamic modeling and simulation framework to enable physical security optimization at commercial nuclear power plants. The framework is based on the dynamic modeling tool EMRALD and is demonstrated for applications that can result in physical security optimization. Two main applications are presented: 1. Integrating FLEX portable equipment performance with FOF models of a plant’s physical security posture, and 2. Location optimization of bullet resistant enclosure. The generic framework for modeling FLEX portable equipment is described in detail, followed by a case study modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical PWR. Two distinct FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial FOF tool, AVERT, are integrated with the FLEX deployment model in EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. Thermal-hydraulic analysis of FLEX performance is performed in RELAP5 and integrated with the EMRALD simulations to provide more realistic timelines in the models. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework of integrating FLEX equipment with FOF models enables the NPPs to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security. The objective of location optimization of BRE is to determine the best location in the plant for a new BRE being planned by the plant to enhance their physical security effectiveness. The plant physical security FOF model is integrated with EMRALD that performs Monte Carlo simulation to run different attack scenarios and a discrete set of potential BRE locations. Sensitivity analysis is used to determine the most effective location for the BRE. The optimization approach can be extended to wide applications such as location optimization of remotely operated weapons and other strategic fixed assets.

97 MATHEMATICS AND COMPUTING↗

Distribution Grid Impacts of Community Solar [Slides]

Community solar (CS) projects often face uncertain interconnection costs and fees associated with distribution grid infrastructure upgrades required to connect the project. These costs can determine the economic viability of a CS project, but they are difficult to assess. Cost uncertainty can discourage new projects and prevent communities from accessing the benefits of community solar projects. At the same time, CS deployment strategies hold potential to defer or avoid some distribution costs due to new loads. To mitigate CS interconnection costs, it is important to find least-cost combinations of distribution system infrastructure solutions (transformer upgrades, reconductoring, voltage regulators, storage), and to understand how location of CS projects within a feeder impact distribution grid upgrade costs. This study aims to quantify CS impacts on the distribution grid and provide policy and regulatory insights and CS deployment strategies to address them. It is the first analysis that has systematically studied the technical impacts of community solar projects on a wide range of distribution feeders using state-of-the-art optimization and power flow tools. The analysis employs Berkeley Lab’s novel Least-cost Optimal Distribution Grid Expansion (LODGE) model, a deterministic version of the REPAIR model, that optimally upgrades hundreds or even thousands of distribution circuits or feeders. This is the first application of the LODGE model. LODGE finds the least-cost portfolio of traditional distribution system upgrades to integrate CS in combination with alternative solutions, such as utility-owned storage and downsizing CS capacity. Working with a set of least-cost solutions per feeder allows us to benchmark, compare and find techno-economic trends in CS interconnection.

14 SOLAR ENERGY↗

Mars Network: Strategies for Deploying Enabling Telecommunications Capabilities in Support of Mars Exploration

The coming decade of Mars exploration will involve a diverse set of robotic science missions, including in situ and sample return investigations, and ultimately moving towards sustained robotic presence on the Martian surface. In supporting this mission set, NASA must establish a robust telecommunications architecture that meets the specific science needs of near-term missions while enabling new methods of future exploration. This paper will assess the anticipated telecommunications needs of future Mars exploration, examine specific options for deploying capabilities, and quantify the performance of these options in terms of key figures of merit.

Edwards, C. D.↗

Bioremediation Retrospective: DOE Experiences and Lessons Learned – 26131

The U.S. Department of Energy (DOE) has implemented bioremediation strategies for chlorinated volatile organic compounds (cVOCs) for more than three decades across multiple contaminated groundwater sites. A retrospective analysis conducted by the Savannah River National Laboratory (SRNL) and collaborating field sites evaluated the design, performance, and outcomes of bioremediation projects at DOE’s Savannah River, Hanford, Idaho, Mound, and Pinellas sites. This retrospective was based on a series of case studies, leveraging historical documentation and site interviews. Technical approaches employed at the various sites were explored, including active bioremediation, enhanced attenuation (EA), and monitored natural attenuation, with specific sub-sections discussing anaerobic, aerobic, and combined anaerobic-aerobic strategies. Each case study includes detailed descriptions of the site-specific conditions, deployment strategies, regulatory considerations, metrics, and performance. Key findings include general cost savings compared to traditional remedies such as pump and treat (P&T), significant success in applying enhanced attenuation to transition remedies toward a passive site management strategy, and documentation of robust subsurface microbial communities at most sites limiting the need for bioaugmentation. Challenges highlighted in the study include underperformance due to poor amendment delivery in low-permeability zones and unfavorable biogeochemical conditions, emphasizing the importance of site-specific designs. Cost analysis across DOE sites suggests bioremediation may offer long-term economic benefits. The retrospective study underscores valuable lessons that can help inform current and future bioremediation efforts.

Newby, Deborah T. [Savannah River National Laborat↗

Grid Architecture Mapping to Understand Transformation (GAMUT): Concept Definition

The electric power system is undergoing significant transformation driven by changes in the generation mix, increasing reliance on information and communication technologies, evolving customer expectations, and a dynamic cyber-physical environment. To address these challenges, substantial investments will be made over the next decade to create a flexible, affordable, secure, reliable, and resilient electric system. In response, the U.S. Department of Energy's Office of Electricity is developing knowledge management tools aimed at systematically documenting technology pilots and demonstration projects. This initiative seeks to improve understanding of operating contexts, planning steps, and integration requirements for innovative grid technologies. The Department of Energy project leverages Grid Architecture principles to collect and organize insights into the interdependencies, requirements, and capabilities of various grid solutions. By employing a systematic approach, the project aims to perform a feasibility study for the development of a software tool that will support stakeholders, including regulators, transmission and distribution system operators, distributed energy resources aggregators, and technology providers. By offering a systematic, software-based framework to document technologies, understand their benefits and impacts, and inform deployment strategies, the proposed Grid Architecture Mapping to Understand Transformation (GAMUT) Tool is intended to reduce costs, enhance decision-making, and facilitate scaling and effective deployment of new technologies. The feasibility study will evaluate the technical and financial viability of the GAMUT Tool, identifying stakeholder needs and assessing risks and mitigation strategies. Ultimately, the GAMUT team aims to develop an initial minimal viable product, followed by staged improvements, to aid in the modernization of the electric grid, contributing to a more sustainable and resilient energy future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Human Exploration of Mars Design Reference Architecture 5.0

This document reviews the Design Reference Architecture (DRA) for human exploration of Mars. The DRA represents the current best strategy for human missions. The DRA is not a formal plan, but provides a vision and context to tie current systems and technology developments to potential missions to Mars, and it also serves as a benchmark against which alternative architectures can be measured. The document also reviews the objectives and products of the 2007 study that was to update NASA's human Mars mission reference architecture, assess strategic linkages between lunar and Mars strategies, develop an understanding of methods for reducing cost/risk of human missions through investment in research, technology development and synergy with other exploration plans. There is also a review of the process by which the DRA will continue to be refined. The unique capacities of human exploration is reviewed. The possible goals and objectives of the first three human missions are presented, along with the recommendation that the mission involve a long stay visiting multiple sites.The deployment strategy is outlined and diagrammed including the pre-deployment of the many of the material requirements, and a six crew travel to Mars on a six month trajectory. The predeployment and the Orion crew vehicle are shown. The ground operations requirements are also explained. Also the use of resources found on the surface of Mars is postulated. The Mars surface exploration strategy is reviewed, including the planetary protection processes that are planned. Finally a listing of the key decisions and tenets is posed.

Drake, Bret G.↗

Analysis of Three Types of Collocated Disdrometer Measurements at the ARM Southern Great Plains Observatory

To better provide U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility’s disdrometer deployment strategy and support ARM precipitation-related projects, this study analyzes 18 months of drop size distribution (DSD) observations from six collocated disdrometers deployed at the ARM Southern Great Plains (SGP) site. Emphasis is placed on quantifying the uncertainties related to DSD and rainfall properties using different types of disdrometers and different pairing concepts. The instrument sampling errors are also discussed, which improves our understanding of instrument-specific impacts on rainfall measurements. The key findings are as follows: 1) All the disdrometers show consistent behaviors overall regarding accumulated precipitation, mean rainfall rate, DSD parameters, and radar reflectivity values; and 2) Strong agreement is shown between three disdrometer types in terms of their DSDs for mid-size drop range (D = 1 mm-4 mm). The two-dimensional video disdrometer performance meets expectations as the most accurate unit among all. The paired disdrometer shows a reduced statistical sampling error in terms of drop counts and other DSD properties. A concept of deploying two or more collocated disdrometers side by side is recommended for future ARM field campaigns.

54 ENVIRONMENTAL SCIENCES↗