Search NASA⌕ Search

SEARCH · Search NASA

Results for “design qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Design, Qualification, and On Orbit Performance of the CALIPSO Aerosol Lidar Transmitter

The laser transmitter for the CALIPSO aerosol lidar mission has been operating on orbit as planned since June 2006. This document discusses the optical and laser system design and qualification process that led to this success. Space-qualifiable laser design guidelines included the use of mature laser technologies, the use of alignment sensitive resonator designs, the development and practice of stringent contamination control procedures, the operation of all optical components at appropriately derated levels, and the proper budgeting for the space-qualification of the electronics and software.

Hovis, Floyd E.↗

LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelerator) PASS (Payload Adapter Separation System) Design & Qualification

On November 10, 2022, NASA, in partnership with United Launch Alliance (ULA), launched Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) as a secondary payload on an Atlas V Centaur out of the Vandenburg Space Force Base (VSFB). After successfully delivering the primary payload, Joint Polar Satellite System-2 (JPSS-2), to a sun synchronous trajectory, the Centaur upper stage reoriented LOFTID onto the desired reentry trajectory. After conducting a de-orbit burn to enter the atmosphere the Payload Adaptor was ejected to expose the packed LOFTID vehicle. The LOFTID Hypersonic Inflatable Aerodynamic Decelerator (HIAD) was deployed and inflated. The Centaur pointed LOFTID to the desired entry attitude and spun the vehicle up to roughly three rpm before separating the reentry vehicle over the Middle East. The LOFTID vehicle flew freely before reentering the atmosphere over Alaska at >8km/sec and decelerating as designed. LOFTID demonstrated stable flight from hypersonic entry through subsonic parachute deployment. LOFTID was enabled by a mission-unique Payload Adapter Separation System (PASS) which separated the Payload Adapter prior to the start of the LOFTID flight demonstration, allowing the launch vehicle to accommodate a superstack of two independent, similarly sized payloads. This paper will discuss the design, development, and qualification effort of the LOFTID PASS.

Sean M Hancock↗

Design, Qualification and Integration Testing of the High-Temperature Resistance Temperature Device for Stirling Power System

The Advanced Stirling Radioisotope Generator (ASRG), developed from 2006 to 2013 under the joint sponsorship of the United States Department of Energy (DOE) and National Aeronautics and Space Administration (NASA) to provide a high-efficiency power system for future deep space missions, employed Sunpower Incorporated's Advanced Stirling Convertors (ASCs) with operating temperature up to 840 C. High-temperature operation was made possible by advanced heater head materials developed to increase reliability and thermal-to-mechanical conversion efficiency. During a mission, it is desirable to monitor the Stirling hot-end temperature as a measure of convertor health status and assist in making appropriate operating parameter adjustments to maintain the desired hot-end temperature as the radioisotope fuel decays. To facilitate these operations, a Resistance Temperature Device (RTD) that is capable of high-temperature, continuous long-life service was designed, developed and qualified for use in the ASRG. A thermal bridge was also implemented to reduce the RTD temperature exposure while still allowing an accurate projection of the ASC hot-end temperature. NASA integrated two flight-design RTDs on the ASCs and assembled into the high-fidelity Engineering Unit, the ASRG EU2, at Glenn Research Center (GRC) for extended operation and system characterization. This paper presents the design implementation and qualification of the RTD, and its performance characteristics and calibration in the ASRG EU2 testing.

Deep Space↗

Development of design, qualification, screening, and application requirements for plastic encapsulated solid-state devices for space applications

Test data were collected on 1035 plastic encapsulated devices and 75 hermetically scaled control group devices that were purchased from each of five different manufacturers in the categories of (1) low power Schottsky TTL (bipolar) digital circuits; (2) CMOS digital circuits; (3) operational amplifier linear circuits; and (4) NPN transistors. These parts were subjected to three different initial screening conditions, then to extended life testing, to determine any possible advantages or trends for any particular screen. Several tests were carried out in the areas of flammability testing, humidity testing, high pressure steam (auroclave) testing, and high temperature storage testing. Test results are presented. Procurement and application considerations for use of plastic encapsulated semiconductors are presented and a statistical analysis program written to study the log normal distributions resulting from life testing is concluded.

Source record↗

Space Technology-5 Lithium-Ion Battery Design, Qualification and Integration and Testing

This document is a viewgraph presentation that reviews the Lithium Ion Battery for the Space Technology-5 (ST-5) mission. Included in the document is a review of the ST-5 Mission, a review of the battery requirements, a description of the battery and the battery materials. The testing and the integration and qualification data is reviewed.

Rao, Gopalakishna M.↗

Design and qualification of the SEU/TD Radiation Monitor chip

This report describes the design, fabrication, and testing of the Single-Event Upset/Total Dose (SEU/TD) Radiation Monitor chip. The Radiation Monitor is scheduled to fly on the Mid-Course Space Experiment Satellite (MSX). The Radiation Monitor chip consists of a custom-designed 4-bit SRAM for heavy ion detection and three MOSFET's for monitoring total dose. In addition the Radiation Monitor chip was tested along with three diagnostic chips: the processor monitor and the reliability and fault chips. These chips revealed the quality of the CMOS fabrication process. The SEU/TD Radiation Monitor chip had an initial functional yield of 94.6 percent. Forty-three (43) SEU SRAM's and 14 Total Dose MOSFET's passed the hermeticity and final electrical tests and were delivered to LL.

Buehler, Martin G.↗

Design and Qualification or the Low-Earth Orbit Flight Test of an Inflatable Decelerator(LOFTID) Payload Adapter Separation System (PASS)

On November 10, 2022, NASA and United Launch Alliance (ULA) launched Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) as a secondary payload on an Atlas V Centaur from Vandenburg Space Force Base (VSFB). After deploying the primary payload, JPSS-2, to a sun-synchronous orbit, the Centaur reoriented LOFTID for reentry, ejecting the Payload Adaptor to expose the stowed LOFTID reentry vehicle (RV). The Hypersonic Inflatable Aerodynamic Decelerator (HIAD) was then deployed and inflated, and the Centaur reoriented the RV to the desired entry attitude, spun the vehicle to roughly three rpm, and separated the reentry vehicle. After nearly half an orbit of free flight, LOFTID reentered the atmosphere at >8 km/sec, demonstrating stable flight from hypersonic entry through subsonic parachute deployment. A mission-unique Payload Adapter Separation System (PASS) enabled the successful LOFTID flight demonstration, allowing the launch vehicle to accommodate a superstack of two independent, similarly sized payloads. This paper discusses the design, development, and qualification of the LOFTID PASS along with lessons learned.

HIAD↗

Textile Material Lessons Learned During the Design and Qualification of the NASA Orion Capsule Parachute Assembly System

The NASA Orion Capsule Parachute Assembly System (CPAS) development and qualification testing was completed in September 2018. Over the course of the airdrop and ground testing campaign, the team benefited from the ability to design, test, and adjust the design based on observations and inspection results. While the design team used the best knowledge available and attempted to utilize best practices, a number of lessons were learned that should be documented for consideration by future designers. This paper describes these lessons learned including the use of textile reefing loops, the importance of performing joint tests, the impact of using bight sleeves on parachute deployment, and a surprising number of design changes required in the CPAS system after the decision was made to change the suspension line braid to save system mass.

Anderson, Brian P.↗

Design improvement, qualification testing, purge and vent investigation, fabrication, and documentation of a GAC-9 insulation system

Results of the research and development program to determine the purge and vent characteristics of the GAC-9 insulation system are summarized. The work scope comprised: (1) literature survey; (2) design improvement and insulation effort; (3) testing; and (4) evaluation of test results. Program objectives to be realized are: (1) definition of purge gas flow characteristics of the GAC-9 insulation system through laboratory measurements; and (2) demonstration of insulation effectiveness as a system for prelaunch purging and launch venting of the 76-cm diameter calorimeter, which is a subscale model simulating a realistic type of GAC-9 insulation application.

Shriver, C. B.↗