Updated Stormwater Management Program Plan: For coverage under the National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Permit for stormwater discharges within the Middle Rio Grande Watershed (v.3)

The SWMPP describes the best management practices (BMPs) employed at SNL, measurable goals, and anticipated implementation dates for compliance with the Permit requirements to ensure that stormwater discharges from the SNL MS4 do not contribute pollutants to Waters of the United States (WOTUS), namely the Tijeras Arroyo and the Rio Grande. The SWMPP is updated annually, and as necessary, to include new information and/or document the development, implementation and assessment of program elements, as required in Part III.B of the Permit. Version 3 of the SWMPP documents compliance activities and program elements developed and implemented between July 1, 2016 and June 30, 2017; it is required to be submitted on or before December 1, 2017.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SWEIS Yearbook-2012 Comparison of 2012 Data to Projections of the 2008 Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory

Los Alamos National Laboratory (LANL or the Laboratory) operations data for Calendar Year (CY) 2012 mostly fell within the 2008 Site-Wide Environmental Impact Statement (SWEIS) projections. Operation levels for one LANL facility exceeded the 2008 SWEIS capability projections—Radiochemistry Facility; however, none of the capability increases caused exceedances in radioactive air emissions, waste generation, or National Pollutant Discharge Elimination System (NPDES) discharge. Several facilities exceeded the2008 SWEIS levels for waste generation quantities; however, all were one-time, non-routine events that do not reflect the day-to-day operations of the Laboratory. In addition, total site-wide waste generation quantities were below SWEIS projections for all waste types, reflecting the overall levels of operations at both the Key and Non-Key Facilities. Although gas and electricity consumption have remained within the 2008 SWEIS limits for utilities, water consumption exceeded the 2008 SWEIS projections by 27 million gallons in CY 2012.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Regulatory Compliance of H Retention Basin Using Rhombo Balls - 16151

Elevated pH conditions in the Savannah River Site 281-8H Retention Basin will have to be resolved prior to the issuance of a new National Pollutant Discharge Elimination System permit. The 281-8H retention basin collects rain water runoff, cooling tower blow downs and steam condensate from H Area Tank Farm operation processes. The basin discharges to a South Carolina Department of Health and Environmental Control National Pollutant Discharge Elimination System permitted out-fall, H-12. The permit requires the out-fall to meet certain discharge requirements. The National Pollutant Discharge Elimination System permit requires the pH to be within the range 4.8 to 8.5. The 281-8H Retention Basin has a steady history of elevated pH levels, above 8.5, especially during the warmer months of the year, normally March through October. The rise in pH has been attributed to the exponential growth of algae which occurs during the warm months of the year. The increased algae colonies undergo photosynthesis which depletes the CO{sub 2} in the basin water and subsequently raises the pH level. The current permit allows simultaneous discharge of low pH well water, pH between 4.6 and 5.0, and the 281-8H Retention Basin water which provides blending to achieve regulatory compliance. The regulatory agency indicated in 2010 that adding well water to achieve compliance of pH limits will not be allowed when the new permit is issued in the future. Therefore, a solution to the high pH had to be identified and implemented in order to ensure regulatory compliance. A system engineering evaluation was conducted to determine the best solution to the large algae colonies and high pH levels. The evaluation identified options in four primary categories as well as some combination of those categories to control algae growth and to ultimately increase the amount of CO{sub 2} in the basin. Eleven evaluation criteria were developed for the various options, and a percentage (out of 100%) was assigned to related groups of criteria. Twenty-six options were evaluated during this process. The highest ranking options determined from the evaluation were the 12-sided Rhombo ball floating cover, biological digester and a combination of the digester and the floating cover. Option 3, a combination of the top two choices, was chosen as the best approach. The Rhombo cover along with the initial shock application of a biological digester has worked to eliminate algae growth and lower the pH level. The Rhombos have significantly lowered the basin pH level from greater than 9 to less than 7, which is within the regulatory compliance pH requirements of 4.8 to 8.5. The system engineering evaluation and subsequent solution chosen are useful in many venues. The application of the 12 sided Rhombo ball's unique ability to nestle together no matter which way they turn is advantageous to applications/problems that need to block 99.99% sunlight from a body of water. The 281-8H Retention Basin required nine 18 wheeler truckloads with trailers that were 16.2 m (53 Ft) long and filled with Rhombo balls. The basin required a total of approximately 700,000 Rhombo balls to be fully covered. They are easy to install and handle. The Rhombo balls have wind resistance up to 120 Km/hr (75 MPH) and have a life expectancy of 25 years. This application can be used to control plant and algae growth and is effective in evaporation reduction at 99%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements:(1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020 (Copy for Informational Puproses Only)

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements: (1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Ascorbic Acid Stability and pH Testing to Support RWM-018 Pilot Scale Wellhead Treatment System Feasibility Determination

A multitude of groundwater remediation techniques for chlorinated volatile organic compounds (cVOCs) have been conducted at the A/M-Areas of the Savannah River Site (SRS). Historical in-situ chemical oxidation (ISCO) injections of potassium permanganate and sodium persulfate conducted in 2018 and 2020, have left residual oxidant concentrations in the A/M-Area groundwater system. ISCO events targeted dense non-aqueous phase liquids (DNAPLs) through the injection of strong oxidants within plume zones upgradient of current groundwater recovery wells RWM-008 and RWM-018. These residual oxidants could significantly impede the operation of the mercury removal system needed to meet National Pollutant Discharge Elimination System (NPDES) permit requirements for the ongoing pump-and-treat system that hydraulically controls potions of the A/M-Area plume. Effluent treated groundwater from this system is discharged to surface water at the receiving outfall of the M-1 Air Stripper. To prevent interference of the M-1 Air Stripper system by residual oxidants, groundwater recovery has been ceased at well RWM-018. Modeling of oxidant transport in A/M-Area from ISCO estimated that the potential oxidant load contributed by RWM-018 could be as high as 120 mg/L. It is also possible that oxidants may be contributed via pumping at well RWM-008 in the near future as residual oxidants within the aquifer migrate toward its zone of influence. Savannah River National Laboratory (SRNL) has conducted research to investigate potential pre-treatment chemicals to neutralize these residual oxidants, before reaching the M-1 Air Stripper, to allow for resumed groundwater recovery at RWM-018 and continued pumping at RWM-008. Deployment of ascorbic acid for neutralization of residual oxidants at RWM-018 (and possibly RWM-008) is recommended based on results from previous reductant testing (SRNL, 2021). For a maximum estimated oxidant load at RWM-0018, a well-head treatment system would need to dose about 400 gallons of ascorbic acid each month to ensure complete neutralization. A second system with additional reagent should also be considered for deployment at RWM-008.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Storm Water Pollution Prevention Plan for the Facility LAMP Project

A site-specific Stormwater Pollution Prevention Plan (SWPPP) is needed for most construction activities/projects that disturb one (1) acre or more of land to meet the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated With Construction and Land Disturbance Activities (General Permit) issued by the State Water Resources Control Board (State Board). This Order No. 2009-0009- DWQ was adopted by the State Board on September 2, 2009 and became effective July 1, 2010

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan for: TA-60-01 Heavy Equipment Shop, Triad National Security, LLC (Triad), Los Alamos National Laboratory, January 2019, Revision 0

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector P – Land Transportation & Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-01 Heavy Equipment Shop at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-60-01 Heavy Equipment Shop (HES). The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan for: TA-03-22 Power and Steam Plant, Triad National Security, LLC (Triad), Los Alamos National Laboratory, January 2019, Revision 0

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant (PSP). The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan for: TA-03-38 Carpentry and Metal Fabrication Shops, Triad National Security, LLC (Triad), Los Alamos National Laboratory, January 2019, Revision 0

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector A-Timber Products and Sector AA-Fabricated Metal Products as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-38 Carpentry and Metal Fabrication Shops (38 Shops) at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-03-38 Carpentry Shop (CS) and/or the Metal Fabrication Shop (MFS). The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan TA-60 Material Recycling Facility

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector N: Scrap Recycling and Waste Recycling Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan TA-60 Roads and Grounds Facility, Sigma Mesa Staging Areas, and Asphalt Batch Plant

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector P: Land Transportation and Warehousing and Sector D: Asphalt Paving and Roofing Material and Lubricant Manufacturing as a guides. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60 Roads and Grounds Facility, Sigma Mesa Staging Areas, and Asphalt Batch Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facilities” refers to the TA-60 Roads and Grounds Facility, Sigma Mesa Staging Areas, and Asphalt Batch Plant. The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Performance of the A-01 Constructed Wetland over 20 Years

The A-01 wetland treatment system (WTS) was designed to remove metals from the effluent at the A-01 National Pollution Discharge Elimination System (NPDES) outfall at the Savannah River Site, Aiken, SC. The A-01 effluent flows from a retention basin to a splitter box, where it is distributed to four pairs of cells in series before discharge to a stream. Each treatment cell is a one-acre wetland that contains Schoenoplectus californicus (giant bulrush) and has a nominal 24-hour retention time. The purpose of this research was to investigate metal removal, distribution and retention in the A-01 WTS over a period of 20 years. During 20 years of operation, systematic water and sediment sampling validated the wetlands' performance. After passage through the treatment cells, Cu concentrations were well below permit limits (22 pg L -1 ) during all years of operation, often falling below 10 pg L -1 . Cu removal has been consistent over time, averaging about 80% despite large changes in influent Cu concentrations. Most divalent metals were rapidly removed from the water and held in the sediments shortly after the water entered the treatment wetlands. Average removal of Pb from water by the wetland system was 67 and 74%, respectively, in 2004, and 2020. Comparable values for Zn were 52 and 65%, respectively. Generally, the highest concentrations of Cu, Pb, and Zn were found in the sediment from the first cell in each pair of cells suggesting that most of the Cu, Pb, and Zn in the A-01 effluent was bound to the sediment quickly. Diffusive gradients in thin films (DGT) measurements of Cu and Zn in the sediments were much lower than bulk sediment concentrations. These results suggest that most of the Cu and Zn in the A-01 WTS sediments was not bioavailable, hence not toxic to aquatic organisms, as a likely consequence of adsorption to sediment particles and complexation with organic and inorganic substances.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removal, distribution and retention of metals in a constructed wetland over 20 years

The A-01 wetland treatment system (WTS) was designed to remove metals (primarily copper) from the effluent at the A-01 National Pollution Discharge Elimination System (NPDES) outfall at the Savannah River Site, Aiken, SC. This research investigated metal removal, distribution and retention in the A-01 WTS over a period of 20 years. The findings are important for ensuring continued metal sequestration in the A-01 WTSs over time, providing management guidance for constructed wetlands, and investigating changes in metal remediation effectiveness as a wetland ages. During 20 years of operation, systematic water and sediment sampling validated the wetlands' performance. After passage through the treatment cells, Cu concentrations were well below permit limits during all years of operation, often falling below 10 μg L -1 . Cu removal has been consistent over time, averaging about 80% despite large changes in influent Cu concentrations. Most divalent metals were rapidly removed from the water and held in the sediments shortly after the water entered the treatment wetland. Average removal of Pb from water by the wetland system was 67 and 74% in 2004 and 2020, respectively. Comparable values for Zn were 52 and 65%, respectively. Generally, the highest concentrations of Cu, Pb, and Zn were found in the sediment from the first cell in each pair of cells suggesting that most of the Cu, Pb, and Zn in the A-01 effluent was bound to the sediment quickly. Diffusive gradients in thin films (DGT) measurements of Cu and Zn in the sediments were much lower than bulk sediment concentrations. These results suggest that most of the Cu and Zn in the A-01 WTS sediments was not bioavailable, hence not toxic to aquatic organisms, as a likely consequence of adsorption to sediment particles and complexation with organic and inorganic substances.

54 ENVIRONMENTAL SCIENCES↗

Stormwater Pollution Prevention Plan, TA-03-38 Metals Fabrication Shop, Revision 4: LANS Archived 2019

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector AA-Fabricated Metal Products as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-38 Metals Fabrication Shop at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-38 Metals Fabrication Shop and associated areas. The current permit expires at midnight on June 4, 2020. As the LANS contract ended for LANL MSGP facilities on October 31, 2018, a Notice of Termination (NOT) for permit coverage was filed and is effective as of 11/02/18. A copy of the NOT acknowledgment is located in Appendix C of this SWPPP. This is the archived and final revision of the SWPPP for LANS.

54 ENVIRONMENTAL SCIENCES↗

Stormwater Pollution Prevention Plan for the TA-03-38 Metals Fabrication Shop, Los Alamos National Laboratory, Revision 3, January 2018

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector AA-Fabricated Metal Products as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-38 Metals Fabrication Shop at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-38 Metals Fabrication Shop and associated areas. The current permit expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Stormwater Pollution Prevention Plan for the TA-60-02 Salvage Warehouse, Los Alamos National Laboratory, Revision 3, January 2018

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015). Contents of the June 4, 2015 Multi-sector General Permit can be viewed at: https://www.epa.gov/sites/production/files/2015- 10/documents/msgp2015_finalpermit.pdf This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-02 Salvage and Warehouse facility at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60-02 Salvage/ Warehouse and associated areas. The current permit expires at midnight on June 4, 2020. A copy of the facility NOI and LANS Delegation of Authority Letter are located in Appendix C of this SWPPP.