Search NASA⌕ Search

SEARCH · Search NASA

Results for “distributed wind energy prototype design and development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

2022 Prototype Design Development Awardee: RRD Engineering

The innovative BladeRunner distributed wind turbine concept from RRD Engineering will address the need for dependable, efficient, and affordable midsize turbines to power operations in the commercial, industrial, agricultural, military, governmental, and institutional sectors. The inventive design funded by this Competitiveness Improvement Project (CIP) award reduces LCOE by using materials and components that cost and weigh less than those found in conventional turbines, while delivering savings related to manufacturing and maintenance requirements.

CIP↗

2022 System Optimization Awardee: XFlow Energy Company

Vertical-axis wind turbines offer several cost-saving advantages over traditional horizontal-axis wind turbines, including lower blade manufacturing costs and a simpler mechanical design. Unfortunately, until now, vertical configurations have not been able to match the power production and durability of more conventional horizontal-axis models. XFlow Energy Company (XFlow Energy) plans to improve the design and reduce the production costs of its 25-kilowatt (kW) vertical-axis wind turbine, delivering a levelized cost of energy that is competitive with that of U.S. retail electricity generated by coal-fired power plants. XFlow Energy's efficient turbine also is designed to maximize power production and longevity. Two previous Competitiveness Improvement Project (CIP) awards funded XFlow Energy's development of a 10-meter vertical-axis turbine prototype.

CIP↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2025 Prototype Manufacture Awardee: XFlow Energy

Vertical-axis wind turbines offer a compelling path to low-cost, reliable distributed energy that can compete with utility prices for businesses, landowners, and municipalities in rural areas. They generate power by using a main rotor shaft perpendicular to the ground to pick up wind from different directions without a yaw mechanism. However, previous commercialization attempts struggled to account for the unsteady aerodynamics of this design, leading to low power production and/or premature structural failure. To address these challenges, Competitiveness Improvement Project recipient XFlow Energy is building on work completed during three previous CIP funding awards to develop a 30-kW vertical-axis wind turbine that achieves both low costs and high energy output.

17 WIND ENERGY↗

2021 Component Innovation Awardee: Siva Powers America

Siva Powers America earned a Competitiveness Improvement Project (CIP) Component Innovation award that will enable the company to evolve its 250/50 wind turbine design, discontinue its existing 13.4-meter wind turbine blades, and develop new 14.4-meter blades. These longer blades, which have additional extenders at the hub, will increase the rotor diameter to 35 meters, allowing for improved energy production at sites with lower wind resources. A collaboration with the National Renewable Energy Laboratory (NREL) includes a redesign, build, and on-site structural test for the new prototype blades. This will ultimately allow Siva Powers America to pursue recertification of the SIVA 250/50 to meet international standards.

CIP↗

2021 Prototype Installation and Testing Awardee: XFlow Energy Company

XFlow Energy Company (XFlow Energy) aims to reduce the cost of wind energy by designing vertical-axis wind turbines (VAWTs), which have a cheaper blade manufacturing process and a mechanically simpler design than traditional wind turbines, among other cost-saving advantages. However, a lack of modeling or simulation tools that can predict the coupling between aerodynamic and structural forces poses a significant challenge to developers of VAWTs. Known as aeroelastic models, these are not just important design tools - they're critical for certifying VAWTs of 25 kilowatts (kW), which is the size of XFlow Energy's prototype wind turbine. Without certification, XFlow Energy will not be able to deliver an independently validated product to its customers, and those customers will not be eligible for state and federal incentives. An accurate aeroelastic model could provide less-conservative structural optimization tactics than are currently used, resulting in a wind turbine with lower capital costs.

CIP↗

2022 Prototype Manufacture and Installation Awardee: Sonsight Wind

The Sonsight Wind 3.5-kilowatt (kW) prototype turbine is designed to compete with solar power, meeting energy needs for a wide range of smaller-scale applications, such as powering individual homes and irrigation systems on farms and ranches in remote areas. The technology's innovative high-torque, low-rotations-per-minute generator permits the use of longer blades that, at moderate wind speed sites, generate the energy of a 5-kW turbine with lower thrust forces than similarly rated turbines. The 3.5-kW turbine is projected to ofer greater durability at a signifcantly lower levelized cost of energy. Sonsight Wind advanced the development of the prototype with a previous Competitiveness Improvement Project (CIP) funding award.

competitiveness improvement project↗

2022 Prototype Installation and Testing Awardee: Windward Engineering

The 60-kilowatt (kW) Zephyr 21/60 wind turbine from Windward Engineering uses a low-cost, full-span independent pitch system that can act as a redundant aerodynamic braking system. This design uses a relatively simple pneumatic rotary vane actuator, allowing each of the turbine's three blades to be pitched independently and any single blade to activate emergency braking for the entire turbine. A previous Competitiveness Improvement Project (CIP) funding award enabled Windward Engineering to design and develop the Zephyr 21/60 wind turbine's aeroelastic model and pitch system. At the end of this current Competitiveness Improvement Project award, a fully validated aeroelastic model will make it possible to certify Windward Engineering's Zephyr 21/60 design and quantify the technology's levelized cost of energy in preparation for certification and entry into the distributed wind market. The Zephyr 21/60 will feature an attractive levelized cost of energy, improved reliability, and a full-span pitch system for safe and redundant protection against rotor overspeed (which occurs when the rotor turns beyond its design limit).

CIP↗

2021 Prototype Design Development Awardee: Accelerate Wind, Inc.

In the United States, rooftop photovoltaic systems can be installed on most commercial buildings. However, even if all available rooftop space is used, solar energy cannot satisfy the building's total energy demand. With many building owners trying to move toward net-zero-carbon-emission energy generation, these customers often have no way to achieve this goal on-site. Rooftop wind energy technology could be an option, but most rooftop wind turbines are not economically viable because they do not produce meaningful amounts of energy and are not likely to pay for themselves within their lifetime. Some rooftop wind turbine companies have attempted to exploit the fact that wind naturally speeds up at the edge of a roof; but, so far, these solutions have also struggled to produce significant energy because only a small portion of that wind can be captured so close to the edge of the roof.

CIP↗

Grid-forming Control of Single- and Two-Stage Solar PV Systems with Mode Transition

Legacy power systems once dominated by con-ventional synchronous machines are transitioning into systems driven by fast-acting power-electronic converters that integrate renewable resources. The majority of integrated renewables such as PV and wind bring down system inertia and can cause stability issues due to their volatile nature. The state-of-the-art grid-forming (GFM) control is proven to enhance system inertia and stability in low-inertia systems. However, most of the existing GFM inverters are applied for battery systems, which are much more expensive than PV. Motivated by this, in this paper we propose a holistic grid-forming (GFM) control strategy for PV systems without the need of energy storage. The proposed strategy is developed on the secondary level of the grid-forming control that enables the PV inverter to operate smoothly among islanded, synchronization, GFM, and limited grid-forming (LGF) modes. The practical criteria for determining the operation modes are established and implemented based on the grid operation scenarios. Here, the proposed design is successfully validated by case studies with a laboratory prototype using Siemens Software Defined Inverters.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a Digital Twin for Hydrogen Dispersion and Safety Assessment in an Electrolyzer Based Hydrogen Production Facility

Digital twin models are virtual representations of physical systems that use real-time data to simulate and optimize performance. This study presents the development and initial implementation of a digital twin (DT) for the electrolyzer-based hydrogen production facility at NREL's Advanced Research on Integrated Energy Systems (ARIES), focused on enhancing safety and optimizing sensor placement through physics-based simulations and metadata integration. The DT incorporates detailed facility-specific information, including component layout, leak locations, and controlled release parameters, to model hydrogen dispersion under varying environmental conditions. Using steady-state computational fluid dynamics (CFD) simulations informed by real meteorological data, such as wind speed, direction, and vertical wind profiles, the DT enables visualization of hydrogen plume behavior and spatial concentration distributions. Comparative analysis between high and low wind speed scenarios illustrates the significant influence of wind dynamics on plume shape and extent, with horizontal momentum dominating dispersion at higher speeds, while buoyancy effects become more prominent under low wind conditions. These simulations generate a rich dataset embedded within the DT, allowing users to assess potential leak outcomes and identify optimal sensor locations based on concentration thresholds. The model supports scenario-based analysis to guide safety strategies and equipment deployment for open-area hydrogen infrastructure. The digital twin thus serves as a dynamic platform for virtual prototyping, providing predictive insight into hydrogen behavior and enhancing risk-informed decision-making. This initial phase establishes a validated foundation for future integration of transient, uncontrolled leak scenarios and real-time sensor feedback, positioning the DT as a critical tool for safety design, operational planning, and adaptive monitoring in hydrogen systems. Overall, the approach demonstrates the value of combining environmental data with digital simulations to inform safer and more efficient deployment of hydrogen technologies.

08 HYDROGEN↗

Development of a Digital Twin for Hydrogen Dispersion and Safety Assessment in an Electrolyzer-Based Hydrogen Production Facility: Preprint

Digital twin models are virtual representations of physical systems that use real-time data to simulate and optimize performance. This study presents the development and initial implementation of a digital twin (DT) for the electrolyzer-based hydrogen production facility at the National Renewable Energy Laboratory (NREL)'s Advanced Research on Integrated Energy Systems (ARIES), focused on enhancing safety and optimizing sensor placement through physics-based simulations and metadata integration. The DT incorporates detailed facility-specific information, including component layout, leak locations, and controlled release parameters, to model hydrogen dispersion under varying environmental conditions. Using steady-state computational fluid dynamics (CFD) simulations informed by real meteorological data, such as wind speed, direction, and vertical wind profiles, the DT enables visualization of hydrogen plume behavior and spatial concentration distributions. Comparative analysis between high and low wind speed scenarios illustrates the significant influence of wind dynamics on plume shape and extent, with horizontal momentum dominating dispersion at higher speeds, while buoyancy effects become more prominent under low wind conditions. These simulations generate a rich dataset embedded within the DT, allowing users to assess potential leak outcomes and identify optimal sensor locations based on concentration thresholds. The model supports scenario-based analysis to guide safety strategies and equipment deployment for open-area hydrogen infrastructure. The digital twin thus serves as a dynamic platform for virtual prototyping, providing predictive insight into hydrogen behavior and enhancing risk-informed decision-making. This initial phase establishes a validated foundation for future integration of transient, uncontrolled leak scenarios and real-time sensor feedback, positioning the DT as a critical tool for safety design, operational planning, and adaptive monitoring in hydrogen systems. Overall, the approach demonstrates the value of combining environmental data with digital simulations to inform safer and more efficient deployment of hydrogen technologies.

08 HYDROGEN↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Investigation of Flux Spreading in a Light-Trapping, Planar-Cavity Receiver for Enclosed Solar Particle Heating

Concentrating solar thermal power (CSP) technology development has recently focused on increasing the operating temperatures to accommodate high efficiency power cycles and thermochemical processes. Inert solid particles as heat transfer media enable solar receivers to operate above 700 degrees Celsius resulting in increased system thermal efficiency compared to the conventional molten salt based CSP system. An open-cavity falling-particle solar receiver that can efficiently heat particles by direct heating from concentrated solar radiation faces challenges with large particle losses from wind and unable to support thermochemical reactions. A light-trapping, planar cavity reiver (LTPCR) where particles are indirectly heated can significantly minimize the particle losses during the operation, support thermochemical reactions, and offer scalability potential. The LTPCR features an array of vertical planar receiver/absorber panels arranged within a cavity configuration. Concentrated solar radiation from heliostats is focused onto the receiver walls, where heat is indirectly transferred to solid particles flowing inside the receiver channels. Heat transfer occurs through direct contact between the receiver panel walls and particles, and can be enhanced by fluidizing particles with air. This fluidization increases particle-wall contact and extends particle residence time, maximizing heat transfer efficiency. The unique vertical planar receiver structure originated from a near-blackbody tubular light absorber, effectively distributing the incoming solar beam spread across the panel walls and trapping light. This flux spreading effect, driven by cosine projection, converts high incident solar flux into a lower, more uniform heat flux on the panel walls. This redistribution enhances heat transfer efficiency between particle-wall or reaction gases-wall, while preventing localized overheating of the receiver panel. Indirect planar cavity solar receivers completely separate solid particles from the ambient environment that can greatly reduce the thermal losses in heated particles resulting in high efficiency at high temperatures above 700 degrees Celsius. This design ensures no particle losses to the environment during the operation while open-cavity designs can experience significant particle losses from wind. An experimental investigation was conducted to observe flux spreading on the receiver panel wall. A lab-scale prototype planar receiver, fabricated using Haynes 230 alloy, was tested under direct concentrated solar radiation using the high-flux solar furnace (HFSF) facility at NREL. The experiment was performed under normal peak radiative heat fluxes ranging from 800 to 1900 kW/m2. A temperature distribution on the panel wall was measured using a thermal imaging camera (FLIR A 6600). To prevent overheating at the receiver front tip, prism-shaped heat shields (Zircar UNIFROM C1) were placed in front of the receiver, and their influence on flux spreading was also studied. Absorbed flux distribution on the panel wall was modeled using SolTrace. The total solar power and flux distributions delivered from HFSF were determined based on the heliostat mirror optical properties, direct normal irradiance (DNI) on the on-sun testing days, peak flux measurement during the on-sun testing, and shutter/attenuator settings Due to the large incident angles of the solar beam on the panel wall, the angular optical properties of Haynes 230 alloy and Zircar heat shields were incorporated into the model. This flux distribution model was then integrated into a computational fluid dynamics (CFD) simulation to predict the receiver panel wall temperature, which was compared with the experimental measurements. Both prediction and measurements identified a temperature hotspot at the backside of the panel, indicating that the incident solar beam can fully reach to the rear of the receiver. The heat shields positioned at the front of the receiver effectively reduced the excessive temperature rise at the receiver front tip. Overall, the temperature was well distributed over the panel wall, with a minor hotspot at the back of the receiver. The model slightly overpredicted the temperature, possibly due to discrepancies in optical properties of the panel and an underprediction of thermal loss in the receiver. The advancement of the particle LTPCR offers a viable alternative to open-cavity receivers by addressing particle loss issues. Additionally, it presents a pathway for enabling solar thermochemical processes, extending CSP technology beyond power generation to fuel and chemical production.

14 SOLAR ENERGY↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗