Reconfigurable Distribution Automation and Control Laboratory: Solar Microgrid Experiments
Not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not provided.
Modern science relies on end-to-end workflows that incorporate experimental instruments and utilize edge, cloud, or high-performance computing and storage resources. These components are geographically dispersed across various user facilities and interconnected through high-speed networks. In this paper, we present Zambeze, an automated distributed framework designed to facilitate this new class of cross-facility workflows. Utilizing swarm intelligence principles, Zambeze orchestrates science campaigns by managing distributed autonomous agents. These agents can offer a suite of services, including computing, storage, and data management. We demonstrate the feasibility of Zambeze through a real-world application involving electron microscopy, enhanced with Artificial Intelligence capabilities.
A series of analyses along with field validations that evaluate efficiency, reliability, and capacity improvements of model-centric distribution automation are presented. With model-centric distribution automation, the same model is used from design to real-time control calculations. A 14-feeder system with 7 substations is considered. The analyses involve hourly time-varying loads and annual load growth factors. Phase balancing and capacitor redesign modifications are used to better prepare the system for distribution automation, where the designs are performed considering time-varying loads. Coordinated control of load tap changing transformers, line regulators, and switched capacitor banks is considered. In evaluating distribution automation versus traditional system design and operation, quasi-steady-state power flow analysis is used. In evaluating distribution automation performance for substation transformer failures, reconfiguration for restoration analysis is performed. In evaluating distribution automation for storm conditions, Monte Carlo simulations coupled with reconfiguration for restoration calculations are used. As a result, the evaluations demonstrate that model-centric distribution automation has positive effects on system efficiency, capacity, and reliability.
In 2009, the U.S. Department of Energy under the American Recovery and Reinvestment Act (ARRA) awarded a grant to the Chattanooga, Tennessee, Electric Power Board (EPB) as part of the Smart Grid Investment Grant Program. The grant had the objective “to accelerate the transformation of the nation’s electric grid by deploying smart grid technologies.” This funding award enabled EPB to expedite the original smart grid implementation schedule from an estimated 10-12 years to 2.5 years. With this funding, EPB invested heavily in distribution automation technologies including installing over 1,200 automated circuit switches and sensors on 171 circuits. For utilities considering a commitment to distribution automation, there are underlying questions such as the following: “What is the value?” and “What are the costs?” This case study attempts to answer these questions. The primary benefit of distribution automation is increased reliability or reduced power outage duration and frequency. Power outages directly impact customer economics by interfering with business functions. In the past, this economic driver has been difficult to effectively evaluate. However, as this case study demonstrates, tools and analysis techniques are now available. In this case study, the impact on customer costs associated with power outages before and after the implementation of distribution automation are compared. Two example evaluations are performed to demonstrate the benefits: 1) a savings baseline for customers under normal operations1 and 2) customer savings for a single severe weather event. Cost calculations for customer power outages are performed using the US Department of Energy (DOE) Interruption Cost Estimate (ICE) calculator2. This tool uses standard metrics associated with outages and the customers to calculate cost impact. The analysis shows that EPB customers have seen significant reliability improvements from the implementation of distribution automation. Under normal operations, the investment in distribution automation has enabled a 43.5% reduction in annual outage minutes since 2012. This has led to an estimated total savings of $26.8 million per year. Examining a single severe weather event3, the distribution automation was able to restore power to 40,579 (nearly 56%) customers within 1–2 seconds and reduce outage minutes by 29.0%. This saved customers an estimated $23.2 million over the course of the storm.
GENI Project: Caltech is developing a distributed automation system that allows distributed generators—solar panels, wind farms, thermal co-generation systems—to effectively manage their own power. To date, the main stumbling block for distributed automation systems has been the inability to develop software that can handle more than 100,000 distributed generators and be implemented in real time. Caltech’s software could allow millions of generators to self-manage through local sensing, computation, and communication. Taken together, localized algorithms can support certain global objectives, such as maintaining the balance of energy supply and demand, regulating voltage and frequency, and minimizing cost. An automated, grid-wide power control system would ease the integration of renewable energy sources like solar power into the grid by quickly transmitting power when it is created, eliminating the energy loss associated with the lack of renewable energy storage capacity of the grid.
The purpose of the NETL Project was to develop a diverse combination of distributed renewable generation technologies and controls and demonstrate how the renewable generation could help manage substation peak demand at the ATK Promontory plant site. The Promontory plant site is located in the northwestern Utah desert approximately 25 miles west of Brigham City, Utah. The plant encompasses 20,000 acres and has over 500 buildings. The ATK Promontory plant primarily manufactures solid propellant rocket motors for both commercial and government launch systems. The original project objectives focused on distributed generation; a 100 kW (kilowatt) wind turbine, a 100 kW new technology waste heat generation unit, a 500 kW energy storage system, and an intelligent system-wide automation system to monitor and control the renewable energy devices then release the stored energy during the peak demand time. The original goal was to reduce peak demand from the electrical utility company, Rocky Mountain Power (RMP), by 3.4%. For a period of time we also sought to integrate our energy storage requirements with a flywheel storage system (500 kW) proposed for the Promontory/RMP Substation. Ultimately the flywheel storage system could not meet our project timetable, so the storage requirement was switched to a battery storage system (300 kW.) A secondary objective was to design/install a bi-directional customer/utility gateway application for real-time visibility and communications between RMP, and ATK. This objective was not achieved because of technical issues with RMP, ATK Information Technology Department’s stringent requirements based on being a rocket motor manufacturing facility, and budget constraints. Of the original objectives, the following were achieved: • Installation of a 100 kW wind turbine. • Installation of a 300 kW battery storage system. • Integrated control system installed to offset electrical demand by releasing stored energy from renewable sources during peak hours of the day. Control system also monitors the wind turbine and battery storage system health, power output, and issues critical alarms. Of the original objectives, the following were not achieved: • 100 kW new technology waste heat generation unit. • Bi-directional customer/utility gateway for real time visibility and communications between RMP and ATK. • 3.4% reduction in peak demand. 1.7% reduction in peak demand was realized instead.
A signal processing approach is proposed to jointly filter and fuse spatially indexed measurements captured from many vehicles. It is assumed that these measurements are influenced by both sensor noise and measurement indexing uncertainties. Measurements from low-cost vehicle-mounted sensors (e.g., accelerometers and Global Positioning System (GPS) receivers) are properly combined to produce higher quality road roughness data for cost-effective road surface condition monitoring. The proposed algorithms are recursively implemented and thus require only moderate computational power and memory space. These algorithms are important for future road management systems, which will use on-road vehicles as a distributed network of sensing probes gathering spatially indexed measurements for condition monitoring, in addition to other applications, such as environmental sensing and/or traffic monitoring. Our method and the related signal processing algorithms have been successfully tested using field data.
The increasing deployment of distributed solar photovoltaics (DPV) to meet clean energy goals can trigger adverse grid operation issues, such as voltage excursions and the violation of thermal loading constraints of the power delivery elements (e.g., lines and transformers) on the evolving electricity infrastructure. Such integration issues would require distribution upgrades with associated costs to mitigate them and to maintain reliable and resilient grid operating conditions. Traditional distribution network upgrade approaches use a specific single snapshot analysis that is overly conservative. This study considers a multi-time point analysis to capture both moderate (probable bounds) and extreme grid operating conditions using time points such as minimum load with minimum photovoltaics (PV), maximum load with maximum PV, maximum load with minimum PV, and minimum load with maximum PV. Further, this study investigates seasonal variation impacts and associated distribution upgrade costs for a spring season case (March, representing a low load and high PV scenario) and a summer case (July, representing a high load and high PV scenario). Such seasonal analysis will allow system operators to characterize upgrade requirements and associated costs across various periods. Because the spatial distribution of DPV can impact upgrade and associated costs, this study investigates three common DPV deployment scenarios - randomly deployed, close to the substation, and far from the substation - at different penetration levels. Apart from spatial distribution impacts, this project evaluates the techno-economic impacts of the nodal photovoltaic penetration factor (NPPF) for generating the various DPV deployment scenarios at increasing penetration levels. This project investigates the impact of varying nodal PV-to-load ratios using conservative and extreme NPPF values of 3 and 10, respectively. This study investigates the deployment of traditional infrastructure upgrade strategies, such as installing new voltage regulating equipment, transformers and lines replacements, and the activation of advanced inverter functionality (e.g., autonomous volt/VAR) in expanding PV hosting capacity. Existing DPV systems are assumed to operate with the legacy unity power factor, and we considered the possibility of retrofitting such systems with the activation of volt/VAR control as integration standards and regulations continue to evolve to allow such functions. The cost-benefit analysis metrics used in study include distribution upgrade costs, average cost per watt of the upgrade cost, average marginal cost per watt of the upgrade cost, and power losses.
With the proliferation of distributed energy resources and advanced metering, modern electric power distribution systems are data rich and include advanced capabilities for distribution automation. Distribution utilities need applications for planning and operations that can integrate all the available data from the enterprise applications and may incorporate distributed approaches to operate and control. This paper describes a framework for standardizing and integrating the data available at different vendor specific applications in a utility utilizing the Common Information Model (CIM). Theframework incorporates the conversion of these the standardized CIM models into models compatible with GridLAB-D, an open source distribution system simulator, for developing advanced planning and operation strategies.
The goal of the 2.5 year Distributed Intelligent Automated Demand Response (DIADR) project was to reduce peak electricity load of Sutardja Dai Hall at UC Berkeley by 30% while maintaining a healthy, comfortable, and productive environment for the occupants. We sought to bring together both central and distributed control to provide “deep” demand response1 at the appliance level of the building as well as typical lighting and HVAC applications. This project brought together Siemens Corporate Research and Siemens Building Technology (the building has a Siemens Apogee Building Automation System (BAS)), Lawrence Berkeley National Laboratory (leveraging their Open Automated Demand Response (openADR), Auto-Demand Response, and building modeling expertise), and UC Berkeley (related demand response research including distributed wireless control, and grid-to-building gateway development). Sutardja Dai Hall houses the Center for Information Technology Research in the Interest of Society (CITRIS), which fosters collaboration among industry and faculty and students of four UC campuses (Berkeley, Davis, Merced, and Santa Cruz). The 141,000 square foot building, occupied in 2009, includes typical office spaces and a nanofabrication laboratory. Heating is provided by a district heating system (steam from campus as a byproduct of the campus cogeneration plant); cooling is provided by one of two chillers: a more typical electric centrifugal compressor chiller designed for the cool months (Nov- March) and a steam absorption chiller for use in the warm months (April-October). Lighting in the open office areas is provided by direct-indirect luminaries with Building Management System-based scheduling for open areas, and occupancy sensors for private office areas. For the purposes of this project, we focused on the office portion of the building. Annual energy consumption is approximately 8053 MWh; the office portion is estimated as 1924 MWh. The maximum peak load during the study period was 1175 kW. Several new tools facilitated this work, such as the Smart Energy Box, the distributed load controller or Energy Information Gateway, the web-based DR controller (dubbed the Central Load-Shed Coordinator or CLSC), and the Demand Response Capacity Assessment & Operation Assistance Tool (DRCAOT). In addition, an innovative data aggregator called sMAP (simple Measurement and Actuation Profile) allowed data from different sources collected in a compact form and facilitated detailed analysis of the building systems operation. A smart phone application (RAP or Rapid Audit Protocol) facilitated an inventory of the building’s plug loads. Carbon dioxide sensors located in conference rooms and classrooms allowed demand controlled ventilation. The extensive submetering and nimble access to this data provided great insight into the details of the building operation as well as quick diagnostics and analyses of tests. For example, students discovered a short-cycling chiller, a stuck damper, and a leaking cooling coil in the first field tests. For our final field tests, we were able to see how each zone was affected by the DR strategies (e.g., the offices on the 7th floor grew very warm quickly) and fine-tune the strategies accordingly.
This presentation provides an overview of full-scale, high-quality, synthetic distribution system data set(s) for testing distribution automation algorithms, distributed control approaches, ADMS capabilities, and other emerging distribution technologies.
The rapid growth of distributed energy resources (DERs) has prompted increasing interest in the monitoring and control of DERs through hybrid smart grid communications. The deployment of communications and computation has transformed the traditional physical power grid into a smart cyber-physical system (CPS). To fully understand the interdependency between physical grid and cyber netowrks, this study designed a power and communications hardware-in-the-loop (PCommHIL) CPS architecture, which enables the flexible verification of DER monitoring and control with hybrid communications architectures and Internet protocols. Design, development and case study of a PCommHIL testbed for the DER coordination are discussed in detail, and the proposed platform integrates DER devices, Advanced Metering Infrastructures (AMIs), and a suite of hybrid communications networks for distribution automation applications. Case study on DER situational awareness and Volt-Var control validates the efficacy of this proposed PCommHIL platform with hybrid communications designs. Results show that the HAN communication technologies play a critical role in hybrid designs and it is the bottleneck for DER applications. High performance communication technologies are highly recommended to be applied in the HAN for enhanced monitoring and real-time control of DERs.
Application packaging and distribution are the final steps for delivering software to end-users; both are frequently neglected when creating scientific software. Commercial businesses rely on electronic distribution systems that have rendered disk drives obsolete. Still, national laboratories continue to rely heavily on removable media to distribute and limit access to controlled applications. With increasing concerns of unauthorized copying of sensitive applications, a modern distribution system that utilizes cryptographically secure communication and authentication protocols has been developed. This new distribution system will secure the chain of custody for nuclear software while simultaneously simplifying access to these tools. This report summarizes four primary advancements made toward the secure distribution of Nuclear Energy Advanced Modeling and Simulation (NEAMS)-developed, Multiphysics Object Oriented Simulation Environment (MOOSE)-based applications: application installation, package distribution, automated package building, and distribution of documentation. NEAMS is currently developing more than ten separate applications based on the open-source MOOSE Framework. Distribution of these applications has primarily been accomplished by distributing source code, with end-users compiling the applications themselves. This work created a mechanism where MOOSE applications can be installed in a similar way to any other software. This allows both administrators and end-users simplified access to runnable executables. With this new installation capability, it was then possible to rethink distribution. A new, secure capability for delivering MOOSE-based applications over the internet has been created. This system requires unique cryptographic tokens for authentication, greatly securing the custody chain for software. Once granted access, installation of any NEAMS code can be accomplished with these terminal commands: "conda install ncrc" "ncrc install ncrc-bison." After these two commands (and authenticating) the BISON application will be securely down- loaded from Idaho National Laboratory (INL)’s servers, installed, and ready to use. To enable this new distribution capability to be successful, the open-source Continuous Integration, Verification, Enhancement, and Testing (CIVET) Continuous Integration (CI) capability was augmented to add Continuous Delivery (CD). CD enables the automated building and packaging of MOOSE-based applications as they are modified by development teams, ensuring that our customers can obtain up-to-date versions of the software at any time. The need for instruction on how to use these applications was addressed through modifications to the MOOSE documentation system. The MooseDocs capability, which enables robust documentation of MOOSE-based applications, has been extended to allow both for the installation of documentation and the packaging of documentation with installed applications. Together, these enhancements form the core of a new, secure distribution mechanism for nuclear simulation tools. In concert with the Nuclear Computational Resource Center (NCRC), NEAMS- developed applications will now be straightforward to obtain securely.
MCwrapper is a set of systems that manages the entire Monte Carlo production workflow for GlueX and provides standards for how that Monte Carlo is produced. MCwrapper was designed to be able to utilize a variety of batch systems in a way that is relatively transparent to the user, thus enabling users to quickly and easily produce valid simulated data at home institutions worldwide. Additionally, MCwrapper supports an autonomous system that takes user’s project submissions via a custom web application. The system then atomizes the project into individual jobs, matches these jobs to resources, and monitors the jobs status. The entire system is managed by a database which tracks almost all facets of the systems from user submissions to the individual jobs themselves. Users can interact with their submitted projects online via a dashboard or, in the case of testing failure, can modify their project requests from a link contained in an automated email. Beginning in 2018 the GlueX Collaboration began to utilize the Open Science Grid (OSG) to handle a bulk of simulation tasks; these tasks are currently being performed on the OSG automatically via MCwrapper. This talk will outline the entire system of MCwrapper, its use cases, and the unique challenges facing the system.
The mid-infrared is an optimal window to trace stellar mass in nearby galaxies and the 3.6 μm IRAC band has been exploited to this effect, but such mass estimates can be biased by dust emission. We present our pipeline to reveal the old stellar flux at 3.6 μm and obtain stellar mass maps for more than 1600 galaxies available from the Spitzer Survey of Stellar Structure in Galaxies (S{sup 4}G). This survey consists of images in two infrared bands (3.6 and 4.5 μm), and we use the Independent Component Analysis (ICA) method presented in Meidt et al. to separate the dominant light from old stars and the dust emission that can significantly contribute to the observed 3.6 μm flux. We exclude from our ICA analysis galaxies with low signal-to-noise ratio (S/N<10) and those with original [3.6]–[4.5] colors compatible with an old stellar population, indicative of little dust emission (mostly early Hubble types, which can directly provide good mass maps). For the remaining 1251 galaxies to which ICA was successfully applied, we find that as much as 10%–30% of the total light at 3.6 μm typically originates from dust, and locally it can reach even higher values. This contamination fraction shows a correlation with specific star formation rates, confirming that the dust emission that we detect is related to star formation. Additionally, we have used our large sample of mass estimates to calibrate a relationship of effective mass-to-light ratio (M/L) as a function of observed [3.6]–[4.5] color: log(M/L) = −0.339(±0.057) × ([3.6]−[4.5])−0.336(±0.002). Our final pipeline products have been made public through IRSA, providing the astronomical community with an unprecedentedly large set of stellar mass maps ready to use for scientific applications.
Explore the source record for details and available documents.
The risk management framework (RMF) provides a well-organized and thorough approach to diagnose information technology (IT) system threats, to gather required materials to comply with industry standards, and to document a plan for achieving authority to operate (ATO). ATO is given by the operating authority with the awareness of vulnerabilities that arise when operating the IT system. The primary goal of the National Renewable Energy Laboratory’s (NREL’s) distributed energy resource (DER) RM application is to provide a user-friendly interface and in-depth guidance for generating the authorization package for the authorizing official to review. In other words, the application satisfies steps 1 through 7 of the RMF process with a focus on DERs.
This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.