Motivation and Requirements for Quasi-Static Time Series (QSTS) for Distribution System Analysis
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
The field of distribution system analysis has made significant advances in the past ten years. It is now standard practice when performing a power flow simulation to use an algorithm that is capable of unbalanced per-phase analysis. Recent work has also focused on examining the need for time-series simulations instead of examining a single time period, i.e., peak loading. One area that still requires a significant amount of work is the proper modeling of end use loads. Currently it is common practice to use a simple load model consisting of a combination of constant power, constant impedance, and constant current elements. While this simple form of end use load modeling is sufficient for a single point in time, the exact model values are difficult to determine and it is inadequate for some time-series simulations. This paper will examine how to improve simple time invariant load models as well as develop multi-state time variant models.
The Production and Distributed Analysis (PanDA) system is a data-driven workload management system engineered to operate at the LHC data processing scale. The PanDA system provides a solution for scientific experiments to fully leverage their distributed heterogeneous resources, showcasing scalability, usability, flexibility, and robustness. The system has successfully proven itself through nearly two decades of steady operation in the ATLAS experiment, addressing the intricate requirements such as diverse resources distributed worldwide at about 200 sites, thousands of scientists analyzing the data remotely, the volume of processed data beyond the exabyte scale, dozens of scientific applications to support, and data processing over several billion hours of computing usage per year. PanDA’s flexibility and scalability make it suitable for the High Energy Physics community and wider science domains at the Exascale. Beyond High Energy Physics, PanDA’s relevance extends to other big data sciences, as evidenced by its adoption in the Vera C. Rubin Observatory and the sPHENIX experiment. As the significance of advanced workflows continues to grow, PanDA has transformed into a comprehensive ecosystem, effectively tackling challenges associated with emerging workflows and evolving computing technologies. The paper discusses PanDA’s prominent role in the scientific landscape, detailing its architecture, functionality, deployment strategies, project management approaches, results, and evolution into an ecosystem.
Recent work in the field of distribution system analysis has shown that the traditional method of peak load analysis is not adequate for the analysis of emerging distribution system technologies. Voltage optimization, demand response, electric vehicle charging, and energy storage are examples of technologies with characteristics having daily, seasonal, and/or annual variations. In addition to the seasonal variations, emerging technologies such as demand response and plug in electric vehicle charging have the potential to send control signals to the end use loads which will affect how they consume energy. In order to support time-series analysis over different time frames and to incorporate potential control signal inputs it is necessary to develop detailed end use load models which accurately represent the load under various conditions, and not just during the peak load period. This paper will build on previous work on detail end use load modeling in order to outline the method of general multi-state load models for distribution system analysis.
Evolution of the ATLAS PanDA Production and Distributed Analysis System T Maeno1,5, K De2, T Wenaus1, P Nilsson2, R Walker3, A Stradling2, V Fine1, M Potekhin1, S Panitkin1 and G Compostella4 Published under licence by IOP Publishing Ltd Journal of Physics: Conference Series, Volume 396, Part 3 Article PDF References Citations Metrics 101 Total downloads Cited by 8 articles Turn on MathJax Share this article Article information Abstract The PanDA (Production and Distributed Analysis) system has been developed to meet ATLAS production and analysis requirements for a data-driven workload management system capable of operating at LHC data processing scale. PanDA has performed well with high reliability and robustness during the two years of LHC data-taking, while being actively evolved to meet the rapidly changing requirements for analysis use cases. We will present an overview of system evolution including automatic rebrokerage and reattempt for analysis jobs, adaptation for the CernVM File System, support for the multi-cloud model through which Tier-2 sites act as members of multiple clouds, pledged resource management and preferential brokerage, and monitoring improvements. We will also describe results from the analysis of two years of PanDA usage statistics, current issues, and plans for the future.
The rapid increase in penetration of distributed energy resources on the electric power distribution system has created a need for more comprehensive interconnection modelling and impact analysis. Unlike conventional scenario - based studies , quasi - static time - series (QSTS) simulation s can realistically model time - dependent voltage controllers and the diversity of potential impacts that can occur at different times of year . However, to accurately model a distribution system with all its controllable devices, a yearlong simulation at 1 - second resolution is often required , which could take conventional computers a computational time of 10 to 120 hours when an actual unbalanced distribution feeder is modeled . This computational burden is a clear l imitation to the adoption of QSTS simulation s in interconnection studies and for determining optimal control solutions for utility operations . Our ongoing research to improve the speed of QSTS simulation has revealed many unique aspects of distribution system modelling and sequential power flow analysis that make fast QSTS a very difficult problem to solve. In this report , the most relevant challenges in reducing the computational time of QSTS simulations are presented: number of power flows to solve, circuit complexity, time dependence between time steps, multiple valid power flow solutions, controllable element interactions, and extensive accurate simulation analysis.
Conducting experiments on large-scale distributed computing systems is becoming significantly easier with the assistance of emulation. Researchers can now create a model of a distributed computing environment and then generate a virtual, laboratory copy of the entire system composed of potentially thousands of virtual machines, switches, and software. The use of real software, running at clock rate in full virtual machines, allows experiments to produce meaningful results without necessitating a full understanding of all model components. However, the ability to inspect and modify elements within these models is bound by the limitation that such modifications must compete with the model, either running in or alongside it. This inhibits entire classes of analyses from being conducted upon these models. We developed a mechanism to snapshot an entire emulation-based model as it is running. This allows us to \freeze time" and subsequently fork execution, replay execution, modify arbitrary parts of the model, or deeply explore the model. This snapshot includes capturing packets in transit and other input/output state along with the running virtual machines. We were able to build this system in Linux using Open vSwitch and Kernel Virtual Machines on top of Sandia's emulation platform Firewheel. This primitive opens the door to numerous subsequent analyses on models, including state space exploration, debugging distributed systems, performance optimizations, improved training environments, and improved experiment repeatability.
This report documents work conducted by Pacific Northwest National Laboratory (PNNL) for the Department of Energy (DOE) to address three basic questions concerning how typical existing electrical distribution systems would be impacted by the addition of PHEVs to residential loads.
The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter summarizes the growth in distribution-connected energy resources and provides a detailed review of impacts to the distribution grid of growth in customer electricity demand, solar, and storage, as well as required distribution grid upgrades and associated costs.
The use of electric vehicles (EVs) in the United States has grown significantly during the last decade, posing benefits to the environment but also potential challenges to our grid. To better understand this scenario , the Department of Energy (DOE) asked Pacific Northwest National Laboratory (PNNL) to perform an authoritative study of the impacts of EVs at scale on the electric grid. The Phase I study focused on the bulk power electricity impacts . This EV-at-scale Phase II work addresses key questions of interest to DOE related to the impacts of EV in the distribution systems: 1. When (which year), where, and how many EVs will be adopted and how will they be charged? 2. Given some prospective answers to the above question, what would be the EV hosting capability of a distribution system circuit? 3. How could the hosting capability be expanded to accommodate more EVs and what would be the potential measures and cost? This report documents the methodologies developed as part of this project and provides EV adoption modeling examples using distribution system circuit data provided by industry partner, Southern California Edison (SCE).
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Abstract not provided.
One of the greatest challenges for the analysis of distribution systems is the high level of diversity across the world. For nearly 20 years the Test Feeder Working Group of the Distribution System Analysis Subcommittee has been developing distribution test feeders. The purpose of these test feeders is to provide openly-available models of distribution systems that reflect the diversity in systems and the analytic challenges they present. Because of their utility and accessibility, the test feeders have been used for a wide range of research, some of which they were not originally intended to cover. The purpose of this paper is to provide an overview of the variety of existing distribution systems, and to clarify the specific analytic challenges that each test feeder was originally designed to examine. Additionally, the paper will provide guidance on which feeders are best suited for various types of analysis. The purpose of this paper is to provide the original intent of the Working Group and to inform researchers so that they may make an informed decision on which of the test feeders are most appropriate for their work.
Rapid and accurate quasi-static time series (QSTS) analysis is becoming increasingly important for distribution system analysis as the complexity of the distribution system intensifies with the addition of new types, and quantities, of distributed energy resources (DER). The expanding need for hosting capacity analysis, control systems analysis, photovoltaic (PV) and DER impact analysis, and maintenance cost estimations are just a few reasons that QSTS is necessary. Historically, QSTS analysis has been prohibitively slow due to the number of computations required for a full-year analysis. Therefore, new techniques are required that allow QSTS analysis to rapidly be performed for many different use cases. This research demonstrates a novel approach to doing rapid QSTS analysis for analyzing the number of voltage regulator tap changes in a distribution system with PV components. A representative portion of a yearlong dataset is selected and QSTS analysis is performed to determine the number of tap changes, and this is used as training data for a machine learning algorithm. The machine learning algorithm is then used to predict the number of tap changes in the remaining portion of the year not analyzed directly with QSTS. The predictions from the machine learning algorithms are combined with the results of the partial year simulation for a final prediction for the entire year, with the goal of maintaining an error <10% on the full-year prediction. Five different machine learning techniques were evaluated and compared with each other; a neural network ensemble, a random forest decision tree ensemble, a boosted decision tree ensemble, support vector machines, and a convolutional neural network deep learning technique. A combination of the neural network ensemble together with the random forest produced the best results. Using 20% of the year as training data, analyzed with QSTS, the average performance of the technique resulted in ~2.5% error in the yearly tap changes, while maintaining a <10% 99.9 th percentile error bound on the results. This is a 5x speedup compared to a standard, full-length QSTS simulation. These results demonstrate the potential for applying machine learning techniques to facilitate modern distribution system analysis and further integration of distributed energy resources into the power grid.
The purpose of this document is to summarize types of electric distribution system analyses along with their application and relative maturity. Particular emphasis is placed on analyses associated with distributed energy resources (DERs). Analyses are separated into the categories of power flow, power quality, fault analysis, dynamic analysis and market analysis. Studies associated with DERs are called out in a separate section.
Electric utilities conduct planning annually to ensure their distribution system meets technical standards, policies, and regulations; addresses forecasted grid conditions; satisfies customer needs; and advances utility priorities. The plan identifies grid deficiencies, analyzes potential solutions, and prioritizes capital investments and other expenditures. About 20 U.S. states and jurisdictions require regulated utilities to file some type of distribution system plan with the public utility commission for review. Requirements for sharing distribution system data and analyses vary widely, from few specific requirements to a detailed list of information that must be provided. While utilities conduct extensive analysis to develop distribution system plans, in most jurisdictions regulators and stakeholders do not know what data are available and how the utility uses the data in planning and investing. This report aims to bridge the gap by increasing understanding of the types of data and analyses utilities employ to develop distribution system plans and how the information affects their decision-making. The report describes information that states and stakeholders can ask for related to 11 data categories: -Forecasting loads and distributed energy resources (DERs) -Scenario analysis -Worst-performing circuits -Asset management strategy -Hosting capacity analysis -Value of DERs -Grid needs assessment -Cost-effectiveness framework for investments -Distribution system investment strategy and implementation -Geotargeted programs -Non-wires alternatives procurements.