Search NASA⌕ Search

SEARCH · Search NASA

Results for “drill sites”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Proposed Drill Sites

Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

15 GEOTHERMAL ENERGY↗

lllinois Storage Corridor CarbonSAFE Phase III: Pre-drilling Site Assessment: Prairie State Generating Company

The Illinois Storage Corridor project will drill a stratigraphic test well as part of the Illinois Storage Corridor CarbonSAFE Phase 3 project near the Prairie State Generating Company coal-fired power plant near Marissa, Illinois. The pre-drilling site evaluation has considered the primary target reservoirs, the Potosi Dolomite and St. Peter Sandstone, and primary seal, the Maquoketa Group. Data to be collected from the well include core, fluid samples, in situ well tests, geophysical logs intended to provide information on lithologic, geomechanical, and geophysical characteristics to determine the feasibility for the geologic sequestration of 50 million metric tons or more of injected carbon dioxide. The planned drilling site has been evaluated using available subsurface geologic data and analyses from the Illinois Basin. These data provide lithologic and structural information, shallow groundwater resource distribution, location of known nearby wellbores, and regional drilling characteristics. The data were used to generate geologic structure and isopach maps for the target reservoir and caprock strata and for prognosing the tops of major lithologic units to aid drilling and coring procedures. The regional analyses indicate that no known structural features are expected to negatively impact the target storage reservoir or caprock. No protected and sensitive areas, groundwater resources, or existing resource development are expected to be impacted by the proposed well drilling activities. The well is planned to be drilled to a total depth of approximately 5,600 feet (1,707 m) and terminate in the Precambrian. Cores (up to 5 intervals) will be collected from the Maquoketa Group, confining units above the St. Peter Sandstone, St. Peter Sandstone, confining units of the Potosi Dolomite and the Potosi Dolomite. Water samples will be attempted to be collected from the St. Peter Sandstone and Potosi Dolomite. Potential impact on drilling progress is a lost circulation zone in the Potosi Dolomite, which has been demonstrated to have intermittent cavernous porosity from karstification elsewhere in the Illinois Basin. This document also presents a preliminary coring and sampling program, proposed logging suite, and well testing program, all of which will be reviewed during drilling.

01 COAL, LIGNITE, AND PEAT↗

Wabash CarbonSAFE Subtask 7.1 – Pre-drilling Site Assessment Topical Report: DOE-FE0031626-1

The Wabash CarbonSAFE project will drill a stratigraphic test well at the Wabash Valley Resources facility near Terre Haute, Indiana. Lithologic, geomechanical, and geophysical data collected from samples testing and an extensive geophysical logging suite will be used to determine the feasibility for the geologic sequestration of 50 million metric tons or more of injected carbon dioxide. The primary target reservoir and caprock to be investigated for the Wabash CarbonSAFE project are the Mt. Simon Sandstone and Eau Claire Shale, respectively. The project team has assessed the planned Wabash #1 drilling site using subsurface geologic data and analyses from both Illinois and Indiana. These data were used to generate geologic structure and isopach thickness maps for target reservoir and caprock layers which were incorporated into a detailed discussion of the nature of the Illinois Basin’s Cambro-Ordovician carbon dioxide storage complex at the drilling site. Formation tops were prognosed for 19 lithologic units to aid drilling and coring procedures. Additional GIS analysis indicates that no known structural features will negatively impact the target storage reservoir or caprock, nor will protected and sensitive areas, groundwater resources, or existing resource development be negatively affected by Wabash #1 drilling activities. The Wabash #1 Geologic/Structure Test well drilling permit was awarded by Indiana Department of Natural Resources (IN-DNR) – Division of Oil and Gas on November 12th, 2019, and the well is expected to be drilled to a total depth of approximately 8,350 feet. Potential impacts on drilling progress include abandoned underground coal mines which mined the Springfield and Survant coals until 1964 and 1954, respectively, and a lost circulation zone in the Potosi Dolomite, which has been demonstrated to have intermittent cavernous porosity from karstification. This document also details the coring and sampling program, proposed logging suite, and well testing program, all of which will be dynamically reviewed as drilling progresses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pre-drilling Site Assessment: One Earth Energy

The Illinois Storage Corridor project will drill a test well in Ford County, IL, near the One Earth Energy facility in Gibson City, IL. Lithologic, geomechanical, and geophysical data collected from samples testing and an extensive geophysical logging suite will be used to determine the feasibility of the geologic sequestration of 50 million tonnes or more of injected carbon dioxide at this location. The primary target reservoir and caprock to be investigated for the Illinois Storage Corridor project are the Mt. Simon Sandstone and Eau Claire Formation, respectively, which together constitute a storage complex that has already been successfully used for natural gas storage in east-central Illinois and for geologic sequestration of carbon dioxide in south-central Illinois. The Lower Mt. Simon, which includes a high- porosity and -permeability arkosic layer, is being targeted as the primary storage zone. Regional maps of this unit indicate that the Lower Mt. Simon is expected to have excellent reservoir characteristics and high net thickness at the drill site.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Impactites of the Yaxcopoil-1 drilling site, Chicxulub impact structure: Petrography, geochemistry, and depositional environment

The impact breccias encountered in drill hole Yaxcopoil-1 (Yax-1) in the Chicxulub impact structure have been subdivided into six units. The two uppermost units are redeposited suevite and suevite, and together are only 28 m thick. The two units below are interpreted as a ground surge deposit similar to a pyroclastic flow in a volcanic regime with a fine-grained top (unit 3; 23 m thick; nuee ardente) and a coarse breccia (unit 4; approx.15 m thick) below. As such, they consist of a melange of clastic matrix breccia and melt breccia. The pyroclastic ground surge deposit and the two units 5 and 6 below are related to the ejecta curtain. Unit 5 (approx.24 m thick) is a silicate impact melt breccia, whereas unit 6 (10 m thick) is largely a carbonate melt breccia with some clastic-matrix components. Unit 5 and 6 reflect an overturning of the target stratigraphy. The suevites of units 1 and 2 were deposited after emplacement of the ejecta curtain debris. Reaction of the super-heated breccias with seawater led to explosive activity similar to phreomagmatic steam explosion in volcanic regimes. This activity caused further brecciation of melt and melt fragments. The fallback suevite deposit of units 1 and 2 is much thinner than suevite deposits at larger distances from the center of the impact structure than the 60 km of the Yax-1 drill site. This is evidence that the fallback suevite deposit (units 1 and 2) originally was much thicker. Unit 1 exhibits sedimentological features suggestive of suevite redeposition. Erosion possibly has occurred right after the IUT impact due to seawater backsurge, but erosion processes spanning thousands of years may also have been active. Therefore, the top of the 100 m thick impactite sequence at Yaxcopoil, in our opinion, is not the K/T boundary.

Dressler, Burkhard O.↗

ChemCam Investigation of the Last Four MSL Drill Sites in the Murray Formation, Gale Crater, Mars

This study utilizes ChemCam data for outcrop surfaces, drill hole walls, tailings, and dump piles in the Middle Murray Formation to investigate chemical variations with depth in the drill holes and pos-sible effects of the drilling and sample processing. This work is a continuation of similar work on drill sites at Yellowknife Bay [1], the Pahrump Hills [2], and the Stimson Formation [3].

Jackson, R. S.↗

Preliminary Drill Sites

Preliminary locations for intermediate depth temperature gradient holes and/or resource confirmation wells based on compilation of geological, geophysical and geochemical data prior to carrying out the DOE-funded reflection seismic survey.

15 GEOTHERMAL ENERGY↗

Drill-Site Selection for Cosmogenic-Nuclide Exposure Dating of the Bed of the Greenland Ice Sheet

Direct observations of the size of the Greenland Ice Sheet during Quaternary interglaciations are sparse yet valuable for testing numerical models of ice-sheet history and sea level contribution. Recent measurements of cosmogenic nuclides in bedrock from beneath the Greenland Ice Sheet collected during past deep-drilling campaigns reveal that the ice sheet was significantly smaller, and perhaps largely absent, sometime during the past 1.1 million years. These discoveries from decades-old basal samples motivate new, targeted sampling for cosmogenic-nuclide analysis beneath the ice sheet. Current drills available for retrieving bed material from the US Ice Drilling Program require < 700 m ice thickness and a frozen bed, while quartz-bearing bedrock lithologies are required for measuring a large suite of cosmogenic nuclides. We find that these and other requirements yield only ∼ 3.4 % of the Greenland Ice Sheet bed as a suitable drilling target using presently available technology. Additional factors related to scientific questions of interest are the following: which areas of the present ice sheet are the most sensitive to warming, where would a retreating ice sheet expose bare ground rather than leave a remnant ice cap, and which areas are most likely to remain frozen bedded throughout glacial cycles and thus best preserve cosmogenic nuclides? Here we identify locations beneath the Greenland Ice Sheet that are best suited for potential future drilling and analysis. These include sites bordering Inglefield Land in northwestern Greenland, near Victoria Fjord and Mylius-Erichsen Land in northern Greenland, and inland from the alpine topography along the ice margin in eastern and northeastern Greenland. Results from cosmogenic-nuclide analysis in new sub-ice bedrock cores from these areas would help to constrain dimensions of the Greenland Ice Sheet in the past.

Greenland↗

Reconnaissance and deep-drill site selection on Taylor Dome, Antarctica

Taylor Dome is a small ice dome near the head of Taylor Valley, Southern Victoria Land. The location of the dome, just west of the Transantarctic Mountains, is expected to make the composition of the accumulating snow sensitive to changes in the extent of the Ross Ice Shelf. Thus, it is linked to the discharge of the West Antarctic Ice Sheet but protected against direct influences of glacial-interglacial sea-level rise. The record of past climatic and environmental changes in the ice provides a valuable complement to the radiocarbon-dated proxy record of climate derived from perched deltas, strandlines, and moraines that have been obtained in the nearby Dry Valleys. We carried out a reconnaissance of the Taylor Dome area over the past two field seasons to determine the most favorable location to obtain a deep core to bedrock. A stake network has been established with an 80-km line roughly along the crest of Taylor Dome, and 40-km lines parallel to it and offset by 10 km. These lines have been surveyed 1990/91, and the positions of 9 grid points have been determined with geoceivers. A higher density stake network was placed and surveyed around the most likely drill area in the second year. Ground-based radar soundings in both years provided details on bedrock topography and internal layering of the ice in the drill area. An airborne radar survey in January 1992, completed the radar coverage of the Taylor Dome field area.

Grootes, Pieter M.↗

TRIDENT Drill Validation at Mars and Lunar Analog Field Sites

Drilling on Earth is typically a human-intensive activity. Drilling on other planets is further complicated by the lack of prior local field surveys of their target area, hence blindly drilling into uncertain target rocks. Field conditions on the Moon or Mars are also different than for shallow drilling on Earth: lower temperatures and pressures, less power available, low masses (hence less weight-on-bit). Given the cost of transport from Earth, no drilling muds or working fluids are likely to be available to carry away cuttings. And impact-gardened regolith and dust vary mechanically and texturally from most terrestrial soils. The Regolith and Ice Drill for Exploration of New Terrains (TRIDENT) is a rotary-percussive 1m-class drill from Honeybee Robotics. It is low-power (rotary and percussive actuators are 200 W each) and lightweight (<20 kg) with the maximum weight on bit limited to 200 N. TRIDENT has been manifested for the Volatiles Investigating Polar Exploration Rover (VIPER) and PRIME-1 lunar south pole missions in 2024, has previously been field tested at a hot, dry analog site in the Atacama Desert, and in lunar conditions in thermal vacuum chamber tests. TRIDENT was also part of the 2019 Icebreaker Mars Discovery proposal, as well as in the Mars Life Explorer concept. During ARADS tests, drill control and fault recovery automation software enabled hands-off operations of a rover-mounted TRIDENT drill. TRIDENT Drill Analog Site Validation: Past TRIDENT tests in thermal vacuum (TVAC) chambers targeted containers of manufactured lunar simulants with added volatiles. 2022 TRIDENT ambient testing at NASA Ames drilled into cemented lunar simulant materials. Low cuttings-permeability led to cuttings buildup, and drill choking and binding was observed. The Atacama analog site in ARADS had desiccated unconsolidated sediments that did not challenge the TRIDENT design. However, lunar polar regolith is expected to be diverse and heterogeneous with varying clast sizes, with abundant impactites and perhaps subsurface ice deposits. Neither the simulants nor Atacama testing had completely covered the TRIDENT-targeted field characteristics, motivating further analog tests prior to the planned lunar missions. To gain more insight into the behavior of the TRIDENT hardware in diverse impactites and subsurface ice, and to verify the software automation in that environment, in August 2023 TRIDENT was brought to Haughton Crater, a field analog site in the Canadian Arctic. In September 2023 the same drill was brought to the Bishop Tuff in southern California to verify whether drilling binding behaviors previously seen in lunar simulant testing would be observed in naturally occurring fine-grained massive layers. The ~22 Ma Haughton Crater impact structure is located at 75 ̊22’ N, 89 ̊41’ W, on northwestern Devon Island, Nunavut, Canada. Numerous deposits of pale-grey crater-fill polymictic impact-melt breccia are found within the crater with a typical thickness reaching ~125 m or greater and covering ~60 km -2 . An approximately 600m-thick permafrost layer is also present with ice typically found within 0.5-0.6m of the surface. The volcanic tableland north of Bishop, CA exposes densely welded tuff laid down during the eruption that created the Long Valley Caldera at approximately 0.76 Ma. Extensional faults and the Owens River gorge expose cross-sections across the plateau. The area is viewed as an analog site for Mars features believed to be of pyroclastic origin. Results: Haughton Crater.Drilling tests were conducted 8-13 August 2023 at a previously undisturbed area separated 5-10 m from past years’ Drill Hill test sites (75.4208, -089.7613). In six days, TRIDENT drilled 8 holes to nearly 1 m depth each, totaling 7.80 m. The active layer/ice boundary was at ~67 cm depth, with a total of approximately 2.4 m drilled into ice or ice-cemented impact breccia. During drilling, five drill fault states were observed and successfully recovered. Holes 23-1, 4 and 7 were drilled under manual control, using Honeybee’s Thorax user interface. Holes 23-5, 6, and 8 were drilled with the Ames IBexec automated drilling control software. TRIDENT was observed to have little difficulty in the thawed uncemented impact breccia above the active layer boundary, but required percussion to make slower headway in the ice-cemented breccia. In Hole 23-7 (Fig.1), drilling slowed down in a massive unit just above the active-layer boundary (perhaps a large rock extending into the ice-cementation?), with only 7cm progress made in 27 minutes of high auger torque and constant percussion, leading to a choking fault and then a binding fault. A similar pattern had been observed in TRIDENT Rio Tinto test data from 2017 [6] as well as in the 2022laboratory tests.Bishop Tuff.A team from NASA Ames and the US Geological Survey deployed the same TRIDENT drill to Bishop Sites 1B and 1C (37.4203, -118.4289; 37.4265, -118.4215) on 13-16 September 2023, on the Bishop Tuff plateau. A third drill site was used 17-18 September 2023(37.4598, -118.3667) in an abandoned pumice mine. Four holes (totaling 2.5m depth) were drilled into the fine-grained, meters-thick tuff units at Sites 1B and 1C, and a further two boreholes (totaling 1.98m depth) were made at the pumice site. Drill behavior in the tuff below 10 cm depth was similar to that seen at 65-74 cm depth in Haughton Hole 23-7 (Fig. 1) and that seen in the 2022 lab simulant drilling. Drill safety torque limits were exceeded multiple times resulting in drill stops downhole. These freezes then required external added torques (with a pipe wrench) to resume rotation, to unstick the drill for withdrawal. To prevent this choking and binding behavior we found that more-frequent cuttings removal was necessary, e.g., reducing the “drill bite” size from the nominal 10 cm to 2 cm per bite --bringing the auger up to the surface more frequently, as seen in Bishop Site 1C Hole 2 (Fig.2). This permitted slow progress without drill binding and without external interventions. Conversely, TRIDENT drilling in the more porous pumice target material showed no cuttings buildup issue, and single bites as large as 40 cm were demonstrated. Discussion: We observed that TRIDENT easily penetrated unconsolidated heterogeneous soils (both above the active layer boundary at Haughton and previously in the Atacama). Cemented or consolidated targets that were cuttings-permeable (icy impact breccia, pumice) required more energy applied and percussion. However, in non-cuttings-permeable targets (welded microporous tuff, cemented simulants, boulder) TRIDENT was observed to be prone to excessive cuttings accumulation leading to choking/binding faults and stalling. The wedge cutting bit, used by TRIDENT in field tests and in its flight versions, pulverizes the target rock and creates fine cuttings that ideally are transported up the auger spirals for removal. In porous, fractured or vesicular target materials (such as at the Bishop pumice site) a significant portion of the cuttings are pushed aside, but for non-fractured, microporous targets the cuttings remain in the borehole and accumulate. Rock powder is relatively incompressible as a working fluid at only 100-200N downward force (TRIDENT limits) and hence eventual drilling progress slows or stops. Our recommended strategy for improving TRIDENT cuttings removal in massive target units with low cuttings-permeability is to reduce TRIDENT bite sizes when encountering these units, from 10cm to as little as 1-2cm, to effectively bail the accumulating cuttings. This approach was demonstrated to reduce choking and allowed slow progress to continue in cuttings-impermeable microporous target units (viz. the Bishop tuff in our September 2023 tests or cemented simulants in 2022 ambient tests).

robotic drilling↗

Exploratory analysis of machine learning techniques in the Nevada geothermal play fairway analysis

Play fairway analysis (PFA) is commonly used to generate geothermal potential maps and guide exploration studies, with a particular focus on locating and characterizing blind geothermal systems. This study evaluates the application of machine learning techniques to PFA in the Great Basin region of Nevada. Following the evaluation of various techniques, we identified two approaches to PFA that produced promising results, 1) supervised Bayesian probabilistic neural networks to generate geothermal potential maps with confidence intervals, and 2) unsupervised principal component analysis paired with k-means clustering to generate both cluster maps to help identify spatial patterns, as well as new combined feature inputs. We applied these techniques to perform a comparative analysis between two principal sets of geological and geophysical features related to permeability and heat and a set of positive (known geothermal resources) and negative training sites (known drill sites with unsuitable geothermal conditions). We found that these methods constrain previously unrecognized feature controls on geothermal favorability, many of which are spatially organized within the extent of cluster groups and the major structural-hydrologic domains of the study area. Furthermore, we utilized exploratory unsupervised modeling to highlight spatial relationships between input data and predictive output results of our supervised modeling. As a result, we demonstrate how our models compare to the previous Nevada PFA and how the rapid insights these machine learning techniques offer may support future assessments of both known and undiscovered blind geothermal systems in the Great Basin region of Nevada and beyond.

15 GEOTHERMAL ENERGY↗

Viper Science Operations: Lunar Dynamic Science Table and ‘Tracker’ Tool.

Introduction: The NASA VIPER lunar rover mission [1] presents a unique operational paradigm within the history of robotic spaceflight. The proximity of the Moon to the Earth and the terrain elements (surface characteristics, light/shadow dynamics, communication links) of the Lunar South Polar landing site create unprecedented operational conditions between these two planetary bodies. Apollo era lunar science and exploration included humans in situ to operate instruments and assimilate observational inputs in real-time. Previous lunar orbital missions have worked to operational timescales, e.g., decisional timelines and communication exchanges, that were weeks in duration. Mars rover missions have worked to operational timescales, e.g., decisional timelines and communication exchanges between Mars and Earth, that were hours, days, and weeks in length. In the case of the VIPER mission, our operational decisioning for rover driving and instrument commanding will be compressed to minute-scale timeframes. These operational conditions will directly impact the workflow and speed with which the VIPER Science Team (VST) will be required to synthesize and analyze data and produce timely science-driven decisions throughout surface mission operations [2]. The VST in the VIPER Mission Science Center (MSC) and the Mission Operations Center (MOC) shall provide mission-enhancing scientific input to guide traverse planning and drill site confirmation/selection throughout surface operations. Further, the VST input will be of vital importance to the mission’s ability to maximize science return and to meet broader NASA objectives for future lunar ISRU and exploration activities. Specifically, the VST in the MSC and MOC will provide science-driven, consensus-based, timely input and decision-making to enhance mission operations and align mission science return with broader Agency goals. They will enable the characterization of the distribution (lateral and vertical extent, concentration, variability), form (chemical/physical state of these reservoirs of lunar water and key isotopes), and context (e.g., accessibility/overburden, environment, soil mechanics, trafficability, and temperatures) of lunar polar volatiles and water content for the VIPER mission. Additionally, the MSC will be selecting or reconfirming the location and path towards and from the third drill site (Drill Site Charlie) within each Science Station [6]. To enable scientific decision-making within the operational paradigm of the VIPER lunar rover mission requires detailed articulation of the VST’s scientific objectives and goals, and the operationalization of these objectives and goals through their association with specific data products, tasks, and decisional procedures. Further, defining and tracking scientific success metrics throughout surface operations will enable the VST to have a quantified understanding of the mission’s evolving ability to accomplish the stated scientific objectives and goals both during and after the mission. This abstract provides an overview of the methods and development activities towards defining, operationalizing, and tracking scientific objectives and goals throughout VIPER surface operations. Specifically, we focus on the VIPER Lunar Dynamic Science Table (LDST) and the VIPER “Tracker” tool.

Darlene Sze Shien Lim↗

Petrology of basaltic sills from ocean drilling program sites 794 and 797 in the Yamato Basin of the Japan Sea

The basaltic sills from ocean drilling program sites 794 and 797 in the Yamato Basin of the Japan Sea are characterized petrographically on the basis of a detailed study of the composition of relict phenocryst and groundmass phases. The systematic variation in the rock compositions is discussed. Results of 1-atm melting experiments on a relatively primitive basalt from site 797 are reported. The sills are found to constitute two distinct groups of suites: primitive, olivine-bearing suites with low potassium and primitive olivine-bearing to evolved, olivine-free suites with relatively high potassium. A pseudoinvariant reaction relationship between olivine and augite and magnetite is inferred. Complex magmatic and tectonic evolutions in the region, perhaps reflecting a transitional stage between subduction zone activity and back arc spreading, are suggested.

Thy, P.↗

Atmospheric CO 2 estimates for the Miocene to Pleistocene based on foraminiferal $δ^{11}$B at Ocean Drilling Program Sites 806 and 807 in the Western Equatorial Pacific

Constraints on the evolution of atmospheric CO 2 levels throughout Earth's history are foundational to our understanding of past variations in climate. Despite considerable effort, records vary in their temporal and spatial coverage and estimates of past CO 2 levels do not always converge, and therefore new records and proxies are valuable. Here we reconstruct atmospheric CO 2 values across major climate transitions over the past 16 million years using the boron isotopic composition (δ 11 B) of planktic foraminifera from 89 samples obtained from two sites in the West Pacific Warm Pool, Ocean Drilling Program (ODP) Sites 806 and 807, measured using high-precision multi-collector inductively coupled plasma mass spectrometry. We compare our results to published data from ODP Site 872, also in the Western Equatorial Pacific, that goes back to 22 million years ago. These sites are in a region that today is near equilibrium with the atmosphere and are thought to have been in equilibrium with the atmosphere for the interval studied. We show that δ 11 B data from this region are consistent with other boron-based studies. The data show evidence for elevated pCO 2 during the Middle Miocene and Early to Middle Pliocene, and reductions in pCO 2 of ~200 ppm during the Middle Miocene Climate Transition, ~250 ppm during Pliocene Glacial Intensification and ~50 ppm during the Mid-Pleistocene Climate Transition. During the Mid-Pleistocene Transition there is a minimum pCO 2 at marine isotopic stage (MIS) 30. Our results are consistent with a coupling between pCO 2 , temperature and ice sheet expansion from the Miocene to the late Quaternary.

54 ENVIRONMENTAL SCIENCES↗

Variation of Accumulation Rates Over the Last Eight Centuries on the East Antarctic Plateau Derived from Volcanic Signals in Ice Cores

Volcanic signatures in ice-core records provide an excellent means to date the cores and obtain information about accumulation rates. From several ice cores it is thus possible to extract a spatio-temporal accumulation pattern. We show records of electrical conductivity and sulfur from firn cores from the Norwegian-USA scientific traverse during the International Polar Year 2007-2009 (IPY) through East Antarctica. Major volcanic eruptions are identified and used to assess century-scale accumulation changes. The largest changes seem to occur in the most recent decades with accumulation over the period 1963- 2007/08 being up to 25 % different from the long-term record. There is no clear overall trend, some sites show an increase in accumulation over the period 1963 to present while others show a decrease. Almost all of the sites above 3200 m above sea level (asl) suggest a decrease. These sites also show a significantly lower accumulation value than large-scale assessments both for the period 1963 to present and for the long-term mean at the respective drill sites. The spatial accumulation distribution is influenced mainly by elevation and distance to the ocean (continentality), as expected. Ground-penetrating radar data around the drill sites show a spatial variability within 10-20 % over several tens of kilometers, indicating that our drill sites are well representative for the area around them. Our results are important for large-scale assessments of Antarctic mass balance and model validation.

Anschuetz, H.↗

ChemCam investigation of the John Klein and Cumberland drill holes and tailings, Gale crater, Mars

The ChemCam instrument on the Mars Science Laboratory rover analyzed the rock surface, drill hole walls, tailings, and unprocessed and sieved dump piles to investigate chemical variations with depth in the first two martian drill holes and possible fractionation or segregation effects of the drilling and sample processing. Furthermore, the drill sites are both in Sheepbed Mudstone, the lowest exposed member of the Yellowknife Bay formation. Yellowknife Bay is composed of detrital basaltic materials in addition to clay minerals and an amorphous component. The drill tailings are a mixture of basaltic sediments and diagenetic material like calcium sulfate veins, while the shots on the drill site surface and walls of the drill holes are closer to those pure end members. The sediment dumped from the sample acquisition, processing, and handling subsystem is of similar composition to the tailings; however, due to the specifics of the drilling process the tailings and dump piles come from different depths within the hole. This then allows the ChemCam instrument to analyze samples representing the bulk composition from different depths. On the pre-drill surfaces, the Cumberland site has a greater amount of CaO and evidence for calcium sulfate veins, than the John Klein site. But, John Klein has a greater amount of calcium sulfate veins below the surface, as seen in mapping, drill hole wall analysis, and observations in the drill tailings and dump pile. In addition, the Cumberland site does not have any evidence of variations in bulk composition with depth down the drill hole, while the John Klein site has evidence for a greater amount of CaO (calcium sulfates) in the top portion of the hole compared to the middle section of the hole, where the drill sample was collected.

79 ASTRONOMY AND ASTROPHYSICS↗

Characterizing Baselines and Change in Gas Hydrate Systems using EM Methods

The objective of this project was to advance our understanding of gas hydrate systems in nature by characterizing their electrical properties in the field and in the laboratory. In the laboratory measurements, methane hydrate was synthesized from pure water ice and flash frozen seawater, with varying amounts of sand or silt added. Electrical conductivity was determined by impedance spectroscopy, using equivalent circuit modeling to separate the effects of electrodes and to gain insight into conduction mechanisms. Silt and sand increase the conductivity of pure hydrate, inferred to be contaminant NaCl contributing to conduction in hydrate, to a peak conductivity in agreement with peak resistivities observed in well logs through massive hydrate (3,000--10,000 Ωm). The addition of silt and sand lowers the conductivity of hydrate synthesized from seawater, by an amount consistent with Archie's Law. All samples were characterized using cryogenic scanning electron microscopy and energy dispersive spectroscopy, which shows good connectivity of salt and brine phases. Electrical conductivity measurements of pure hydrate and hydrate mixed with silt during pressure-induced dissociation supports previous conclusions that sediment increases dissociation rate. In order to characterize gas hydrate systems in the field, we collected 360 line kilometers of controlled-source electromagnetic data on Walker Ridge 313, Orca Basin (WR100), Mad Dog (GC781), and Green Canyon 955 in the Gulf of Mexico, all areas with known or seismically inferred gas hydrate deposits and which have be drilled or targeted for future drilling. We deep-towed an EM transmitter that generates an alternating electric field which propagates through the seafloor geology. Data were recorded on 6 receivers towed behind the transmitter at distances between 550 and 1550 m. In the presence of conductive geology, the electric fields will be attenuated, and conversely, in resistive geology the fields will be preserved. Our data were inverted using a 2D inversion method that first optimizes the model-data misfit, then finds the smoothest model fitting the data. This ensures that resistivity structures present in the final model are likely necessary. At each of the proposed drilling sites we found increased resistivity, interpreted as increased hydrate concentrations. However, not only were the primary drilling sites not always more resistive than the alternate sites, at WR313 the strongest resistors were not at the locations targeted for drilling.

03 NATURAL GAS↗