Search NASA⌕ Search

SEARCH · Search NASA

Results for “drilling technology”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Evaluation of Microhole Drilling Technology for Geothermal Exploration, Assessment, And Monitoring

One of the greatest barriers to geothermal energy expansion is the high cost of drilling during exploration, assessment, and monitoring. Microhole drilling technology—small-diameter 2–4 in. (~5.1–10.2 cm) boreholes—is one potential low-cost alternative for monitoring and evaluating bores. However, delivering high weight-on-bit (WOB), high torque rotational horsepower to a conventional drill bit does not scale down to the hole sizes needed to realize the cost savings. Coiled tube drilling technology is one solution, but these systems are limited by the torque resistance of the coil system, helical buckling in compression, and most of all, WOB management. The evaluation presented herein will: (i) evaluate the technical and economic feasibility of low WOB technologies (specifically, a percussive hammer and a laser-mechanical system), (ii) develop downhole rotational solutions for low WOB drilling, (iii) provide specifications for a low WOB microhole drilling system, (iv) implement WOB control for low WOB drilling, and (v) evaluate and test low WOB drilling technologies.

15 GEOTHERMAL ENERGY↗

Microhole drilling technology utilizing a golden section search algorithm

A fundamental issue in microhole drilling is that delivering high weight-on-bit (WOB), high torque rotational horsepower to a conventional drill bit does not scale down to the hole sizes necessary to realize the envisioned cost savings An optimization algorithm called a golden section search (GSS) was used to systematically identify the preferred WOB for a given set of conditions. This research focused on implementing and evaluating two low WOB drilling technologies for microhole drilling: - Laser-assisted mechanical drill, which was tested in the laboratory - Lightly modified commercial off-the-shelf (COTS) percussive hammer, which was tested in a limited field test. Data were collected for microhole GSS using WOB optimization via simulation as well as at the Blue Canyon Dome Site in Socorro, NM. Information on the attached files and folders are as follows: - the .tdms files are LabView data files, which can be opened within Excel using a .tdms add-in or using a Matlab .tdms converter - the .tdms_index files are part of the .tdms file structure - sampling rate, column headers, and length data within the .tdms files follow SOP when utilizing Excel and/or Matlab as described above

15 GEOTHERMAL ENERGY↗

Surface drilling technologies for Mars

We propose rock drilling and coring conceptual designs for the surface activities associated with a manned Mars mission. Straightforward extensions of equipment and procedures used on Earth are envisioned for the sample coring and shallow high explosive shot holes needed for tunneling and seismic surveying. A novel rocket exhaust jet piercing method is proposed for very rapid drilling of shot holes required for explosive excavation of emergency radiation shelters. Summaries of estimated equipment masses and power requirements are provided, and the indicated rotary coring rigs are scaled from terrestrial equipment and use compressed C02 from the Martian atmosphere for core bit cooling and cuttings removal. A mass of 120 kg and power of 3 kW(e) are estimated for a 10 m depth capability. A 100 m depth capacity core rig requires about 1150 kg and 32 kw(e). The rocket exhaust Jet equipment devised for shallow (3m) explosive emplacement shot holes requires no surface power beyond an electrical ignition system, and might have a 15 kg mass.

J D Blacic↗

Utah FORGE: Sanvean Technologies Drilling Data from Well 16B(78)-32

Included here is Sanvean Technologies bit sensor data amalgamated with data from National Oilwell Varco's (NOV) BlackBox tool for Reed Hycalog bits used during drilling of Well 16B(78)-32. The dataset contains information collected at the bit while drilling including rate of penetration (ROP), top drive torque, and bit box temperature. The data was recorded at the bit box and top sub of the motor. RPM was measured by onboard gyro recording continuously in each sensor, and shock levels were also recorded on X, Y and Z axis. This data was merged with EDR in time format and saved in file sets (the zipped files) then output into CSV files. Please note: fields in the CSV files, such as the date field, may need to be formatted to display properly. There is an additional zipped folder in each dataset that is password protected. Sanvean GameChanger Viewer software must be used to view this password protected data. Information on how to use and download this free software is also included here.

15 GEOTHERMAL ENERGY↗

Rock melting technology and geothermal drilling

National awareness of the potential future shortages in energy resources has heightened interest in exploration and utilization of a variety of geothermal energy (GTE) reservoirs. The status of conventional drilling of GTE wells is reviewed briefly and problem areas which lead to higher drilling costs are identified and R and D directions toward solution are suggested. In the immediate future, an expanded program of drilling in GTE formations can benefit from improvements in drilling equipment and technology normally associated with oil or gas wells. Over a longer time period, the new rock-melting drill bits being developed as a part of the Los Alamos Scientific Laboratory's Subterrene Program offer new solutions to a number of problems which frequently hamper GTE drilling, including the most basic problem - high temperature. Two of the most favorable characteristics of rock-melting penetrators are their ability to operate effectively in hot rock and produce glass linings around the hole as an integral part of the drilling process. The technical advantages to be gained by use of rock-melting penetrators are discussed in relation to the basic needs for GTE wells.

Rowley, J. C.↗

An Innovative Manufacturing of CCC Ion Thruster Grids by North Carolina A&T's RTM Carbon/Carbon Process

Electric ion thrusters are the preferred engines for deep space missions, because of very high specific impulse. The ion engine consists of screen and accelerator grids containing thousands of concentric very small holes. The xenon gas accelerates between the two grids, thus developing the impulse force. The dominant life-limiting mechanism in the state-of-the-art molybdenum thrusters is the xenon ion sputter erosion of the accelerator grid. Carbon/carbon composites (CCC) have shown to be have less than 1/7 the erosion rates than the molybdenum, thus for interplanetary missions CCC engines are inevitable. Early effort to develop CCC composite thrusters had a limited success because of limitations of the drilling technology and the damage caused by drilling. The proposed is an in-situ manufacturing of holes while the CCC is made. Special low CTE molds will be used along with the NC A&T s patented resin transfer molding (RTM) technology to manufacture the CCC grids. First, a manufacture process for 10-cm diameter thruster grids will be developed and verified. Quality of holes, density, CTE, tension, flexure, transverse fatigue and sputter yield properties will be measured. After establishing the acceptable quality and properties, the process will be scaled to manufacture 30-cm diameter grids. The properties of the two grid sizes are compared with each other.

Haag, Thomas W.↗

Physics-Based Limiter Redesign and Bit Performance Analysis at The Geysers

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC (GPC), an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration, with increased footage on bottom for each bit coupled with increased bit life and time drilling. The project leverages advances in oil and gas drilling technologies including PDC bits, along with the physics-based limiter redesign techniques championed in drilling demonstrations conducted at the Utah FORGE geothermal site. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. The wells are typically drilled to the top of the reservoir with mud and then air-drilled to total depth (TD) through fractured zones at temperatures ≥ 450°F. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate rock reduction technologies. The first demonstration well has been completed, with 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However, in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges. This paper provides updates on drilling activities conducted since the Phase 1 demonstration well at GDC-36 which was drilled from November 2023-January 2024. Additional analysis of the bit performance has been conducted. Furthermore, in subsequent wells drilled by GPC, PDC bits have been used extensively, building on the gains realized at GDC-36. GPC has continued to work with bit vendors to identify designs that last longer in the harsh, air-drilled 8.5” portions of the wells. Planning for the Phase 2 demonstration at Prati-44 is ongoing.

15 GEOTHERMAL ENERGY↗

Design and performance validation of a high-temperature downhole permanent magnet generator used for an electro-pulse boring system in geothermal energy applications

Novel, direct-energy drilling technologies such as electro-pulse boring, have the potential to significantly increase the speed and depth of geothermal drilling but have not achieved widespread adoption due to several economic and technical barriers. One major challenge is that these drilling systems require electric power downhole. The current practice is to supply power to the drill string components by running electric cables down the geothermal well, but at the targeted well depths, this practice is cost-inhibitive, inefficient in terms of power consumption, and adds an additional failure point with the long cabling going through a highly corrosive, high-temperature environment. A solution to this problem is to develop high-temperature electric generator technology that can generate the required power downhole. Such a generator must also operate with high efficiency at the target downhole ambient temperature of 250 °C. In this paper, we investigate the various design considerations for this concept and subsequently design the downhole electric generator using a multi-objective design optimization approach. Through electromagnetic-, thermal- and short-circuit fault condition analysis, it is demonstrated that the optimized downhole electric generator concept presented in this paper can meet the performance requirements within this extreme drilling environment. Most remarkably, it is shown that a generator efficiency of 90% is achieved. In conclusion, to validate the results presented in this paper, a prototype generator is built and its performance is measured at 250 °C using a test bench uniquely developed for this application.

15 GEOTHERMAL ENERGY↗

Establishing a Baseline for Global Geothermal Drilling Rates

Geothermal is a promising source of renewable energy with almost zero emissions. However, there remains untapped geothermal potential around the world. This is largely because geothermal projects have high development costs and high resource-value uncertainty, and returns on initial investments can be slow to materialize. Increasing drilling efficiency of geothermal wells is one way to decrease development costs, as drilling accounts for up to 50% of the upfront costs of a geothermal power project. Currently, little quantitative information exists about how fast geothermal drilling occurs on a global scale. This paper was originally intended to be an extension of Frone and Boyd's 2018 report on geothermal drilling rates in California and Nevada. Our project includes global data and considers additional measures, such as flat time. Data for the project was limited to published papers and drilling reports that are publicly available online. The goal of our project was to establish a baseline geothermal drilling rate that is representative of current global geothermal drilling practices can be used to gauge the impact of future improvements in geothermal drilling technology. We recorded the number of days from beginning to end of a project, the number of days spent drilling, and the number of days considered to be flat time. We found the average global rate at which a drilling project is completed (including non-drilling activities) to be 160 ft/day, and the average drilling rate (including only time during which active drilling occurred) to be 360 ft/day. Our data shows no clear trend in rate change from 2000 to 2017 and significant variability in drilling rates between countries and within countries.

baseline↗

Auto-Gopher-II – An Autonomous Wireline Rotary-Hammer Ultrasonic Drill

Developing technologies that would enable future NASA exploration missions to penetrate deeper into the subsurface of planetary bodies for sample collection is of great importance. Performing these tasks while using minimal mass/volume systems and with low energy consumption is another set of requirements imposed on such technologies. A deep drill, called Auto-Gopher II, is currently being developed as a joint effort between JPL’s NDEAA laboratory and Honeybee Robotics Corp. The Auto-Gopher II is a wireline rotary-hammer drill that combines formation breaking by hammering using an ultrasonic actuator and cuttings removal by rotating a fluted auger bit. The hammering mechanism is based on the Ultrasonic/Sonic Drill/Corer (USDC) mechanism that has been developed as an adaptable tool for many drilling and coring applications. The USDC uses an intermediate free-flying mass to transform high frequency vibrations of a piezoelectric transducer horn tip into sonic hammering of the drill bit. The USDC concept was used in a previous task to develop an Ultrasonic/Sonic Ice Gopher and then integrated into a rotary hammer device to develop the Auto-Gopher-I. The lessons learned from these developments are being integrated into the development of the Auto-Gopher-II, an autonomous deep wireline drill with integrated cuttings and sample management and drive electronics. Subsystems of the wireline drill are being developed in parallel at JPL and Honeybee Robotics Ltd. This paper presents the development efforts of the piezoelectric actuator, cuttings removal and retention flutes and drive electronics.

Badescu, Mircea↗

Lunar deep drill apparatus

Proposed as a baseline configuration, this rotary drill apparatus is designed to produce 100-mm diameter holes in the lunar surface at depths up to 50 meters. The drill is intended to acquire samples for scientific analysis, mineral resource location, calibration of electronic exploration devices, and foundation analysis at construction sites. It is also intended to prepare holes for emplacement of scientific instruments, the setting of structural anchors, and explosive methods in excavation and mining activities. Defined as a deep drill because of the modular drill string, it incorporates an automatic rod changer. The apparatus is teleoperated from a remote location, such as earth, utilizing supervisory control techniques. It is thus suitable for unmanned and man-tended operation. Proven terrestrial drilling technology is used to the extent it is compatible with the lunar environment. Augers and drive tubes form holes in the regolith and may be used to acquire loose samples. An inertial cutting removal system operates intermittently while rock core drilling is in progress. The apparatus is carried to the work site by a three-legged mobile platform which also provides a 2-meter feed along the hole centerline, an off-hole movement of approximately .5 meters, an angular alignment of up to 20 deg. from gravity vertical, and other dexterity required in handling rods and samples. The technology can also be applied using other carriers which incorporate similar motion capabilities. The apparatus also includes storage racks for augers, rods, and ancillary devices such as the foot-plate that holds the down-hole tooling during rod changing operations.

Source record↗

Mitigation for Removal of Building 01-202681 in the Main Storage Yard of the Area 1 Subdock, Nevada National Security Site, Nye County, Nevada

The Main Storage Yard was originally recorded as SHPO Resource No. S2772 in 2020 during an architectural survey of the Area 1 Subdock (Collins et al. 2022). It was recommended individually eligible for listing in the NRHP under Criteria A and C and as contributing to the significance of the potential Area 1 Subdock Historic District. The SHPO concurred with these determinations in a letter dated April 29, 2022 (Reed). The Main Storage Yard retains all seven aspects of integrity. The location, design, materials, workmanship, feeling, and association have not changed since the original construction. Since the purpose of the yard is to maintain storage equipment that is actively being used, the design and feeling will change each time equipment is moved. Such actions reinforce the integrity of design and feeling. Buildings 01-101 and 01-102 were removed (Collins and Menocal 2020), but the other buildings and storage yard remain. Therefore, the setting has been changed, but not to the degree that the Main Storage Yard no longer conveys its significance (see Figures 4 and 5 for comparison). The Main Storage Yard was designed to facilitate the relocation of the Area 3 Subdock to Area 1 in 1985. The design for the overall Subdock provided a centralized cluster of buildings surrounded by two large storage yards. While the North Storage Yard largely serves as overflow storage, the Main Storage Yard holds the majority of drill rigs and drilling equipment needed to support big hole drilling. The Main Storage Yard and its contents were essential elements of the nuclear testing drilling program on the NNSS thus making it eligible for the NRHP under Criterion A for its contribution to broad patterns of history by storing specially designed equipment for underground nuclear testing at the NNSS. It is also eligible under Criterion C as it is an engineered landscape that now serves as an open-air repository of drilling technology and nuclear testing. In addition to its individual significance, the Main Storage Yard also contributes to the significance of the Area 1 Subdock Historic District as it showcases a variety of big-hole drilling equipment, support facilities, and warehouses that were specially designed for nuclear testing at the NNSS. Despite the demolition of two contributing elements to date, the district still contains numerous examples of other facilities with the purpose of supporting big-hole drilling; therefore, the district still remains eligible under Criteria A and C.

54 ENVIRONMENTAL SCIENCES↗

Modeling of particle flow due to ultrasonic drilling

In-situ sampling and analysis is one of the major tasks in future NASA exploration missions. It is essential that the samples on other planets including Mars are free of contaminations from the earth. Recently, a novel drilling technology that is actuated by a piezoelectric drive mechanism was developed at it is called Ultrasonic/Sonic Driller/Corer.

ultrasonic/sonic↗

Development and Field Testing Novel Natural Gas Surface Process Equipment for Replacement of Water as Primary Hydraulic Fracturing Fluid (Final Report)

Southwest Research Institute® (SwRI ® ), Schlumberger Technology Corporation (SLB), and Chevron Corporation ® (Chevron) developed a novel, optimized, and lightweight process for natural gas (NG) to replace water as a low-cost fracturing medium with a low environmental impact. Hydraulic fracturing is used to increase oil and NG production by injecting high-pressure fluid, primarily water, into a rock formation, which fractures the rock and releases trapped oil and NG. This method was developed to increase yield and make feasible production areas that would not otherwise be viable for large-scale oil and NG extraction using traditional drilling technologies. Since the fracturing fluid is composed of approximately 90% water, one of the principal drawbacks to hydraulic fracturing is its excessive water use and associated large environmental footprint. According to recent data collected at fracture sites within the United States, fracturing applications in North America can consume as much as 9 million gallons of water per well. During the fracturing process, some of the fracturing fluid is permanently lost and the portion that is recovered is contaminated by both fracturing chemicals and dissolved solids from the formation. The recovered water or flow-back represents a significant environmental challenge, as it must be treated before it can be reintroduced into the natural water system. Although there is some recycling for future fracturing, the majority of the flow-back water is hauled from the well site to a treatment facility or to an injection well for permanent underground disposal. To mitigate these issues, an optimized, lightweight and modular surface process using NG to replace a majority of the water was developed as a cost-effective and environmentally clean fracturing fluid. Using NG will result in significantly less consumption since the gas that is injected as a fracturing fluid will be mixed with the formation gas and extracted as if it were from the formation itself. This process will minimize the collection, waste, and treatment of large amounts of water and will reduce the environmental impact of transporting and storing the fracturing fluid. There are two major steps involved in utilizing NG as the primary fracturing medium: (1) increasing the supply pressure of NG to wellhead pressures suitable for fracturing and (2) mixing the required chemicals and proppant needed for the fracturing process at these elevated pressures. The second step (NG-proppant mixing at elevated pressures) still requires demonstration; but very similar processes have been demonstrated in the field with other gases such as nitrogen (N 2 ) and carbon dioxide (CO 2 ). However, the first step (a compact, on-site unit for generating high-pressure NG at costs feasible for fracturing) has not been developed and is currently not commercially available. Due to the inherent compressibility of NG, more energy is required to compress the gas than what is required to pump water (or other incompressible liquids) to the very high pressure required for downhole injection. This project aimed to develop a novel, hybrid method to overcome this challenge. The project accomplishments and findings are discussed in this report. Ultimately, the research and development efforts described herein demonstrate that fracturing with NG foam is a feasible alternative to using water.

02 PETROLEUM↗