Search NASA⌕ Search

SEARCH · Search NASA

Results for “driveway”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Conserving asphalt resources: Rethinking rejuvenator performance evaluation through peptizing efficiency

Timely rejuvenation and restoration of asphalt are essential conservation practices that help preserve and extend the service life of roads, bridges, driveways, and parking lots. The performance of asphalt rejuvenators is often assessed based on their diffusion rates and softening power, yet these metrics alone fail to capture true rejuvenation potential. Here, this study integrates density functional theory (DFT) modeling with experimental analysis to show that rejuvenation effectiveness is primarily governed by molecular interactions with oxidized asphaltene nanoaggregates. DFT results revealed that amide- and unsaturated-chain compounds, such as hexadecanamide, oleic acid, and 9,17-octadecadienal, act cooperatively to disrupt π–π stacking and exfoliate asphaltene layers, reducing binding strength and enhancing dispersion. Unlike bulky, rigid molecules that remain trapped, these components remain mobile and repeatedly interact with multiple aggregation sites. Experimental validation using rheometry and FTIR confirmed that such molecularly compatible rejuvenators restore the binder flexibility and polydispersity, even when diffusion is relatively slow. Building on this mechanistic foundation, six rejuvenators (A2, A5, A7, A8, A9, and A10) were evaluated using a three-metric performance framework encompassing cracking resistance (Glover–Rowe parameter), UV stability, and surface hydrophobicity. Among the six rejuvenators evaluated, A9 exhibited the highest overall performance, reducing the Glover–Rowe cracking parameter by 85% (from 351 kPa to 53 kPa), demonstrating the greatest resistance to UV-induced aging with a stability index of 4.17 h·kPa⁻¹, and increasing surface hydrophobicity to a contact angle of 103.6°. Its superior performance is primarily attributed to its amide- and unsaturated-chain components, which act cooperatively to disrupt π–π stacking interactions and exfoliate asphaltene layers, thereby promoting molecular deagglomeration and enhancing long-term durability. These results shift the criteria for selecting rejuvenators: effective candidates must pair the electronic capability to unlock aged asphaltenes with sufficient structural stability to resist secondary aging and restore hydrophobicity. Restoring hydrophobicity is critical, as aging reduces the asphalt’s water repellency and increases water diffusion, which in turn accelerates moisture-related damage; consequently, a high-performing rejuvenator must effectively restore the binder’s hydrophobic characteristic. Collectively, these findings provide a framework for the rational design of next-generation of bio-based rejuvenators that enhance pavement longevity and promote long-term sustainability.

Aging↗

Site 200 - Building 225 Construction Project: Steel Pipe Abandonment Work Plan (October 2020)

In December 2019, a capped, 4-inch diameter pipe located inside a square concrete collar was discovered on the north side of a driveway leading into a construction project located at the northeast corner of First Street and Avenue and petroleum like odors were reported to Lawrence Livermore National Laboratory's (LLNL) Environment, Safety and Health (ES&H) staff. The pipe was also found to contain liquid, which was sampled. Analysis of the liquid showed the presence of refined petroleum hydrocarbons - primarily benzene, toluene, ethylbenzene and total xylenes, and lead. Based on various historical documents and maps, the pipe is assumed to be associated with one, or more of four 25,000-gallon, single-wall, concrete-construction, underground storage tanks (USTs) installed by the U.S. Department of Navy in approximately 1943. The USTs were reported to have been closed - abandoned in place and filled with sand in 1950.

54 ENVIRONMENTAL SCIENCES↗

Secure & Sustainable Disposition of Security Sensitive Materials

Dual-stage Disintegrator with in-line briquettor Disintegrated paper transitioned from a waste to a commodity Briquettes reused to make an industrial cellulose fiber additive for construction products such as asphalt sealants, roofing cement, driveway coatings, etc. Briquettes are now also being blended with mixed paper and recycled

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

A Safe Response to Renewable Energy Hazards

The International Association of Fire Fighters (IAFF) and Underwriters Laboratories, LLC (UL) in conjunction with UL Solutions initiated a joint project in 2022 under an agreement with the United States Department of Energy-Office of Energy Efficiency and Renewable Energy (DOE-EERE). This project focused on two separate and important initiatives related to energy efficiency in residential buildings. Initiative 1: Fire Performance on Energy Efficient Exterior Walls. Initiative 2: Firefighting Tactics in Residential Properties with Building Energy Storage Systems (BESS). The project’s first initiative addresses concerns surrounding new technologies with enhanced, energy-efficient exterior walls installed on residential properties. The concerns of fire rapidly traveling vertically up the exterior of these walls were examined. This addressed a growing concern from the first responder community that many times, the fires on the exterior of residential buildings have already evolved into an attic fire by the time of arrival – making it problematic to address the fire scenario. The test plan for Initiative 1 incorporated a modified version of an American Society for Testing and Materials (ASTM) test method, ASTM E2707, Standard Test Method for Determining Fire Penetration of Exterior Wall Assemblies Using a Direct Flame Impingement Exposure, as the foundation of the research. The test method involved a wall structure intended to represent retrofit construction to evaluate how fire would spread vertically or laterally. The second aspect of the UL-IAFF Project focuses on the fire service response to Residential Battery Energy Storage System (RBESS) incidents. These simulation tests were constructed in the large-scale fire test facility at UL Solutions’ Northbrook, IL campus. A baseline test was conducted that involved a test structure with no batteries—shelving units populated with standardized commodities, representing a typical garage with cellulosic and plastic contents. Three additional tests have been conducted to generate data with the contribution of energy storage system (ESS) batteries to compare fire and explosion hazards against the baseline test. Through this work, fire service tactical considerations can be explored. From the data, the team can determine 1) the visual indicators of a residential fire that has involved an RBESS (or, potentially, other large batteries) and 2) the impact of fire service-initiated ventilation of the structure on the fire conditions and explosion risks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗