At least 19 records

When Every Drum is a Win - Tackling a Thirty-Five Thousand Drum Legacy - 20064

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. As a result, Cameco was granted an allocation of 150,000 cubic metres of space in the Long-Term Waste Management Facility (LTWMF) located in the Municipality of Port Hope (MPH), which opened to the receipt of Cameco material in June 2018. Cameco is currently undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is known as the Vision in Motion (VIM) project. Over its operating history, Eldorado accumulated an inventory of over 35,000 drums of accumulated waste that was primarily stored at two offside warehouse locations. In 2017 and 2018, the project focused on repackaging two well characterized legacy wastes (magnesium fluoride slag and depleted uranium titanium oxide) from one of the two offsite locations. At the conclusion of this work, approximately 15,000 drums of these wastes had been repackaged and disposed of at the LTWMF. There remained approximately 1000 drums from this location that either could not be repackaged safely or were different waste types and required further verification and/or processing. The buildings at this location were scheduled for demolition in early 2019, which triggered the development of a process for triaging legacy drums in August 2018, which allowed for preparation and shipment of approximately half of these drums to the LTWMF by March 2019, with the remainder moved to the second offsite warehouse location in February 2019 for further characterization which is ongoing. This paper will discuss key lessons learned as the drummed legacy waste disposal inventory has been reduced to approximately half of the initial inventory. This will include the development of an alternate packaging process; prioritization of characterization activities and selection of techniques where minimal inventory information is available; determination of next step(s) for each drum as it is assessed; key safety considerations; and how to make inroads into an overwhelming task while under public and regulatory scrutiny. In a relatively short period of time, significant progress has been made to organize and gather information about the legacy waste, update the inventory records and determine the most appropriate pathways (i.e. LTWMF disposal, disposal at another appropriate facility, site storage until future processing and/or disposal). Since 2017 the volume of the decades-old legacy waste inventory has decreased significantly. With the majority of the known materials safely disposed of at the LTWMF, every drum removed from the endless rows of 20,000 pyramidally-stacked waste drums with limited history that is safely characterized, prepared and shipped is considered a win. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and performance testing of a novel far field Gamma system to assay radioactive waste in 400 and 200 litre drums - 15339

A Far Field Gamma ray Measurement system has been developed for measuring and assaying both 400 and 200 litre waste drums with a wide range of activity at nuclear power stations. These include radioactive waste drums with surface dose-rates of less than 2 mSv/h (200 mrem/h) and, at the higher range of activity, 400 litre drums with surface dose-rates of up to 50 mSv/h (5 rem/h). The assay system incorporates an electro-mechanically cooled high purity Germanium profile detector and advanced digital spectroscopic analysis electronics. A novel optimised conical-trapezoidal collimator has been incorporated to reduce the effect of the radioactive background in addition to the conventional detector lead shield with tin and copper graded lining to reduce the effect of lead X-rays. Two features have been incorporated to reduce detector dead time and maintain detector resolution when measuring high activity drums. The first is the inclusion of two automated tungsten filters of different thickness as an integral part of the detector collimator. The filters are used in conjunction with an automated rail system on which the detector platform is mounted. The detector can be positioned at different distances from the drum surface in order to reduce detector dead time. The deployment of the filters and the adjustment of the drum - detector position are automatically controlled based on a user defined dose-rate limit table. The data is provided by two Geiger-Muller dose-rate detectors, which are used to measure the drum surface dose-rate. This data is subsequently used to adjust the detector position and in cases of higher dose-rate deploy one or other of the tungsten filters. The drum rotation platform incorporates a load cell to determine drum weight and hence the drum density. This information is used to calculate an attenuation correction based on the assumption of uniform drum density and uniform distribution of activity within the drum. Where the waste drums have a more complicated and known regular internal structure, such as a small radioactive region surrounded by an annulus of shielding material, the analysis algorithms incorporated into the far field geometry and attenuation correction spectroscopic data analysis code are able to make a more accurate determination of drum activity than would be possible assuming a completely uniform drum. The detector energy and efficiency calibration is achieved using a point source with multiple gamma ray energy peaks. The response of the high purity Germanium detector is also modelled using the Monte Carlo Neutron Photon code and the model is benchmarked using the measured point source calibration data. The performance of the instrument has been determined for a range of uniform density matrix drums containing a set of Eu-152 line or rod sources located in re-entrant tubes positioned on an equal volume basis. When rotated, the test drums with volume distributed line sources simulate waste drums of different density each with a uniformly distributed radioactive source. The measurements have been validated using Monte Carlo simulations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Screening and Spectral Summing of LANL Empty Waste Drums - 13226

Empty 55-gallon drums that formerly held transuranic (TRU) waste (often over-packed in 85- gallon drums) are generated at LANL and require radiological characterization for disposition. These drums are typically measured and analyzed individually using high purity germanium (HPGe) gamma detectors. This approach can be resource and time intensive. For a project requiring several hundred drums to be characterized in a short time frame, an alternative approach was developed. The approach utilizes a combination of field screening and spectral summing that was required to be technically defensible and meet the Nevada Nuclear Security Site (NNSS) Waste Acceptance Criteria (WAC). In the screening phase of the operation, the drums were counted for 300 seconds (compared to 600 seconds for the typical approach) and checked against Low Level (LL)/TRU thresholds established for each drum configuration and detector. Multiple TRU nuclides and multiple gamma rays for each nuclide were evaluated using an automated spreadsheet utility that can process data from up to 42 drums at a time. Screening results were reviewed by an expert analyst to confirm the field LL/TRU determination. The spectral summing analysis technique combines spectral data (channel-by-channel) associated with a group of individual waste containers producing a composite spectrum. The grouped drums must meet specific similarity criteria. Another automated spreadsheet utility was used to spectral sum data from an unlimited number of similar drums grouped together. The composite spectrum represents a virtual combined drum for the group of drums and was analyzed using the SNAP{sup TM}/Radioassay Data Sheet (RDS)/Batch Data Report (BDR) method. The activity results for a composite virtual drum were divided equally amongst the individual drums to generate characterization results for each individual drum in the group. An initial batch of approximately 500 drums were measured and analyzed in less than 2 months in 2011. A second batch of approximately 500 more drums were measured and analyzed during the following 2 1/2 months. Four different HPGe detectors were employed for the operation. The screening and spectral summing approach can reduce the overall measurement and analysis time required. However, developing the technical details and automation spreadsheets requires a significant amount of expert time prior to beginning field operations and must be considered in the overall project schedule. This approach has continued to be used for characterizing several hundred more empty drums in 2012 and is planned to continue in 2013. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retrieval of Transuranic Drums with Deflagration to Detonation Potential from a Vault at the Oak Ridge National Laboratory - 20207

During the final phase of a long-term project, a total of 80 TRU waste drums at ORNL have been retrieved from a below-grade storage vault in which they have remained untouched for about 25 years. The drums, which house material generated from past ORNL operations, are now stored and ready for eventual transfer to the Transuranic Waste Processing Center, located on Highway 95 in Oak Ridge. The Transuranic Waste Processing Center will process and ship the drums to WIPP in Carlsbad, New Mexico, for disposal. Workers lifted the drums one-by-one from the underground storage vault with a 110-ton crane over a one-week period in October 2017. Although the physical work was performed in one week, years of detailed planning preceded the fieldwork. A key obstacle needed to be overcome before the project could safely proceed. This obstacle involved the need to ensure controls were developed for the Deflagration to Detonation Transition (DDT) potential. DDT refers to a phenomenon in ignitable mixtures of a flammable gas and air (or oxygen) when a sudden transition takes place from a deflagration type of combustion to a detonation type of explosion. Basically, these drums, under certain circumstances, have a potential to detonate and overpressurize. Extensive analysis of the drums verified that detonation, while unlikely, was possible. Of the total 103 drums that were retrieved or moved in preparation for retrieval, 18 had DDT potential. Extensive security requirements were also necessary, due to the nature of the material, and this added another layer of complexity to the fieldwork. Prior to retrieving the drums from the underground storage vault, space needed to be made for them within the various above-grade facilities. Inventory and security requirements dictated what could be stored where, and the first step of the field work involved a number of drum movements in preparation for storage of the newly retrieved drums. This effort involved moving 21 drums already in the storage area to facilitate the addition of the newly retrieved ones. The retrieval project required a total of 107 critical lifts using the 110-ton crane, under 3 critical lift plans. The TRU waste storage facility is a Category 2 Nuclear Facility and is managed under an extensive Documented Safety Analysis. The TRU retrieval project was conducted in accordance with DOE Order 425.1D and included three Implementation Verification Reviews, two Management Assessments, one Readiness Assessment, and seven mock-ups in preparation for the field work. Despite being stored for 25 years, the drums were in good shape due to the integrity of the facilities where the drums were stored. Of the 80 drums that were retrieved, 12 were placed in special containers called 'overpacks' based on their content. The drums were removed safely and without incident, thanks to a lot of preparation and the efforts of a highly skilled team. Lessons learned through the DDT control development and the drum retrieval and overpacking process could be beneficial to others having to manage similar drums of TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ISRU Pilot Excavator: Bucket Drum Scaling Experimental Results

NASA’s Space Technology Mission Directorate (STMD) is funding the development of a robotic excavator called the “ISRU Pilot Excavator” (IPEx) which will be a technology demonstration of excavating and transporting 10 metric tons of lunar regolith on the surface of the moon with a 30kg-class robotic excavator. IPEx will be the next generation of robotic excavators to use bucket drums as excavation tools. This is an evolution of the Regolith Advanced Surface Systems Operations Robot (RASSOR) developed at NASA’s Kennedy Space Center (KSC). Bucket drums are hollow cylinders with regularly spaced scoops around the perimeter. The drums rotate in one direction to collect regolith with the scoops. The regolith slides down an internal baffling system inside the drum which prevents the regolith from falling back out of the scoops (see Figure 1). The captured regolith can then be transported while held in the drum and then deposited by rotating the drum in the opposite direction allowing the regolith to slide back down the baffling and out of the excavation scoops. Bucket drums were developed by Lockheed Martin in 2008 and used on multiple robotic excavator prototypes ever since. However, the forces on a bucket drum and considerations for scaling have not been measured in detail. Bucket drums are challenging to model using classical blade\bucket equations because of their unique geometry. Therefore, this experiment was performed to measure the forces on three bucket drums of the same geometry at different scales. Small: 9.4” (239mm) dia. x 8.1” (206mm) width, Medium: 11.6” (294mm) dia. x 10” (254mm) width, and Large: 17” (432mm) dia. x 14.1” (358mm) width. The test stand consisted of an actuated gantry with controlled motion in the vertical (Z) and horizontal (X) axes and a single rotation axis (R). The bucket drums were individually mounted to the rotary axis of the test stand and translated across a prepared bed of BP-1 lunar regolith simulant at a specified linear speed and cutting depth. The test stand was outfitted with a torque sensor in line with the rotation of the drum (R) and a 3 axis (X, Y, and Z) load cell. In addition to the three sizes of bucket drums the linear excavation speed and cutting depth were test variables. The results of these experiments show the relationship between the three scales of bucket drums for factors such as: excavation force, torque due to regolith rotation inside the drum, excavation energy, time to fill, etc. and will be discussed in detail in this paper. This fundamental data will be used in the design of IPEx and can inform the design of future bucket drum excavators.

RASSOR↗

ISRU Pilot Excavator: Bucket Drum Scaling Experimental Results

NASA’s Space Technology Mission Directorate (STMD) is funding the development of a robotic excavator called the “ISRU Pilot Excavator” which will be a technology demonstration of excavating and transporting 10 metric tons of lunar regolith on the surface of the moon with a 30k-class robotic excavator. ISRU Pilot Excavator will be the next generation of robotic excavator to use bucket drums as excavation tools. This is an evolution of the Regolith Advanced Surface Systems Operations Robot (RASSOR) developed at NASA’s Kennedy Space Center. Bucket drums are hollow cylinders with regularly spaced scoops around the perimeter. The drums rotate in one direction to collect regolith with the scoops. The regolith slides down an internal baffling system inside the drum which prevents the regolith from falling back out of the scoops. The captured regolith can then be transported while held in the drum and then deposited by rotating the drum in the opposite direction allowing the regolith to slide back down the baffling and out of the excavation scoops. Bucket drums were developed by Lockheed Martin in 2008 and used on multiple robotic excavator prototypes ever since. However the forces on a bucket drum and considerations for scaling have not been measured in detail. Bucket drums are challenging to model using classical blade\bucket equations because of their unique geometry. Therefore this experiment was performed to measure the forces on three bucket drums of the same geometry at different scales. Small: 9.4” (239mm) dia. x 8.1” (206mm) width, Medium: 11.6” (294mm) dia. x 10” (254mm) width, and Large: 17” (432mm) dia. x 14.1”(358mm) width. The test stand consisted of an actuated gantry with controlled motion in the vertical (Z) and horizontal (X) axes and a single rotation axis (R). The bucket drums were individually mounted to the rotary axis of the test stand and translated across a prepared bed of BP-1 lunar regolith simulant at a specified linear speed and cutting depth. The test stand was outfitted with a torque sensor in line with the rotation of the drum (R) and a 3 axis (X, Y, and Z) load cell. In addition to the three sizes of bucket drums the linear excavation speed and cutting depth were test variables. The results of these experiments show the relationship between the three scales of bucket drums for factors such as: excavation force, torque due to regolith rotation inside the drum, excavation energy, time to fill, etc. and will be discussed in detail in this paper. This fundamental data will be used in the design of the ISRU Pilot Excavator and can inform the design of future bucket drum excavators.

Jason Michael Schuler↗

Mechanical Modeling of a WIPP Drum Under Pressure

Mechanical modeling was undertaken to support the Waste Isolation Pilot Plant (WIPP) technical assessment team (TAT) investigating the February 14th 2014 event where there was a radiological release at the WIPP. The initial goal of the modeling was to examine if a mechanical model could inform the team about the event. The intention was to have a model that could test scenarios with respect to the rate of pressurization. It was expected that the deformation and failure (inability of the drum to contain any pressure) would vary according to the pressurization rate. As the work progressed there was also interest in using the mechanical analysis of the drum to investigate what would happen if a drum pressurized when it was located under a standard waste package. Specifically, would the deformation be detectable from camera views within the room. A finite element model of a WIPP 55-gallon drum was developed that used all hex elements. Analyses were conducted using the explicit transient dynamics module of Sierra/SM to explore potential pressurization scenarios of the drum. Theses analysis show similar deformation patterns to documented pressurization tests of drums in the literature. The calculated failure pressures from previous tests documented in the literature vary from as little as 16 psi to 320 psi. In addition, previous testing documented in the literature shows drums bulging but not failing at pressures ranging from 69 to 138 psi. The analyses performed for this study found the drums failing at pressures ranging from 35 psi to 75 psi. When the drums are pressurized quickly (in 0.01 seconds) there is significant deformation to the lid. At lower pressurization rates the deformation of the lid is considerably less, yet the lids will still open from the pressure. The analyses demonstrate the influence of pressurization rate on deformation and opening pressure of the drums. Analyses conducted with a substantial mass on top of the closed drum demonstrate that the drums will still open provided the pressure is high enough. Investigation teams should look for displaced drum lids when searching for drums that have pressurized and failed. The mechanical modeling study for this program is summarized in the following memo. Following a brief introduction, there is a summary of a brief literature review of previous pressure testing of drums, an explanation of the model, presentation of the key results, some discussion, and concluding with a summary and key points.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and testing of a sensitive heat-flow calorimeter for measuring radioactive waste in 55-gallon (US) drums - 15334

A sensitive large volume calorimeter for measuring the thermal power generated by the radioactive decay of heat producing materials in 55-gallon drums has been developed and tested. The technology is applicable to the measurement of all radionuclides that decay by alpha or beta decay such as waste or product material containing plutonium, tritium and americium. It is also relevant to the measurement of drums where gamma rays from radioactive decay are captured locally in attenuating materials and the resulting rate of thermal energy deposition (sample thermal power) is of sufficient magnitude for a calorimetry measurement. The initial application of the drum calorimeter is for measuring and characterizing plutonium-bearing waste drums. The calorimeter design has optimised the two characteristics of high thermal sensitivity and reduced measurement times. In order to achieve these characteristics for large volume drums, the heat-flow method of operation was chosen in a single measurement chamber configuration. Using a drum-lifting device, the waste drum is positioned on a sliding platform and subsequently moved by the operator inside an octagonal inner chamber, which acts as the heat sink. The heat-sink chamber has significant thermal inertia and remains effectively at a constant temperature throughout the duration of a drum measurement. The octagonal inner measurement chamber is constructed inside a multi-layer external thermal enclosure, which provides both thermal insulation and significant thermal inertia. The external thermal enclosure isolates the measurement process from the effects of changes in the external ambient temperature. During a measurement, heat flows from the drum being measured to the heat sink. This heat-flow is measured by a series of thermopile sensor assemblies, which are positioned between the waste drum and the heat sink. A high sensitivity of greater than 200 μV/mW (microvolts per milliwatt) has been achieved using multiple close-coupled thermopile sensors in each assembly. Reduced measurement times are achieved by positioning the thermopile sensor assemblies close to the drum surface in order to reduce the thermal transport delay. The instrument incorporates a calibrated precision power supply, which requires annual recalibration and is traceable to national standards. It is used to power a calibration heater that has been built into a calibration and test drum. The calibration and test drum is used both to calibrate the instrument and provide periodic confirmation of correct operation. Measurements of calorimeter performance are reported for a range of drum thermal powers. Long-term temperature drift measurements are used to provide estimates of the minimum detectable drum thermal power and hence the minimum detectable activity for both plutonium and tritium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Neutron Screening Measurements of 110 gallon drums at T Plant

The Pacific Northwest National Laboratory (PNNL) Nondestructive Assay (NDA) Service Center was contracted to develop and demonstrate a simple and inexpensive method of assaying 110 gallon drums at the Hanford Site’s T-Plant. The drums contained pucks of crushed old drums used for storage of transuranic (TRU) waste. The drums were to be assayed to determine if they meet the criteria for TRU or Low Level Waste (LLW). Because of the dense matrix (crushed steel drums) gamma measurement techniques were excluded and a mobile, configurable neutron system, consisting of four sequentially connected slab detectors was chosen to be used for this application. An optimum measurement configuration was determined through multiple test measurements with californium source. Based on these measurements the initial calibration of the system was performed applying the isotopic composition for aged weapon-grade plutonium. A series of background and blank puck drum measurements allowed estimating detection limits for both total (singles) and coincidence (doubles) counting techniques. It was found that even conservative estimates for minimum detection concentration using singles count rate were lower than the essential threshold of 100 nCi/g. Whereas the detection limit of coincidence counting appeared to be about as twice as high of the threshold. A series of measurements intended to verify the technique and revise the initial calibration obtained were performed at the Waste Receiving and Processing (WRAP) facility with plutonium standards. Standards with a total mass of 0.3 g of plutonium (which is estimated to be equivalent of 100 nCi/g for net waste weight of 300 kg) loaded in the test puck drum were clearly detected. The following measurements of higher plutonium loadings verified the calibration factors obtained in the initial exercise. The revised and established calibration factors were also confirmed within established uncertainties by additional measurements of plutonium standards in various locations in the test drum. Due to necessity to dispense the blank test drum an alternative method of baseline determination was established during field measurements. Count rates of ambient background were corrected by the differences between observed background and blank test drum count rates which were previously determined over a series of measurements. Only 31 drums out of 352 counted during the intensive measurement campaign at T-Plant were determined to be Suspect TRU. 25 of these drums were re-measured at the WRAP facility using the SuperHENC. Of the 25 drums measured, 21 were confirmed to be TRU and the remaining four LLW.

neutron measurements, TRU waste, T-Plant, configur↗

Cookoff Modeling of a WIPP waste drum (68660)

A waste drum located 2150 feet underground may have been the root cause of a radiation leak on February 14, 2014. Information provided to the WIPP Technical Assessment Team (TAT) was used to describe the approximate content of the drum, which included an organic cat litter (Swheat Scoop®, or Swheat) composed of 100% wheat products. The drum also contained various nitrate salts, oxalic acid, and a nitric acid solution that was neutralized with triethanolamine (TEA). CTH-TIGER was used with the approximate drum contents to specify the products for an exothermic reaction for the drum. If an inorganic adsorbent such as zeolite had been used in lieu of the kitty litter, the overall reaction would have been endothermic. Dilution with a zeolite adsorbent might be a useful method to remediate drums containing organic kitty litter. SIERRA THERMAL was used to calculate the pressurization and ignition of the drum. A baseline simulation of drum 68660 was performed by assuming a background heat source of 0.5-10 W of unknown origin. The 0.5 W source could be representative of heat generated by radioactive decay. The drum ignited after about 70 days. Gas generation at ignition was predicted to be 300-500 psig with a sealed drum (no vent). At ignition, the wall temperature increases modestly by about 1°C, demonstrating that heating would not be apparent prior to ignition. The ignition location was predicted to be about 0.43 meters above the bottom center portion of the drum. At ignition only 3-5 kg (out of 71.6 kg total) has been converted into gas, indicating that most of the material remained available for post-ignition reaction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ice nucleation measurements from DRUM impactors during TRACER campaign in the Houston TX region from July to September 2022

During TRACER, three Davis Rotating Uniform size-cut Monitors (DRUM; DRUMAir 4-DRUM) were used to collect aerosols for ice nucleation measurements in the Brooks laboratory at Texas A&M University. The three instruments were located at AMF1 in La Porte, Ancillary site in Guy (ANC), and onboard the Texas A&M Rapid Onsite Atmospheric Measurements Van (ROAM-V). ROAM-V was deployed to capture airmasses behind (maritime) and ahead (continental) of the passage of the sea-breeze front through Houston. On select sampling days, ROAM-V sampled in the morning/mid-day on the coast and then transited to a second inland site for the afternoon/evening. The suite of instruments deployed on ROAM-V included a Condensation Particle Counter (CPC; GRIMM Model 5.403 CPC), Scanning Mobility Particle Sizer (SMPS; TSI 3750 detector, TSI 3082 classifier, TSI 3088 neutralizer, TSI 3081A Differential Mobility Analyzer), Cloud Condensation Nuclei counter (Droplet Measurement Technologies CCN Counter), micro pulse lidar (Droplet Measurement Technologies Micro Pulse LiDAR (miniMPL)), and one of the Davis Rotating Uniform size-cut Monitors (DRUM; DRUMAir 4-DRUM). Before sampling at each location, the latitude and longitude were recorded using the GPS on the phone application “My Altitude”. Each DRUM sampler was operated at a flow rate of 23 LPM. Each DRUM has four stages where the aerodynamic diameter size cuts are as follows: stage 1 larger than 3 μm, stage 2 from 3 to 1.2 μm, stage 3 from 1.2 to 0.34 μm, and stage 4 from 0.34 to 0.15 μm. Pretreated aluminum foil was used as a substrate on all stages. At AMF1 and ANC sites, the DRUMs were operated on the shared aerosol inlet, with generous support of the DOE ARM site staff. These instruments rotated 24 mm per day and only contained aluminum foil substrates. Substrates were changed weekly and transported to Texas A&M for storage in -80C freezer until analysis. The DRUM onboard ROAM-V was operated at a faster rotation rate of 150 mm per day to clearly separate the multiple deployment locations for ROAM-V. For the ROAM-V DRUM, substrates were changed every deployment and transported to Texas A&M for storage in -80C freezer until analysis. At Texas A&M, ice nucleation experiments were conducted to measure the ice nucleation temperature of the ambient aerosol samples collected from the three DRUMs using our previously established procedures (Alsante et al., 2023; Fornea et al., 2009; Matthews et al., 2023). For ice nucleation, only samples collected on stage 3 were analyzed, given that these are the most relevant size (1.2 to 0.34 μm diameter) for potential ice nucleating particles. For the AMF1 and ANC sites, we cut and analyzed 2 mm (2-hour) samples. We analyzed the time periods of the AMF1 site instrument when the ROAM-V was deployed. A 72-hour period from July 11th at 23:49 through July 15th at 1:49 was analyzed from the ANC site instrument. For the ROAM-V instrument, we separated the daily samples by site location. Between 1- and 6-hour independent samples were analyzed at each location. We also cut the ROAM-V samples in half to allow for compositional analysis of the aerosol on the other half of the substrate. All viable samples from the ROAM-V were analyzed. Analysis was done using a custom-built ice nucleation apparatus, recently updated to include an array of 16 individual samples (Matthews et al., 2023). On our experimental setup, we used 100 μL of Ultra-High-Performance Liquid Chromatography (UHPLC) water (Sigma Aldrich, >99.9% purity) to wash off the aerosol from the DRUM substrate. Then, we micropipetted 2 μL droplet samples into each of the 16 wells of the array, using hydrophobically coated microscope slides. Experiments would cycle 28 times from 10 C to -40C over a 20-hour period. During analysis of the TRACER samples, nine experiments were conducted with UHPLC water process blanks that followed an identical preparation procedure. The average freezing temperature and standard deviation for these process blanks is -27.7±2.4 C. This data was collected for ARM Field Campaign AFC07023 and supported by DOE ASR grant DE-SC0021047. For any further questions, please feel free to contact the instrument PI, Sarah D. Brooks, sbrooks@tamu.edu. Alsante, A. N., Thornton, D. C., & Brooks, S. D. (2023). Ice nucleation catalyzed by the photosynthesis enzyme RuBisCO and other abundant biomolecules. Communications Earth & Environment, 4(1), 51. Fornea, A. P., Brooks, S. D., Dooley, J. B., & Saha, A. (2009). Heterogeneous freezing of ice on atmospheric aerosols containing ash, soot, and soil. Journal of Geophysical Research: Atmospheres, 114(D13). DOI:10.1029/2009JD011958 Matthews, B. H., Alsante, A. N., & Brooks, S. D. (2023). Pollen Emissions of Subpollen Particles and Ice Nucleating Particles. ACS Earth and Space Chemistry.

54 ENVIRONMENTAL SCIENCES↗

Moisture ingress in commercial steel drums: Water content determination, diffusion modelling and predicted permeation rates

Commercial steel drums underpin the global economy, playing a pivotal role in the storage and transportation of critical materials. Transported and stored materials, such as food, chemical and nuclear waste, can be sensitive to ambient conditions, particularly moisture that can enhance negative effects such as corrosion and material degradation. Although international standards and regulations are in place for the qualification of steel drums, there are no current testing requirements, established limits or boundaries for the permeation of moisture into the drums during transportation or storage. This work aims to provide insights into the moisture ingress over time into properly sealed steel drums and provides estimated moisture ingress rates over time through extrapolation. Water vapour transmission rate (WVTR) measurements through the gasket material at 10–40°C were 0.11–2.1 g/m 2 /day resulting in a permeation activation energy of 30.2 kJ/mol. Water sorption measurements and Karl Fischer titration (KFT) on ethylene propylene diene monomer (EPDM) gasket material revealed a decrease in equilibrium moisture saturation with increasing temperature. KFT measurements also revealed the presence of moisture within the adhesive and drum wall after exposure to ambient conditions. KFT and Fourier transform infrared spectroscopy (FTIR) show that moisture will desorb from the EPDM and drum wall after exposure to desiccating conditions, although a minimal amount of moisture will remain present. When sealed to the manufacturer's recommendations, the steel drums are effective in minimizing moisture ingress. In conclusion, in sealed empty drums, moisture ingress rates for 19-L drums were 0.4–1.5 mg/day at 25°C 15% relative humidity (RH) and increased to 7.1–8.8 mg/day at 40°C 90% RH, and moisture ingress rates for 210-L drums were 2.5 and 3.5 mg/day at field deployment conditions of 15.5°C 51.5% RH and 23°C 40% RH, respectively.

42 ENGINEERING↗

DEGRADATION EVALUATION OF HEAVY WATER DRUMS AND TANKS

Heavy water with varying chemistries is currently being stored in over 6700 drums in L- and K-areas and in seven tanks in L-, K-, and C-areas. A detailed evaluation of the potential degradation of the drums and tanks, specific to their design and service conditions, has been performed to support the demonstration of their integrity throughout the desired storage period. The 55-gallon drums are of several designs with Type 304 stainless steel as the material of construction. The tanks have capacities ranging from 8000 to 45600 gallons and are made of Type 304 stainless steel. The drums and tanks were designed and fabricated to national regulations, codes and standards per procurement specifications for the Savannah River Site. The drums have had approximately 25 leakage failures over their 50+ years of use with the last drum failure occurring in 2003. The tanks have experienced no leaks to date. The failures in the drums have occurred principally near the bottom weld, which attaches the bottom to the drum sidewall. Failures have occurred by pitting, crevice and stress corrosion cracking and are attributable, in part, to the presence of chloride ions in the heavy water. Probable degradation mechanisms for the continued storage of heavy water were evaluated that could lead to future failures in the drum or tanks. This evaluation will be used to support establishment of an inspection plan which will include susceptible locations, methods, and frequencies for the drums and tanks to avoid future leakage failures.

36 MATERIALS SCIENCE↗

Design and Testing of a Novel Wide Range - Segmented Gamma Scanner Incorporating Tomographic Gamma Scanning for Measuring Both Low and Intermediate Level Waste in Drums - 13470

This paper describes the design and testing of a novel automated Wide Range Segmented Gamma ray Scanning (WR-SGS) assay instrument that also incorporates Tomographic Gamma Scanning (TGS). The instrument is designed for the measurement of both Low and Intermediate Level Waste (LLW and ILW) in 200 litre drums and other waste containers covering a wide range of density. Like earlier ANTECH WR-SGS instruments, the system employs a single shielded and collimated high purity germanium (HPGe) detector to quantify the radionuclide content of the waste and like conventional SGS instruments it is suitable for the measurement of relatively homogeneous waste matrices. Also, like earlier WR-SGS systems the instrument incorporates an automated variable aperture collimator, which allows the vertical segment height to be adjusted in order to measure both high dose-rate and very low activity drums. The instrument employs both conventional discrete SGS vertical segment measurements as well as vertical segment measurement by continuous helical-scanning of the drum as it rotates. This latter method reduces measurement times for SGS measurements. In order to determine the density corrections for both low and high-density drums, a high activity Eu-152 transmission source is employed. When not in use, and in place of a conventional shutter mechanism, the shielded transmission source is moved to a shielded storage position to eliminate background radiation from the source. Due to its novel features, the WR-SGS is applicable to the measurement of both very low and very high activity waste drums as well as waste drums with a wide range of density. If located in a low background position and with the effective shielding of the strong transmission source, the instrument can be used to measure very low level or exempt waste. In order to extend the range of applicability to the measurement of heterogeneous drums, TGS measurement capability has been included in the basic WR-SGS design. This is achieved by adding horizontal motion to the waste drum rotation platform and incorporating TGS collimation into the variable aperture collimator, as well as a filter to reduce the detector signal when straight-through measurements are made using the strong transmission source. Test measurements are presented of the system operating in both SGS and TGS modes using different drum densities and source strengths. The test measurement results are compared with benchmarked MCNP Monte Carlo calculations. The Wide Range SGS - TGS instrument extends the range of both activity and density that can be measured in 200 and 340 litre drums. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Over-Pressurized Drums: Their Causes and Mitigation

Having to contend with bulging or over-pressurized drums is, unfortunately, a common event for people storing chemicals and chemical wastes. (Figure 1) The Department of Energy alone reported over 120 incidents of bulging drums between 1992 and 1999 (1). Bulging drums can be caused by many different mechanisms, represent a number of significant hazards and can be tricky to mitigate. In this article, we will discuss reasons or mechanisms by which drums can become over-pressurized, recognition of the hazards associated with and mitigation of over-pressurized drums, and methods that can be used to prevent drum over-pressurization from ever occurring. Drum pressurization can represent a significant safety hazard. Unless recognized and properly mitigated, improperly manipulated pressurized drums can result in employee exposure, employee injury, and environmental contamination. Therefore, recognition of when a drum is pressurized and knowledge of pressurized drum mitigation techniques is essential.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗