Search NASA⌕ Search

SEARCH · Search NASA

Results for “due diligence”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Streamlining and Standardizing Due Diligence to Ensure Quality of PV Power Plants

Those investing in PV power plants would like to have confidence that the plants will provide the anticipated return on investment. While due diligence is capably performed by independent engineers today, as PV systems mature, there will be benefit in standardization and streamlining of this process. The IECRE has defined technical information that is needed as a basis for each transaction step such as approving a design to begin construction, documenting readiness to operate, quantifying performance after a year of operation, and assessing the health of the plant in preparation for sale of the plant. The technical requirements have been defined by IEC Technical Committee 82 and have been designed to be both effective and efficient in completing the assessments. This workshop will describe these new tools that are now available to the community and will include a panel/audience discussion about how and when they can be most effectively used.

14 SOLAR ENERGY↗

Meeting Summary of Kitchen Cabinet on Financial Due Diligence to Reduce Proliferation Risks

The U.S. Department of Energy’s Pacific Northwest National Laboratory convened the Kitchen Cabinet (KC) to facilitate a candid discussion about the role of financial institutions (FIs) in antiproliferation efforts to reduce nuclear proliferation risks by identifying suspicious business transactions and exports when making lending or insurance decisions. The meeting brought together a group of export control specialists, largely representatives from the Nuclear Suppliers Group (NSG) Participating Governments (PGs) and finance experts representing banks and insurance companies. By assembling a KC of experts, the group could understand what suspicious transactions look like from each other’s perspectives and better inform each of their operations. The goal was to develop red flags FIs could use to identify suspicious proliferation-related transactions and to help governments gain a clearer picture of proliferation using financial information.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Financial incentives for reducing proliferation risks

This article submitted for publication to the Bulletin of Atomic Scientists explains the possible financial incentives for financial institutions and large integrators to reduce nuclear proliferation risks by including anti-proliferation measures in their due diligence and requiring their suppliers to meet heightened compliance standards. Because manufacturers of dual-use nuclear goods are diverse and numerous outreach is difficult. However, financial institutions and large integrators work with nearly all dual-use manufacturers, making financial institutions and integrators well-positioned to increase awareness of proliferation and trafficking risks throughout the nuclear supply chain

anti-proliferation↗

Distribution Grid Impact Study in Highland Park, Michigan: Understanding Rooftop Solar, Behind-the-Meter Energy Storage, Electric Vehicle Charging, and Building Electrification [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. Highland Park community members face frequent, long-duration power interruptions due largely to the aging distribution system serving the area and the legacy design standards used in its construction. While degrading physical infrastructure such as poles, crossarms, and transformers can result in this substandard reliability, another notable characteristic of this legacy system is the lower, 4.8 kV, voltage class. This is a legacy construction standard which many utilities, DTE included, are phasing out in favor of higher, 15 or 25 kV, voltage classes instead. The existing 4.8 kV distribution system serving Highland Park may limit significant adoptions of clean-energy technologies like high percentages of building electrification or electric vehicle adoption. The following analysis seeks to quantify these limitations under a variety of clean-energy technology adoption scenarios. It compares the overall system risks of the present system to those of a hypothetical, upgraded 13.2 kV system, using NREL-developed risk metrics and offers upgrade cost considerations. The legacy 4.8 kV voltage class serving Highland park is not, as we have modeled it, a major limitation to the widespread adoption of cost-optimal rooftop solar and/or behind-the-meter energy storage. Within our modeling framework, these technologies namely impact secondary, low-voltage assets, which may be remedied without the need for a system-wide upgrade to a 13.2 kV voltage class. Our model of the current 4.8kV system indicates it is not capable of supporting community-wide electrification efforts. Widespread building electrification, and the resulting large increase in wintertime load, dramatically increases the prevalence of voltage violations and thermal overloading on the current 4.8 kV distribution system. These impacts illustrate the need for system-wide upgrades to a 13.2 kV voltage class to accommodate these technologies. Low to Moderate DER adoption does not adversely impact the grid but does improve undervoltage and asset overloading issues. However, these benefits are insufficient to defer grid upgrades. Higher DER penetration is shown to increase overvoltage and asset overloading in future electrification scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Anticipating Change - A Means to Save Time and Rethink the Implementation of the 10 Code of Federal Regulations 770 Real Property Transfer Process - 15662

The Department of Energy (DOE) issued 10 Code of Federal Regulations (CFR) 770 in 2000 for the 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development'. The rule was issued in order to 'offset negative impacts on communities caused by unemployment from related DOE down-sizing, facility close-outs and workforce restructuring'. There is a sense of urgency implied in efforts designed to address economic conditions, especially in communities that have hosted DOE facilities and are experiencing negative impacts of mission changes. Despite the urgency, the transfer of real property from DOE or any federal agency is a lengthy, complex, iterative, but necessarily diligent effort. After all, the aim of the process is to be able to demonstrate that the property proposed for transfer is protective of human health and the environment for the intended use. Notwithstanding the efforts of the economic development organization to market, recruit, and prepare a robust proposal to request property, and the efforts of DOE to perform the many due diligence activities in response to that request, the actual results of the evaluations are an unknown until a major portion of the process is completed. Will the property be determined to be suitable for transfer? Will there be deed restrictions? Is indemnification available? Has a mission need for the property arisen while working through the reviews? There are many points along the way that can sidetrack or delay progress and, in the interim, the economic viability of the proposal can collapse. Even without the unforeseen events, the process in and of itself is lengthy. It is often heard (loudly) that it takes far too long to obtain a piece of property once a request is made; that observation/criticism is worthy of serious attention. Rather than revisit old debates, why not learn from them? Why not look at the transfer process from a different point of view and ameliorate it so it can be more responsive to community needs? Why not anticipate change, anticipate requests, and make property available before a request as well as responding to requests to make property available? There are several ways to rethink and modify the way the transfer process is implemented to reduce the time following a request. The modifications would arise from both internal information sharing, integrated and timely up-front planning and, in particular, by varying how and when certain elements of the process to enable transfer are performed. This paper will address: 1. How a unified overall vision can be created from the cleanup input of Site-Specific Advisory Boards with the Community Reuse Organizations' planning for economic development and can help inform site cleanup to end state to future use; 2. Why DOE is in the best position to know its site conditions and could determine ahead of a transfer request what property is indeed available and notify of that determination; 3. How a range of disposition paths for real property are available to DOE; and 4. Why broadening the understanding of 'best interest of the government' to one that is clearly able to recognize non-monetary benefits is in the best interest of the government. Anticipating change helps prepare DOE and their host communities for the future. It creates opportunities for flexibility and time savings. The sooner DOE's unneeded and under-utilized real property can be made available to the communities that need it most, the sooner those communities can work to moderate the adverse effects of DOE mission changes. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comprehensive study of performance degradation of field‐mounted photovoltaic modules in India

Abstract The All India Survey of Photovoltaic Module Reliability 2014 is an enhanced version of the survey conducted in the previous year, with detailed characterization of PV modules including current‐voltage, infrared and electroluminescence imaging, visual inspection, insulation resistance test and interconnect breakage test. More than a thousand modules were inspected in the field and the main results of the survey are presented in this paper. The average P max degradation rate for the so‐called ‘good’ modules (Group X) is 1.33%/year which is higher than that commonly projected by manufacturers, and widely employed in financial calculations. Modules falling in the ‘not‐so‐good’ category (Group Y) show even higher degradation rates, and it is at least partly due to higher number of micro‐cracks in the modules, and increased degradation of the packaging materials like encapsulant, backsheet, etc. Modules in ‘Hot’ climates degrade faster than modules in the ‘Non‐Hot’ climates. Degradation in fill factor is the primary cause for performance degradation in the young modules (ages <5 years), whereas short‐circuit current degradation is the main contributor to power degradation in the older modules. Small installations (<100 kW p capacity) show higher degradation than large systems, which may be partly due to lack of proper due diligence by the owner at the time of procurement and installation.

Dubey, Rajiv↗

A Complex Brownfields Case Study—The Former Bannister Federal Complex, Kansas City, Missouri

Abstract In November 2017, 225 acres (91 ha) of the former Bannister Federal Complex (BFC) in Kansas City, Missouri were transferred from the Federal Government to Bannister Transformation & Development, LLC (BTD), for demolition; environmental corrective measures; and preparation of the site for redevelopment. This presented a once‐in‐a‐lifetime opportunity to reconfigure groundwater remedies and address long‐standing soil contamination issues. The property included more than 40 previously‐identified Solid Waste Management Units, 3.9 million square feet (362,000 m 2 ) of buildings, subsurface utilities dating back to the 1940s, and an active groundwater containment system. Demolition of buildings and installation of an interim groundwater containment system began almost immediately after property transfer. In 2018, BTD substantially modified its project schedule to incorporate the construction of the first new buildings while demolition and remedial activities were ongoing. By October 2020, construction of the first new warehouse commenced while excavation and capping of contaminated soils, installation of a groundwater containment treatment systems, and abandonment of legacy utilities were still underway. Completion of this work, within the originally planned timeframe, was made possible by factors including up‐front multi‐year funding, early and ongoing engagement of regulators, an extended 3‐year due diligence program and planning stage, and establishment of well‐defined environmental targets. Both the soil and groundwater remedies were also designed with the flexibility needed to accommodate unknown conditions, changing schedules, and revisions to the regrading and redevelopment plans. This case study highlights key technical and management factors that led to the successful completion of this complex brownfields remediation project.

Water Resources↗

TH-C-19A-03: Characterization of the Dose Per Pulse Dependence of Various Detectors Used in Quality Assurance of FFF Treatment Plans

Purpose: To present the dose per pulse dependence of various QA devices under Flattening Filter Free (FFF) conditions. Methods: Air and liquid filled ion chamber arrays, diode arrays, radiochromic film and optically stimulated luminescence detectors were investigated. All detectors were irradiated under similar conditions of varying dose per pulse on a TrueBeam linac. Dose per pulse was controlled by varying SSD from 70 to 160 cm providing a range from ~0.5 to ~3 mGy per pulse. MU rates of up to 2400 MU/min for 10X FFF and 1400 MU/min for the 6X FFF beam were used. Beam pulses were counted using the Profiler™ diode array and pulse timing was confirmed by examining linac node files. Delivered doses were calculated with the Eclipse™ treatment planning system. Results: The detectors show a range of behaviors depending on the detector type, as expected. Diode arrays show up to 4% change in sensitivity (sensitivity increases with increasing dose per pulse) over the range tested. Air and liquid ion chambers arrays show a change in sensitivity of up to 3% (air) and 6% (liquid) (sensitivity decreases with increasing dose per pulse) while film and OSLD do not demonstrate a dependence on dose per pulse. Conclusion: Dependence of detector response on dose per pulse varies considerably depending on detector design. Interplay between dose per pulse and MU rate also exists for some detectors. Due diligence is required to characterize detector response prior to implementation of a QA protocol for FFF treatment delivery. During VMAT delivery, the MU rate may also vary dramatically within a treatment fraction. We intend to further investigate the implications of this for VMAT FFF patient specific quality assurance. T Karan and F Viel have received partial funding through the Varian Research program.

60 APPLIED LIFE SCIENCES↗

Wind Generation Feasibility Study for Sac & Fox Tribe of the Mississippi in Iowa (Meskwaki Nation)

The Meskwaki Nation will obtain an anemometer tower. Install the tower at the site that has been pre-qualified as the site most likely to produce maximum electric power from the wind. It will collect meteorological data from the tower's sensors for a one year period, as required for due diligence to identify the site as appropriate for the installation of a wind turbine to provide electric power for the community. Have the collected data analyzed by a meteorologist and a professionally certified wind engineer to produce the reports of expected power generation at the site, for the specific wind turbine(s) under consideration for installation.

17 WIND ENERGY↗

Improving Fatigue Performance of AHSS Welds

Reported herein is technical progress on a U.S. Department of Energy CRADA project with industry cost-share aimed at developing the technical basis and demonstrate the viability of innovative in-situ weld residual stresses mitigation technology that can substantially improve the weld fatigue performance and durability of auto-body structures. The developed technology would be cost-effective and practical in high-volume vehicle production environment. Enhancing weld fatigue performance would address a critical technology gap that impedes the widespread use of advanced high-strength steels (AHSS) and other lightweight materials for auto body structure light-weighting. This means that the automotive industry can take full advantage of the AHSS in strength, durability and crashworthiness without the concern of the relatively weak weld fatigue performance. The project comprises both technological innovations in weld residual stress mitigation and due-diligence residual stress measurement and fatigue performance evaluation. Two approaches were investigated. The first one was the use of low temperature phase transformation (LTPT) weld filler wire, and the second focused on novel thermo-mechanical stress management technique. Both technical approaches have resulted in considerable improvement in fatigue lives of welded joints made of high-strength steels. Synchrotron diffraction measurement confirmed the reduction of high tensile weld residual stresses by the two weld residual stress mitigation techniques.

42 ENGINEERING↗

Solar Access to Public Capital (SAPC) Working Group: Best Practices in PV System Installation; Version 1.0, March 2015; Period of Performance, October 2014 - September 2015

The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligence activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.

14 SOLAR ENERGY↗

Uncertainty and Risk Assessment in the Design Process for Wind

This report summarizes the concepts and opinions that emerged from an initial study on the subject of uncertainty in wind design that included expert elicitation during a workshop held at the National Wind Technology Center at the National Renewable Energy Laboratory July 12-13, 2016. In this paper, five major categories of uncertainties are identified. The first category is associated with direct impacts on turbine loads, (i.e., the inflow including extreme events, aero-hydro-servo-elastic response, soil-structure inter- action, and load extrapolation). The second category encompasses material behavior and strength. Site suitability and due-diligence aspects pertain to the third category. Calibration of partial safety factors and optimal reliability levels make up the fourth one. And last but not least, is the category associated with uncertainties in computational modeling. The main sections of this paper follow this organization.

17 WIND ENERGY↗

Review of Authentication Strategies and Trends for Distributed Energy Resources (DERs)

In this study we review literature on machine to machine (M2M) authentication and encryption pertaining to communication with grid-attached power inverters. We regard security recommendations from NIST, constrained device recommendations from CoAP, as well as influences from the existing markets. We will not focus on passwordless or multifactor schemes of user authentication, the handover/roaming authentication of mobile systems, or the group authentication of WiMAX/LTE communications. The de-facto standards for authentication and encryption are certificate-based public key cryptography and AES, respectively. While certificate-based public key cryptography is widely adopted, certificate management is seen as an Achilles heel of public key infrastructure (PKI). State of the art authentication system research includes work on certificateless authentication; however, much work in the areas of privacy preservation, efficient or lightweight systems continue to be based in public key methods. We will see efforts such as bilinear pairing, aggregate message authentication codes, one-time signatures, and Merkle trees surface and resurface with improved authentication approaches. Though research continues to produce new encryption schemes, AES prevails as a viable choice, as it can be implemented across a variety of resource constrained devices. Other lightweight encryption algorithms often employ the same fundamental addition-rotation-xor operations as AES while achieving higher efficiency, but at steep tradeoffs to security. Despite mathematical proofs of the security of cryptographic algorithms, in practice the greatest weaknesses continue to be incurred during implementation. Security researchers will find edge cases and bugs that allow unintentional behavior. In the following sections, accepted methodologies of authentication and encryption are discussed. Due diligence for securing M2M communications requires consideration during planning, design, implementation and product lifetime, as opposed to a set-it and forget-it policy. Best practices can be gleaned from published successes and failures, with no single end-all, be-all detailed solution.

97 MATHEMATICS AND COMPUTING↗

Solar Resource Calibration, Measurement, and Dissemination: Final Report FY 2016-FY 2018

The Solar Resource Calibration, Measurement, and Dissemination project supports the U.S. Department of Energy's Solar Energy Technologies Office (SETO) initiative to make solar energy cost-competitive with other forms of electricity by improving the tools and methods to measure and model solar radiation and therefore reduce uncertainty in predicting solar output and improve the bankability of solar projects. This project has three tasks that conduct research on advancing solar resource measurements and modeling: Task 1: Applied solar Radiation Measurements. Task 2: National Solar Radiation Data Base (NSRDB). Task 3: Knowledge Sharing. The National Renewable Energy Laboratory's (NREL's) Solar Radiation Research Laboratory (SRRL) activities ensure traceable solar measurements throughout the United States that are essential for project feasibility, due diligence, financing, and plant operations. The SRRL houses NREL's Baseline Measurement System (BMS), which provides a platform for improving the accuracy of solar measurements through research to improve the calibration and characterization of instruments and enable the development of new measurement technology and standards. The platform contains a variety of instruments measuring solar radiation and other meteorological parameters. Following best practices, BMS instruments are calibrated to ensure traceability to the World Radiometric Reference in compliance with ISO/IEC 17025 accreditation requirements. The BMS data sets are quality-controlled and made publicly available through the Measurement and Instrumentation Data Center website. The NSRDB is the most accessed public database of solar irradiance and associated weather parameters for use in energy modeling. It supports SETO's goals of reducing barriers to high penetrations of solar technologies by providing easy access to high-quality, foundational data essential for innovative product development and downstream modeling through the NSRDB website. Data are currently available for the contiguous United States and beyond for 20 years covering 1998-2017. The Physical Solar Model (PSM) that underpins the current NSRDB data sets is a unique physics-based model that has been developed at NREL and has opened the door to the use of next-generation satellite data sets for solar resource assessment and forecasting. Through the American Society for Testing Materials (ASTM) International and other international standards organizations, NREL continues to provide leadership in the development of standards that are relevant to the measurement and modeling of solar radiation for solar energy applications. Standards developed cover the calibration method of pyrheliometers (direct normal irradiance measurements), pyranometers (global horizontal irradiance measurements), spectroradiometers, ultraviolet radiometers, correct field deployment of these instruments, spectral distribution reference tables for photovoltaic modeling, and transfer of indoor calibrations. Further, NREL leads the International Energy Agency (IEA) Photovoltaic Power Systems Programme Task 16: Subtask 1, which focuses on the evaluation of current and emerging resource assessment methodologies. NREL and the IEA updated the Best Practices Handbook for the Collection and Use of Solar Resource Data for Solar Energy Applications, which is widely used by the solar industry.

14 SOLAR ENERGY↗

Leveraging Technology Services for Public Good

As the technological world expands, vulnerabilities of our critical infrastructure are becoming clear. Fortunately, emerging services provide an opportunity to improve the efficiency and security of current practices. In particular, serverless computing (such as Amazon Web Services and REDFISHs Acequia) provide opportunities to improve current practices. However, the critical infrastructure needs to evolve and that will require due diligence to ensure that transferring aspects of its practices onto the internet is done in a secure manner.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗