Search NASA⌕ Search

SEARCH · Search NASA

Results for “dynamic scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Improving logistic efficiency of WEEE collection through dynamic scheduling using simulation modeling

Highlights: • Latest EU regulation on WEEE require more flexible logistics models. • The implementation of dynamic scheduling is evaluated for WEEE collection. • A hybrid simulation model compares dynamic (pure and “mixed”) and static collection schemes. • Results confirm the higher flexibility and efficiency of dynamic systems. • Dynamic scheduling “mixed” solutions result more efficient than pure ones. - Abstract: The complexity of collection systems for Waste from Electric and Electronic Equipment (WEEE) in the EU is increasing, due to the latest directive that sets new collection targets and modes. The high variability and the uncertainty of reverse flows require innovative logistic approaches. One recent option for increasing efficiency and responsiveness in waste collection services, boosted by new technological solutions for waste level monitoring, is to adopt a dynamic collection scheme, where the collection frequency is not established a priori (based on a fixed plan), but it is based on the actual filling levels of waste bins. This option can allow the service provider to plan the collection service following the actual demand, resulting in a more responsive service, while improving the logistic efficiency. This paper evaluates the implementation of dynamic scheduling schemes for the collection of WEEE. A hybrid simulation model has been developed in order to support researchers and practitioners in assessing quantitative impacts of adopting dynamic scheduling in WEEE collection. Three logistic alternatives (a fixed collection schedule scheme, a pure dynamic scheme and a mixed one) have been compared in a test case based on data of an Italian municipality; collection services for different types of WEEE (i.e. large appliances and small items) have been analyzed. Results show a promising performance of dynamic schedules compared to the fixed one, revealing, for the specific test case, how a mixed solution can combine the advantages of dynamic and fixed scheduling, gaining flexibility towards customer demand while improving truck resource utilization.

42 ENGINEERING↗

Using Grid Benchmarks for Dynamic Scheduling of Grid Applications

Navigation or dynamic scheduling of applications on computational grids can be improved through the use of an application-specific characterization of grid resources. Current grid information systems provide a description of the resources, but do not contain any application-specific information. We define a GridScape as dynamic state of the grid resources. We measure the dynamic performance of these resources using the grid benchmarks. Then we use the GridScape for automatic assignment of the tasks of a grid application to grid resources. The scalability of the system is achieved by limiting the navigation overhead to a few percent of the application resource requirements. Our task submission and assignment protocol guarantees that the navigation system does not cause grid congestion. On a synthetic data mining application we demonstrate that Gridscape-based task assignment reduces the application tunaround time.

Frumkin, Michael↗

Applications of dynamic scheduling technique to space related problems: Some case studies

The paper discusses the applications of 'Dynamic Scheduling' technique, which has been invented for the scheduling of Flexible Manufacturing System, to two space related scheduling problems: operation scheduling of a future space transportation system, and resource allocation in a space system with limited resources such as space station or space shuttle.

Nakasuka, Shinichi↗

IRIS: Exploring Performance Scaling of the Intelligent Runtime System and its Dynamic Scheduling Policies

High-Performance Computing is becoming increasingly heterogeneous, relying on a diverse mix of hardware to achieve good performance. Paradoxically, current drivers and frameworks for these devices typically require separate languages and implementations for each vendor. Furthermore, there are few tools and little support to schedule codes between these devices in a truly heterogeneous manner-partly because of this fragmentation between vendors and the languages each supports. To overcome both limitations, the Intelligent Runtime System (IRIS) was developed. It allows a common task abstraction to automatically be shared among contemporary vendors and is run from a single host-side API. At runtime, IRIS queries the host system and registers which frameworks and drivers are available, these determine which kernels can be used by the scheduler-CPUs via OpenMP, Nvidia GPUs (CUDA), AMD GPUs (HIP), and Intel and Xilinx FPGAs with OpenCL. IRIS enables tasks to be scheduled to any heterogeneous device and resolves to the appropriate kernel binary at runtimeit only uses the devices supported by the system on which it is run. IRIS supports single-task and graph-based expressions of dependencies of tasks. Additionally, IRIS features a range of dynamic scheduling policies, allowing complex chains of tasks and interactions to be executed, relieving the programmer/user from considering the system to assign tasks to devices optimally. This paper presents the peak performance attainable by IRIS over a range of systems-each with different numbers and types of accelerator devices, it highlights the flexibility of IRIS since these devices are truly heterogeneous, relying on different backends (drivers, frameworks, and languages) which historically required unique implementations to utilize them. We then use this peak performance as a baseline to compare increasingly complex chains of tasks (with increasingly complex task dependencies) and evaluate how IRIS copes. Finally, we consider the performance of different IRIS scheduling policies on this range of task graphs.

Johnston, Beau↗

Dynamically Scheduled Region-Based Image Compositing

Algorithms for sort-last parallel volume rendering on large distributed memory machines usually divide a dataset equally across all nodes for rendering. Depending on the features that a user wants to see in a dataset, all the nodes will rarely finish rendering at the same time. Here, existing compositing algorithms do not often take this into consideration, which can lead to significant delays when nodes that are compositing wait for other nodes that are still rendering. In this paper, we present an image compositing algorithm that uses spatial and temporal awareness to dynamically schedule the exchange of regions in an image and progressively composite images as they become available. Running on the Edison supercomputer at NERSC, we show that a scheduler-based algorithm with awareness of the spatial contribution from each rendering node can outperform traditional image compositing algorithms.

97 MATHEMATICS AND COMPUTING↗

Efficient Synthesis of Graph Methods: a Dynamically Scheduled Architecture

RDF databases naturally map to a graph representation and employ languages, such as SPARQL, that implements queries as graph pattern matching routines. Graph methods exhibit an irregular behavior: they present unpredictable, fine-grained data accesses, and are synchronization inten- sive. Graph data structures expose large amounts of dy- namic parallelism, but are difficult to partition without gen- erating load unbalance. In this paper, we present a novel ar- chitecture to improve the synthesis of graph methods. Our design addresses the issues of these algorithms with two com- ponents: a Dynamic Task Scheduler (DTS), which reduces load unbalance and maximize resource utilization, and a Hi- erarchical Memory Interface controller (HMI), which pro- vides support for concurrent memory operations on multi- ported/multi-banked shared memories. We evaluate our ap- proach by generating the accelerators for a set of SPARQL queries from the Lehigh University Benchmark (LUBM). We first analyze the load unbalance of these queries, showing that execution time among tasks can differ even of order of magnitudes. We then synthesize the queries and com- pare the performance of the resulting accelerators against the current state of the art. Experimental results show that our solution provides a speedup over the serial implementa- tion close to the theoretical maximum and a speedup up to 3.45 over a baseline parallel implementation. We conclude our study by exploring the design space to achieve maximum memory channels utilization. The best design used at least three of the four memory channels for more than 90% of the execution time.

architecture↗

Dynamic Scheduling Under Uncertainty

Often, autonomous agents that operate in real-world environments must be able to schedule and execute actions to accomplish mission goals while being robust to uncertainty and disturbances that arise during operations. This tutorial will focus on classes of models and algorithms that have been used to enable effective, robust strategies for dynamically dispatching plans in real time. The tutorial will begin with a survey of past and current research in modeling uncertainty in planning and scheduling, as well as research in different classes of approaches to dynamic scheduling. We then focus on a general class of approaches based on executing temporal plans using graphical models of events and their temporal ordering. These approaches allow for ensuring temporal flexibility in scheduling, as well as for developing strategies for executing partially controllable plans.

Morris, Robert↗

Dynamic scheduling of runway operations

Automated ATM/C decision making is discussed. Runway scheduling and flight plan generator algorithms are considered. Terminal area geometry, ATM/C schematics, vector controller display and simulation work are reported.

Pararas, J.↗

Dynamic Scheduling: Target of Opportunity Observations of Gravitational Wave Events

The simultaneous detection of electromagnetic and gravitational waves from the coalescence of two neutron stars (GW170817 and GRB170817A) has ushered in a new era of ‘multimessenger’ astronomy, with electromagnetic detections spanning from gamma to radio. This great opportunity for new scientific investigations raises the issue of how the available multimessenger tools can best be integrated to constitute a powerful method to study the transient Universe in particular. To facilitate the classification of possible optical counterparts to gravitational wave events, it is important to optimize the scheduling of observations and the filtering of transients, both key elements of the follow-up process. In this work, we describe the existing workflow whereby telescope networks such as GRANDMA and GROWTH are currently scheduled; we then present modifications we have developed for the scheduling process specifically, so as to face the relevant challenges that have appeared during the latest observing run of Advanced LIGO and Advanced Virgo. We address issues with scheduling more than one epoch for multiple fields within a skymap, especially for large and disjointed localizations. This is done in two ways: by optimizing the maximum number of fields that can be scheduled and by splitting up the lobes within the skymap by right ascension to be scheduled individually. In addition, we implement the ability to take previously observed fields into consideration when rescheduling. We show the improvements that these modifications produce in making the search for optical counterparts more efficient, and we point to areas needing further improvement.

Gravitational waves↗

Multi-Timescale Integrated Dynamics and Scheduling for Solar (MIDAS-Solar) (Final Technical Report)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)

100% Renewables↗

Low Latency and High Data Rate (LLHD) Scheduler: A Multipath TCP Scheduler for Dynamic and Heterogeneous Networks

The scheduler is a crucial component of the multipath transmission control protocol (MPTCP) that dictates the path that a data packet takes. Schedulers are in charge of delivering data packets in the right order to prevent delays caused by head-of-line blocking. The modern Internet is a complicated network whose characteristics change in real-time. MPTCP schedulers are supposed to understand the real-time properties of the underlying network, such as latency, path loss, and capacity, in order to make appropriate scheduling decisions. However, the present scheduler does not take into account all of these characteristics together, resulting in lower performance. We present the low latency and high data rate (LLHD) scheduler, which successfully makes scheduling decisions based on real-time information on latency, path loss, and capacity, and achieves around 25% higher throughput and 45% lower data transmission delay than Linux’s default MPTCP scheduler.

97 MATHEMATICS AND COMPUTING↗

A scalable approach to solving dense linear algebra problems on hybrid CPU-GPU systems

Aiming to fully exploit the computing power of all CPUs and all graphics processing units (GPUs) on hybrid CPU-GPU systems to solve dense linear algebra problems, in this paper we design a class of heterogeneous tile algorithms to maximize the degree of parallelism, to minimize the communication volume, and to accommodate the heterogeneity between CPUs and GPUs. The new heterogeneous tile algorithms are executed upon our decentralized dynamic scheduling runtime system, which schedules a task graph dynamically and transfers data between compute nodes automatically. The runtime system uses a new distributed task assignment protocol to solve data dependencies between tasks without any coordination between processing units. By overlapping computation and communication through dynamic scheduling, we are able to attain scalable performance for the double-precision Cholesky factorization and QR factorization. Finally, our approach demonstrates a performance comparable to Intel MKL on shared-memory multicore systems and better performance than both vendor (e.g., Intel MKL) and open source libraries (e.g., StarPU) in the following three environments: heterogeneous clusters with GPUs, conventional clusters without GPUs, and shared-memory systems with multiple GPUs.

97 MATHEMATICS AND COMPUTING↗

Coordinated scheduling for dynamic real-time systems

In this project, we addressed issues in coordinated scheduling for dynamic real-time systems. In particular, we concentrated on design and implementation of a new distributed real-time system called R-Shell. The design objective of R-Shell is to provide computing support for space programs that have large, complex, fault-tolerant distributed real-time applications. In R-shell, the approach is based on the concept of scheduling agents, which reside in the application run-time environment, and are customized to provide just those resource management functions which are needed by the specific application. With this approach, we avoid the need for a sophisticated OS which provides a variety of generalized functionality, while still not burdening application programmers with heavy responsibility for resource management. In this report, we discuss the R-Shell approach, summarize the achievement of the project, and describe a preliminary prototype of R-Shell system.

Natarajan, Swaminathan↗

Wind-To-Hydrogen Energy Pilot Project

WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energy development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the feasibility study showed that several factors can greatly affect, both positively and negatively, the "per kg" cost of hydrogen. After a September 15, 2005, meeting to evaluate the advisability of funding Phase II of the project DOE concurred with BEPC that Phase I results did warrant a "go" recommendation to proceed with Phase II activities. The hydrogen production system was built by Hydrogenics and consisted of several main components: hydrogen production system, gas control panel, hydrogen storage assembly and hydrogen-fueling dispenser The hydrogen production system utilizes a bipolar alkaline electrolyzer nominally capable of producing 30 Nm3/h (2.7 kg/h). The hydrogen is compressed to 6000 psi and delivered to an on-site three-bank cascading storage assembly with 80 kg of storage capacity. Vehicle fueling is made possible through a Hydrogenics-provided gas control panel and dispenser able to fuel vehicles to 5000 psi. A key component of this project was the development of a dynamic scheduling system to control the wind energy's variable output to the electrolyzer cell stacks. The dynamic scheduling system received an output signal from the wind farm, processed this signal based on the operational mode, and dispatched the appropriate signal to the electrolyzer cell stacks. For the study BEPC chose to utilize output from the Wilton wind farm located in central ND. Site design was performed from May 2006 through August 2006. Site construction activities were from August to November 2006 which involved earthwork, infrastructure installation, and concrete slab construction. From April - October 2007, the system components were installed and connected. Beginning in November 2007, the system was operated in a start-up/shakedown mode. Because of numerous issues, the start-up/shakedown period essentially lasted until the end of January 2008, at which time a site acceptance test was performed. Official system operation began on February 14, 2008, and continued through the end of December 2008. Several issues continued to prevent consistent operation, resulting in operation of the system in fits and starts. During the operational period, three ramp tests were performed on the electrolyzer cell stacks to evaluate cell stack degradation, if present. In addition, from December 23 - 30 2008, the hydrogen system was operated using Mode 1 protocol. From February 14, 2008 - December 31, 2008, the system produced a total of just less than 26,000,000 liters (2320 kg), including approximately 3,300,000 liters (295 kg) of hydrogen during Mode 1 operation. Unfortunately, the chronic shutdown issues prevented consistent operation and, therefore, did not allow for any accurate economic analysis as originally intended. With that said, much valuable experience was gained in the form of "lessons learned," and the project served as an extremely valuable platform for educating the public.

17 WIND ENERGY↗