Search NASA⌕ Search

SEARCH · Search NASA

Results for “dynamic scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Improving logistic efficiency of WEEE collection through dynamic scheduling using simulation modeling

Highlights: • Latest EU regulation on WEEE require more flexible logistics models. • The implementation of dynamic scheduling is evaluated for WEEE collection. • A hybrid simulation model compares dynamic (pure and “mixed”) and static collection schemes. • Results confirm the higher flexibility and efficiency of dynamic systems. • Dynamic scheduling “mixed” solutions result more efficient than pure ones. - Abstract: The complexity of collection systems for Waste from Electric and Electronic Equipment (WEEE) in the EU is increasing, due to the latest directive that sets new collection targets and modes. The high variability and the uncertainty of reverse flows require innovative logistic approaches. One recent option for increasing efficiency and responsiveness in waste collection services, boosted by new technological solutions for waste level monitoring, is to adopt a dynamic collection scheme, where the collection frequency is not established a priori (based on a fixed plan), but it is based on the actual filling levels of waste bins. This option can allow the service provider to plan the collection service following the actual demand, resulting in a more responsive service, while improving the logistic efficiency. This paper evaluates the implementation of dynamic scheduling schemes for the collection of WEEE. A hybrid simulation model has been developed in order to support researchers and practitioners in assessing quantitative impacts of adopting dynamic scheduling in WEEE collection. Three logistic alternatives (a fixed collection schedule scheme, a pure dynamic scheme and a mixed one) have been compared in a test case based on data of an Italian municipality; collection services for different types of WEEE (i.e. large appliances and small items) have been analyzed. Results show a promising performance of dynamic schedules compared to the fixed one, revealing, for the specific test case, how a mixed solution can combine the advantages of dynamic and fixed scheduling, gaining flexibility towards customer demand while improving truck resource utilization.

42 ENGINEERING↗

IRIS: Exploring Performance Scaling of the Intelligent Runtime System and its Dynamic Scheduling Policies

High-Performance Computing is becoming increasingly heterogeneous, relying on a diverse mix of hardware to achieve good performance. Paradoxically, current drivers and frameworks for these devices typically require separate languages and implementations for each vendor. Furthermore, there are few tools and little support to schedule codes between these devices in a truly heterogeneous manner-partly because of this fragmentation between vendors and the languages each supports. To overcome both limitations, the Intelligent Runtime System (IRIS) was developed. It allows a common task abstraction to automatically be shared among contemporary vendors and is run from a single host-side API. At runtime, IRIS queries the host system and registers which frameworks and drivers are available, these determine which kernels can be used by the scheduler-CPUs via OpenMP, Nvidia GPUs (CUDA), AMD GPUs (HIP), and Intel and Xilinx FPGAs with OpenCL. IRIS enables tasks to be scheduled to any heterogeneous device and resolves to the appropriate kernel binary at runtimeit only uses the devices supported by the system on which it is run. IRIS supports single-task and graph-based expressions of dependencies of tasks. Additionally, IRIS features a range of dynamic scheduling policies, allowing complex chains of tasks and interactions to be executed, relieving the programmer/user from considering the system to assign tasks to devices optimally. This paper presents the peak performance attainable by IRIS over a range of systems-each with different numbers and types of accelerator devices, it highlights the flexibility of IRIS since these devices are truly heterogeneous, relying on different backends (drivers, frameworks, and languages) which historically required unique implementations to utilize them. We then use this peak performance as a baseline to compare increasingly complex chains of tasks (with increasingly complex task dependencies) and evaluate how IRIS copes. Finally, we consider the performance of different IRIS scheduling policies on this range of task graphs.

Johnston, Beau↗

Dynamically Scheduled Region-Based Image Compositing

Algorithms for sort-last parallel volume rendering on large distributed memory machines usually divide a dataset equally across all nodes for rendering. Depending on the features that a user wants to see in a dataset, all the nodes will rarely finish rendering at the same time. Here, existing compositing algorithms do not often take this into consideration, which can lead to significant delays when nodes that are compositing wait for other nodes that are still rendering. In this paper, we present an image compositing algorithm that uses spatial and temporal awareness to dynamically schedule the exchange of regions in an image and progressively composite images as they become available. Running on the Edison supercomputer at NERSC, we show that a scheduler-based algorithm with awareness of the spatial contribution from each rendering node can outperform traditional image compositing algorithms.

97 MATHEMATICS AND COMPUTING↗

Efficient Synthesis of Graph Methods: a Dynamically Scheduled Architecture

RDF databases naturally map to a graph representation and employ languages, such as SPARQL, that implements queries as graph pattern matching routines. Graph methods exhibit an irregular behavior: they present unpredictable, fine-grained data accesses, and are synchronization inten- sive. Graph data structures expose large amounts of dy- namic parallelism, but are difficult to partition without gen- erating load unbalance. In this paper, we present a novel ar- chitecture to improve the synthesis of graph methods. Our design addresses the issues of these algorithms with two com- ponents: a Dynamic Task Scheduler (DTS), which reduces load unbalance and maximize resource utilization, and a Hi- erarchical Memory Interface controller (HMI), which pro- vides support for concurrent memory operations on multi- ported/multi-banked shared memories. We evaluate our ap- proach by generating the accelerators for a set of SPARQL queries from the Lehigh University Benchmark (LUBM). We first analyze the load unbalance of these queries, showing that execution time among tasks can differ even of order of magnitudes. We then synthesize the queries and com- pare the performance of the resulting accelerators against the current state of the art. Experimental results show that our solution provides a speedup over the serial implementa- tion close to the theoretical maximum and a speedup up to 3.45 over a baseline parallel implementation. We conclude our study by exploring the design space to achieve maximum memory channels utilization. The best design used at least three of the four memory channels for more than 90% of the execution time.

architecture↗

Multi-Timescale Integrated Dynamics and Scheduling for Solar (MIDAS-Solar) (Final Technical Report)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)

100% Renewables↗

Low Latency and High Data Rate (LLHD) Scheduler: A Multipath TCP Scheduler for Dynamic and Heterogeneous Networks

The scheduler is a crucial component of the multipath transmission control protocol (MPTCP) that dictates the path that a data packet takes. Schedulers are in charge of delivering data packets in the right order to prevent delays caused by head-of-line blocking. The modern Internet is a complicated network whose characteristics change in real-time. MPTCP schedulers are supposed to understand the real-time properties of the underlying network, such as latency, path loss, and capacity, in order to make appropriate scheduling decisions. However, the present scheduler does not take into account all of these characteristics together, resulting in lower performance. We present the low latency and high data rate (LLHD) scheduler, which successfully makes scheduling decisions based on real-time information on latency, path loss, and capacity, and achieves around 25% higher throughput and 45% lower data transmission delay than Linux’s default MPTCP scheduler.

97 MATHEMATICS AND COMPUTING↗

A scalable approach to solving dense linear algebra problems on hybrid CPU-GPU systems

Aiming to fully exploit the computing power of all CPUs and all graphics processing units (GPUs) on hybrid CPU-GPU systems to solve dense linear algebra problems, in this paper we design a class of heterogeneous tile algorithms to maximize the degree of parallelism, to minimize the communication volume, and to accommodate the heterogeneity between CPUs and GPUs. The new heterogeneous tile algorithms are executed upon our decentralized dynamic scheduling runtime system, which schedules a task graph dynamically and transfers data between compute nodes automatically. The runtime system uses a new distributed task assignment protocol to solve data dependencies between tasks without any coordination between processing units. By overlapping computation and communication through dynamic scheduling, we are able to attain scalable performance for the double-precision Cholesky factorization and QR factorization. Finally, our approach demonstrates a performance comparable to Intel MKL on shared-memory multicore systems and better performance than both vendor (e.g., Intel MKL) and open source libraries (e.g., StarPU) in the following three environments: heterogeneous clusters with GPUs, conventional clusters without GPUs, and shared-memory systems with multiple GPUs.

97 MATHEMATICS AND COMPUTING↗

Wind-To-Hydrogen Energy Pilot Project

WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energy development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the feasibility study showed that several factors can greatly affect, both positively and negatively, the "per kg" cost of hydrogen. After a September 15, 2005, meeting to evaluate the advisability of funding Phase II of the project DOE concurred with BEPC that Phase I results did warrant a "go" recommendation to proceed with Phase II activities. The hydrogen production system was built by Hydrogenics and consisted of several main components: hydrogen production system, gas control panel, hydrogen storage assembly and hydrogen-fueling dispenser The hydrogen production system utilizes a bipolar alkaline electrolyzer nominally capable of producing 30 Nm3/h (2.7 kg/h). The hydrogen is compressed to 6000 psi and delivered to an on-site three-bank cascading storage assembly with 80 kg of storage capacity. Vehicle fueling is made possible through a Hydrogenics-provided gas control panel and dispenser able to fuel vehicles to 5000 psi. A key component of this project was the development of a dynamic scheduling system to control the wind energy's variable output to the electrolyzer cell stacks. The dynamic scheduling system received an output signal from the wind farm, processed this signal based on the operational mode, and dispatched the appropriate signal to the electrolyzer cell stacks. For the study BEPC chose to utilize output from the Wilton wind farm located in central ND. Site design was performed from May 2006 through August 2006. Site construction activities were from August to November 2006 which involved earthwork, infrastructure installation, and concrete slab construction. From April - October 2007, the system components were installed and connected. Beginning in November 2007, the system was operated in a start-up/shakedown mode. Because of numerous issues, the start-up/shakedown period essentially lasted until the end of January 2008, at which time a site acceptance test was performed. Official system operation began on February 14, 2008, and continued through the end of December 2008. Several issues continued to prevent consistent operation, resulting in operation of the system in fits and starts. During the operational period, three ramp tests were performed on the electrolyzer cell stacks to evaluate cell stack degradation, if present. In addition, from December 23 - 30 2008, the hydrogen system was operated using Mode 1 protocol. From February 14, 2008 - December 31, 2008, the system produced a total of just less than 26,000,000 liters (2320 kg), including approximately 3,300,000 liters (295 kg) of hydrogen during Mode 1 operation. Unfortunately, the chronic shutdown issues prevented consistent operation and, therefore, did not allow for any accurate economic analysis as originally intended. With that said, much valuable experience was gained in the form of "lessons learned," and the project served as an extremely valuable platform for educating the public.

17 WIND ENERGY↗

Multi-Timescale Integrated Dynamic and Scheduling Model (MIDAS-Solar)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power system operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power systems steady-state and dynamic performance. This project helps meet and exceed the Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for electric grid planning and operation. This will be accomplished by developing temporally comprehensive, closed-loop simulation models that seamlessly simulate power systems operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). Both a multi-timescale grid model and an integrated PV model will be developed in this project to accurately study the impacts of PV variability and uncertainty on system reliability at multiple timescales. Using quasi-dynamic simulation methods and data-driven security assessment (DSA) criteria will allow the dynamic characteristics of PV to be fed forward into longer-timescale scheduling models for a complete understanding of the effect of short-term PV dynamics on bulk systems operations (e.g., reserve scheduling and deployment). Upon completion of the proposed model, this project will help operators accurately assess system reliability by deploying energy and reserve scheduling under critical contingency conditions and studying interactions among all types of essential reliability services provided by modern PV power plants.

14 SOLAR ENERGY↗

Dynamic Resource Scheduling in Mobile Edge Cloud with Cloud Radio Access Network

Nowadays, by integrating the cloud radio access network (C-RAN) with the mobile edge cloud computing (MEC) technology, mobile service provider (MSP) can efficiently handle the increasing mobile traffic and enhance the capabilities of mobile devices. But the power consumption has become skyrocketing for MSP and it gravely affects the profit of MSP. Previous work often studied the power consumption in C-RAN and MEC separately while less work had considered the integration of C-RAN with MEC. In this paper, we present an unifying framework for the power-performance tradeoff of MSP by jointly scheduling network resources in C-RAN and computation resources in MEC to maximize the profit of MSP. To achieve this objective, we formulate the resource scheduling issue as a stochastic problem and design a new optimization framework by using an extended Lyapunov technique. Specially, because the standard Lyapunov technique critically assumes that job requests have fixed lengths and can be finished within each decision making interval, it is not suitable for the dynamic situation where the mobile job requests have variable lengths. To solve this problem, we extend the standard Lyapunov technique and design the VariedLen algorithm to make online decisions in consecutive time for job requests with variable lengths. Furthermore, our proposed algorithm can reach time average profit that is close to the optimum with a diminishing gap (1/V) for the MSP while still maintaining strong system stability and low congestion. With extensive simulations based on a real world trace, we demonstrate the efficacy and optimality of our proposed algorithm.

97 MATHEMATICS AND COMPUTING↗

Dynamic Optimized Advanced Scheduling of Bandwidth Demands for Large-Scale Science Applications (Final Report)

In this project, developed scheduling frameworks for dynamic bandwidth demands for large-scale science applications. In particular, we developed scheduling algorithms for dynamic bandwidth demands in this project. Apart from theoretical approaches such as Integer Linear Programming, Tabu Search and Genetic Algorithm heuristics, we have utilized practical data from ESnet OSCARS project (from our DOE lab partners) to conduct realistic simulations of our approaches. We have disseminated our work through conference paper presentations and journal papers and a book chapter. In this project we addressed the problem of scheduling of lightpaths over optical wavelength division multiplexed (WDM) networks. We published several conference papers and journal papers on this topic. We also addressed the problems of joint allocation of computing, storage and networking resources in Grid/Cloud networks and proposed energy-efficient mechanisms for operation optical WDM networks.

97 MATHEMATICS AND COMPUTING↗

Dynamic Path Scheduling through Extensions to Generalized Multiprotocol Label Switching (GMPLS) (Final Report)

The major accomplishments of the project are the successful software implementation of the Phase I scheduling algorithms for GMPLS Label Switched Paths (LSPs) and the extension of the IETF Path Computation Element (PCE) Protocol to support scheduling extensions. In performing this work, we have demonstrated the theoretical work of Phase I, analyzed key issues, and made relevant extensions. Regarding the software implementation, we developed a proof of concept prototype as part of our Algorithm Evaluation System (AES). This implementation uses the Linux operating system to provide software portability and will be the foundation for our commercial software. To demonstrate proof of concept, we have implemented LSP scheduling algorithms to support two of the key GMPLS switching technologies (Lambda and Packet) and support both Fixed Path (FP) and Switched Path (SP) routing. We chose Lambda and Packet because we felt it was essential to include both circuit and packet switching technologies as well as to address all-optical switching in the study. As conceptualized in Phase I, the FP algorithms use a traditional approach where the LSP uses the same physical path for the entire service duration while the innovative SP algorithms allow the physical path to vary during the service duration. As part of this study, we have used the AES to conduct a performance analysis using metro size networks (up to 32 nodes) that showed that these algorithms are suitable for commercial implementation. Our results showed that the CPU time required to compute an LSP schedule was small compared to expected inter-arrival time between LSP requests. Also, when the network size increased from 7 to 15 to 32 nodes with 10, 26, and 56 TE links, the CPU processing time showed excellent scaling properties. When Fixed Path and Switched Path routing were compared, SP provided only modestly better performance with respect to LSP completion rate, service duration, path length, and start time deviation. In addition, the SP routing required somewhat more CPU time than the FP routing. However, when the allowable range for the start time is increased, the CPU time for SP increased less rapidly than FP such that the CPU processing times became comparable. Therefore, SP routing may scale better than FP routing. The Path Computation Element Working Group is a complementary working group to the GMPLS working group (CCAMP) in the IETF and is developing standards to discover, manage, and access elements that compute routes for GMPLS for LSPs. The algorithms used to compute the routes are not subject to standardization. Since the PCE supports only standard GMPLS LSPs, it does not support scheduled LSPs. Therefore, it is a natural extension of our Phase I work to introduce this enhancement into the PCE. In addition, the PCE adds another dimension to our product line because the PCE by itself may be a product with a standard interface.

97 MATHEMATICS AND COMPUTING↗