Search NASA⌕ Search

SEARCH · Search NASA

Results for “efficiency software risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Methodology for the Measurement of Test Effectiveness

In developing a software system, we would like to estimate the total number of faults inserted in to the system, its residual fault content at any given time, and the efficacy of the testing activity in executing the code containing the newly inserted faults.

software reliability software faults software faul↗

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assurance of Fault Management: Risk-Significant Adverse Condition Awareness

Fault Management (FM) systems are ranked high in risk-based assessment of criticality within flight software, emphasizing the importance of establishing highly competent domain expertise to provide assurance for NASA projects, especially as spaceflight systems continue to increase in complexity. Insight into specific characteristics of FM architectures seen embedded within safety- and mission-critical software systems analyzed by the NASA Independent Verification Validation (IVV) Program has been enhanced with an FM Technical Reference (TR) suite. Benefits are aimed beyond the IVV community to those that seek ways to efficiently and effectively provide software assurance to reduce the FM risk posture of NASA and other space missions. The identification of particular FM architectures, visibility, and associated IVV techniques provides a TR suite that enables greater assurance that critical software systems will adequately protect against faults and respond to adverse conditions. The role FM has with regard to overall asset protection of flight software systems is being addressed with the development of an adverse condition (AC) database encompassing flight software vulnerabilities.Identification of potential off-nominal conditions and analysis to determine how a system responds to these conditions are important aspects of hazard analysis and fault management. Understanding what ACs the mission may face, and ensuring they are prevented or addressed is the responsibility of the assurance team, which necessarily should have insight into ACs beyond those defined by the project itself. Research efforts sponsored by NASAs Office of Safety and Mission Assurance defined terminology, categorized data fields, and designed a baseline repository that centralizes and compiles a comprehensive listing of ACs and correlated data relevant across many NASA missions. This prototype tool helps projects improve analysis by tracking ACs, and allowing queries based on project, mission type, domain component, causal fault, and other key characteristics. The repository has a firm structure, initial collection of data, and an interface established for informational queries, with plans for integration within the Enterprise Architecture at NASA IVV, enabling support and accessibility across the Agency. The development of an improved workflow process for adaptive, risk-informed FM assurance is currently underway.

Software Verification & Validation↗

LWRS Newsletter March 2019 Issue 28

The latest issue of the LWRS Program Newsletter (Issue 28) was recently posted on the LWRS Program website. This issue includes the following articles: • Stakeholder Engagement Review Meeting • Simulating the Effects of Neutron Irradiation on Concrete with the MOSAIC Software • Risk and Cost Analysis of Utilizing FLEX Equipment for Efficient Maintenance in Nuclear Power Plants • Integration of Classical PRA models into Dynamic PRA • Toward a Predictive Model for Cabling Failure: An interdisciplinary, collaborative effort between the University of Minnesota–Duluth and the Materials Research Pathway • Compact Digital Modernization – Enabling Nuclear Power Plant Operations and Maintenance Cost Benefits • Increasing the Value of the U.S. Nuclear Reactor Fleet

42 ENGINEERING↗

Developing interpretable models with optimized set reduction for identifying high risk software components

Applying equal testing and verification effort to all parts of a software system is not very efficient, especially when resources are limited and scheduling is tight. Therefore, one needs to be able to differentiate low/high fault frequency components so that testing/verification effort can be concentrated where needed. Such a strategy is expected to detect more faults and thus improve the resulting reliability of the overall system. This paper presents the Optimized Set Reduction approach for constructing such models, intended to fulfill specific software engineering needs. Our approach to classification is to measure the software system and build multivariate stochastic models for predicting high risk system components. We present experimental results obtained by classifying Ada components into two classes: is or is not likely to generate faults during system and acceptance test. Also, we evaluate the accuracy of the model and the insights it provides into the error making process.

Briand, Lionel C.↗

SU-D-BRD-02: Auto Weekly - An Automated Online Weekly Chart Check System for Medical Physics

Purpose: Radiation therapy has evolved to become not only more precise and potent, but also more complicated to monitor and deliver. More rigorous and comprehensive quality assurance is needed to safeguard ever advancing radiation therapy. ICRU standards dictate that an ever growing set of treatment parameters are manually checked weekly by medical physicists. This “weekly chart check” procedure is laborious and subject to human errors or other factors. A computer-assisted chart checking process will enable more complete and accurate human review of critical parameters, reduce the risk of medical errors, and improve the efficiency. Methods: We developed a web-based software system that enables a thorough weekly quality assurance checks. In the backend, the software retrieves all machine parameters from a Treatment Management System (TMS) and compares them against the corresponding ones from the treatment planning system. They are also checked for validity against preset rules. The results are displayed as a web page in the front-end for physicists to review. Then a summary report is generated and uploaded automatically to the TMS as a record for weekly chart checking. Results: The software system has been deployed on a web server in our department’s intranet, and has been tested thoroughly by our clinical physicists. A plan parameter would be highlighted when it is off the preset limit. The developed system has changed the way of checking charts with significantly improved accuracy, efficiency, and completeness. It has been shown to be robust, fast, and easy to use. Conclusion: A computer-assisted system has been developed for efficient, accurate, and comprehensive weekly chart checking. The system has been extensively validated and is being implemented for routine clinical use.

60 APPLIED LIFE SCIENCES↗

Probabilistic structural analysis algorithm development for computational efficiency

The PSAM (Probabilistic Structural Analysis Methods) program is developing a probabilistic structural risk assessment capability for the SSME components. An advanced probabilistic structural analysis software system, NESSUS (Numerical Evaluation of Stochastic Structures Under Stress), is being developed as part of the PSAM effort to accurately simulate stochastic structures operating under severe random loading conditions. One of the challenges in developing the NESSUS system is the development of the probabilistic algorithms that provide both efficiency and accuracy. The main probability algorithms developed and implemented in the NESSUS system are efficient, but approximate in nature. In the last six years, the algorithms have improved very significantly.

Wu, Y.-T.↗

Improving and Automating Building Model Data Exchange

There are many instances throughout a project’s lifecycle where there arises a need for quick and accurate risk assessment of building designs. For example, an unexpected design change during construction may necessitate structural engineers to perform a seismic risk assessment on analytical models of the updated building design using high fidelity structural analysis software, such as ANSYS or Abaqus. However, the efficiency of such workflows often depends upon the interoperability of architectural design software and structural analysis software. When the quality of this interoperability is lacking or even non-existent, the efficiency of virtual engineering workflows is hampered, which increases project costs. A McGraw Hill industry survey of professional users of Building Information Modeling (BIM) technologies found that there is high demand for BIM interoperability for structural analysis, but that the value/difficulty ratio is currently too low for practical use. There have been efforts by the academic community to facilitate model data exchange between the architectural design and structural analysis domains, but such solutions have not been widely adopted by industry, face technical challenges, and oftentimes are limited in applicability for users of various BIM software. Therefore, INL is developing capabilities to improve, automate, and generalize model data exchange between architectural BIM software (e.g., Revit) and structural analysis software (e.g., SAP2000, ANSYS). The goal is to help expedite and automate as much of the pre-processing step for creating analytical models in finite element analysis software as reasonably as possible. Such a "BIM-to-FEA" conversion tool should provide direct benefit to end-users through accuracy, automation, quick turn-around, and wide applicability. To generalize the application of this BIM-to-FEA conversion tool and increase its useability among the many different commercial BIM software currently used by industry, the program is being developed with the concept of openBIM. OpenBIM is the application of non-proprietary, open data standards that allow for BIM model data exchange in a format that is accessible, retainable, and useable for all users. The most widely used open, non-proprietary data exchange format for BIM is the Industry Foundation Classes (IFC) schema. IFC is developed by buildingSMART international and is ISO certified (ISO 16739-1:2018). The BIM-to-FEA conversion tool is being developed for compatibility with typical commercial building designs of steel framed structures. The tool is currently capable of importing architectural BIM data of framed building structures, recognizing and extracting the aspects of the model that are required for structural analysis, adjusting the connectivity of frame members, and finally exporting to an analytical model stored in the IFC format. The exported IFC analytical model can then be imported into various openBIM compliant software, such as SAP2000. Such capabilities have already been tested on commercial software, as shown above, and continue to be improved. Work is underway to test the conversion on various commercial BIM software, develop a user-friendly interface, incorporate the program into the broader DeepLynx data warehouse project being developed by INL, and to eventually open-source the tool for the benefit of the community. Future development of the tool envisions the ability for efficient iterative risk assessment of generative building designs, all within a workflow utilizing open-source tools. One such open-source tool will be MOOSE, an advanced finite element analysis tool developed at INL. The conversion tool will also branch out from typical commercial building designs and will aim to incorporate nuclear construction. The aim will be to convert both structural and non-structural components of nuclear facilities, such as curved concrete containment structures and piping systems, respectively.

97 MATHEMATICS AND COMPUTING↗

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek A Whitman↗

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek Whitman↗

Fire Risk Investigation in 3D (FRI3D) Software and Process for Integrated Fire Modeling

Modeling and implementing fire safety for nuclear power plants is a costly activity. Because of the complexity of fire phenomena and multiple operational procedures, it is difficult to computationally provide assurance that mitigation methods are adequate for critical areas using current analysis methods in a cost-effective manner. The nuclear industry needs efficient methods to provide more accurate modeling and optimize mitigation methods to improve nuclear power plant understanding for fire scenarios. This report describes the work done over the last two year on the Fire Risk Investigation in 3D (FRI3D) software. This software simplifies the modeling process by importing existing plant models and data, incorporating a 3D modeling environment and coupling with the fire simulation software CFAST. This eliminates the manual labor and errors associated with much of the fire modeling process. The report lays out the status and path of FRID software for the Risk Informed Safety Analysis pathway of the Light Water Reactor Sustainability project at Idaho National Laboratory and industry collaborators to best help reduce costs and improve realism in fire probabilistic risk analysis.

97 MATHEMATICS AND COMPUTING↗

National Residential Efficiency Measures Database Aimed at Reducing Risk for Residential Retrofit Industry [Fact Sheet]

This technical highlight describes NREL research to develop a publicly available database of energy retrofit measures containing performance characteristics and cost estimates for nearly 3,000 measures. Researchers at the U.S. Department of Energy (DOE) National Renewable Energy Laboratory (NREL) have developed the National Residential Efficiency Measures Database, a public database that characterizes the performance and costs of common residential energy efficiency measures. The data are available for use in software programs that evaluate cost-effective retrofit measures to improve the energy efficiency of residential buildings. The database provides a single, consistent source of current data for DOE and private-sector energy audit and simulation software tools and the retrofit industry. The database will reduce risk for residential retrofit industry stakeholders by providing a central, publicly vetted source of up-to-date information.

14 SOLAR ENERGY↗

National Residential Efficiency Measures Database Aimed at Reducing Risk for Residential Retrofit Industry (Fact Sheet)

This technical highlight describes NREL research to develop a publicly available database of energy retrofit measures containing performance characteristics and cost estimates for nearly 3,000 measures. Researchers at the U.S. Department of Energy (DOE) National Renewable Energy Laboratory (NREL) have developed the National Residential Efficiency Measures Database, a public database that characterizes the performance and costs of common residential energy efficiency measures. The data are available for use in software programs that evaluate cost-effective retrofit measures to improve the energy efficiency of residential buildings. The database provides a single, consistent source of current data for DOE and private-sector energy audit and simulation software tools and the retrofit industry. The database will reduce risk for residential retrofit industry stakeholders by providing a central, publicly vetted source of up-to-date information.

14 SOLAR ENERGY↗

Practical Issues in Implementing Software Reliability Measurement

Many ways of estimating software systems' reliability, or reliability-related quantities, have been developed over the past several years. Of particular interest are methods that can be used to estimate a software system's fault content prior to test, or to discriminate between components that are fault-prone and those that are not. The results of these methods can be used to: 1) More accurately focus scarce fault identification resources on those portions of a software system most in need of it. 2) Estimate and forecast the risk of exposure to residual faults in a software system during operation, and develop risk and safety criteria to guide the release of a software system to fielded use. 3) Estimate the efficiency of test suites in detecting residual faults. 4) Estimate the stability of the software maintenance process.

Nikora, Allen P.↗

An Efficient Sampling-Based Method for Sensitivity and Uncertainty Analysis Through RAVEN

Sensitivity analysis (SA) and uncertainty quantification (UQ) are now widely recognized as essential parts of analyses for complex nuclear systems. Plenty of well-established methodologies are already available for performing SA and UQ, such as Monte Carlo analysis, adjoint-based method, and variance decomposition. The focus of this summary is on developing an efficient sampling-based approach to perform SA and UQ through RAVEN. RAVEN (Risk Analysis and Virtual control Environment) is a software framework able to perform SA and UQ, currently under development at the Idaho National Laboratory. In literature, a number of approaches have been developed to accelerate the process of SA and UQ for large complex systems, such as principal component analysis (PCA) of input space, input-output correlation analysis, and intersection subspace methods. The fundamental idea is to identify the dominant active directions in the parameter space prior to conducting SA and UQ. The premise is that the number of active directions is much less than the dimensionality of input space. In this work, the PCA or Karhunen-Loeve expansion or SVD method is implemented in RAVEN to identify the active directions. This approach is also combined with the forward sampling approaches, such as Monte Carlo, Grid, Latin Hypercube, and Response Surface Design sampling approaches that are currently available in RAVEN, to perform SA and UQ more efficiently. The summary is organized as follows. In the following section, we present the PCA-based forward sampling approach. The effectiveness and efficiency are discussed in the numerical results section. The paper then ends with a concluding summary. In this summary, we have presented PCA-based forward sampling approach to perform SA and UQ. The goal is to reduce the computational overhead for repetitive executions of complex nuclear systems that are generally required when performing SA and UQ. The control of correlations between input parameters is implemented in RAVEN to better represent the input relationships. In addition, we are currently examining our implementations with more realistic models, and we are also focusing on implementation of some new high-dimensional input reduction techniques in RAVEN. (authors)

97 MATHEMATICS AND COMPUTING↗

Emerging Threats and Technology Investigation: Industrial Internet of Things - Risk and Mitigation for Nuclear Infrastructure

Industries supporting the global nuclear infrastructure striving for cost savings, expansions in efficiency, and convenience are likely to adopt components (e.g., hardware, software) that comprise the Internet of Things (IoT) and Industrial Internet of Things (IIoT). These devices offer potential improvements along with security challenges. Modern conveniences achieved through application of technology have propagated through society in the form of interconnected devices, from doorbells to microwave ovens, commonly referred to as IoT. IoT devices are often Internet-connected devices that are designed to send data back to a cloud-based server, where a smart phone application then presents device status and control options. Home-based IoT applications carry a different set of risks when compared to a business or security environment, where there is also a history of convenience and interconnection. Industrial settings have long relied on specifically designed Supervisory Control and Data Acquisition (SCADA) systems for process control where IIoT devices are intended to inform business decisions and augment traditional processes. A recent National Institute of Standards and Technology (NIST) report provides a distinction between process control and IIoT in that traditional process control is not replaced by IIoT, but rather IIoT devices are intended to enhance industrial processes through additional monitoring of various sensors and application of data analytics models using artificial intelligence (AI) and machine learning (ML) (Fagan, Marron, et al. 2021) (Ross, et al. 2021).

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Use of the NetBeans Platform for NASA Robotic Conjunction Assessment Risk Analysis

The latest Java and JavaFX technologies are very attractive software platforms for customers involved in space mission operations such as those of NASA and the US Air Force. For NASA Robotic Conjunction Assessment Risk Analysis (CARA), the NetBeans platform provided an environment in which scalable software solutions could be developed quickly and efficiently. Both Java 8 and the NetBeans platform are in the process of simplifying CARA development in secure environments by providing a significant amount of capability in a single accredited package, where accreditation alone can account for 6-8 months for each library or software application. Capabilities either in use or being investigated by CARA include: 2D and 3D displays with JavaFX, parallelization with the new Streams API, and scalability through the NetBeans plugin architecture.

assessment↗