Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric vehicle support equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Space Vehicle Powerdown Philosophies Derived from the Space Shuttle Program

In spaceflight, electrical power is a vital but limited resource. Almost every spacecraft system, from avionics to life support systems, relies on electrical power. Since power can be limited by the generation system s performance, available consumables, solar array shading, or heat rejection capability, vehicle power management is a critical consideration in spacecraft design, mission planning, and real-time operations. The purpose of this paper is to capture the powerdown philosophies used during the Space Shuttle Program. This paper will discuss how electrical equipment is managed real-time to adjust the overall vehicle power level to ensure that systems and consumables will support changing mission objectives, as well as how electrical equipment is managed following system anomalies. We will focus on the power related impacts of anomalies in the generation systems, air and liquid cooling systems, and significant environmental events such as a fire, decrease in cabin pressure, or micrometeoroid debris strike. Additionally, considerations for executing powerdowns by crew action or by ground commands from Mission Control will be presented. General lessons learned from nearly 30 years of Space Shuttle powerdowns will be discussed, including an in depth case-study of STS-117. During this International Space Station (ISS) assembly mission, a failure of computers controlling the ISS guidance, navigation, and control system required that the Space Shuttle s maneuvering system be used to maintain attitude control. A powerdown was performed to save power generation consumables, thus extending the docked mission duration and allowing more time to resolve the issue.

Willsey, Mark↗

Design and Development of a 200-kW Turbo-Electric Distributed Propulsion Testbed

The National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center (AFRC) (Edwards, California) is developing a Hybrid-Electric Integrated Systems Testbed (HEIST) Testbed as part of the HEIST Project, to study power management and transition complexities, modular architectures, and flight control laws for turbo-electric distributed propulsion technologies using representative hardware and piloted simulations. Capabilities are being developed to assess the flight readiness of hybrid electric and distributed electric vehicle architectures. Additionally, NASA will leverage experience gained and assets developed from HEIST to assist in flight-test proposal development, flight-test vehicle design, and evaluation of hybrid electric and distributed electric concept vehicles for flight safety. The HEIST test equipment will include three trailers supporting a distributed electric propulsion wing, a battery system and turbogenerator, dynamometers, and supporting power and communication infrastructure, all connected to the AFRC Core simulation. Plans call for 18 high performance electric motors that will be powered by batteries and the turbogenerator, and commanded by a piloted simulation. Flight control algorithms will be developed on the turbo-electric distributed propulsion system.

distributed↗

Qualification of Electrical Ground Support Equipment for New Space Programs

With the Space Shuttle program coming to an end, the National Aeronautics and Space Administration (NASA) is moving to a new space flight program that will allow expeditions beyond low earth orbit. The space vehicles required to comply with these missions will be carrying heavy payloads. This implies that the Earth departure stage capabilities must be of higher magnitudes, given the current propulsion technology. The engineering design of the new flight hardware comes with some structural, thermal, propulsion and other subsystems' challenges. Meanwhile, the necessary ground support equipment (GSE) used to test, validate, verify and process the flight hardware must withstand the new program specifications. This paper intends to provide the qualification considerations during implementation of new electrical GSE for space programs. A team of engineers was formed to embark on this task, and facilitate the logistics process and ensure that the electrical, mechanical and fluids subsystems conduct the proper level of testing. Ultimately, each subsystem must certify that each piece of ground support equipment used in the field is capable of withstanding the strenuous vibration, acoustics, environmental, thermal and Electromagnetic Interference (EMf) levels experienced during pre-launch, launch and post-launch activities. The benefits of capturing and sharing these findings will provide technical, cost savings and schedule impacts infon11ation to both the technical and management community. Keywords: Qualification; Testing; Ground Support Equipment; Electromagnetic Interference Testing; Vibration Testing; Acoustic Testing; Power Spectral Density.

SotoToro, Felix A.↗

Concepts to Automate Fluid Transfer Capability of Low Impact Docking System (LIDS)

The capability to transfer mass between spacecraft is necessary for many mission scenarios. Docking and berthing operations have enabled fluid, electrical, crew and equipment transfers to some degree on all manned space operations since the Gemini program. The Apollo program performed some sophisticated docking maneuvers to land men on the moon and return them safely to Earth. These programs primarily transferred crew, equipment, and pressurized atmosphere between docked spacecraft. The International Space Station (ISS) U.S. modules are connected by Common Berthing Mechanism (CBM) portals. They provide many feed-through ports for electrical, and fluid transfer between modules, as well as a large diameter crew and equipment tunnel. Fluid and electrical jumpers are manually installed after the CBM sealing surfaces have been securely mated to maintain the pressurized cabin environment. CBM berthing and subsequent fluid transfer capability requires a lengthy manual process involving an active interface that mates with a passive half. The Androgynous Peripheral Attach System (MAS) a Russian technology that docked the Russian Zarya module to Unity, or Node 1, is a more complex system that also is capable of fuel transfer, enabling refueling of the Russian re-boost engines on ISS. For several years, a Low Impact Docking System (LIDS) has been under development at Johnson Space Center (JSC). This docking technology has a requirement to be androgynous in order to allow the fabrication of a single configuration that can dock with all other LIDS units. It is desired to make electrical and fluid coupling mating an automated process to enable routine docking and undocking operations to support future exploration missions. It is envisioned that modular design and vehicle assembly will require an efficient LIDS for fuel, electrical, crew, and equipment transfer. Marshall Space Flight Center (MSFC) has joined the LIDS development effort and plans to employ fluid transfer concepts and technology from previous development programs, such as the Automated Fluid Interface System (AFIS) and the Ohital Fluid Transfer System (OFTS) that were developed and tested by MSFC. Orbital Expressderived robotic satellite servicing technology is scheduled to fly soon to demonstrate fluid transfer technology developed for the Air Force. This paper will compare known technology against possible fluid transfer requirements for LIDS to develop design strategies for automated fluid transfer.

Miernik, Janie H.↗

Ion propulsion technology requirements for planetary mission applications

Integrating a clustered, four engine ion propulsion system to the Mariner Mark II spacecraft is shown to reduce total trip time for the five proposed Mariner Mark II missions by fifteen years. In addition, this advanced Solar Electric Propulsion (SEP) system enables rendezvous encounters with five main belt asteroids rather than one. A precursor Advanced Capability Explorer (ACE) technology demonstration vehicle is proposed to investigate SEP spacecraft interaction and control requirements in support of these future mission opportunities. It is shown that the ACE spacecraft could be assembled from existing residual hardware, protoflight equipment and commercially available flight tested components. The ion propulsion system requirements to support ambitious Nuclear Electric Propulsion (NEP) missions are also examined and specific technology development objectives presented.

Aston, G.↗

The space station - An overview of the design process

The design factors being considered in the NASA space-station development program are summarized. The currently envisioned mission requirements are listed, and the system architecture is defined as a core station, mission-dedicated elements, and supporting equipment such as an orbit maneuvering vehicle. System design factors discussed include orbit selection, contamination control, autonomy, system safety, technology implementation, long life, reliability and maintainability, and cost; subsystem design factors include structural considerations, electrical power, environmental control and life support, data management, communications and tracking, onboard propulsion, habitability, and crew support. Configurational design is seen as driven by a number of factors, primarily the need to fit all components into the Shuttle payload bay for assembly in LEO by the Shuttle crew.

Covington, C.↗

Overview of Small and Large-Scale Space Solar Power Concepts

An overview of space solar power studies performed at the Boeing Company under contract with NASA will be presented. The major concepts to be presented are: 1. Power Plug in Orbit: this is a spacecraft that collects solar energy and distributes it to users in space using directed radio frequency or optical energy. Our concept uses solar arrays having the same dimensions as ISS arrays, but are assumed to be more efficient. If radiofrequency wavelengths are used, it will necessitate that the receiving satellite be equipped with a rectifying antenna (rectenna). For optical wavelengths, the solar arrays on the receiving satellite will collect the power. 2. Mars Clipper I Power Explorer: this is a solar electric Mars transfer vehicle to support human missions. A near-term precursor could be a high-power radar mapping spacecraft with self-transport capability. Advanced solar electric power systems and electric propulsion technology constitute viable elements for conducting human Mars missions that are roughly comparable in performance to similar missions utilizing alternative high thrust systems, with the one exception being their inability to achieve short Earth-Mars trip times. 3. Alternative Architectures: this task involves investigating alternatives to the traditional solar power satellite (SPS) to supply commercial power from space for use on Earth. Four concepts were studied: two using photovoltaic power generation, and two using solar dynamic power generation, with microwave and laser power transmission alternatives considered for each. All four architectures use geostationary orbit. 4. Cryogenic Propellant Depot in Earth Orbit: this concept uses large solar arrays (producing perhaps 600 kW) to electrolyze water launched from Earth, liquefy the resulting hydrogen and oxygen gases, and store them until needed by spacecraft. 5. Beam-Powered Lunar Polar Rover: a lunar rover powered by a microwave or laser beam can explore permanently shadowed craters near the lunar poles to search for water ice and other frozen volatiles. Near such craters are mountain peaks and highlands that are in near permanent sunlight. Power can be beamed from a collector on a sunlit mountain or crater rim to a rover inside a crater. Near-term applications of space solar power technology can therefore pave the way toward large-scale commercial power from space.

Potter, Seth↗

Solar Power System Evaluated for the Human Exploration of Mars

The electric power system is a crucial element of any mission for the human exploration of the Martian surface. The bulk of the power generated will be delivered to crew life support systems, extravehicular activity suits, robotic vehicles, and predeployed in situ resource utilization (ISRU) equipment. In one mission scenario, before the crew departs for Mars, the ISRU plant operates for 435 days producing liquefied methane and oxygen for ascent-stage propellants and water for crew life support. About 200 days after ISRU production is completed, the crew arrives for a 500-day surface stay. In this scenario, the power system must operate for a total of 1130 days (equivalent to 1100 Martian "sols"), providing 400 MW-hr of energy to the ISRU plant and up to 18 kW of daytime user power. A photovoltaic power-generation system with regenerative fuel cell (RFC) energy storage has been under study at the NASA Glenn Research Center at Lewis Field. The conceptual power system is dominated by the 4000- m2 class photovoltaic array that is deployed orthogonally as four tent structures, each approximately 5 m on a side and 100-m long. The structures are composed of composite members deployed by an articulating mast, an inflatable boom, or rover vehicles, and are subsequently anchored to the ground. Array panels consist of thin polymer membranes with thin-film solar cells. The array is divided into eight independent electrical sections with solar cell strings operating at 600 V. Energy storage is provided by regenerative fuel cells based on hydrogen-oxygen proton exchange membrane technology. Hydrogen and oxygen reactants are stored in gaseous form at 3000 psi, and the water produced is stored at 14.7 psi. The fuel cell operating temperature is maintained by a 40-m2 deployable pumped-fluid loop radiator that uses water as the working fluid. The power management and distribution (PMAD) architecture features eight independent, regulated 600-Vdc channels. Power management and distribution power cables use various gauges of copper conductors with ethylene tetrafluoroethylene insulation. To assess power system design options and sizing, we developed a dedicated Fortran code to predict detailed power system performance and estimate system mass. This code also modeled the requisite Mars surface environments: solar insolation, Sun angles, dust storms, dust deposition, and thermal and ultraviolet radiation. Using this code, trade studies were performed to assess performance and mass sensitivities to power system design parameters (photovoltaic array geometry and orientation) and mission parameters (landing date and landing site latitude, terrain slope, and dust storm activity). Mission analysis cases were also run. Power results are shown in this graph for an analysis case with a September 1, 2012, landing date; 18.95 North latitude landing site; two seasonal dusts storms; and tent arrays. To meet user load requirements and the ISRU energy requirement, an 8-metric ton (MT) power system and 4000-m2 photovoltaic array area were required for the assumed advanced CuInS2 thin-film solar cell technology. In this figure, the top curve is the average daytime photovoltaic array power, the middle curve is average daytime user load power, and the bottom curve is nighttime power. At mission day 1, daytime user power exceeds 120 kW before falling off to 80 kW at the end of the mission. Throughout the mission, nighttime user power is set to the nighttime power requirement. In this analysis, "nighttime" is defined as the 13- to 15-hr period when array power output is below the daytime power requirement. During dust storms, power system capability falls off dramatically so that by mission day 900, a daily energy balance cannot be maintained. Under these conditions, the ISRU plant is placed in standby mode, and the regenerative fuel cell energy storage is gradually discharged to meet user loads.

Kerslake, Thomas W.↗

Failure Analysis at the Kennedy Space Center

History has shown that failures occur in every engineering endeavor, and what we learn from those failures contributes to the knowledge base to safely complete future missions. The necessity of failure analysis is at its apex at the end of one aged program (i.e. Shuttle) and at the beginning of a new and untested program (i.e. Constellation). The information that we gain through failure analysis corrects the deficiencies in the current vehicle to make the next generation of vehicles more efficient and safe. The Failure Analysis and Materials Evaluation section in the Materials Science Division at the Kennedy Space Center performs metallurgical, mechanical, electrical, and non-metallic failure analysis and accident investigations on both flight hardware and ground support equipment (GSE) for the Shuttle, International Space Station, Constellation, and Launch Services Programs. This presentation will explore a variety of failure case studies at KSC and the lessons learned that can be applied in future programs.

Salazar, Victoria L.↗

Space Shuttle system solid rocket booster.

Description of the mission and systems requirement of the solid rocket booster as it supports the Shuttle vehicle configuration. The solid booster is equipped with load skirts and linkages that can accommodate full mission loads, a solid propellant motor for delivering required performance, thrust vector control for augmentation of Shuttle vehicle ascent control, staging and separation systems, and electrical subsystems. To recover and reuse the solid booster case a recovery package is provided. The definition of these functional elements of the solid booster are discussed with the requirements placed on each element to satisfy the overall booster objective.

Thomason, H. E.↗

Failure Analysis at the Kennedy Space Center

History has shown that failures occur in every engineering endeavor, and what we learn from those failures contributes to the knowledge base to safely complete future missions. The necessity of failure analysis is at its apex at the end of one aged program and at the beginning of a new and untested program. The information that we gain through failure analysis corrects the deficiencies in the current vehicle to make the next generation of vehicles more efficient and safe. The Failure Analysis and Materials Evaluation Branch in the Materials Science Division at the Kennedy Space Center performs metallurgical, mechanical, electrical, and non-metallic materials failure analyses and accident investigations on both flight hardware and ground support equipment for the Space Shuttle, International Space Station, Constellation, and Launch Services Programs. This paper will explore a variety of failure case studies at the Kennedy Space Center and the lessons learned that can be applied in future programs.

Salazar, Victoria L.↗

Quick Attach Docking Interface for Lunar Electric Rover

The NASA Lunar Electric Rover (LER) has been developed at Johnson Space Center as a next generation mobility platform. Based upon a twelve wheel omni-directional chassis with active suspension the LER introduces a number of novel capabilities for lunar exploration in both manned and unmanned scenarios. Besides being the primary vehicle for astronauts on the lunar surface, LER will perform tasks such as lunar regolith handling (to include dozing, grading, and excavation), equipment transport, and science operations. In an effort to support these additional tasks a team at the Kennedy Space Center has produced a universal attachment interface for LER known as the Quick Attach. The Quick Attach is a compact system that has been retro-fitted to the rear of the LER giving it the ability to dock and undock on the fly with various implements. The Quick Attach utilizes a two stage docking approach; the first is a mechanical mate which aligns and latches a passive set of hooks on an implement with an actuated cam surface on LER. The mechanical stage is tolerant to misalignment between the implement and the LER during docking and once the implement is captured a preload is applied to ensure a positive lock. The second stage is an umbilical connection which consists of a dust resistant enclosure housing a compliant mechanism that is optionally actuated to mate electrical and fluid connections for suitable implements. The Quick Attach system was designed with the largest foreseen input loads considered including excavation operations and large mass utility attachments. The Quick Attach system was demonstrated at the Desert Research And Technology Studies (D-RA TS) field test in Flagstaff, AZ along with the lightweight dozer blade LANCE. The LANCE blade is the first implement to utilize the Quick Attach interface and demonstrated the tolerance, speed, and strength of the system in a lunar analog environment.

Schuler, Jason M.↗

Structural Analysis of Lightning Protection System for New Launch Vehicle

This project includes the design and specification of a lightning protection system for Launch Complex 39 B (LC39B) at Kennedy Space Center, FL in support of the Constellation Program. The purpose of the lightning protection system is to protect the Crew Launch Vehicle (CLV) or Cargo Launch Vehicle (CaLV) and associated launch equipment from direct lightning strikes during launch processing and other activities prior to flight. The design includes a three-tower, overhead catenary wire system to protect the vehicle and equipment on LC39B as described in the study that preceded this design effort: KSC-DX-8234 "Study: Construct Lightning Protection System LC3 9B". The study was a collaborative effort between Reynolds, Smith, and Hills (RS&H) and ASRC Aerospace (ASRC), where ASRC was responsible for the theoretical design and risk analysis of the lightning protection system and RS&H was responsible for the development of the civil and structural components; the mechanical systems; the electrical and grounding systems; and the siting of the lightning protection system. The study determined that a triangular network of overhead catenary cables and down conductors supported by three triangular free-standing towers approximately 594 ft tall (each equipped with a man lift, ladder, electrical systems, and communications systems) would provide a level of lightning protection for the Constellation Program CLV and CaLV on Launch Pad 39B that exceeds the design requirements.

Cope, Anne↗

Development of environmental criteria guidelines for aerospace vehicle design

The types of guideline data on natural environmental conditions for the various major geographic locations that are applicable to the design of aerospace vehicles and associated equipment are discussed. Since relationships between aerospace vehicle parameters and atmospheric variables cannot always be clearly defined, there should be a close working relationship and team philosophy between the design/operational engineer and the respective organizations' aerospace meteorologists. Consideration should be given to protecting aerospace vehicles from some extremes by using support equipment and specialized monitoring personnel to advise on the expected occurrence of critical environmental conditions. It is pointed out that the services of these specialized personnel may be very economical in comparison with the more expensive designing that would be necessary to cope with all environmental possibilities. The environment considered here includes wind, atmospheric electricity, upper atmospheric density, and solar wind.

Turner, R. E.↗

Usability Testing and Analysis Facility (UTAF)

This slide presentation reviews the work of the Usability Testing and Analysis Facility (UTAF) at NASA Johnson Space Center. It is one of the Space Human Factors Laboratories in the Habitability and Human Factors Branch (SF3) at NASA Johnson Space Center The primary focus pf the UTAF is to perform Human factors evaluation and usability testing of crew / vehicle interfaces. The presentation reviews the UTAF expertise and capabilities, the processes and methodologies, and the equipment available. It also reviews the programs that it has supported detailing the human engineering activities in support of the design of the Orion space craft, testing of the EVA integrated spacesuit, and work done for the design of the lunar projects of the Constellation Program: Altair, Lunar Electric Rover, and Outposts

Wong, Douglas T.↗