Search NASA⌕ Search

SEARCH · Search NASA

Results for “energy efficiency checklist”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Plug Load Assessment Guidelines

Part of a series of 34 energy efficiency checklists, data collection forms, and how-to guides, the Plug Load Assessment Guidelines provides detailed assessment procedures.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pump System Assessment Guidelines

Part of a series of 34 energy efficiency checklists, data collection forms, and how-to guides, the Pump System Assessment Guidelines provides detailed assessment procedures.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Water Site Assessment Guidelines

Part of a series of 34 energy efficiency checklists, data collection forms, and how-to guides, the Water Site Assessment Guidelines provides detailed assessment procedures.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Water Inventory Data Collection Form

Part of a series of 34 energy efficiency checklists, data collection forms, and how-to guides, the Water Inventory Data Collection Form facilitates data entry.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Plug Load Equipment Data Collection Form

Part of a series of 34 energy efficiency checklists, data collection forms, and how-to guides, this Plug Load Equipment Data Collection Form facilitates data entry.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Motor Assessment Guidelines

Part of a series of 34 energy efficiency checklists, data collection forms, and how-to guides, the Motor Assessment Guidelines provides detailed assessment procedures.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Motors Data Collection Form

Part of a series of 34 energy efficiency checklists, data collection forms, and how-to guides, this Motor Data Collection Form facilitates data entry.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Metering System Assessment Guidelines

Part of a series of 34 energy efficiency checklists, data collection forms, and how-to guides, the Metering System Assessment Guidelines provides detailed assessment procedures.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Measure Guideline. Five Steps to Implement the Public Housing Authority Energy-Efficient Unit Turnover Checklist

Five Steps to Implementing the PHA Energy Efficient Unit Turnover Package (ARIES, 2014) is a guide to prepare for the installation of energy efficient measures during a typical public housing authority unit turnover. While a PHA is cleaning, painting and readying a unit for a new resident, there is an opportunity to incorporate energy efficiency measures to further improve the unit's performance. The measures on the list are simple enough to be implemented by in-house maintenance personnel, inexpensive enough to be folded into operating expenses without needing capital budget, and fast enough to implement without substantially changing the number of days between occupancies, a critical factor for organizations where the demand for dwelling units far outweighs the supply. The following guide lays out a five step plan to implement the EE Unit Turnover Package in your PHA, from an initial Self-Assessment through to Package Implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Simple Wins: Driving Effective Implementation of Energy Efficiency Projects

Small- and medium-sized manufacturers (SMMs) in the United States, making up over 98% of manufacturing firms, account for 48.3% of the sector’s energy consumption. Despite access to energy assessments and technical resources, such as those from the US Department of Energy’s Better Plants program and Industrial Training and Assessment Centers, implementation rates for identified energy-saving measures remain lower than expectations, averaging 47%. Some barriers were identified by other researchers as limited workforce capacity, inadequate training, and time constraints hinder progress. This article studied the development of customized checklists together with the energy assessment report as a practical solution to improve implementation rates for energy efficiency projects among SMMs. The framework for the checklists was grounded in five principles: short, precise, actionable, relevant, and codeveloped (SPARC). A case study of a 500,000-squarefoot SMM demonstrates how tailored checklists targeting significant energy users—such as heating, ventilating and air conditioning (HVAC), lighting, and compressed air systems for this facility—can simplify the process for staff to do facility walkthroughs to monitor best practices and track the progress of energy efficiency project implementation.

Guo, Wei [Oak Ridge National Laboratory (ORNL), Oa↗

Home Improvement Expert Checklist: Air Conditioner Replacement

This checklist provides home remodeling and renovation contractors with a checklist of action items to follow to help ensure energy efficiency, quality, durability, health, and safety when implementing home energy upgrades. The checklist is based on building science research from DOE’s Building America program. The checklist will be available online through DOE’s Building America Solution Center, https://basc.pnnl.gov/.

Gilbride, Theresa L↗

Home Improvement Expert Checklist: Attic Air Sealing and Insulation

This Attic Air Sealing and Insulation checklist provides home remodeling and renovation contractors with a checklist of action items to follow to help ensure energy efficiency, quality, durability, health, and safety when implementing home energy upgrades. The checklist is based on building science research from DOE’s Building America program. The checklist will be available online through DOE’s Building America Solution Center, https://basc.pnnl.gov/.

Gilbride, Theresa L↗

Building America Case Study: Meeting DOE Challenge Home Program Certification, Chicago, Illinois; Denver, Colorado; Devens, Massachusetts (Fact Sheet)

The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. BSC consulted on the construction of five test houses by three Cold Climate production builders in three separate US cities. BSC worked with the builders to develop a design package tailored to the cost-related impacts for each builder. Therefore, the resulting design packages do vary from builder to builder. BSC provided support through this research project on the design, construction and performance testing of the five test homes. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations on the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: 1. Adding services to the scope of work for various trades, such as HERS Rater, HVAC contractor. 2. Increased material costs related to the checklists, especially the EPA Indoor airPLUS and EPA WaterSense Efficient Hot Water Distribution requirement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders

The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America program goals, specifically compliance with the DOE Challenge Home Program. BSC consulted on the construction of five test houses by three cold climate production builders in three U.S. cities and worked with the builders to develop a design package tailored to the cost-related impacts for each builder. Also, BSC provided support through performance testing of the five test homes. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations on the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: adding services to the scope of work for various trades, such as HERS Rater, HVAC contractor; and increased material costs related to the checklists, especially the EPA Indoor airPLUS and EPA WaterSense® Efficient Hot Water Distribution requirement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders

The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. BSC consulted on the construction of five test houses by three Cold Climate production builders in three separate US cities. BSC worked with the builders to develop a design package tailored to the cost-related impacts for each builder. Therefore, the resulting design packages do vary from builder to builder. BSC provided support through this research project on the design, construction and performance testing of the five test homes. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations on the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: 1. Adding services to the scope of work for various trades, such as HERS Rater, HVAC contractor; 2. Increased material costs related to the checklists, especially the EPA Indoor airPLUS and EPA WaterSense(R) Efficient Hot Water Distribution requirement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders - Chicago, IL and Devens, MA

TO4 Task 3.1 - K Hovnanian Chicago, IL DOE Challenge Home Program Certified Home Constructed and Verified Specifications DOE Challenge Home Building envelope Ceiling R-49 blown fiberglass, Grade I Walls 2x4 framing @ 16 o.c. with R-13 fiberglass batts, Grade I and 1"" R-5 extruded polystyrene (XPS) insulating sheathing Frame Floors R-38 blown fiberglass, Grade I Basement Walls R-19 fiberglass batts draped full height, Grade I Basement Slab uninsulated Windows Above Grade: ENERGY STAR certified, U=0.29, SHGC=0.28 Basement: Non ENERGY STAR certified, U=0.29, SHGC=0.24 Infiltration 2 ACH 50 Mechanical systems Heat 95% AFUE sealed combustion natural gas furnace in conditioned space Goodman GMH950703BXAF Cooling 13 SEER split system Goodman GSX130301BC DHW AO Smith Vertex 100 0.96 EF natural gas tank water heater in 2nd floor utility closet Hot Water Distribution Redesigned trunk and branch Compliant with EPA WaterSense Efficient Distribution Requirements Ducts Located 100% in conditioned space via floor joists leak free to outside (5% or less) Ventilation Central Fan Integrated Supply (CFIS) ventilation with 6"" insulated outside air duct Fan Controller: Air Cycler FRV, with 6"" motorized damper 50 CFM outside air flow, 33% duty cycle (10 minutes on, 20 minutes off); ASHRAE 62.2-2010 compliance via an exhaust fan - Panasonic FV-08VQ5 WhisperCeiling Rerturn Pathways Active Return at Master Bedroom Transfer Grilles in Secondary Bedrooms Appliances, Lighting, MELs Lights 80% ENERGY STAR certified CFL Appliances ENERGY STAR certified refrigerator, dishwasher, and clothes washer; Natural gas range/oven and clothes dryer" STRUCTURE - Test House Lot 145 - 2013 DOE Challenge Test House Task 3.1 Bolingbrook, IL 60490 House is constructed and is DOE Challenge Verified by Don Nelson, a local rater. The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. To that end, Building Science Corporation (BSC) consulted on the construction of five test houses by three cold climate production builders in three separate U.S. cities. (1) K. Hovnanian Homes, Chicago, Illinois (2) David Weekley Homes, Denver, Colorado (3) Transformations, Inc., Devens, Massachusetts. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations about the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: (1) Adding services to the scope of work for various trades, such as HERS Rater and heating, ventilation, and air conditioning contractor. (2) Increased material costs related to the checklists, especially the U.S. Environmental Protection Agency Indoor airPLUS and WaterSense Efficient Hot Water Distribution requirement. Ceiling - 18" cellulose Walls - 12" open cell spray foam in double stud walls Foundation - R-10 under slab, 3 1/2" closed-cell spray foam at walls Windows - Harvey U=0.20, SHGC=0.22 Infiltration - 1.0 sq in per 100 sq ft Heating - Mini split heat pump, 10.6 HSPF, 23 SEER Cooling - Mini split heat pump, 10.6 HSPF, 23 SEER DHW - 0.97 EF instantaneous propane water heater Ventilation - bathroom exhaust fans as basic option, HRV upgrade option Adams Circle Devens MA 01434 Cavite Street Devens, MA 01434

Array↗

Measure Guideline: High Efficiency Natural Gas Furnaces

This Measure Guideline covers installation of high-efficiency gas furnaces. Topics covered include when to install a high-efficiency gas furnace as a retrofit measure, how to identify and address risks, and the steps to be used in the selection and installation process. The guideline is written for Building America practitioners and HVAC contractors and installers. It includes a compilation ofinformation provided by manufacturers, researchers, and the Department of Energy as well as recent research results from the Partnership for Advanced Residential Retrofit (PARR) Building America team.

03 NATURAL GAS↗

Measure Guideline: High Efficiency Natural Gas Furnaces

This measure guideline covers installation of high-efficiency gas furnaces, including: when to install a high-efficiency gas furnace as a retrofit measure; how to identify and address risks; and the steps to be used in the selection and installation process. The guideline is written for Building America practitioners and HVAC contractors and installers. It includes a compilation of information provided by manufacturers, researchers, and the Department of Energy as well as recent research results from the Partnership for Advanced Residential Retrofit (PARR) Building America team.

03 NATURAL GAS↗