Search NASA⌕ Search

SEARCH · Search NASA

Results for “energy scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

An integrated approach to space station power system autonomous control

Space Station electrical power management must be accomplished autonomously in order to decrease both airborne and ground support costs. Attention is presently given to the augmentation of terrestrial utility algorithmic decision aids for power dispatching for space station use, using expert systems to direct power demand analyses and the integration of results into operational decisions. Functions to be thus managed encompass power scheduling, energy allocation, failure cause diagnoses, goal proposal and plan preparation, consequence evaluation, and execution plan selection. The operating states of the system are normal, preventive, emergency, and restorative.

Dolce, James L.↗

Profile-Following Entry Guidance Using Linear Quadratic Regulator Theory

This paper describes one of the entry guidance concepts that is currently being tested as part of Marshall Space Flight Center's Advance Guidance and Control Project. The algorithm is of the reference profile tracking type. The reference profile consists of the reference states, range-to-go, altitude, and flight path angle, and reference controls, bank angle and angle of attack, versus energy. A linear control law using state feedback is used with energy-scheduled gains. The gains are obtained offline using Matlab's steady state linear quadratic regulator function. Lateral trajectory control is effected by performing periodic bank sign reversals based on a heading error corridor. A description and results of the AG&C test cases on which it has been tested are given. Although it is not anticipated that the algorithm will be quite as robust as algorithms with onboard trajectory re-generation capability, the results nevertheless show it to be very robust with respect to varying initial conditions and works satisfactorily even for entries from widely different orbits than that of the reference profile. Moreover, the commanded bank and angle of attack histories are very smooth, making it easier for the attitude control system to implement the guidance commands. Finally, results indicate that the guidance gains are more or less trajectory-independent which is a potentially useful property.

Dukeman, Greg A.↗

Propagating Resource Constraints Using Mutual Exclusion Reasoning

One of the most recent techniques for propagating resource constraints in Constraint Based scheduling is Energy Constraint. This technique focuses in precedence based scheduling, where precedence relations are taken into account rather than the absolute position of activities. Although, this particular technique proved to be efficient on discrete unary resources, it provides only loose bounds for jobs using discrete multi-capacity resources. In this paper we show how mutual exclusion reasoning can be used to propagate time bounds for activities using discrete resources. We show that our technique based on critical path analysis and mutex reasoning is just as effective on unary resources, and also shows that it is more effective on multi-capacity resources, through both examples and empirical study.

Frank, Jeremy↗

Analog Simulation of a Pilot-Controlled Rendezvous

The rendezvous of a pilot-controlled space ferry vehicle with an orbiting space station was simulated in six degrees of freedom. A fixed-base simulator and an analog computer were used. The ferry vehicle was assumed to have a single main thrusting rocket and to be provided with attitude control. Control of the thrust was provided by a rocket throttle quadrant which could provide either proportional or on-off control. The attitude of the vehicle was controlled during the rendezvous with a two-axis, pencil-type side-arm controller and rudder pedals. For the most part rendezvous maneuvers were made with the target satellite in a circular orbit. In addition, an elliptical station orbit was investigated. Tolerable initial conditions, as well as adequate data presentations, were determined. Results of the investigation indicate that a human pilot can rendezvous successfully with the vehicle and instrumentation considered over a wide band of initial conditions. Coplanar conditions are not necessary. Retro-rocket fuel used is not greatly increased by imposing perturbing influences such as rocket-misalignment torques on the rendezvous vehicle. When excessive attitude-control torques are required to maintain the necessary trim attitudes under misalignment influences, the reaction fuel used for this control increases. The time required for a specific rendezvous varies somewhat between pilots. If control of the time for completing the rendezvous is desired, requirements for retrorocket fuel are affected, and an energy-management schedule is required. Continuous variation of the thrust is not necessary. The pilot positions the throttle to obtain a desired level of thrust, and applies bursts of thrust as required. All data were presented on dialed instruments. The quantities required are range and range rate and line-of-sight rates between the vehicle and the station, vehicle attitudes and angular rates, and the angles subtended by the line of sight. For the equipment assumed herein, satellite rendezvous presented no great problem to the pilot.

Brissenden, Roy F.↗

The Ames Power Monitoring System

The Ames Power Monitoring System (APMS) is a centralized system of power meters, computer hardware, and specialpurpose software that collects and stores electrical power data by various facilities at Ames Research Center (ARC). This system is needed because of the large and varying nature of the overall ARC power demand, which has been observed to range from 20 to 200 MW. Large portions of peak demand can be attributed to only three wind tunnels (60, 180, and 100 MW, respectively). The APMS helps ARC avoid or minimize costly demand charges by enabling wind-tunnel operators, test engineers, and the power manager to monitor total demand for center in real time. These persons receive the information they need to manage and schedule energy-intensive research in advance and to adjust loads in real time to ensure that the overall maximum allowable demand is not exceeded. The APMS (see figure) includes a server computer running the Windows NT operating system and can, in principle, include an unlimited number of power meters and client computers. As configured at the time of reporting the information for this article, the APMS includes more than 40 power meters monitoring all the major research facilities, plus 15 Windows-based client personal computers that display real-time and historical data to users via graphical user interfaces (GUIs). The power meters and client computers communicate with the server using Transmission Control Protocol/Internet Protocol (TCP/IP) on Ethernet networks, variously, through dedicated fiber-optic cables or through the pre-existing ARC local-area network (ARCLAN). The APMS has enabled ARC to achieve significant savings ($1.2 million in 2001) in the cost of power and electric energy by helping personnel to maintain total demand below monthly allowable levels, to manage the overall power factor to avoid low power factor penalties, and to use historical system data to identify opportunities for additional energy savings. The APMS also provides power engineers and electricians with the information they need to plan modifications in advance and perform day-to-day maintenance of the ARC electric-power distribution system.

Osetinsky, Leonid↗

Automating the U.S. Space Station's electrical power system

NASA's Lewis Research Center is developing a highly automated system for the generation, storage and distribution of electrical power aboard the projected Space Station. This autonomous power system will employ conventional algorithms, enhanced by expert systems, to schedule power, allocate energy, diagnose causes of failure, propose goals, prepare plans for their implementation, evaluate their consequences, and select optimum plans for their execution. While crew-interactive expert systems will be ready for the initial Space Station, total system autonomy is expected to require additional development time.

Dolce, James L.↗

Development of an End-to-End Demonstration Readout Chain for Athena-X-IFU

The X-IFU (X-ray Integral Field Unit) of the Athena (Advanced Telescope for High-ENergy Astrophysics) telescope, scheduled for launch in the early 2030's, will provide X-ray spectroscopy data with unprecedented spectral and spatial resolution. This will be achieved by a 3 kilo-pixel array of TES (transition-edge sensor) microcalorimeters. The complete detection chain is under development by a large international collaboration. The detector array will be provided by NASA Goddard Space Flight Center, the cold TDM (time domain multiplexing) electronics by NIST, the cold amplifier by VTT, the cold focal-plane assembly by SRON, the warm front-end electronics by APC, and the DRE (digital readout electronics) by IRAP. In order to perform an end-to-end demonstration of the X-IFU readout chain, a 50 mK test bench is being developed at IRAP in collaboration with CNES. The test bench is based on a two-stage ADR cryostat from Entropy GmbH and a 1024-pixel array from Goddard associated with its cold TDM readout from NIST. The setup will initially be validated using a warm electronic chain from NIST and Goddard. We will describe the complete system being installed in the cryostat and the first results obtained with these electronics. We will also review the status of the integration of the DRE prototype in the demonstration chain and the way forward in the integration and testing of the complete X-IFU readout chain.

S Beaumont↗

Should’ve Could’ve: Progress in the Systems Engineering of the Mars2020 On-Board Planner

Mars rover operations has traditionally controlled behavior using meticulously compiled, so-called “Master” sequences that enforce deterministic timing and ordering of activities. While the approach is effective at managing risk and complexity, it can also be inefficient. Extended operations of the Mars2020 rover envisions a fundamentally different scheduling and execution approach. Atomic activities are constrained by mission operators in time, resource usage, and a structure of dependencies. The rover flight software will create and re-create schedules, responding to available energy, data volume, actual activity durations and execution status, observed temperatures, and other on-board state. Schedules are expected to change substantially in the course of execution. The solution space is prohibitively large and probabilistic in nature. A range of emergent behavior is accessible depending on the interaction between actual on-board state and a given formulation of constraints. For years, the specification and implementation of this capability have been considered and refined, as testing and analysis have mapped the contours of the system. Many concepts that could have been adopted were rejected, and in some cases, emergent properties have been exposed and beaten back with approaches to steer the behavior. This paper discusses some of the design history and underlying reasoning in the systems engineering of the first autonomous activity planner on Mars.

Kuhn, Stephen R↗

Development requirements for a high-energy hybrid propulsion system Final report

This document presents the development requirements, costs, and schedule for a high-energy upper-stage hybrid propulsion system. High energy is achieved through the use of a lithium fuel formulation (solid) and fluorinated oxidizer (liquid). The propulsion system contains 3 2OO lb of propellant and may be used as a terminal stage for Atlas/Centaur or DSV-3M Delta launch vehicle. A program to develop a fluorinated hybrid propulsion system could be initiated with little risk. An extensive investigation revealed that the technology required to develop most of the components has either been demonstrated or is in progress. Further, it was found that there were no areas of critical technology. The cost to develop a hybrid propulsion system to a status where it could be integrated into a flight-test stage is about $17 million. This cost does not include the development of the stage astrionics. Length of the total development program is 34 months. A total recurring cost of $381 600 was estimated for the first unit (less astrionics and fee). This includes purchased hard\rare, manufacturing, material, assembly, and test costs.

M.B. Adams↗

Concepts for design of an energy management system incorporating dispersed storage and generation

New forms of generation based on renewable resources must be managed as part of existing power systems in order to be utilized with maximum effectiveness. Many of these generators are by their very nature dispersed or small, so that they will be connected to the distribution part of the power system. This situation poses new questions of control and protection, and the intermittent nature of some of the energy sources poses problems of scheduling and dispatch. Under the assumption that the general objectives of energy management will remain unchanged, the impact of dispersed storage and generation on some of the specific functions of power system control and its hardware are discussed.

Kirkham, H.↗

Thermal energy storage subsystems. A collection of quarterly reports

The design, development, and progress toward the delivery of three subsystems is discussed. The subsystem used a salt hydrate mixture for thermal energy storage. The program schedules, technical data, and other program activities from October 1, 1976, through December 31, 1977 are presented.

Source record↗

Electric and hybrid electric vehicle study utilizing a time-stepping simulation

The applicability of NASA's advanced power technologies to electric and hybrid vehicles was assessed using a time-stepping computer simulation to model electric and hybrid vehicles operating over the Federal Urban Driving Schedule (FUDS). Both the energy and power demands of the FUDS were taken into account and vehicle economy, range, and performance were addressed simultaneously. Results indicate that a hybrid electric vehicle (HEV) configured with a flywheel buffer energy storage device and a free-piston Stirling convertor fulfills the emissions, fuel economy, range, and performance requirements that would make it acceptable to the consumer. It is noted that an assessment to determine which of the candidate technologies are suited for the HEV application has yet to be made. A proper assessment should take into account the fuel economy and range, along with the driveability and total emissions produced.

Schreiber, Jeffrey G.↗

Exploring the High Energy Universe: GLAST Mission and Science

GLAST, the Gamma-Ray Large Area Space Telescope, is NASA's next-generation high-energy gamma-ray satellite scheduled for launch in Autumn 2007. GLAST will allow measurements of cosmic gamma-ray sources in the 10 MeV to 100 GeV energy band to be made with unprecedented sensitivity. Amongst its key scientific objectives are to understand particle acceleration in Active Galactic Nuclei, Pulsars and Supernovae Remnants, to provide high resolution measurements of unidentified gamma-ray sources, to study transient high energy emission from objects such as gamma-ray bursts, and to probe Dark Matter and the early Universe. Dr. McEnery will present an overview of the GLAST mission and its scientific goals.

McEnery, Julie↗

Exploring the High Energy Universe: GLAST Mission and Science

GLAST, the Gamma-Ray Large Area Space Telescope, is NASA's next-generation high-energy gamma-ray satellite scheduled for launch in Autumn 2007. GLAST will allow measurements of cosmic gamma-ray sources in t he 10 MeV to 100 GeV energy band to be made with unprecedented sensi tivity. Amongst its key scientific objectives are to understand part icle acceleration in Active Galactic Nuclei, Pulsars and Supernovae Remnants, to provide high resolution measurements of unidentified ga mma-ray sources, to study transient high energy emission from objects such as gamma-ray bursts, and to probe Dark Matter and the early Uni verse. Dr. McEnery will present an overview of the GLAST mission and its scientific goals.

McEnery, Julie↗

Operations analysis of gravity assisted rapid transit

Gravity assisted rapid transit (GART) with 6 percent grades before and after each station are compared with conventional systems in terms of energy consumption, run time, line capacity and schedule stability under abnormal circumstances. Parametric analyses of run times and energy consumption include the impact of alternate accelerating and braking levels. The capcity analysis uses a network simulation program to determine the location and severity of all signal delays. Based on results of initial simulations, the block design was revised to eliminate bottlenecks in normal operations. The systems are then compared at headways of 80 to 180 seconds. One month of incidence reports of a modern operating transit system are reviewed to determine the failures to be simulated. The impact of failures resulting in station delays (30 to 360 seconds), speed limit reduction (20 mph and 30 mph to one or more trains), vehicle performance (75 percent acceleration) are compared at scheduled headway of 90 to 180 seconds.

Source record↗

TOPEX electrical power system

The TOPEX mission requirements which impact the power requirements and analyses are presented. A description of the electrical power system (EPS), including energy management and battery charging methods that were conceived and developed to meet the identified satellite requirements, is included. Analysis of the TOPEX EPS confirms that all of its electrical performance and reliability requirements have been met. The TOPEX EPS employs the flight-proven modular power system (MPS) which is part of the Multimission Modular Spacecraft and provides high reliability, abbreviated development effort and schedule, and low cost. An energy balance equation, unique to TOPEX, has been derived to confirm that the batteries will be completely recharged following each eclipse, under worst-case conditions. TOPEX uses three NASA Standard 50AH Ni-Cd batteries, each with 22 cells in series. The MPS contains battery charge control and protection based on measurements of battery currents, voltages, temperatures, and computed depth-of-discharge. In case of impending battery depletion, the MPS automatically implements load shedding.

Chetty, P. R. K.↗

A Fresnel collector process heat experiment at Capitol Concrete Products

An experiment is planned, conducted and evaluated to determine the feasibility of using a Power Kinetics' Fresnel concentrator to provide process heat in an industrial environment. The plant provides process steam at 50 to 60 psig to two autoclaves for curing masonry blocks. When steam is not required, the plant preheats hot water for later use. A second system is installed at the Jet Propulsion Laboratory parabolic dish test site for hardware validation and experiment control. Experiment design allows for the extrapolation of results to varying demands for steam and hot water, and includes a consideration of some socio-technical factors such as the impact on production scheduling of diurnal variations in energy availability.

Hauger, J. S.↗

Seasonal and Vegetational Variation in Albedo Measured During CERES Ground-Validation Pilot Study

The Clouds and the Earth's Radiant Energy System (CERES) satellite is scheduled for launch in the Fall of 1997 aboard the Tropical Rainfall Measuring Mission (TRMM). A surface measurement pilot study has been initiated in a 37-km region near Richmond, VA, for comparison with the CERES surface flux retrievals. Two-minute averaged upwelling and downwelling surface fluxes over a mostly deciduous forest have been recorded daily for the past two years, and show a broadband, shortwave daily albedo increase during the summer months. Evidence is presented that indicates vegetational changes in the forest as the overriding mechanism for this change. Upwelling flux measured over the entire region by helicopter-mounted instrumentation has been processed for four solar seasons. Future plans include the installation of four more albedo surface sites over various types of vegetation throughout the region.

Schuster, G. L.↗