Search NASA⌕ Search

SEARCH · Search NASA

Results for “environmental compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Waste Isolation Pilot Plant Biennial Environmental Compliance Report

This biennial environmental compliance report (BECR), the eighth to be issued, documents United States (U.S.) Department of Energy (DOE) compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste and mixed TRU waste. TRU waste is radioactive waste that contains alpha-emitting radionuclides of atomic number greater than 92, with half lives longer than 20 years, and which are present in concentrations greater than 100 nanocuries per gram of waste. The BECR meets the requirements of the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201, WIPP Land Withdrawal Act Amendments of 1996.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Biennial Environmental Compliance Report

This biennial environmental compliance report (BECR), the ninth to be issued, documents United States (U.S.) Department of Energy (DOE) compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste and mixed TRU waste. TRU waste is radioactive waste which contains alpha-emitting radionuclides of atomic number greater than 92, with half lives longer than 20 years, and which are present in concentrations greater than 100 nanocuries per gram of waste. The BECR meets the requirements of the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201, WIPP Land Withdrawal Act Amendments of 1996).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Compliance Audit& Assessment Program Manual

This document describes the elements, schedule, roles, and responsibilities of the Lawrence Berkeley National Laboratory (LBNL) Environmental Compliance Audit & Assessment Program (ECAAP). The ECAAP has been developed to meet the requirements of DOE Order 450.1A,1 and Executive Order 13423.2 These referenced Orders stipulate that government agencies must develop environmental compliance audit programs to monitor and improve compliance with environmental regulations. As stated specifically in the DOE Order, as a part of a DOE facility's Environmental Management System (EMS), 'An environmental compliance audit and review program that identifies compliance deficiencies and root causes of non-compliance' shall be developed and implemented. The ECAAP has also been developed to satisfy LBNL's institutional technical assurance assessment requirements promulgated in the Environment, Safety and Health (ES&H) Self-Assessment Program (LBNL/PUB-5344) and described by the ES&H Technical Assurance Program (TAP) Manual (LBNL/PUB-913E). The ES&H TAP Manual provides the framework for systematic reviews of ES&H programs with the intent to provide assurance that these programs comply with their guiding regulations, are effective, and are properly implemented. As required by the DOE and Executive Orders and by LBNL's TAP, the goal of the ECAAP is to identify environmental regulatory compliance deficiencies and to determine their respective causes. The ECAAP then provides a means of correcting any deficiencies identified, and leads to continually improving environmental compliance performance.

99 GENERAL AND MISCELLANEOUS↗

Environmental Compliance and Protection Program Description Oak Ridge, Tennessee

The objective of the Environmental Compliance and Protection (EC and P) Program Description (PD) is to establish minimum environmental compliance requirements and natural resources protection goals for the Bechtel Jacobs Company LLC (BJC) Oak Ridge Environmental Management Cleanup Contract (EMCC) Contract Number DE-AC05-98OR22700-M198. This PD establishes the work practices necessary to ensure protection of the environment during the performance of EMCC work activities on the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, by BJC employees and subcontractor personnel. Both BJC and subcontractor personnel are required to implement this PD. A majority of the decontamination and demolition (D and D) activities and media (e.g., soil and groundwater) remediation response actions at DOE sites on the ORR are conducted under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). CERCLA activities are governed by individual CERCLA decision documents (e.g., Record of Decision [ROD] or Action Memorandum) and according to requirements stated in the Federal Facility Agreement for the Oak Ridge Reservation (DOE 1992). Applicable or relevant and appropriate requirements (ARARs) for the selected remedy are the requirements for environmental remediation responses (e.g., removal actions and remedial actions) conducted under CERCLA.

54 ENVIRONMENTAL SCIENCES↗

Fortifying Environmental Compliance Strategies at Hanford - 19541

At the Hanford Site, located near Richland, Washington, the Department of Energy is cleaning up legacy radioactive and mixed-waste generated from the Manhattan Project in the 1940's. A major component of cleaning up the waste is maintaining compliance with federal and state environmental regulations. Environmental compliance is also determined through permits, agreements, and consent orders issued by regulating agencies such as the Washington State Department of Health: Office of Radiation Protection, Washington State Department of Ecology Nuclear Waste Program, and the Environmental Protection Agency. Maintaining compliance at Hanford reduces environmental impacts and addresses violations, or non-compliances. The following strategies improve compliance and support the avoidance of enforcement actions. At Hanford, regulatory agency environmental enforcement actions, and their corrective actions, are tracked to completion using databases maintained by inspection subject matter experts. The databases are used to provide the Department of Energy and contractor management with up-to-date status of regulatory agency activity and the required corrective actions. Trending enforcement actions helps target compliance vulnerabilities. Findings and corrective actions that are entered into the databases are then trended by date, location, responsible contractor, agency, and type of compliance issue. The ability to review previous non-compliances in certain locations of the Site, or by general alleged violation, provides the project's environmental contacts with information on what types of issues to look for on pre-inspection walk downs. Finding non-compliances during pre-inspection walk downs allows the contractor to correct the issue and avoid potential fines from regulating agencies. The walk downs are conducted by environmental specialists and project personnel looking for issues that may be viewed as a compliance problem. Using agency checklists and previous inspection correspondence can help to provide valuable information during pre-inspection activities. Training regulatory agency inspectors on Site security requirements, cultural and ecological standards, and inspection protocols allows for increased efficiency and reduces potential miscommunication between regulatory agencies and the regulated contractors. The training also allows the contractors to give the regulating agencies the up-to-date policies and procedures that will be addressed during the inspection. Hanford has pre-identified inspection coordinators within each contractor to assist in coordinating with Department of Energy personnel, projects, and management prior to the inspections. These inspection coordinators notify affected management, accommodate and escort the regulators to locations they ask to inspect, set up requested interviews, and gather requested information that will need to be cleared for public release. These practices make for positive experiences and interactions with the regulating agency personnel and help reduce and eliminate environmental non-compliances, findings, violations, and fines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of Environmental Compliance at the Savannah River Site - 13024

The Savannah River Site (SRS) is a large federal installation hosting diverse missions and multiple organizations with competing regulatory needs. Accordingly, there was a need to integrate environmental compliance strategies to ensure the consistent flow of information between Department of Energy-Savannah River (DOE-SR), the regulatory agencies and other interested parties. In order to meet this objective, DOE and major SRS contractors and tenants have committed to a strategy of collaboratively working together to ensure that a consistent, integrated, and fully coordinated approach to environmental compliance and regulator relationships is maintained. DOE-SR and Savannah River Nuclear Solutions, LLC, the SRS management and operations contractor, have established an environmental compliance integration process that provides for the consistent flow down of requirements to projects, facilities, SRS contractors, and subcontractors as well as the upward flow of information to assist in the early identification and resolution of environmental regulatory issues and enhancement of compliance opportunities. In addition, this process strongly fosters teamwork to collaboratively resolve complex regulatory challenges, promote pollution prevention and waste minimization opportunities to advance site missions in a manner that balances near-term actions with the long-term site vision, while being protective of human health and the environment. Communication tools are being utilized, some with enhancements, to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. SRS internal regulatory integration is accomplished through a variety of informational exchange forums (e.g., Challenges, Opportunities and Resolution (COR) Team, DOE's Joint Site Regulatory Integration Team, and the Senior Environmental Managers Council (SEMC)). SRS communications and problem-solving with the regulatory agencies have been enhanced through formation of an interagency 'SRS Regulatory Integration Team (SRIT)'. The SRIT is a partnership comprised of representatives from DOE-SR (with contractor support), EPA Region 4 and the South Carolina Department of Health and Environmental Control (SCDHEC) and is chartered to develop a consensus understanding of SRS regulatory issues and activities. These forums and a formal environmental compliance integration process improve timely cross-functional decision making, problem solving, information sharing, and issue resolution. The SRS internal process has been formally documented in an Environmental Regulatory Integration Program Description, which is linked to the SRS Environmental Policy and agreed upon by all major contractors, subcontractors and tenants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automation of environmental compliance data acquisition and management - 15267

Regulatory sampling for environmental compliance at the Savannah River Site (SRS), Aiken, South Carolina employs several different types of sampling techniques at various sampling frequencies. These sampling events result in the collection of large quantities of data and generate substantial data-related documents. The use of paper documents resulted in the need for manual input of data collected in the field and distribution of documents from one group to the next. To efficiently and effectively manage the extensive amounts of data and documents, elements of the sampling process were automated using hand-held field tablets and an electronic application. The tablets allow for easier distribution of sampling documents, and the application allows for digital transfer of sampling information and collected field data. The transition to automated data acquisition and management has resulted in a more efficient and reliable manner for conducting business at SRS. This system benefits numerous organizations at SRS by utilizing a centralized database for efficient management of all environmental data collected. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2017 Workshop Summary: MHK Environmental Compliance Cost Reduction Strategies Workshop

This three year effort started in FY17 with the objectives of capturing environmental compliance costs and lessons learned from MHK developments that have gone through the permitting and compliance process. The goal is to find ways to improve the efficiency and effectiveness of the permitting and compliance process and reduce costs to encourage investment in MHK projects. The project team is composed of Sandia National Laboratories, Integral Consulting, Kearns & West, and H. T. Harvey & Associates. Step one of the project process, collect data to determine permitting and compliance costs, is currently underway. Step two of the project process, identify cost reduction pathways and step three, develop cost reduction strategies, will follow and are envisioned as an iterative approach to best meet the project goal.

54 ENVIRONMENTAL SCIENCES↗

2018 Webinar Summary: MHK Environmental Compliance Cost Reduction Strategies Workshop

This three-year effort started in FY17 with the primary objective of detailing the environmental compliance costs and lessons learned from U.S. based MHK projects that have gone through the permitting and compliance process. The project goal is to find ways to improve the efficiency and effectiveness of the permitting and compliance process that reduce deployment uncertainties and associated risks/costs; ultimately encouraging investment in MHK projects. The project team is composed of Sandia National Laboratories, H. T. Harvey & Associates, Integral Consulting, and Kearns & West. Step one of the project process, collect data to determine permitting and compliance costs, was a focus during 2017, but is an ongoing process to ensure the project team is working with the most recent and accurate data as possible. Currently, the project team is focusing on step two of the project process, identify cost reduction pathways. Step three, develop cost reduction strategies, will follow during Fall 2018 and Winter 2019. Each step is envisioned as an iterative approach working with industry and regulators to best meet the project goal.

54 ENVIRONMENTAL SCIENCES↗

2018 Workshop Summary: MHK Environmental Compliance Cost Reduction Strategies Workshop

This three-year effort started in FY17 with the primary objective of detailing the environmental compliance costs and lessons learned from U.S. based MHK projects that have gone through the permitting and compliance process. The project goal is to find ways to improve the efficiency and effectiveness of the permitting and compliance process that reduce deployment uncertainties and associated risks/costs; ultimately encouraging investment in MHK projects. The project team is composed of Sandia National Laboratories, H. T. Harvey & Associates, Integral Consulting, and Kearns & West. Step one of the project process, collect data to determine permitting and compliance costs, was a focus during 2017, but is an ongoing process to ensure the project team is working with the most recent and accurate data as possible. Currently, the project team is focusing on step two of the project process, identify cost reduction pathways. Step three, develop cost reduction strategies, will follow during Fall 2018 and Winter 2019. Each step is envisioned as an iterative approach working with industry and regulators to best meet the project goal.

54 ENVIRONMENTAL SCIENCES↗

Environmental projects. Volume 5, part 1: Study of subsurface contamination. Part 2: Guide to implement environmental compliance programs

In support of the national goal for the preservation of the environment and the protection of human health and safety, NASA, the Jet Propulsion Laboratory, and the Goldstone Deep Space Communications Complex have adopted the position that their operating installations shall maintain a high level of compliance in regard to regulations concerning environmental hazards. An investigation carried out by Engineering Science, Inc. focused on possible underground contamination that may have resulted from leaks and/or spills from storage facilities at the Goldstone Communications Complex. It also involved the cleanup of a non-hazardous waste dumpsite at the Mojave Base Site at the Goldstone complex. The report also includes details of the management duties and responsibilities needed to maintain compliance with environmental laws and regulations.

Bengelsdorf, I.↗

Environmental Compliance through Inventory Management

This poster serves as an overview of the summer 2024 Environmental Program Department Internship projects. These include updating the air emissions inventory to appropriately calculate the previous year's emissions for all relevant sources at the Batavia site, as well as beginning a site-wide chemical inventory to eventually establish a database to track all non-household chemicals at the lab.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Site Identification framework and environmental compliance for floating ocean turbines in US Waters (Abstract)

Like all potential marine energy deployment sites, characterizing the site, understanding the environmental interactions with floating tidal technology, and mapping a pathway towards regulatory acceptance will be needed to site and permit ocean current development within the Florida Current. The proposed work will be based on a modeling analysis, a desk-top review and analysis, focusing on the characteristics of the ocean current technology and environmental monitoring information on the marine animals and habitats that are specific to the appropriate latitude, particularly those that are endemic to the offshore Florida area. The analysis will also describe the state and federal authorizations required for deploying a floating tidal energy technology, with an emphasis on how they differ from those in Washington, Alaska, and Maine. Environmentally compliant sites within Florida Current will be selected based on environmental, logistical, and regulatory criteria. Recommendations on monitoring needs and adaptive management practices will be provided. The need to acquire social acceptance for the Orbital Marine Power technology will also be explored and general recommendations prepared to encourage the best acceptance in the communities of interest.

16 TIDAL AND WAVE POWER↗

Linking international technical specifications for acoustic characterization of marine energy converter sounds with environmental compliance criteria

As new ocean energy technologies emerge and are deployed for testing and operations, sound emissions are a potential concern for environmental effects to marine life. Consistent acoustic measurement and data analysis methods can help promote comparisons of technologies and transferability between project sites. In 2022, acoustic emissions from a prototype scale wave energy converter (WEC) were characterized for a range of environmental conditions and power generation states in the coastal waters off southern California using a set of international technical specifications. Results from the international technical specification analyses were applied to United States regulatory threshold criteria for acoustic impacts to marine mammals and examined in the context of European underwater noise monitoring guidelines. Weighted 24 hour cumulative sound exposure levels SEL24h calculated from the highest power generation state WEC sound pressure levels were often more than 20 dB below threshold criteria for temporary threshold shifts in five relevant marine mammal hearing groups. Following European Union recommendations for analyses and reporting, WEC sound characterization in third octave bands centered at 63 Hz and 125 Hz show clear spatial decay of WEC-generated noise, with more pronounced attenuation at 63 Hz, and a less marked but still detectable gradient at 125 Hz, collectively suggesting a relatively confined acoustic footprint under the observed conditions. The value of the international technical specification approach is highlighted by the isolation of WEC sounds from the surrounding soundscape. This allows for a robust characterization of acoustic emissions through a range of device power generation and sea states. Furthermore, in threshold-based regulatory contexts like the U.S., this facilitates direct evaluation of source contributions, while in broader monitoring frameworks used in the E.U. it provides a reproducible foundation for assessing the contribution of emerging ocean energy technologies to the underwater acoustic environment.

Haxel, Joseph H. (ORCID:0000000273864761)↗

Environmental projects. Volume 3: Environmental compliance audit

The Goldstone Deep Space Communications Complex is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Activities at Goldstone are carried out in support of six large parabolic dish antennas. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL and Goldstone have adopted a position that their operating installations shall maintain a high level of compliance with Federal, state, and local laws governing the management of hazardous substances, abestos, and underground storage tanks. A JPL version of a document prepared as an environmental audit of Goldstone operations is presented. Both general and specific items of noncompliance at Goldstone are identified and recommendations are provided for corrective actions.

Source record↗

Environmental Compliance Methodology for Floating Tidal Turbines in US Waters: CRADA 513 [Abstract only]

Orbital Marine Power seeks to deploy their floating tidal technology in US waters, with an initial main focus in the Pacific Northwest (PNW) and partial focus in Western Passage, Maine. To achieve the deployment of the technology, Orbital will need to satisfy all relevant environmental permitting requirements and provide insight into what might be expected of the company.

16 TIDAL AND WAVE POWER↗

TEAMER: Supporting model output files for Environmental Compliance Framework for Floating Tidal Turbines, Cook Inlet, AK

Orbital Marine Power (Orbital) is seeking to deploy their floating tidal technology in US waters and has considered the possibility of deploying in temperate waters including the Pacific Northwest (PNW) and the Western Passage, Maine. It has become apparent that some of the most promising tidal sites in the US are located in high latitudes, within the State of Alaska. Within the state, the most likely sites for grid-scale tidal energy are in Cook Inlet, with the largest city (Anchorage) located on the shores, ready and able to absorb the electrical output of a commercial scale tidal development. Through the TEAMER project, Pacific Northwest National Laboratory (PNNL) developed a framework to select environmentally compliant sites partially based on hydrodynamic model output. This uploaded dataset summarizes the key hydrodynamic model output files discussed in the TEAMER project report. Please unzip the file to see actual data files and the ReadMe file. This project is part of the TEAMER RFTS 4 (request for technical support) program.

16 TIDAL AND WAVE POWER↗