Search NASA⌕ Search

SEARCH · Search NASA

Results for “equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Earthquake response of head-mounted equipment in advanced nuclear reactors

The seismic response of safety-related equipment mounted on the head of an advanced reactor, including pumps, control rod drive mechanisms, and reactor monitoring devices, will affect the design and layout of many advanced reactors. High earthquake-induced accelerations in such equipment may challenge their seismic qualification and trigger the need for additional support framing on the reactor head. Base isolation is a design solution that can drastically reduce seismic demands on equipment. This article describes a set of earthquake-simulator experiments conducted on a scale-model of a base-isolated reactor vessel including four representations of head-mounted equipment, with frequencies spanning from 4.5 to 27 Hz. Dynamic responses of the head-mounted equipment, including displacements, accelerations, and strains, were measured in the experiments for three support conditions: conventional, and seismically isolated using single concave Friction Pendulum (SFP) bearings and triple Friction Pendulum (TFP) bearings. Seismic isolation was effective at reducing equipment responses (accelerations, displacements, and strains) with respect to those in the conventionally supported vessel across a range of seismic inputs. Companion numerical studies highlight the accuracy to be expected in the calculation of different response quantities for lightly damped equipment. The importance of characterizing damping in head-mounted, safety-related equipment through physical experiments to support design and risk assessment is made clear through the numerical simulations.

Engineering↗

Space processing applications payload equipment study. Volume 2E: Commercial equipment utility

Examination of commercial equipment technologies revealed that the functional performance requirements of space processing equipment could generally be met by state-of-the-art design practices. Thus, an apparatus could be evolved from a standard item or derived by custom design using present technologies. About 15 percent of the equipment needed has no analogous commercial base of derivation and requires special development. This equipment is involved primarily with contactless heating and position control. The derivation of payloads using commercial equipment sources provides a broad and potentially cost-effective base upon which to draw. The derivation of payload equipment from commercial technologies poses other issues beyond that of the identifiable functional performance, but preliminary results on testing of selected equipment testing appear quite favorable. During this phase of the SPA study, several aspects of commercial equipment utility were assessed and considered. These included safety, packaging and structural, power conditioning (electrical/electronic), thermal and materials of construction.

Smith, A. G.↗

Programmatic Equipment Procurement: An Improved System for Coordinating the Procurement of New Programmatic Equipment

A better structured system that outlines the communication required between the Project Manager (PM) and all the Key Stakeholders. This system will help the PM work with the SMEs to define the scope of the equipment to be procured. It will also help the PM confirm that all associated key stakeholders (WCI IT, FPOC, etc.) have been contacted and have reviewed the new equipment being proposed to be procured. This step is crucial in order to confirm that the piece of equipment being procured not only meets the SME requirements but also the security, safety and building requirements on site. This is a step that is currently missed or overlooked and can cause delays in procurement after the piece of equipment has already been decided on. This new system should help mitigate any delays or miscommunication regarding the piece of equipment being procured.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Managing EHS of PV-Related Equipment at the National Renewable Energy Laboratory: Preprint

Managing environment, health, and safety (EHS) risks at a national laboratory, or university, can be intimidating to a researcher who is focused on research results. Laboratory research and development (R&D) operations are often driven by scientists with limited engineering support and lack well-refined equipment development resources. To add to the burden for a researcher, there is a plethora ofcodes, standards, and regulations that govern the safe installation and operation of photovoltaic-related R&D equipment -- especially those involving hazardous production materials. To help guide the researcher through the vast list of requirements, the EHS office at NREL has taken a variety of steps. Organizationally, the office has developed hazard-specific laboratory-level procedures togovern particular activities. These procedures are a distillation of appropriate international codes, fire agencies, SEMI standards, U.S. Department of Energy orders, and other industry standards to those necessary and sufficient to govern the safe operation of a given activity. The EHS office works proactively with researchers after a concept for a new R&D capability is conceived to help guidethe safe design, acquisition, installation, and operation of the equipment. It starts with a safety assessment at the early stages such that requirements are implemented to determine the level of risk and degree of complexity presented by the activity so appropriate controls can be put in place to manage the risk. As the equipment requirements and design are refined, appropriate equipmentstandards are applied. Before the 'to-build' specifications are finalized, a process hazard analysis is performed to ensure that no single-point failure presents an unacceptable risk. Finally, as the tool goes through construction and installation stages, reviews are performed at logical times to ensure that the requisite engineering controls and design are in place and operational.Authorization to operate is not given until adherence to these requirements is fully verified and documented. Operations continue under the conditions defined through this process and are reviewed with changing processes.

14 SOLAR ENERGY↗

A Study to Compare the Failure Rates of Current Space Shuttle Ground Support Equipment with the New Pathfinder Equipment and Investigate the Effect that the Proposed GSE Infrastructure Upgrade Might Have to Reduce GSE Infrastructure Failures

The purposes of this study are to compare the current Space Shuttle Ground Support Equipment (GSE) infrastructure with the proposed GSE infrastructure upgrade modification. The methodology will include analyzing the first prototype installation equipment at Launch PAD B called the "Pathfinder". This study will begin by comparing the failure rate of the current components associated with the "Hardware interface module (HIM)" at the Kennedy Space Center to the failure rate of the neW Pathfinder components. Quantitative data will be gathered specifically on HIM components and the PAD B Hypergolic Fuel facility and Hypergolic Oxidizer facility areas which has the upgraded pathfinder equipment installed. The proposed upgrades include utilizing industrial controlled modules, software, and a fiber optic network. The results of this study provide evidence that there is a significant difference in the failure rates of the two studied infrastructure equipment components. There is also evidence that the support staff for each infrastructure system is not equal. A recommendation to continue with future upgrades is based on a significant reduction of failures in the new' installed ground system components.

Kennedy, Barbara J.↗

Restraining Loose Equipment Aboard the International Space Station: The Payload Equipment Restraint System

As the International Space Station (ISS) grows, so do the supplies and equipment needed to support its daily operations. Each day many items must be unstowed and relocated to various worksites so they are readily available to the crew. Due to the lack of gravity, these items may become loose and float away if not restrained. The Payload Equipment Restraint System was developed to meet the new and unique challenge of restrain no loose equipment aboard the ISS.

Smith, Kenneth A.↗

Restraining Loose Equipment Aboard the International Space Station: The Payload Equipment Restraint System

As the International Space Station (ISS) grows, so do the supplies and equipment needed to support its daily operations. Each day many items must be unstowed and moved to various worksites so that they are readily available to the crew. Due to the lack of gravity, these items ,may become loose and float away if not restrained. The Payload Equipment Restraint System (PERS) was developed to meet the new and unique challenge of restraining loose equipment aboard the ISS.

Smith Kenneth A.↗

Managing Army Plug Load Equipment Energy Use: Office Equipment

Office equipment covers a large and diverse group of plug load devices. Policies focused on equipment purchase, power management, and usage limitations can save the Army more than 10 million kWh and $620K per year within just four building categories. This represents a top opportunity for energy- and cost-savings identified by a recent Army plug load study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Equipment Loan for Concentrated PV Cavity Converter (PVCC) Research: (CRADA CRD-08-285 Final Report)

Interest in High Concentration Photovoltaics (HCPV) for terrestrial applications has significantly grown in recent years. A major driver behind this growth trend is the availability of high efficiency multi-junction (MJ) cells that promise reliable operation under high concentrations (500 to 1000 suns). The primary impact of HCPV on the solar electricity cost is the dramatic reduction in cell cost. For terrestrial HCPV systems, operating at concentrations >/=500 suns, the expensive MJ cells are marginally affordable. Most recently, triple-junction test cells have achieved a conversion efficiency of over 40% under concentrated sunlight. Photovoltaic Cavity Converter (PVCC) is a multi-bandgap, high concentration PV device developed by United Innovations, Inc., under subcontract to NREL. The lateral- (2- dimensional) structure of PVCC, as opposed to vertical multi-junction (MJ) structure, helps to circumvent most of the developmental challenges MJ technology has yet to overcome. This CRADA will allow the continued development of this technology by United Innovations. cost. For terrestrial HCPV systems, operating at concentrations >/=500 suns, the expensive MJ cells are marginally affordable. Most recently, triple-junction test cells have achieved a conversion efficiency of over 40% under concentrated sunlight. Photovoltaic Cavity Converter (PVCC) is a multi-bandgap, high concentration PV device developed by United Innovations, Inc., under subcontract to NREL. The lateral- (2- dimensional) structure of PVCC, as opposed to vertical multi-junction (MJ) structure, helps to circumvent most of the developmental challenges MJ technology has yet to overcome. This CRADA will allow the continued development of this technology by United Innovations. cost. For terrestrial HCPV systems, operating at concentrations >/=500 suns, the expensive MJ cells are marginally affordable. Most recently, triple-junction test cells have achieved a conversion efficiency of over 40% under concentrated sunlight. Photovoltaic Cavity Converter (PVCC) is a multi-bandgap, high concentration PV device developed by United Innovations, Inc., under subcontract to NREL. The lateral- (2- dimensional) structure of PVCC, as opposed to vertical multi-junction (MJ) structure, helps to circumvent most of the developmental challenges MJ technology has yet to overcome. This CRADA will allow the continued development of this technology by United Innovations. cost. For terrestrial HCPV systems, operating at concentrations >/=500 suns, the expensive MJ cells are marginally affordable. Most recently, triple-junction test cells have achieved a conversion efficiency of over 40% under concentrated sunlight. Photovoltaic Cavity Converter (PVCC) is a multi-bandgap, high concentration PV device developed by United Innovations, Inc., under subcontract to NREL. The lateral- (2- dimensional) structure of PVCC, as opposed to vertical multi-junction (MJ) structure, helps to circumvent most of the developmental challenges MJ technology has yet to overcome. This CRADA will allow the continued development of this technology by United Innovations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Potential Heating Energy and Cost Savings of Dual Fuel Heat Pump Controls as a Residential Building Equipment Retrofit in the U.S.

This study investigated the energy and cost savings potential by modeling a dual fuel heat pump system with its control for a residential building in (5A) cold climate in U.S. The simulation analysis showed that the application of the DFHP system and its control to the target building can save the heating energy by 42% over a gas furnace system (baseline system). Although the HP-only system can save more heating energy (i.e., 53%) over the baseline system than DFHP system does, the DFHP with its control demonstrated the higher cost savings when a time of use electricity rate was considered.

Yoon, Yeobeom↗

Modeling and new equipment definition for the vibration isolation box equipment system

Our MSAD-funded research project is to provide numerical modeling support for the VIBES (Vibration Isolation Box Experiment System) which is an IML2 flight experiment being built by the Japanese research team of Dr. H. Azuma of the Japanese National Aerospace Laboratory. During this reporting period, the following have been accomplished: A semi-consistent mass finite element projection algorithm for 2D and 3D Boussinesq flows has been implemented on Sun, HP And Cray Platforms. The algorithm has better phase speed accuracy than similar finite difference or lumped mass finite element algorithms, an attribute which is essential for addressing realistic g-jitter effects as well as convectively-dominated transient systems. The projection algorithm has been benchmarked against solutions generated via the commercial code FIDAP. The algorithm appears to be accurate as well as computationally efficient. Optimization and potential parallelization studies are underway. Our implementation to date has focused on execution of the basic algorithm with at most a concern for vectorization. The initial time-varying gravity Boussinesq flow simulation is being set up. The mesh is being designed and the input file is being generated. Some preliminary 'small mesh' cases will be attempted on our HP9000/735 while our request to MSAD for supercomputing resources is being addressed. The Japanese research team for VIBES was visited, the current set up and status of the physical experiment was obtained and ongoing E-Mail communication link was established.

Sani, Robert L.↗

Preventive Rad/Nuc Detection Equipment Categorization for Consequence Management

The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection equipment (PRND) to provide state and local agencies with guidance on how to best use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed for detection and interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management response take place. This effort will provide scientific guidance on the best way to deploy and operate this class of equipment for consequence management missions. With the support of the US Department of Homeland Security’s (DHS) Domestic Nuclear Detection Office (DNDO), PRND equipment has been placed into service at federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be repurposed to support the emergency response in the aftermath of a radiological of nuclear event. This report evaluates PRND equipment to define key categories of equipment and the types of missions they can be used for. This is important because there are over 100 different types of PRND equipment, often with significantly different capabilities with respect to the consequence management mission. The current DNDO draft NIMS PRND equipment types were used as a foundation and expanded, when necessary, to address key characteristics important for the consequence mission. Table 1 provides a summary of the PRND instrument categories developed for this effort. Also included on the table are some common response mission detection equipment categories that will be used for capability comparisons.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Utilizing FLEX Equipment for O&M Cost Reduction in Nuclear Power Plants

There are many ways of reducing the O&M costs; this work presents an innovative framework of reducing O&M costs by utilizing the onsite Flex equipment at NPPs. Flex strategies were postulated by the U.S. Nuclear Regulatory Commission (NRC) in the wake of Fukushima Dai-ichi accident to address beyond-design-basis accidents and improve plant flexibility. Onsite Flex includes equipment such as portable pumps, generators, batteries, compressors, and other supporting equipment or tools, all stored in a dedicated and secure building designed to withstand external hazards. In the past years, several NPPs have invested in procuring and maintaining the onsite Flex asset that stands unutilized most of the time. Recently there have been active efforts to develop strategies through which NPPs can take credit for the Flex equipment. This work focuses on identifying areas where Flex equipment can be utilized during normal plant operation and develop a framework that would aide in reduction of O&M costs without impacting plant safety. Earlier work in the current project, published in INL/EXT 18 51531, had presented the risk- and cost-analysis framework for utilizing FLEX portable equipment during technical specification required shutdown due to component failure. The licensee event report (LER) database of the NRC shows that the commercial NPPs in the US reported 86 technical specification required shutdowns since year 2010. When a component failure or unavailability leads to a technical specification required shutdown, the NPPs suffers both direct costs in terms of loss of revenue arising from the loss of generation and indirect costs in form of reporting and inspection required by the NRC. The earlier work developed the following framework and implemented it on a demonstration probabilistic risk assessment (PRA) model to utilize the portable Flex equipment when a component failure could potentially lead to a technical specification required shutdown: 1. Identify the components, the failure or unavailability of which would result in a 10 CFR 50.73(a)(2)(i)A-reportability requirement, postulated by the NRC for technical specification required shutdown to be reported in NRC’s LER database. 2. Identify the Flex equipment that can be utilized as a standby to the failed component. 3. Develop a probabilistic risk assessment (PRA) model that incorporates the Flex equipment within the current plant PRA model. 4. Perform PRA calculations to determine change in core damage frequency and change in risk-informed allowable outage time. 5. Perform cost-benefit analysis to determine the economic feasibility of implementing the Flex equipment The current work, presented in this report, implement the above framework in a plant PRA model obtained from a US commercial nuclear power plant by prestaging onsite FLEX equipment as a redundancy to the existing auxiliary feedwater system, and pre-coordinating with offsite FLEX centers. The new configuration increased the allowable outage time by about a fifty percent overall for the diesel generator being out of service. The benefits to NPPs of utilizing the Flex equipment during normal operations, and performing the PRA developed in this work, include: 1. A risk-informed plant shutdown alternative to the current technical specification required shutdown. 2. Extension of allowable outage time to initiate technical specification required shutdown. 3. Reducing economic impact of component failure, avoiding plant shutdown, and maximizing generation. 4. Save the direct and indirect costs associated with technical specification required shutdown.

42 ENGINEERING↗

TANK 18 AND 19-F TIER 1A EQUIPMENT FILL MOCK UP TEST SUMMARY

The United States Department of Energy (US DOE) has determined that Tanks 18-F and 19-F have met the F-Tank Farm (FTF) General Closure Plan Requirements and are ready to be permanently closed. The high-level waste (HLW) tanks have been isolated from FTF facilities. To complete operational closure they will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) discouraging future intrusion, and (4) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. Bulk waste removal and heel removal equipment remain in Tanks 18-F and 19-F. This equipment includes the Advance Design Mixer Pump (ADMP), transfer pumps, transfer jets, standard slurry mixer pumps, equipment-support masts, sampling masts, dip tube assemblies and robotic crawlers. The present Tank 18 and 19-F closure strategy is to grout the equipment in place and eliminate vertical pathways by filling voids in the equipment to vertical fast pathways and water infiltration. The mock-up tests described in this report were intended to address placement issues identified for grouting the equipment that will be left in Tank 18-F and Tank 19-F. The Tank 18-F and 19-F closure strategy document states that one of the Performance Assessment (PA) requirements for a closed tank is that equipment remaining in the tank be filled to the extent practical and that vertical flow paths 1 inch and larger be grouted. The specific objectives of the Tier 1A equipment grout mock-up testing include: (1) Identifying the most limiting equipment configurations with respect to internal void space filling; (2) Specifying and constructing initial test geometries and forms that represent scaled boundary conditions; (3) Identifying a target grout rheology for evaluation in the scaled mock-up configurations; (4) Scaling-up production of a grout mix with the target rheology (16 second flow cone value) from 0.25 cubic feet to 4.3 cubic feet. (Ten 0.43 cubic batches were produced because full-scale equipment was not available for the Tier 1A test.); (5) Demonstrating continuous gravity filling of the ADMP mock up test form; (6) Demonstrating continuous gravity filling of 1 inch and 2 inch schedule 40 pipe; and (7) Demonstrating filling of 1 inch and 2 inch schedule 40 pipe from the bottom up by discharging through a tube inserted into the pipes. The Tier 1A mock-up test focused on the ADMP and pipes at least one inch in diameter. The ADMP which is located in center riser of Tank 18-F is a concern because the column for this long-shaft (55 ft) pump is unique and modification to the pump prior to placing it in service limited the flow path options for filling by creating a single flow path for filling and venting the ADMP support column. The large size, vertical orientation, and complicated flow path in the ADMP warrants a detailed description of this piece of ancillary equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mission Analysis for Using Preventive Radiological/Nuclear Detection Equipment for Consequence Management

The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection (PRND) equipment to provide state and local agencies with scientific guidance on how to effectively use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed by technology manufacturers and purchased by responders for preventive detection and source interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management (CM) response take place, as it is currently the most widely available and fielded radiological instrumentation by state and local agencies. This effort will provide scientific guidance on the most effective way to utilize this class of equipment for consequence management missions. Gaining a better understanding of how PRND equipment can operate and perform for these missions will allow for recommendations on the tactical approach responders can use for consequence management operations. PRND equipment has been placed into service by federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be leveraged to support the emergency response in the aftermath of a radiological or nuclear event. With several hundred makes and models of PRND equipment, often with significantly different detection capabilities that do not align with their nominal PRND equipment type, development of a streamlined categorization scheme with respect to consequence management missions was the first step to identifying safe and effective uses of PRND equipment for radiological/nuclear incident response.

61 RADIATION PROTECTION AND DOSIMETRY↗