Search NASA⌕ Search

SEARCH · Search NASA

Results for “event assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Common-Cause Failure Treatment in Event Assessment: Basis for a Proposed New Model

Event assessment is an application of probabilistic risk assessment in which observed equipment failures and outages are mapped into the risk model to obtain a numerical estimate of the event’s risk significance. In this paper, we focus on retrospective assessments to estimate the risk significance of degraded conditions such as equipment failure accompanied by a deficiency in a process such as maintenance practices. In modeling such events, the basic events in the risk model that are associated with observed failures and other off-normal situations are typically configured to be failed, while those associated with observed successes and unchallenged components are assumed capable of failing, typically with their baseline probabilities. This is referred to as the failure memory approach to event assessment. The conditioning of common-cause failure probabilities for the common cause component group associated with the observed component failure is particularly important, as it is insufficient to simply leave these probabilities at their baseline values, and doing so may result in a significant underestimate of risk significance for the event. Past work in this area has focused on the mathematics of the adjustment. In this paper, we review the Basic Parameter Model for common-cause failure, which underlies most current risk modelling, discuss the limitations of this model with respect to event assessment, and introduce a proposed new framework for common-cause failure, which uses a Bayesian network to model underlying causes of failure, and which has the potential to overcome the limitations of the Basic Parameter Model with respect to event assessment.

99 GENERAL AND MISCELLANEOUS↗

Common-Cause Failure Analysis in Event Assessment

This paper describes the approach taken by the U. S. Nuclear Regulatory Commission to the treatment of common-cause failure in probabilistic risk assessment of operational events. The approach is based upon the Basic Parameter Model for common-cause failure, and examples are illustrated using the alpha-factor parameterization, the approach adopted by the NRC in their Standardized Plant Analysis Risk (SPAR) models. The cases of a failed component (with and without shared common-cause failure potential) and a component being unavailable due to preventive maintenance or testing are addressed. The treatment of two related failure modes (e.g., failure to start and failure to run) is a new feature of this paper. These methods are being applied by the NRC in assessing the risk significance of operational events for the Significance Determination Process (SDP) and the Accident Sequence Precursor (ASP) program.

99 GENERAL AND MISCELLANEOUS↗

Feasibility Study of Developing Alternative Common-Cause Failure Model for Event Assessment

This report is a revision of the original report, INL/LTD-14-33376. The original report, which was a limited distribution to the Nuclear Regulatory Commission (NRC) only and not available to the public, was revised as this report for public distribution. The report presents the feasibility study of alternative common-cause failure (CCF) models that could be used for event assessment in the Standardized Plant Analysis Risk (SPAR) models. The current CCF model used by the SPAR models is the alpha factor model. The proposed alternative CCF models are the partial alpha factor model and general dependency model. These alternative CCF models are reviewed and compared to the current alpha factor model, with the partial alpha factor model being identified as the preferred CCF model that could be used for event assessment in the SPAR models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Common-Cause Failure Analysis in Event Assessment

This paper reviews the basic concepts of modelling common-cause failures (CCFs) in reliability and risk studies and then applies these concepts to the treatment of CCF in event assessment. The cases of a failed component (with and without shared CCF potential) and a component being unavailable due to preventive maintenance or testing are addressed. The treatment of two related failure modes (e.g. failure to start and failure to run) is a new feature of this paper, as is the treatment of asymmetry within a common-cause component group.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

OCCURRENCE OF EXTREME SOLAR PARTICLE EVENTS: ASSESSMENT FROM HISTORICAL PROXY DATA

The probability of occurrence of extreme solar particle events (SPEs) with proton fluence (>30 MeV) F{sub 30} {>=} 10{sup 10} cm{sup -2} is evaluated based on data on the cosmogenic isotopes {sup 14}C and {sup 10}Be in terrestrial archives covering centennial-millennial timescales. Four potential candidates with F{sub 30} = (1-1.5) Multiplication-Sign 10{sup 10} cm{sup -2} and no events with F{sub 30} > 2 Multiplication-Sign 10{sup 10} cm{sup -2} are identified since 1400 AD in the annually resolved {sup 10}Be data. A strong SPE related to the Carrington flare of 1859 AD is not supported by the data. For the last 11,400 years, 19 SPE candidates with F{sub 30} = (1-3) Multiplication-Sign 10{sup 10} cm{sup -2} are found and clearly no event with F{sub 30} > 5 Multiplication-Sign 10{sup 10} cm{sup -2} (50 times the SPE of 1956 February 23) has occurred. These values serve as observational upper limits on the strength of SPEs on the timescale of tens of millennia. Two events, ca. 780 and 1460 AD, appear in different data series making them strong candidates for extreme SPEs. We build a distribution of the occurrence probability of extreme SPEs, providing a new strict observational constraint. Practical limits can be set as F{sub 30} Almost-Equal-To 1, 2-3, and 5 Multiplication-Sign 10{sup 10} cm{sup -2} for occurrence probabilities Almost-Equal-To 10{sup -2}, 10{sup -3}, and 10{sup -4} yr{sup -1}, respectively. Because of the uncertainties, our results should be interpreted as a conservative upper limit on the SPE occurrence near Earth. The mean solar energetic particle (SEP) flux is evaluated as Almost-Equal-To 40 (cm{sup 2} s){sup -1}, in agreement with estimates from lunar rocks. On average, extreme SPEs contribute about 10% to the total SEP fluence.

79 ASTRONOMY AND ASTROPHYSICS↗

Convolution Correction Factor Adjustments on Static PRA Models for Event Assessment

Current probabilistic risk assessment (PRA) models will contain cut sets that have time-constrained basic events such as switched components, recovery of failed components, and failures in time. For these cut sets that have multiple time-constrained events that interact (e.g., offsite power recover at the same time as multiple diesel generators fail to run), there is the possibility that the minimal cut set quantified result is too large. Since current PRA models typically assume that the accident scenario starts at “time zero,” the fails-to-run basic events use this starting time as the basis for their respective reliability models. Over time, the standard practice was to recognize this issue and accept it as part of the conservatism built into the event tree/fault tree PRA models. However, now that these same PRA models are being used in a regulatory forum, this conservatism needs to be addressed. Further, this issue exists not only for the baseline PRA results, but for deficiencies that have been observed or those that have the potential of occurrence, whether the deficiency is complete failure or just a degraded condition. We have found that this conservatism becomes very important when evaluating scenarios such as station blackout sequences and other loss of offsite power sequences. This paper will address the theory and implemented process used by the Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) PRA software. Starting with SAPHIRE version 8, the process that was developed is to calculate a “convolution correction factor” based on three distinct calculations. The first calculation is the cut set based frequency calculated via the standard event tree/fault tree PRA model (assuming all run failures start at time equal to zero). The second calculation is to perform the exact time-constrained calculation by integrating the component failure models over the time period of interest (e.g., time to recover, a mission time). For example, this exact calculation for the case of the diesel generators is to convolve their failure models with the offsite power recovery model to obtain the exact frequency. The third calculation is to produce the convolution correction factor by dividing the exact frequency calculation by the standard cut set frequency. This convolution correction factor is then applied to the PRA cut sets in order to remove the time-constrained conservatism. The process used to obtain the convolution correction factor for the baseline PRA is important; however, in this paper we also describe what happens when there is degradation of a component or a potential deficiency. These issues become very important in order to ensure that the convolution correction factor is re-calculated correctly. If the correction factor does not get re-calculated and the same baseline convolution correction factor is used, the final analysis result could be over conservative or under conservative. This paper will discuss how these issues are addressed and provide examples on how SAPHIRE automatically makes the necessary adjustments. MathCad verification results can be computed using the provided equations and input data.

99 GENERAL AND MISCELLANEOUS↗

Risk Assessment in Event Evaluation P-302

Incidents at locations such as nuclear power plants, waste repositories, and medical treatment facilities occur at many different times and under a variety of situations. Even the most modern, well run organizations may experience events that are precursors to more serious situations. Currently, the U.S. Nuclear Regulatory Commission evaluates a variety of such events at commercial nuclear plants via the Significance Determination Process (SDP), Management Directive 8.3, and the Accident Sequence Precursor (ASP) program. In these programs, the analyst calculates a conditional risk measure (e.g., conditional core damage probability) for an initiating event situation or an unplanned equipment outage. This calculation is called an “event evaluation.” An “event evaluation” uses a probabilistic risk assessment model to obtain a risk measure that is conditional on the situation which existed during an incident. The Risk Assessment in Event Evaluation material is intended to address how this evaluation is performed using modern risk analysis tools.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Assessing Adverse Events of Postprostatectomy Radiation Therapy for Prostate Cancer: Evaluation of Outcomes in the Regione Emilia-Romagna, Italy

Purpose: Although the likelihood of radiation-related adverse events influences treatment decisions regarding radiation therapy after prostatectomy for eligible patients, the data available to inform decisions are limited. This study was designed to evaluate the genitourinary, gastrointestinal, and sexual adverse events associated with postprostatectomy radiation therapy and to assess the influence of radiation timing on the risk of adverse events. Methods: The Regione Emilia-Romagna Italian Longitudinal Health Care Utilization Database was queried to identify a cohort of men who received radical prostatectomy for prostate cancer during 2003 to 2009, including patients who received postprostatectomy radiation therapy. Patients with prior radiation therapy were excluded. Outcome measures were genitourinary, gastrointestinal, and sexual adverse events after prostatectomy. Rates of adverse events were compared between the cohorts who did and did not receive postoperative radiation therapy. Multivariable Cox proportional hazards models were developed for each class of adverse events, including models with radiation therapy as a time-varying covariate. Results: A total of 9876 men were included in the analyses: 2176 (22%) who received radiation therapy and 7700 (78%) treated with prostatectomy alone. In multivariable Cox proportional hazards models, the additional exposure to radiation therapy after prostatectomy was associated with increased rates of gastrointestinal (rate ratio [RR] 1.81; 95% confidence interval [CI] 1.44-2.27; P<.001) and urinary nonincontinence events (RR 1.83; 95% CI 1.83-2.80; P<.001) but not urinary incontinence events or erectile dysfunction. The addition of the time from prostatectomy to radiation therapy interaction term was not significant for any of the adverse event outcomes (P>.1 for all outcomes). Conclusion: Radiation therapy after prostatectomy is associated with an increase in gastrointestinal and genitourinary adverse events. However, the timing of radiation therapy did not influence the risk of radiation therapy–associated adverse events in this cohort, which contradicts the commonly held clinical tenet that delaying radiation therapy reduces the risk of adverse events.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Evaluation of Physical Security Risk for Potential Implementation of FLEX using Dynamic Simulation Methods

The requirements for United States nuclear power plants to maintain a large onsite physical security force contribute to their large operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability Program Physical Security Pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. This pathway will analyze and minimize the conservatisms built into current security postures in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within this pathway has successfully developed a dynamic force-on-force (FOF) modeling framework using various computer simulation tools and integrated them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an overview of lessons learned in applying a dynamic computational framework that links results from a commercially available FOF simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework. Previous reports described how a user could integrate their plant-specific FOF models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as Computer Aided Fault Tree Analysis System or Systems Analysis Programs for Hands-on Integrated Reliability Evaluations, and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance of the use of the framework. Such an assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants. NOTE: The work performed in this report is based on a generic EMRALD model with actual plant data used for the analysis. However, only the generic model and general results of the analysis are in the report. No plant’s sensitive information is discussed in this report. The discussion shows examples of insights that can be obtained from the MASS-DEF methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Plant-specific Model and Data Analysis using Dynamic Security Modeling and Simulation

The requirements for U.S. nuclear power plants to maintain a large on-site physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an update on the progress in applying a dynamic computational framework that links results from a commercially available force-on-force simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework or MASS-DEF. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report does not contain any plant's sensitive information and/or Safeguards Information. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗