Search NASA⌕ Search

SEARCH · Search NASA

Results for “extended mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Tracking and data system support for the Viking 1975 mission to Mars: Extended mission operations, December 1976 to May 1978, volume 4

The support which was provided by the Deep Space Network to the Viking Extended Mission from December 1976 to May 1978 is described. Tracking and data acquisition support required the continuous operation of a world-wide network of tracking stations with 64-meter and 26-meter diameter antennas, together with a global communications system for the transfer of commands, telemetry, and radio metric data between the stations and the Network Operations Control Center in Pasadena, California. Performance of the deep-space communications links between Earth and Mars, and innovative new management techniques for operations and data handling are included.

Mudgway, D. J.↗

Propellant management report for the Titan Centaur TC-5 extended mission

An extended mission was conducted to perform experiments demonstrating increased operational capabilities. The Centaur propellant behavior, the effects of reduced tank pressurization levels, and a propellant duct prechill technique were successfully evaluated. The major flight data results show that: (1) the propellants can be controlled with short collection times, even with a simulated H202 engine failure; (2) extensive tank ventings can be safely performed; (3) the Centaur boost pumps can perform adequately with no LH2 tank pressurization, and with low LO2 tank pressurization levels; (4) the duct prechill technique is an effective way to reduce boost pump cavitation and improve engine chilldown; and (5) the Centaur boost pumps should be completely stopped prior to an engine start sequence.

Lacovic, R.↗

Developing a corss-project support system during mission operations: Deep Space 1 extended mission flight control

NASA is focusing on small, low-cost spacecraft for both planetary and earth science missions. Deep Space 1 (DS1) was the first mission to be launched by the NMP. The New Millennium Project (NMP) is designed to develop and test new technology that can be used on future science missions with lower cost and risk. The NMP is finding ways to reduce cost not only in development, but also in operations. DS 1 was approved for an extended mission, but the budget was not large, so the project began looking into part time team members shared with other projects. DS1 launched on October 24, 1998, in it's primary mission it successfully tested twelve new technologies. The extended mission started September 18, 1999 and ran through the encounter with Comet Borrelly on September 22,2001. The Flight Control Team (FCT) was one team that needed to use part time or multi mission people. Circumstances led to a situation where for the few months before the Borrelly encounter in September of 2001 DSl had no certified full time Flight Control Engineers also known as Aces. This paper examines how DS 1 utilized cross-project support including the communication between different projects, and the how the tools used by the Flight Control Engineer fit into cross-project support.

New Millennium Project NMP DS flight control↗

Recent Results from the Lunar Reconnaissance Orbiter Mission and Plans for the Extended Mission

The Lunar Reconnaissance Orbiter spacecraft (LRO), launched on June 18, 2009, began with the goal of seeking safe landing sites for future robotic missions or the return of humans to the Moon as part of NASA's Exploration Systems Mission Directorate (ESMD). In addition, LRO's objectives included the search for surface resources and to investigate the Lunar radiation environment. After spacecraft commissioning, this phase of the mission began on September 15, 2009, completed on September 15, 2010 when operational responsibility for LRO was transferred to NASA's Science Mission Directorate (SMD). The SMD mission is scheduled for 2 years and will be completed in 2012 with an opportunity for an extended mission beyond 2012. Under SMD, the mission focuses on a new set of goals related to understanding the geologic history of the Moon, its current state, and what it can tell us about the evolution of the Solar System. Having marked the two year anniversary will review here the major results from the LRO mission for both exploration and science and discuss plans and objectives going forward including a proposed 2-year extended mission. These objectives include: 1) understanding the bombardment history of the Moon, 2) interpreting Lunar geologic processes, 3) mapping the global Lunar regolith, 4) identifying volatiles on the Moon, and 5) measuring the Lunar atmosphere and radiation environment.

Keller, John W.↗

Exploring the Relationship Between Science Funding and Science Productivity on Extended Missions

Introduction: The goal of this summer internship research project was to explore the relationship between the level of funding for science team research and science productivity for planetary spaceflight missions. The productivity and funding for the prime and extended missions were compared when possible. Determining the actual rather than anecdotal relationship between the level of science team funding and their productivity will help determine the adequacy of science team funding. Additionally, determining whether productivity increases or decreases over time (within missions, or within the years between different missions) provides insights into ongoing trends. This project was conducted using data from 11 extended missions within the Planetary Science Division. The main goals of this project were to 1) quantify the level of productivity of the science team during the extended portion of each mission, 2) compare the level of productivity between different types of missions, and 3) compare the level of productivity between the prime missions and extended missions. Methodology: The central metric enters around the “publication rate” of each mission. This rate is normalized in a variety of ways, including the number of publications per year, per Co-I, and per instruments. For the most part, this data was attainable through mission websites, team rosters, and data collected from previous projects. The publication data for this project utilized the SAO/NASA Astrophysics Data System, and it consisted of a search for any papers from the extended mission that had a co-investigator as an author. The time period for these searches also included an additional two years after the end of the extended mission to account for additional time it typically takes to finish data analysis and publish papers. Data from prime missions was collected from a previous project that measured similar metrics for the same missions. When comparing the different types of missions, three factors were used: mission size, dates of the prime and extended missions, and the type of the mission (rover, flyby, orbiter, or lander). To determine mission size, missions were compared by the number of Co-I’s on the mission, the number of instruments in the payload, and the mission class. Findings: On average, prime mission publication rates were generally higher than those of extended missions. Out of the nine missions used for this comparison, six had a higher prime mission publication rate and three had a higher extended mission publication rate. This distinction was interesting to observe, but it should be noted that the methodology for determing the number of published papers differed for the prime missions and the extended missions Discovery missions were found to be the most scientifically productive. Additionally, more recent extended missions tend to possess greater productivity. When comparing missions of different types, it was found that orbiters were much more productive than other types of missions. Future Work: There are a number of opportunities to extend and improve on this project in the future. Even though the metrics used were the same, the prime mission data could be recollected from the same sources as the extended mission data (Astrophysics Data System) to insure greater consistency. The impact level of the publications could also be accounted for, and financial data could be used to compare teams with different levels of funding. Additionally, more missions could be examined to increase the sample size of these comparisons, especially the comparison of different mission types which had an incredibly small sample size for some categories.

Cameron Maxwell Thompson↗

The Lunar Prospector Mission: Final Results of Trajectory Design, Quasi-Frozen Orbits, Extended Mission Targeting, and Lunar Topography and Potential Models

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission was NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control will focus on the use of innovative and proven trajectory analysis programs. As part of this effort, the Goddard Space Flight Center and the Ames Research Center became partners in the Lunar Prospector trajectory team to provide the trajectory analysis and orbit determination support. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100-km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered its extended mission phase. The mission orbit was lowered from 100 km to a mean altitude of 40 km. Due to lunar potential effects, the altitude of Lunar Prospector varied from 25 to 55 km above the mean lunar geoid. After one month at 40 km, the lunar potential model was updated based upon the new tracking data at 40 km. On January 15, 1999, the altitude was lowered again to a mean altitude of 30 km. The spherical altitude varied between 15 km and 45 km above the mean lunar geoid while the topographical altitude varied between 10 km and 50 km. Various means were employed to get accurate lunar surface elevation including Clementine altimetry and LOS analysis. Based upon the best available terrain maps, Lunar Prospector reached actual altitudes of 8 km above lunar mountains in the southern polar region. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. At the end of the operations mission, LP was targeted for impact at a chosen location that allowed optical observation of the lunar ejecta as LP ended its mission at 1.6 km/sec. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector nominal and extended mission including maneuver design, eccentricity vs. argument of perigee evolution, topographical altitude estimation, and lunar potential modeling. This paper provides understanding of the quasi-frozen orbit design of the LP mission, the optimization process of lunar orbit targets, the impacts that the selected lunar potential models play, and discusses the feasibility of meeting the mission goals. Observed evolution of the Keplerian orbit elements are compared to the theoretical predictions using the latest lunar potential model available which incorporates the Lunar Prospector Doppler data. Mapping orbit maintenance maneuver design along with results of the actual maneuvers to maintain the orbital requirements are also presented.

Folta, David↗

Design of an Extended Mission for GRAIL

The GRAIL extended mission will extend the measurement of the lunar gravity field beyond what was achieved by the primary GRAIL mission this past spring (2012). By lowering the orbits of the two GRAIL spacecraft to less than half the altitude of the primary mission orbits on average, the resolution of the gravity field measurements will be improved by a factor of two, yielding a signicant improvement in our knowledge of the structure of the upper crust of the Moon. The challenges of flying so low and the design which will meet those challenges is presented here.

eccentricty vector↗

Re-Engineering the Mission Operations System (MOS) for the Prime and Extended Mission

One of the most challenging tasks in a space science mission is designing the Mission Operations System (MOS). Whereas the focus of the project is getting the spacecraft built and tested for launch, the mission operations engineers must build a system to carry out the science objectives. The completed MOS design is then formally assessed in the many reviews. Once a mission has completed the reviews, the Mission Operation System (MOS) design has been validated to the Functional Requirements and is ready for operations. The design was built based on heritage processes, new technology, and lessons learned from past experience. Furthermore, our operational concepts must be properly mapped to the mission design and science objectives. However, during the course of implementing the science objective in the operations phase after launch, the MOS experiences an evolutional change to adapt for actual performance characteristics. This drives the re-engineering of the MOS, because the MOS includes the flight and ground segments. Using the Spitzer mission as an example we demonstrate how the MOS design evolved for both the prime and extended mission to enhance the overall efficiency for science return. In our re-engineering process, we ensured that no requirements were violated or mission objectives compromised. In most cases, optimized performance across the MOS, including gains in science return as well as savings in the budget profile was achieved. Finally, we suggest a need to better categorize the Operations Phase (Phase E) in the NASA Life-Cycle Phases of Formulation and Implementation

Extended Mission↗

Statistical Performance of TOPEX/POSEIDON Prime Mission Ground and On-Board Ephemerides and Consequences for the Extended Mission

TOPEX/POSEIDON is a joint American/French ocean topography experiment currently in the last year of its nominal mission and soon to enter a three year extended mission. To meet science requirements, the satellite must point the altimeter antenna at the ocean local nadir with good accuracy. This paper discusses the pointing accuracy of the Operational Orbit Ephemeris and its Fourier power series representation in the On-Board Computer. The consequences for the extended mission due to this performance are also discussed.

TOPEX/POSEIDON↗

Mars atmosphere during the Mariner 9 Extended Mission - Television results.

The Extended Mission of Mariner 9 provided data from 23 revolutions and recorded seasonal changes in the atmosphere of Mars during northern spring and early summer. The visibility of the surface was exceptional, indicating atmospheric clarity greater than that previously observed by Mariner 9 or by Mariner 6 and 7. Cloud systems were observed over both polar regions and indicated westerly winds in the -45 to -65 deg latitude zone (southern winter) and easterly winds in the vicinity of +75 deg (northern summer). The puzzling brightening phenomena that recur seasonally and diurnally over Tharsis, Amazonis, and Nix Olympica were seen to be clouds of a generally diffuse character but with some indications of convective activity. These clouds show a remarkable degree of topographic control, and their large-scale patterns are closely duplicated from day to day.

Leovy, C. B.↗

The extended mission of Viking

The extended mission of the Viking project emphasizing the study of weather on Mars is presented. Samples were acquired for the analysis of surface material, and investigations were made of the physical and magnetic properties of the surface, with orbiters and landers producing large quantities of photographs of the surface and of atmospheric phenomena. The operation and chronology of Viking Orbiter 1 and 2 and Viking Lander 1, including the Viking continuation, the survey, and the orbiter completion missions are discussed.

Snyder, C. W.↗

Extended mission life support systems

The life support systems employed in manned space missions have generally been based on the use of expendables, such as, for instance, liquid oxygen. For the conducted space missions, such systems have advantages related to volume, weight, and economy of power consumption. However, this situation will change in connection with Shuttle Orbiter missions of extended duration, permanent manned facilities in low-earth orbit, and ultimately manned planetary vehicles. A description is given of suitable regenerative life support systems for such extended manned space missions. Attention is given to advanced life support systems technology, air revitalization, CO2 reduction, oxygen generation, nitrogen generation, trace contaminant control, air revitalization system integration, control/monitor instrumentation, water reclamation, solid waste management, manned testing and life support integration, an enhanced duration orbiter, a space operations center, manned interplanetary life support systems, and future development requirements.

Quattrone, P. D.↗

Overview of the Cassini Extended Mission Trajectory

Due to the highly successful execution of the Cassini-Huygens prime mission and the estimated propellant remaining at the conclusion of the prime mission, NASA Headquarters allocated funding for the development of a 2-year long Cassini extended mission. The resultant extended mission, stemming from 1.5 years of development, includes an additional 26 targeted Titan flybys, 9 close flybys of icy satellites, and 60 orbits about Saturn. This paper describes, in detail, the different phases of the Cassini extended mission and the associated design methodology, which attempted to maximize the number and quality of high-priority scientific objectives while minimizing the total delta v expenditure and adhering to mission-imposed constraints.

gravity assist↗

Preparing Cassini Uplink Operations for Extended Mission

The Cassini-Huygens Mission to Saturn and Titan, a joint venture between the National Aeronautics and Space Administration, the European Space Agency, and the Italian Space Agency, is conducting a four-year, prime mission exploring the Saturnian system, including its atmosphere, rings, magnetosphere, moons and icy satellites. Launched in 1997, Cassini began its prime mission in 2004. Cassini is now preparing for a new era, a two-year extended mission to revisit many of the highlights and new discoveries made during the prime mission. Because of the light time delay from Earth to Saturn, and the time needed to coordinate the complicated science and engineering activities that take place on the spacecraft, commanding on Cassini is done in approximately 40-day intervals known as sequences. The Cassini Uplink Operations team is responsible for the final development and validation of the pointing profile and instrument and spacecraft commands that are contained in a sequence. During this final analysis prior to uplink to the spacecraft, thorough and exact evaluation is necessary to ensure there are no mistakes during commanding. In order to perform this evaluation, complete and refined processes and procedures are fundamental. The Uplink Operations team is also responsible for anomaly response during sequence execution, a process in which critical decisions often are made in real-time. Recent anomalies on other spacecraft missions have highlighted two major risks in the operations process: (1) personnel turnover and the retirement of critical knowledge and (2) aging, outdated operations procedures. If other missions are a good barometer, the Cassini extended mission will be presented with a high personnel turnover of the Cassini flight team, which could lead to a loss of expertise that has been essential to the success of the prime mission. In order to prepare the Cassini Uplink Operations Team for this possibility and to continue to develop and operate safe science and engineering sequences, a review and major update of the current documentation and operations procedures was needed. This paper will address the changes made to extended mission sequence generation processes primarily due to new restrictions in spacecraft operating capability and lessons learned from prime mission. In addition, it will address the state of the prime mission operations procedures, the philosophy changes and updates that were made to those procedures in response to process improvement, and the validation of those new procedures through the training of current and new personnel. And lastly, it will address the lessons learned throughout prime mission and how the Uplink Operations team chose to incorporate those lessons into the working documentation and team knowledge. This incorporation was necessary to facilitate the success of the extended mission with potentially all new personnel at some point prior to the end of the mission.

Maxwell, Jennifer L.↗

TESS in the Extended Mission: A Powerful Tool for Time-Domain Exoplanet Science

Since its launch in 2018, the Transiting Exoplanet Survey Satellite (TESS) has embarked on an ambitious mission to image almost the entire sky in search of nearby transiting exoplanet systems. Upon completion of its Primary Mission in July 2020, TESS transitioned to its first Extended Mission, during which it has returned to both the southern and northern ecliptic hemispheres and revisited most of the targets it observed during the first two years of operation. With future Extended Missions likely, the end-to-end time baseline provided by TESS will significantly exceed that of Kepler, enabling a plethora of scientific investigations into time-domain exoplanet science. TESS has already established itself as an extremely productive tool for studying visible-wavelength exoplanet phase curves. During the Primary Mission, we carried out a systematic phase-curve analysis of more than 30 transiting exoplanet systems. These datasets constrained the dayside hemisphere brightness temperatures, day-night brightness contrasts, and optical geometric albedos of a wide range of gas giant planets, revealing some tantalizing trends that warrant further study. In particular, we uncovered a tentative positive correlation between geometric albedo and equilibrium temperature for gas giants with 1500 < Teq < 3000 K. The new light curves from the Extended Mission have refined the measured astrophysical parameters of the previously studied systems and yielded statistically significant secondary eclipse and phase-curve detections for dozens of more systems. By comparing the phase-curve properties obtained from TESS observations separated by months or years, we have also probed for possible atmospheric variability, as well as transit-timing variations due to orbital decay or additional companions. In this presentation, I will provide an overview of the main results from our ongoing multiyear study of TESS light curves and discuss potentially fruitful avenues for further research as TESS continues its all-sky survey into the future.

Ian Wong↗